Skip to content
IMPACTFEES.ORG

Anna, Texas Impact Fees

Anna applies its own fee schedule. Collin County does not currently add county-level impact fees inside city limits. A new single-family home pays $20,117.90 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Anna Impact Fees by Project Type

Anna: Single-Family Impact Fees

A new single-family home in Anna pays $20,117.90 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Anna) — 3/4" meter ($5,500.00), Wastewater Impact Fee (City of Anna) — 3/4" meter ($5,500.00) and Roadway Impact Fee (City of Anna) — Service Area 1, 2.82 veh-mi × $1,845/veh-mi ($5,202.90).

Water Meter Set Fee (City of Anna) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Anna Impact Fee Schedule
Water$6,565.00
  • Water Impact Fee (City of Anna) — 3/4" meter
    City of Anna
    Anna's water impact fee is $5,500 per living unit equivalent, adopted in 2022 at the maximum for all service areas. A home on a 3/4 inch meter pays 1 unit; larger meters pay more (1 inch 1.7 units, 1-1/2 inch 3.3, 2 inch 5.3). A separate water tap fee ($750) and meter-set fee also apply.
    $5,500.00
  • Water Tap Fee (City of Anna)
    City of Anna
    Water tap fee for a 3/4 in. or 1 in. tap; paid in addition to the water impact fee.
    $750.00
  • Water Meter Set Fee (City of Anna)
    City of Anna
    Water meter set fee for a 3/4 in. meter where a tap already exists.
    $315.00Requires confirmation
Sewer$6,250.00
  • Wastewater Impact Fee (City of Anna) — 3/4" meter
    City of Anna
    Anna's wastewater impact fee is $5,500 per living unit equivalent, adopted in 2022 at the maximum for all service areas. A home on a 3/4 inch meter pays 1 unit; larger meters pay more (1 inch 1.7 units, 1-1/2 inch 3.3, 2 inch 5.3). A separate sewer tap fee ($750) also applies.
    $5,500.00
  • Sewer Tap Fee (City of Anna)
    City of Anna
    Sewer tap fee for a 4 in. tap; paid in addition to the wastewater impact fee.
    $750.00
City$7,302.90
County$0.00
  • County Impact Fee (Collin County)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Anna): $20,117.90
Sources last checked Official fee schedules:City of Anna Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Anna: Multifamily Impact Fees

A new multifamily unit in Anna pays $17,573.65 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Anna, MF) — 3/4" meter ($5,500.00), Wastewater Impact Fee (City of Anna, MF) — 3/4" meter ($5,500.00) and Roadway Impact Fee (City of Anna, MF) — Mid-Rise, Service Area 1, 1.17 veh-mi × $1,845/veh-mi ($2,158.65).

Water Meter Set Fee (City of Anna, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Anna Impact Fee Schedule
Water$6,565.00
  • Water Impact Fee (City of Anna, MF) — 3/4" meter
    City of Anna
    Charged by water meter size, not per unit: a building on one master meter pays once at its meter size, from $5,500 at a 3/4 inch meter (1 living unit equivalent). Adopted in 2022 at the maximum for all service areas. A separate water tap fee and meter-set fee also apply.
    $5,500.00
  • Water Tap Fee (City of Anna, MF)
    City of Anna
    Water tap fee for a 3/4 in. or 1 in. tap, charged per tap; a building on one tap pays once. Paid in addition to the water impact fee.
    $750.00
  • Water Meter Set Fee (City of Anna, MF)
    City of Anna
    Water meter set fee for a 3/4 in. meter where a tap already exists.
    $315.00Requires confirmation
Sewer$6,250.00
  • Wastewater Impact Fee (City of Anna, MF) — 3/4" meter
    City of Anna
    Charged by water meter size, not per unit: a building on one master meter pays once at its meter size, from $5,500 at a 3/4 inch meter (1 living unit equivalent). Adopted in 2022 at the maximum for all service areas. A separate sewer tap fee also applies.
    $5,500.00
  • Sewer Tap Fee (City of Anna, MF)
    City of Anna
    Sewer tap fee for a 4 in. tap, charged per tap; a building on one tap pays once. Paid in addition to the wastewater impact fee.
    $750.00
City$4,758.65
County$0.00
  • County Impact Fee (Collin County, MF)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Anna): $17,573.65
Sources last checked Official fee schedules:City of Anna Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Anna: Commercial Impact Fees

