Allen Impact Fees by Project Type
Allen: Single-Family Impact Fees
A new single-family home in Allen pays $8,161.19 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Allen) — 5/8" or 3/4" meter ($3,137.90), Wastewater Impact Fee (City of Allen) — 5/8" or 3/4" meter ($1,989.69) and Roadway Impact Fee (City of Allen) — Service Area 1 ($1,673.60).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Allen Impact Fee Schedule
- Water Impact Fee (City of Allen) — 5/8" or 3/4" meter$3,137.90City of AllenWater impact fee for 1 living unit equivalent at the 5/8 x 3/4 in. meter (Ord. 3928-7-22, July 12, 2022). Larger meters pay more by LUE.
- Water Service Tap Fee (City of Allen)$400.00City of AllenWater service tap fee for the 5/8 in. meter; paid in addition to the water impact fee. The meter itself is billed at the city's cost.
- $55.00
- Wastewater Impact Fee (City of Allen) — 5/8" or 3/4" meter$1,989.69City of AllenWastewater impact fee for 1 living unit equivalent at the 5/8 x 3/4 in. meter (Ord. 3928-7-22, July 12, 2022). Larger meters pay more by LUE.
- Sewer Tap Fee (City of Allen)$260.00City of AllenSewer tap fee for a 4 in. service line; paid in addition to the wastewater impact fee.
- Roadway Impact Fee (City of Allen) — Service Area 1$1,673.60City of AllenRoadway impact fee per single-family home in Service Area 1, the highest of 3 service areas. Rates set by Ord. 3928-7-22 (July 12, 2022); assessed at the rate in effect when the final plat is released for recording.
- Park Fee (City of Allen)$645.00City of AllenAllen charges a park fee of $645 per residential unit (city fee schedule, land development fees). It is paid at final plat as money in lieu of parkland dedication, so a lot already platted has paid it; dedicating land may replace it, and a project that ends up with more homes than platted pays the difference.
- County Impact Fee (Collin County)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Allen: Multifamily Impact Fees
A new multifamily unit in Allen pays $7,146.89 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Allen, MF) — 5/8" or 3/4" meter ($3,137.90), Wastewater Impact Fee (City of Allen, MF) — 5/8" or 3/4" meter ($1,989.69) and Roadway Impact Fee (City of Allen, MF) — Mid Rise, Service Area 1 ($659.30).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Allen Impact Fee Schedule
- Water Impact Fee (City of Allen, MF) — 5/8" or 3/4" meter$3,137.90City of AllenCharged by water meter size: $3,137.90 per living unit equivalent at the 5/8 x 3/4 in. meter. A master-metered building pays by its meter's LUE count.
- Water Service Tap Fee (City of Allen, MF)$400.00City of AllenWater service tap fee at the smallest (5/8 in.) meter, charged per connection; a building on one connection pays once.
- Water Meter Set Fee (City of Allen, MF)$55.00City of AllenMeter setting fee at the smallest (5/8 in.) meter, charged per connection; a building on one meter pays once.
- Wastewater Impact Fee (City of Allen, MF) — 5/8" or 3/4" meter$1,989.69City of AllenCharged by meter size: $1,989.69 per living unit equivalent at the 5/8 x 3/4 in. meter. A master-metered building pays by its meter's LUE count.
- Sewer Tap Fee (City of Allen, MF)$260.00City of AllenSewer tap fee for a 4 in. service line, charged per connection; a building on one connection pays once.
- Roadway Impact Fee (City of Allen, MF) — Mid Rise, Service Area 1$659.30City of AllenRoadway impact fee per mid-rise apartment unit in Service Area 1, the highest of 3 service areas (Ord. 3928-7-22, July 12, 2022). Low-rise units pay a different rate.
- Park Fee (City of Allen, MF)$645.00City of AllenAllen charges a park fee of $645 per residential unit (city fee schedule, land development fees). It is paid at final plat as money in lieu of parkland dedication, so a lot already platted has paid it; dedicating land may replace it, and a project that ends up with more homes than platted pays the difference.
