Prosper Impact Fees by Project Type
Prosper: Single-Family Impact Fees
A new single-family home in Prosper pays $30,937.77 per unit in impact fees (rates sourced November 20, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Impact Fee (Town of Prosper) — 1" displacement meter ($8,421.00), Roadway Impact Fee (Town of Prosper) — Service Area 2 (East of BNSF RR) ($7,879.00) and Water Impact Fee (Town of Prosper) — 1" displacement meter ($5,969.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Prosper Impact Fee Schedule
- Water Impact Fee (Town of Prosper) — 1" displacement meter$5,969.00Water impact fee at the 1 inch meter, the smallest size the schedule prints, for final plats approved after August 26, 2025. Larger meters pay more.
- Water Tap Fee (Town of Prosper) — 1" service$2,217.77Town of ProsperTown water tap fee for a lot without an existing water service line, by service line size, effective October 15, 2026. A lot with an existing service line pays only the connection fee. Boring and pavement work are extra.
- Water Connection Fee (Town of Prosper) — 1" meter$644.00Town of ProsperTown water connection fee by meter size, paid at building permit, effective October 15, 2026; shown at the 1 inch meter, the smallest size on Prosper's impact fee schedule.
- Wastewater Impact Fee (Town of Prosper) — 1" displacement meter$8,421.00Wastewater impact fee at the 1 inch meter, the smallest size the schedule prints, for final plats approved after August 26, 2025. Larger meters pay more.
- Wastewater Tap Fee (Town of Prosper) — 4" line$3,157.00Town of ProsperTown wastewater tap fee for a lot without an existing wastewater service line, effective October 15, 2026. A lot with an existing line pays only the connection fee. Boring and pavement work are extra.
- Wastewater Connection Fee (Town of Prosper)$400.00Town of ProsperTown wastewater connection fee, paid at building permit, the same for 4 and 6 inch lines; effective October 15, 2026.
- Roadway Impact Fee (Town of Prosper) — Service Area 2 (East of BNSF RR)$7,879.00Town of ProsperRoadway impact fee per single-family home east of the BNSF railroad, the higher of 2 service areas, for final plats approved after August 26, 2025. West of the railroad the fee is $7,597.
- $2,250.00
- County Impact Fee (Collin County)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Prosper: Multifamily Impact Fees
A new multifamily unit in Prosper pays $27,577.77 per unit in impact fees (rates sourced November 20, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Impact Fee (Town of Prosper, MF) — 1" displacement meter ($8,421.00), Water Impact Fee (Town of Prosper, MF) — 1" displacement meter ($5,969.00) and Park Improvement Fee (Town of Prosper, MF) ($3,500.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Prosper Impact Fee Schedule
- Water Impact Fee (Town of Prosper, MF) — 1" displacement meter$5,969.00Water impact fee by meter size, shown at the 1 inch meter (the smallest printed); a building on one master meter pays by its size. Final plats approved after August 26, 2025.
- Water Tap Fee (Town of Prosper, MF) — 1" service$2,217.77Town of ProsperTown water tap fee per service line for a lot without an existing line, effective October 15, 2026; a building on one connection pays once. A lot with an existing line pays only the connection fee.
- Water Connection Fee (Town of Prosper, MF) — 1" meter$644.00Town of ProsperTown water connection fee per meter, paid at building permit, effective October 15, 2026; a building on one master meter pays once by its size.
- Wastewater Impact Fee (Town of Prosper, MF) — 1" displacement meter$8,421.00Wastewater impact fee by meter size, shown at the 1 inch meter (the smallest printed); a building on one master meter pays by its size. Final plats approved after August 26, 2025.
- Wastewater Tap Fee (Town of Prosper, MF) — 4" line$3,157.00Town of ProsperTown wastewater tap fee per line for a lot without an existing line, effective October 15, 2026; a building on one connection pays once.
- Wastewater Connection Fee (Town of Prosper, MF)$400.00Town of ProsperTown wastewater connection fee per connection, paid at building permit, effective October 15, 2026; a building on one connection pays once.
- $3,500.00
- Roadway Impact Fee (Town of Prosper, MF) — Mid-Rise, Service Area 2 (East of BNSF RR)$3,269.00Town of ProsperRoadway impact fee per mid-rise apartment unit east of the BNSF railroad, the higher of 2 service areas, for final plats approved after August 26, 2025.
- County Impact Fee (Collin County, MF)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Prosper: Commercial Impact Fees
Commercial development in Prosper pays $9.78 per square foot in impact fees, plus $20,808.77 in one-time water and sewer connection fees (rates sourced November 20, 2026).