Commercial development in Anna pays $12.07 per square foot in impact fees, plus $20,610.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $623,925.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Anna) — 1" simple meter ($9,350.00 one-time), Wastewater Impact Fee (City of Anna) — 1" simple meter ($9,350.00 one-time) and Sewer Tap Fee (City of Anna) — 4" meter ($750.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Roadway Impact Fee (City of Anna, Commercial) — Service Area 1, 8.72 veh-mi × $1,845/veh-mi × 75% is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Anna Impact Fee Schedule
Water$10,510.00 one-time
  • Water Impact Fee (City of Anna) — 1" simple meter
    City of Anna
    Anna water impact fee: $5,500 per living unit equivalent times the LUE rating of the meter (1 inch = 1.7 LUE). The code's table lists 2 inch and larger compound meters as typical for commercial and industrial uses. Charged before connection, in addition to tap and meter set fees.
    $9,350.00 one-time
  • Water Tap Fee (City of Anna) — 3/4" to 1" meter
    City of Anna
    Anna water tap fee per tap: $750 for 3/4 to 1 inch, $950 for 1-1/2 inch, $1,000 for 2 inch, $1,500 for 2 inch compound, $2,250 for 3 inch, $3,500 for 4 inch and over.
    $750.00 one-time
  • Water Meter Set Fee (City of Anna) — 1" meter
    City of Anna
    Anna water meter set fee: $410 for a 1 inch meter, from $315 (3/4 inch) to $5,100 (6 inch); meters over 6 inches at vendor list price.
    $410.00 one-time
Sewer$10,100.00 one-time
  • Wastewater Impact Fee (City of Anna) — 1" simple meter
    City of Anna
    Anna wastewater impact fee: $5,500 per living unit equivalent times the LUE rating of the meter (1 inch = 1.7 LUE). The code's table lists 2 inch and larger compound meters as typical for commercial and industrial uses. Charged before connection, in addition to tap and meter set fees.
    $9,350.00 one-time
  • Sewer Tap Fee (City of Anna) — 4" meter
    City of Anna
    Anna sewer tap fee per tap: $750 for a 4 inch, $1,000 for 6 inch, $1,250 for 8 inch.
    $750.00 one-time
City$12.07/sq ft
County$0.00
  • County Impact Fee (Collin County, Commercial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Anna): $12.07/sq ft + $20,610.00 one-time (≈ $623,925.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Anna Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Anna: Industrial Impact Fees

Industrial development in Anna pays $3.06 per square foot in impact fees, plus $20,610.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $173,514.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Anna) — 1" simple meter ($9,350.00 one-time), Wastewater Impact Fee (City of Anna) — 1" simple meter ($9,350.00 one-time) and Sewer Tap Fee (City of Anna) — 4" meter ($750.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Roadway Impact Fee (City of Anna, Industrial) — Service Area 1, 1.95 veh-mi × $1,845/veh-mi × 85% is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Anna Impact Fee Schedule
Water$10,510.00 one-time
  • Water Impact Fee (City of Anna) — 1" simple meter
    City of Anna
    Anna water impact fee: $5,500 per living unit equivalent times the LUE rating of the meter (1 inch = 1.7 LUE). The code's table lists 2 inch and larger compound meters as typical for commercial and industrial uses. Charged before connection, in addition to tap and meter set fees.
    $9,350.00 one-time
  • Water Tap Fee (City of Anna) — 3/4" to 1" meter
    City of Anna
    Anna water tap fee per tap: $750 for 3/4 to 1 inch, $950 for 1-1/2 inch, $1,000 for 2 inch, $1,500 for 2 inch compound, $2,250 for 3 inch, $3,500 for 4 inch and over.
    $750.00 one-time
  • Water Meter Set Fee (City of Anna) — 1" meter
    City of Anna
    Anna water meter set fee: $410 for a 1 inch meter, from $315 (3/4 inch) to $5,100 (6 inch); meters over 6 inches at vendor list price.
    $410.00 one-time
Sewer$10,100.00 one-time
  • Wastewater Impact Fee (City of Anna) — 1" simple meter
    City of Anna
    Anna wastewater impact fee: $5,500 per living unit equivalent times the LUE rating of the meter (1 inch = 1.7 LUE). The code's table lists 2 inch and larger compound meters as typical for commercial and industrial uses. Charged before connection, in addition to tap and meter set fees.
    $9,350.00 one-time
  • Sewer Tap Fee (City of Anna) — 4" meter
    City of Anna
    Anna sewer tap fee per tap: $750 for a 4 inch, $1,000 for 6 inch, $1,250 for 8 inch.
    $750.00 one-time
City$3.06/sq ft
County$0.00
  • County Impact Fee (Collin County, Industrial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Anna): $3.06/sq ft + $20,610.00 one-time (≈ $173,514.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Anna Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Anna: Office Impact Fees