- County Impact Fee (Collin County, MF)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Allen: Commercial Impact Fees
Commercial development in Allen pays $5.26 per square foot in impact fees, plus $14,892.15 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $278,046.65. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Allen) — 1" meter ($8,660.60 one-time), Wastewater Impact Fee (City of Allen) — 1" meter ($5,491.55 one-time) and Water Service Tap Fee (City of Allen) — 1" meter ($420.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Allen Impact Fee Schedule
- Water Impact Fee (City of Allen) — 1" meter$8,660.60 one-timeCity of AllenAllen water impact fee by meter size: $3,137.90 per living unit equivalent times the meter's LUE rating (1 inch = 2.8 LUE). One citywide rate adopted by Ordinance 3928-7-22 (July 12, 2022). Charged in addition to the tap fee, meter set fee and the meter's actual cost.
- Water Service Tap Fee (City of Allen) — 1" meter$420.00 one-timeCity of AllenAllen water service tap fee: $420 for a 1 inch meter (5/8 and 3/4 inch $400, 1-1/2 inch $580, 2 inch $660). Taps for 3, 4 and 6 inch meters are quoted individually. Paid before work begins.
- Water Meter Set Fee (City of Allen) — 1" meter$60.00 one-timeCity of AllenAllen water meter set fee: $60 for a 1 inch meter, up to $460 for a 6 inch meter. The meter itself is billed at the City's actual cost at the time of setting (larger meters include strainers).
- Wastewater Impact Fee (City of Allen) — 1" meter$5,491.55 one-timeCity of AllenAllen wastewater impact fee by meter size: $1,989.69 per living unit equivalent times the meter's LUE rating (1 inch = 2.8 LUE). One citywide rate adopted by Ordinance 3928-7-22 (July 12, 2022). Charged in addition to the tap fee, meter set fee and the meter's actual cost.
- Sewer Tap Fee (City of Allen) — 4"$260.00 one-timeCity of AllenAllen sewer tap fee: $260 for a 4 inch tap, $300 for a 6 inch tap. Paid before work begins.
- Roadway Impact Fee (City of Allen, Commercial) — Service Area 1$5.26/sq ftCity of AllenAllen roadway impact fee per 1,000 sq ft of gross floor area (Shopping Center (40,000-150,000 sf)), highest of 3 service areas: $5,263.09 in Service Area 1, $2,914.08 in Service Area 2, $2,652.56 in Service Area 3. Adopted by Ordinance 3928-7-22 (July 12, 2022); assessed at final plat and paid at building permit. Gross floor area includes all roofed areas, including free-standing canopies.
- County Impact Fee (Collin County, Commercial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Allen: Industrial Impact Fees
Industrial development in Allen pays $1.10 per square foot in impact fees, plus $14,892.15 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $69,833.65. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Allen) — 1" meter ($8,660.60 one-time), Wastewater Impact Fee (City of Allen) — 1" meter ($5,491.55 one-time) and Water Service Tap Fee (City of Allen) — 1" meter ($420.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Allen Impact Fee Schedule
- Water Impact Fee (City of Allen) — 1" meter$8,660.60 one-timeCity of AllenAllen water impact fee by meter size: $3,137.90 per living unit equivalent times the meter's LUE rating (1 inch = 2.8 LUE). One citywide rate adopted by Ordinance 3928-7-22 (July 12, 2022). Charged in addition to the tap fee, meter set fee and the meter's actual cost.
- Water Service Tap Fee (City of Allen) — 1" meter$420.00 one-timeCity of AllenAllen water service tap fee: $420 for a 1 inch meter (5/8 and 3/4 inch $400, 1-1/2 inch $580, 2 inch $660). Taps for 3, 4 and 6 inch meters are quoted individually. Paid before work begins.
- Water Meter Set Fee (City of Allen) — 1" meter$60.00 one-timeCity of AllenAllen water meter set fee: $60 for a 1 inch meter, up to $460 for a 6 inch meter. The meter itself is billed at the City's actual cost at the time of setting (larger meters include strainers).
