Lavon, Texas Impact Fees

Lavon applies its own fee schedule. Collin County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $21,875.68 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Lavon Impact Fees by Project Type

Lavon: Single-Family Impact Fees

A new single-family home in Lavon pays at least $21,875.68 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (Bear Creek SUD) ($6,375.00), Sewer Tap Fee (City of Lavon) ($5,000.00) and Park Development Fee (City of Lavon) ($1,092.42).

Parkland Dedication Fee-in-Lieu (City of Lavon) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Infrastructure Fee (City of Lavon) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Lavon Impact Fee Schedule
Water$6,375.00
  • Water Connection Fee (Bear Creek SUD)
    Bear Creek Special Utility District
    Water in Lavon is provided by Bear Creek Special Utility District. Its standard connection fee covers the tap, service line and 3/4 inch meter; bores, line extensions and larger meters cost extra.
    $6,375.00
Sewer$5,000.00
  • Sewer Tap Fee (City of Lavon)
    Sewer tap fee per single-family home under the FY 2026-27 fee schedule (Ordinance 2026-09-05, effective September 15, 2026). Water is provided separately by Bear Creek Special Utility District.
    $5,000.00
  • Sewer Infrastructure Fee (City of Lavon)
    City of Lavon
    Lavon's fee schedule lists a sewer infrastructure fee calculated from the plumbing fixtures in each facility, charged in addition to the sewer tap fee. The schedule publishes no per-fixture rate, so no amount is shown here.
    Requires confirmation
City$10,500.68
  • Parkland Dedication Fee-in-Lieu (City of Lavon)
    City of Lavon
    Lavon charges a parkland fee in lieu of land dedication of $9,408.26 per home, due before the plat is recorded (Ordinance 2024-03-08). A plat of four or fewer lots on previously unplatted land is exempt from parkland dedication.
    $9,408.26Requires confirmation
  • Park Development Fee (City of Lavon)
    City of Lavon
    Lavon charges a park development fee of $1,092.42 per home (Ordinance 2024-03-08), collected with the plat for single-family lots. A developer may build approved park improvements instead. Plats of four or fewer lots on unplatted land are exempt from parkland dedication.
    $1,092.42
  • Roadway Impact Fee (City of Lavon)
    The City of Lavon has not adopted roadway, water, wastewater or drainage impact fees. Parkland fees apply separately.
    $0.00
County$0.00
  • County Impact Fee (Collin County)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Lavon): $21,875.68
Sources last checked Official fee schedules:Bear Creek Special Utility District City of Lavon Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lavon: Multifamily Impact Fees

A new multifamily unit in Lavon pays at least $20,875.68 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Parkland Dedication Fee-in-Lieu (City of Lavon, MF) ($9,408.26), Water Connection Fee (Bear Creek SUD, MF) ($6,375.00) and Sewer Tap Fee (City of Lavon, MF) ($4,000.00).

Sewer Infrastructure Fee (City of Lavon, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Lavon Impact Fee Schedule
Water$6,375.00
  • Water Connection Fee (Bear Creek SUD, MF)
    Bear Creek Special Utility District
    Bear Creek Special Utility District charges $6,375 per standard 3/4 inch service connection. A building with an individual meter for each unit pays this per unit; a master-metered building is non-standard service quoted by the district.
    $6,375.00
Sewer$4,000.00
  • Sewer Tap Fee (City of Lavon, MF)
    Sewer tap fee per multifamily dwelling unit under the FY 2026-27 fee schedule (Ordinance 2026-09-05, effective September 15, 2026). Water is provided separately by Bear Creek Special Utility District.
    $4,000.00
  • Sewer Infrastructure Fee (City of Lavon, MF)
    City of Lavon
    Lavon's fee schedule lists a sewer infrastructure fee calculated from the plumbing fixtures in each facility, charged in addition to the sewer tap fee. The schedule publishes no per-fixture rate, so no amount is shown here.
    Requires confirmation
City$10,500.68
  • Parkland Dedication Fee-in-Lieu (City of Lavon, MF)
    City of Lavon
    Lavon charges a parkland fee in lieu of land dedication of $9,408.26 per apartment unit, due before the building permit is issued (Ordinance 2024-03-08). Large projects may dedicate land instead.
    $9,408.26
  • Park Development Fee (City of Lavon, MF)
    City of Lavon
    Lavon charges a park development fee of $1,092.42 per apartment unit in addition to the parkland fee, due before the building permit is issued (Ordinance 2024-03-08).
    $1,092.42
  • Roadway Impact Fee (City of Lavon, MF)
    The City of Lavon has not adopted roadway, water, wastewater or drainage impact fees. Parkland fees apply separately.
    $0.00
County$0.00
  • County Impact Fee (Collin County, MF)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Lavon): $20,875.68
Sources last checked Official fee schedules:Bear Creek Special Utility District City of Lavon Collin County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lavon: Commercial Impact Fees