For a 50,000 sq ft building, that comes to about $509,958.77. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (Town of Prosper) — 1" Displacement ($8,421.00 one-time), Water Impact Fee (Town of Prosper) — 1" Displacement ($5,969.00 one-time) and Wastewater Tap Fee (Town of Prosper) — 4" line ($3,157.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Prosper Impact Fee Schedule
- Water Impact Fee (Town of Prosper) — 1" Displacement$5,969.00 one-timeTown of ProsperProsper water impact fee for a 1 inch displacement meter, adopted August 26, 2025 at 50% of the maximum fee. Larger meters pay by size and type, up to $775,970 for a 10 inch turbine meter. Assessed at final plat; final plats approved by September 17, 2025 keep the earlier rates. Paid with the building permit, in addition to the tap and meter connection fees.
- Water Tap Fee (Town of Prosper) — 1" service$2,217.77 one-timeTown of ProsperProsper water tap fee for a 1 inch service line on a lot without an existing water service line, by line size up to $4,976 for 6 inches. Boring and pavement work are extra. Charged in addition to the water meter connection fee and the water impact fee.
- Water Connection Fee (Town of Prosper) — 1" meter$644.00 one-timeTown of ProsperProsper water meter connection fee for a 1 inch meter, paid with the building permit, in addition to any tap fee and the water impact fee. Sizes run from $572 (5/8 inch) to $1,689 (2 inch turbine).
- Wastewater Impact Fee (Town of Prosper) — 1" Displacement$8,421.00 one-timeTown of ProsperProsper wastewater impact fee for a 1 inch displacement meter, adopted August 26, 2025 at 50% of the maximum fee. Larger meters pay by size and type, up to $1,094,730 for a 10 inch turbine meter. Assessed at final plat; final plats approved by September 17, 2025 keep the earlier rates. Paid with the building permit, in addition to the sewer tap and connection fees.
- Wastewater Tap Fee (Town of Prosper) — 4" line$3,157.00 one-timeTown of ProsperProsper wastewater tap fee for a 4 inch service line on a lot without an existing sewer service line ($6,339 for a 6 inch line). Boring and pavement work are extra. Charged in addition to the wastewater connection fee and the wastewater impact fee.
- Wastewater Connection Fee (Town of Prosper)$400.00 one-timeTown of ProsperProsper wastewater connection fee, the same for a 4 or 6 inch service, paid with the building permit, in addition to any tap fee and the wastewater impact fee.
- Roadway Impact Fee (Town of Prosper, Commercial) — Service Area 2 (East of BNSF RR)$9.78/sq ftTown of ProsperProsper roadway impact fee for shopping plaza space (40,000 to 150,000 sq ft), per 1,000 sq ft, in Service Area 2 (east of the BNSF railroad), the higher of 2 rate districts (Service Area 1, west of the railroad: $9,433). Adopted August 26, 2025 at 50% of the maximum fee. Assessed at final plat; final plats approved by September 17, 2025 keep the earlier rates. Based on the primary land use on the approved site plan and collected with the building permit; other retail uses carry their own rates.
- County Impact Fee (Collin County, Commercial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Prosper: Industrial Impact Fees
Industrial development in Prosper pays $4.55 per square foot in impact fees, plus $20,808.77 in one-time water and sewer connection fees (rates sourced November 20, 2026).
For a 50,000 sq ft building, that comes to about $248,258.77. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (Town of Prosper) — 1" Displacement ($8,421.00 one-time), Water Impact Fee (Town of Prosper) — 1" Displacement ($5,969.00 one-time) and Wastewater Tap Fee (Town of Prosper) — 4" line ($3,157.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Prosper Impact Fee Schedule
- Water Impact Fee (Town of Prosper) — 1" Displacement$5,969.00 one-timeTown of ProsperProsper water impact fee for a 1 inch displacement meter, adopted August 26, 2025 at 50% of the maximum fee. Larger meters pay by size and type, up to $775,970 for a 10 inch turbine meter. Assessed at final plat; final plats approved by September 17, 2025 keep the earlier rates. Paid with the building permit, in addition to the tap and meter connection fees.
- Water Tap Fee (Town of Prosper) — 1" service$2,217.77 one-timeTown of ProsperProsper water tap fee for a 1 inch service line on a lot without an existing water service line, by line size up to $4,976 for 6 inches. Boring and pavement work are extra. Charged in addition to the water meter connection fee and the water impact fee.
- Water Connection Fee (Town of Prosper) — 1" meter$644.00 one-timeTown of ProsperProsper water meter connection fee for a 1 inch meter, paid with the building permit, in addition to any tap fee and the water impact fee. Sizes run from $572 (5/8 inch) to $1,689 (2 inch turbine).
- Wastewater Impact Fee (Town of Prosper) — 1" Displacement$8,421.00 one-timeTown of ProsperProsper wastewater impact fee for a 1 inch displacement meter, adopted August 26, 2025 at 50% of the maximum fee. Larger meters pay by size and type, up to $1,094,730 for a 10 inch turbine meter. Assessed at final plat; final plats approved by September 17, 2025 keep the earlier rates. Paid with the building permit, in addition to the sewer tap and connection fees.