- Wastewater Impact Fee (City of Allen) — 1" meter$5,491.55 one-timeCity of AllenAllen wastewater impact fee by meter size: $1,989.69 per living unit equivalent times the meter's LUE rating (1 inch = 2.8 LUE). One citywide rate adopted by Ordinance 3928-7-22 (July 12, 2022). Charged in addition to the tap fee, meter set fee and the meter's actual cost.
- Sewer Tap Fee (City of Allen) — 4"$260.00 one-timeCity of AllenAllen sewer tap fee: $260 for a 4 inch tap, $300 for a 6 inch tap. Paid before work begins.
- Roadway Impact Fee (City of Allen, Industrial) — Service Area 1$1.10/sq ftCity of AllenAllen roadway impact fee per 1,000 sq ft of gross floor area (Light Industrial), highest of 3 service areas: $1,098.83 in Service Area 1, $608.40 in Service Area 2, $553.80 in Service Area 3. Adopted by Ordinance 3928-7-22 (July 12, 2022); assessed at final plat and paid at building permit. Gross floor area includes all roofed areas, including free-standing canopies.
- County Impact Fee (Collin County, Industrial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Allen: Office Impact Fees
Office development in Allen pays $2.43 per square foot in impact fees, plus $14,892.15 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 25,000 sq ft building, that comes to about $75,750.15. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Allen) — 1" meter ($8,660.60 one-time), Wastewater Impact Fee (City of Allen) — 1" meter ($5,491.55 one-time) and Water Service Tap Fee (City of Allen) — 1" meter ($420.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Allen Impact Fee Schedule
- Water Impact Fee (City of Allen) — 1" meter$8,660.60 one-timeCity of AllenAllen water impact fee by meter size: $3,137.90 per living unit equivalent times the meter's LUE rating (1 inch = 2.8 LUE). One citywide rate adopted by Ordinance 3928-7-22 (July 12, 2022). Charged in addition to the tap fee, meter set fee and the meter's actual cost.
- Water Service Tap Fee (City of Allen) — 1" meter$420.00 one-timeCity of AllenAllen water service tap fee: $420 for a 1 inch meter (5/8 and 3/4 inch $400, 1-1/2 inch $580, 2 inch $660). Taps for 3, 4 and 6 inch meters are quoted individually. Paid before work begins.
- Water Meter Set Fee (City of Allen) — 1" meter$60.00 one-timeCity of AllenAllen water meter set fee: $60 for a 1 inch meter, up to $460 for a 6 inch meter. The meter itself is billed at the City's actual cost at the time of setting (larger meters include strainers).
- Wastewater Impact Fee (City of Allen) — 1" meter$5,491.55 one-timeCity of AllenAllen wastewater impact fee by meter size: $1,989.69 per living unit equivalent times the meter's LUE rating (1 inch = 2.8 LUE). One citywide rate adopted by Ordinance 3928-7-22 (July 12, 2022). Charged in addition to the tap fee, meter set fee and the meter's actual cost.
- Sewer Tap Fee (City of Allen) — 4"$260.00 one-timeCity of AllenAllen sewer tap fee: $260 for a 4 inch tap, $300 for a 6 inch tap. Paid before work begins.
- Roadway Impact Fee (City of Allen, Office) — Service Area 1$2.43/sq ftCity of AllenAllen roadway impact fee per 1,000 sq ft of gross floor area (Office Building), highest of 3 service areas: $2,434.32 in Service Area 1, $1,347.84 in Service Area 2, $1,226.88 in Service Area 3. Adopted by Ordinance 3928-7-22 (July 12, 2022); assessed at final plat and paid at building permit. Gross floor area includes all roofed areas, including free-standing canopies.
- County Impact Fee (Collin County, Office)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Allen Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Allen Impact Fee FAQs
What are the total impact fees for a single-family home in Allen, Texas?
A new single-family home in Allen pays $8,161.19 per unit in combined impact fees (rates sourced November 19, 2026).
How much are commercial impact fees in Allen?
Commercial development in Allen pays $5.26 per square foot in impact fees, plus $14,892.15 in one-time water and sewer connection fees (assuming a 1-inch meter), about $278,046.65 for a 50,000 sq ft building.
Does Allen charge its own impact fees?
Yes. Allen levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Allen. The schedule on this page shows every fee that applies to development in Allen.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.