Commercial development in Lavon pays no per-square-foot impact fees, but owes $18,875.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $18,875.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Lavon) — 1" meter ($12,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Fee (Bear Creek SUD) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Lavon Impact Fee Schedule
Water$6,375.00 one-time
  • Water Connection Fee (Bear Creek SUD)
    Bear Creek Special Utility District
    Bear Creek Special Utility District serves Lavon with water. Its connection fee is $6,375 for a standard 3/4 inch meter, covering the tap, service line and meter. A commercial meter of 1 inch or larger is non-standard service: the district quotes it in writing and adds costs such as larger meters, bores and line extensions, plus an inspection fee of 5% of construction cost.
    $6,375.00 one-timeRequires confirmation
Sewer$12,500.00 one-time
  • Sewer Tap Fee (City of Lavon) — 1" meter
    City of Lavon
    Lavon's commercial sewer tap fee is set by the size of the domestic water meter, from $5,000 for a 5/8 inch meter to $400,000 for an 8 inch meter (FY 2026-27 fee schedule, Ordinance 2026-09-05, effective September 15, 2026). Industrial or extraordinary connections are priced by the city engineer, and the schedule also lists a sewer infrastructure fee calculated from each facility's fixtures.
    $12,500.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Collin County, Commercial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Lavon): $18,875.00 one-time (≈ $18,875.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Bear Creek Special Utility District City of Lavon Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lavon: Industrial Impact Fees

Industrial development in Lavon pays no per-square-foot impact fees, but owes $18,875.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $18,875.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Lavon) — 1" meter ($12,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Fee (Bear Creek SUD) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Lavon Impact Fee Schedule
Water$6,375.00 one-time
  • Water Connection Fee (Bear Creek SUD)
    Bear Creek Special Utility District
    Bear Creek Special Utility District serves Lavon with water. Its connection fee is $6,375 for a standard 3/4 inch meter, covering the tap, service line and meter. A commercial meter of 1 inch or larger is non-standard service: the district quotes it in writing and adds costs such as larger meters, bores and line extensions, plus an inspection fee of 5% of construction cost.
    $6,375.00 one-timeRequires confirmation
Sewer$12,500.00 one-time
  • Sewer Tap Fee (City of Lavon) — 1" meter
    City of Lavon
    Lavon's commercial sewer tap fee is set by the size of the domestic water meter, from $5,000 for a 5/8 inch meter to $400,000 for an 8 inch meter (FY 2026-27 fee schedule, Ordinance 2026-09-05, effective September 15, 2026). Industrial or extraordinary connections are priced by the city engineer, and the schedule also lists a sewer infrastructure fee calculated from each facility's fixtures.
    $12,500.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Collin County, Industrial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Lavon): $18,875.00 one-time (≈ $18,875.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Bear Creek Special Utility District City of Lavon Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lavon: Office Impact Fees

Office development in Lavon pays no per-square-foot impact fees, but owes $18,875.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $18,875.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Lavon) — 1" meter ($12,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Fee (Bear Creek SUD) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Lavon Impact Fee Schedule
Water$6,375.00 one-time
  • Water Connection Fee (Bear Creek SUD)
    Bear Creek Special Utility District
    Bear Creek Special Utility District serves Lavon with water. Its connection fee is $6,375 for a standard 3/4 inch meter, covering the tap, service line and meter. A commercial meter of 1 inch or larger is non-standard service: the district quotes it in writing and adds costs such as larger meters, bores and line extensions, plus an inspection fee of 5% of construction cost.
    $6,375.00 one-timeRequires confirmation
Sewer$12,500.00 one-time
  • Sewer Tap Fee (City of Lavon) — 1" meter
    City of Lavon
    Lavon's commercial sewer tap fee is set by the size of the domestic water meter, from $5,000 for a 5/8 inch meter to $400,000 for an 8 inch meter (FY 2026-27 fee schedule, Ordinance 2026-09-05, effective September 15, 2026). Industrial or extraordinary connections are priced by the city engineer, and the schedule also lists a sewer infrastructure fee calculated from each facility's fixtures.
    $12,500.00 one-time
City$0.00
  • City Impact Fee (City of Lavon, Office)
    City of Lavon
    The City of Lavon has not adopted impact fees under Texas Local Government Code Chapter 395, so no city impact fee applies to office development.
    $0.00
County$0.00
  • County Impact Fee (Collin County, Office)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Lavon): $18,875.00 one-time (≈ $18,875.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Bear Creek Special Utility District City of Lavon Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lavon Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Lavon Impact Fee FAQs

What are the total impact fees for a single-family home in Lavon, Texas?

A new single-family home in Lavon pays at least $21,875.68 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Lavon?

Commercial development in Lavon pays no per-square-foot impact fees, but owes $18,875.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Lavon charge its own impact fees?

Yes. Lavon levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Lavon. The schedule on this page shows every fee that applies to development in Lavon.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Collin County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.