- Wastewater Tap Fee (Town of Prosper) — 4" line$3,157.00 one-timeTown of ProsperProsper wastewater tap fee for a 4 inch service line on a lot without an existing sewer service line ($6,339 for a 6 inch line). Boring and pavement work are extra. Charged in addition to the wastewater connection fee and the wastewater impact fee.
- Wastewater Connection Fee (Town of Prosper)$400.00 one-timeTown of ProsperProsper wastewater connection fee, the same for a 4 or 6 inch service, paid with the building permit, in addition to any tap fee and the wastewater impact fee.
- Roadway Impact Fee (Town of Prosper, Industrial) — Service Area 2 (East of BNSF RR)$4.55/sq ftTown of ProsperProsper roadway impact fee for general light industrial space, per 1,000 sq ft, in Service Area 2 (east of the BNSF railroad), the higher of 2 rate districts (Service Area 1, west of the railroad: $4,387). Adopted August 26, 2025 at 50% of the maximum fee. Assessed at final plat; final plats approved by September 17, 2025 keep the earlier rates. Collected with the building permit.
- County Impact Fee (Collin County, Industrial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Prosper: Office Impact Fees
Office development in Prosper pays $12.07 per square foot in impact fees, plus $20,808.77 in one-time water and sewer connection fees (rates sourced November 20, 2026).
For a 25,000 sq ft building, that comes to about $322,558.77. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (Town of Prosper) — 1" Displacement ($8,421.00 one-time), Water Impact Fee (Town of Prosper) — 1" Displacement ($5,969.00 one-time) and Wastewater Tap Fee (Town of Prosper) — 4" line ($3,157.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Prosper Impact Fee Schedule
- Water Impact Fee (Town of Prosper) — 1" Displacement$5,969.00 one-timeTown of ProsperProsper water impact fee for a 1 inch displacement meter, adopted August 26, 2025 at 50% of the maximum fee. Larger meters pay by size and type, up to $775,970 for a 10 inch turbine meter. Assessed at final plat; final plats approved by September 17, 2025 keep the earlier rates. Paid with the building permit, in addition to the tap and meter connection fees.
- Water Tap Fee (Town of Prosper) — 1" service$2,217.77 one-timeTown of ProsperProsper water tap fee for a 1 inch service line on a lot without an existing water service line, by line size up to $4,976 for 6 inches. Boring and pavement work are extra. Charged in addition to the water meter connection fee and the water impact fee.
- Water Connection Fee (Town of Prosper) — 1" meter$644.00 one-timeTown of ProsperProsper water meter connection fee for a 1 inch meter, paid with the building permit, in addition to any tap fee and the water impact fee. Sizes run from $572 (5/8 inch) to $1,689 (2 inch turbine).
- Wastewater Impact Fee (Town of Prosper) — 1" Displacement$8,421.00 one-timeTown of ProsperProsper wastewater impact fee for a 1 inch displacement meter, adopted August 26, 2025 at 50% of the maximum fee. Larger meters pay by size and type, up to $1,094,730 for a 10 inch turbine meter. Assessed at final plat; final plats approved by September 17, 2025 keep the earlier rates. Paid with the building permit, in addition to the sewer tap and connection fees.
- Wastewater Tap Fee (Town of Prosper) — 4" line$3,157.00 one-timeTown of ProsperProsper wastewater tap fee for a 4 inch service line on a lot without an existing sewer service line ($6,339 for a 6 inch line). Boring and pavement work are extra. Charged in addition to the wastewater connection fee and the wastewater impact fee.
- Wastewater Connection Fee (Town of Prosper)$400.00 one-timeTown of ProsperProsper wastewater connection fee, the same for a 4 or 6 inch service, paid with the building permit, in addition to any tap fee and the wastewater impact fee.
- Roadway Impact Fee (Town of Prosper, Office) — Service Area 2 (East of BNSF RR)$12.07/sq ftTown of ProsperProsper roadway impact fee for a general office building, per 1,000 sq ft, in Service Area 2 (east of the BNSF railroad), the higher of 2 rate districts (Service Area 1, west of the railroad: $11,638). Adopted August 26, 2025 at 50% of the maximum fee. Assessed at final plat; final plats approved by September 17, 2025 keep the earlier rates. Collected with the building permit.
- County Impact Fee (Collin County, Office)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Prosper Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Prosper Impact Fee FAQs
What are the total impact fees for a single-family home in Prosper, Texas?
A new single-family home in Prosper pays $30,937.77 per unit in combined impact fees (rates sourced November 20, 2026).
How much are commercial impact fees in Prosper?
Commercial development in Prosper pays $9.78 per square foot in impact fees, plus $20,808.77 in one-time water and sewer connection fees (assuming a 1-inch meter), about $509,958.77 for a 50,000 sq ft building.
Does Prosper charge its own impact fees?
Yes. Prosper levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Prosper. The schedule on this page shows every fee that applies to development in Prosper.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Collin County impact fees page.