Office development in Anna pays $6.77 per square foot in impact fees, plus $20,610.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $189,981.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Anna) — 1" simple meter ($9,350.00 one-time), Wastewater Impact Fee (City of Anna) — 1" simple meter ($9,350.00 one-time) and Sewer Tap Fee (City of Anna) — 4" meter ($750.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Roadway Impact Fee (City of Anna, Office) — Service Area 1, 4.32 veh-mi × $1,845/veh-mi × 85% is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Anna Impact Fee Schedule
Water$10,510.00 one-time
  • Water Impact Fee (City of Anna) — 1" simple meter
    City of Anna
    Anna water impact fee: $5,500 per living unit equivalent times the LUE rating of the meter (1 inch = 1.7 LUE). The code's table lists 2 inch and larger compound meters as typical for commercial and industrial uses. Charged before connection, in addition to tap and meter set fees.
    $9,350.00 one-time
  • Water Tap Fee (City of Anna) — 3/4" to 1" meter
    City of Anna
    Anna water tap fee per tap: $750 for 3/4 to 1 inch, $950 for 1-1/2 inch, $1,000 for 2 inch, $1,500 for 2 inch compound, $2,250 for 3 inch, $3,500 for 4 inch and over.
    $750.00 one-time
  • Water Meter Set Fee (City of Anna) — 1" meter
    City of Anna
    Anna water meter set fee: $410 for a 1 inch meter, from $315 (3/4 inch) to $5,100 (6 inch); meters over 6 inches at vendor list price.
    $410.00 one-time
Sewer$10,100.00 one-time
  • Wastewater Impact Fee (City of Anna) — 1" simple meter
    City of Anna
    Anna wastewater impact fee: $5,500 per living unit equivalent times the LUE rating of the meter (1 inch = 1.7 LUE). The code's table lists 2 inch and larger compound meters as typical for commercial and industrial uses. Charged before connection, in addition to tap and meter set fees.
    $9,350.00 one-time
  • Sewer Tap Fee (City of Anna) — 4" meter
    City of Anna
    Anna sewer tap fee per tap: $750 for a 4 inch, $1,000 for 6 inch, $1,250 for 8 inch.
    $750.00 one-time
City$6.77/sq ft
  • Roadway Impact Fee (City of Anna, Office) — Service Area 1, 4.32 veh-mi × $1,845/veh-mi × 85%
    City of Anna
    Anna roadway impact fee for a general office building: 4.32 vehicle-miles per 1,000 sq ft times the service area rate ($1,845 per vehicle-mile in Service Area 1, $1,423 in Service Area 2) times 85%, the code's share for general commercial uses (3+ story professional offices, employment centers and corporate campuses pay 65%). Highest of 2 service areas.
    $6.77/sq ftRequires confirmation
County$0.00
  • County Impact Fee (Collin County, Office)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Anna): $6.77/sq ft + $20,610.00 one-time (≈ $189,981.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Anna Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Anna Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Anna Impact Fee FAQs

What are the total impact fees for a single-family home in Anna, Texas?

A new single-family home in Anna pays $20,117.90 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Anna?

Commercial development in Anna pays $12.07 per square foot in impact fees, plus $20,610.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $623,925.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Anna charge its own impact fees?

Yes. Anna levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Anna. The schedule on this page shows every fee that applies to development in Anna.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Collin County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.