Argyle Impact Fees by Project Type
Argyle: Single-Family Impact Fees
A new single-family home in Argyle pays at least $18,313.84 per unit in impact fees (rates sourced November 26, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (Town of Argyle) ($5,091.84), Wastewater Impact Fee (Town of Argyle) — 3/4" or smaller meter ($2,452.00) and Parkland Development Fee (Town of Argyle) ($1,000.00).
Water Connection Fee (Argyle Water Supply Corporation) — 3/4" x 5/8" meter: 1.0 ESU × ($9,595 capital + $175 membership) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Installation Fee (Town of Argyle) is set by the utility and not published online. Parkland Dedication Fee in Lieu (Town of Argyle) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Argyle Impact Fee Schedule
- Water Connection Fee (Argyle Water Supply Corporation) — 3/4" x 5/8" meter: 1.0 ESU × ($9,595 capital + $175 membership)$9,770.00Requires confirmationArgyle Water Supply CorporationWater in Argyle is provided by the Argyle Water Supply Corporation, not the Town. A new service pays a capital recovery fee of $9,595 (as of January 1, 2026) plus a $175 membership fee per service unit; a standard 3/4 by 5/8 inch home meter is one service unit. Meter installation is charged at cost.
- Wastewater Impact Fee (Town of Argyle) — 3/4" or smaller meter$2,452.00Argyle charges a wastewater impact fee by water meter size: $2,452 per service unit for a 3/4 inch or smaller meter, the standard single-family home (Ordinance 2020-10, effective January 1, 2021). Ordinance 2026-52, adopted October 27, 2026, sets new fees for building permits issued from January 1, 2027 on plats approved after October 27, 2026: two wastewater service areas, TRA at $3,407 and Denton at $9,375 per service unit. Land platted earlier keeps the fee assessed at final plat.
- Sewer Installation Fee (Town of Argyle)Requires confirmationTown of ArgyleThe Town of Argyle collects a wastewater installation fee when a sewer service is installed, in addition to the wastewater impact fee; the amount is not published in the Town's fee schedules.
- Roadway Impact Fee (Town of Argyle)$5,091.84Roadway impact fee of $5,091.84 per single-family home ($1,632 per vehicle-mile at 3.12 vehicle-miles), effective January 1, 2021 under Ordinance 2020-10. Ordinance 2026-52, adopted October 27, 2026, sets a new roadway impact fee for building permits issued from January 1, 2027 on plats approved after October 27, 2026.
- Parkland Development Fee (Town of Argyle)$1,000.00Town of ArgyleTown of Argyle charges $1,000 per dwelling unit as a park development fee. It is paid at final plat, so a lot already platted has paid it.
- Parkland Dedication Fee in Lieu (Town of Argyle)Requires confirmationTown of ArgyleTown of Argyle requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- County Impact Fee (Denton County)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Argyle: Multifamily Impact Fees
A new multifamily unit in Argyle pays at least $16,094.32 per unit in impact fees (rates sourced November 26, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (Town of Argyle, MF) — 1.76 veh-mi × $1,632/veh-mi ($2,872.32), Wastewater Impact Fee (Town of Argyle, MF) — 3/4" or smaller meter ($2,452.00) and Parkland Development Fee (Town of Argyle, MF) ($1,000.00).
Water Connection Fee (Argyle Water Supply Corporation, MF) — 1.0 LUE × ($9,595 capital + $175 membership) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Installation Fee (Town of Argyle, MF) is set by the utility and not published online. Parkland Dedication Fee in Lieu (Town of Argyle, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Argyle Impact Fee Schedule
- Water Connection Fee (Argyle Water Supply Corporation, MF) — 1.0 LUE × ($9,595 capital + $175 membership)$9,770.00Requires confirmationArgyle Water Supply CorporationWater in Argyle is provided by the Argyle Water Supply Corporation. Its tariff counts each apartment unit as one living unit equivalent, so each unit pays the capital recovery fee of $9,595 (as of January 1, 2026) plus the $175 membership fee. Meter installation is charged at cost.
- Wastewater Impact Fee (Town of Argyle, MF) — 3/4" or smaller meter$2,452.00Argyle charges its wastewater impact fee by water meter size, $2,452 per service unit for a 3/4 inch or smaller meter (Ordinance 2020-10, effective January 1, 2021). A master-metered building pays by its meter size; 3 and 4 inch meters pay $57,131.60 and $98,080. Ordinance 2026-52, adopted October 27, 2026, sets new fees for building permits from January 1, 2027 on plats approved after October 27, 2026.
- Sewer Installation Fee (Town of Argyle, MF)Requires confirmationTown of ArgyleThe Town of Argyle collects a wastewater installation fee when a sewer service is installed, in addition to the wastewater impact fee; the amount is not published in the Town's fee schedules.
- Roadway Impact Fee (Town of Argyle, MF) — 1.76 veh-mi × $1,632/veh-mi$2,872.32Argyle charges apartments and townhouses its residential roadway impact fee of $1,632 per vehicle-mile at 1.76 vehicle-miles per unit, $2,872.32 per unit (Ordinance 2020-10, effective January 1, 2021). New roadway and wastewater impact fees adopted October 27, 2026 apply to permits from January 1, 2027 on plats approved after that date.
- Parkland Development Fee (Town of Argyle, MF)$1,000.00Town of ArgyleTown of Argyle charges $1,000 per dwelling unit as a park development fee. It is paid at final plat, so a lot already platted has paid it.
- Parkland Dedication Fee in Lieu (Town of Argyle, MF)Requires confirmationTown of ArgyleTown of Argyle requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- County Impact Fee (Denton County, MF)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Argyle: Commercial Impact Fees
Commercial development in Argyle pays $5.88 per square foot in impact fees, plus $31,045.40 in one-time water and sewer connection fees (rates sourced November 26, 2026).
For a 50,000 sq ft building, that comes to at least $324,805.40. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (Town of Argyle) — 1" meter, 2.7 SU × $2,452/SU ($6,620.40 one-time) and Roadway Impact Fee (Town of Argyle, Commercial) — ITE retail/shopping center, 4.50 veh-mi × $1,305.60/veh-mi ($5.88/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (Argyle Water Supply Corporation) — 1" meter: 2.5 ESU × ($9,595 capital + $175 membership) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Installation Fee (Town of Argyle) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Argyle Impact Fee Schedule
- Water Connection Fee (Argyle Water Supply Corporation) — 1" meter: 2.5 ESU × ($9,595 capital + $175 membership)$24,425.00 one-timeRequires confirmationArgyle Water Supply CorporationArgyle Water Supply Corporation charges a capital recovery fee of $9,595 (as of January 1, 2026) and a membership fee of $175 per service unit; a 1 inch meter counts as 2.5 service units, and a nonresidential site is served through a master meter sized by the corporation's engineer. Meter installation is charged at cost. The Town charges no water impact fee.
- Wastewater Impact Fee (Town of Argyle) — 1" meter, 2.7 SU × $2,452/SU$6,620.40 one-timeTown of ArgyleArgyle charges a wastewater impact fee by water meter size: $2,452 per service unit (50% of the maximum), with a 1 inch meter at 2.7 service units. Effective for building permits from January 1, 2021 under Ordinance 2020-10. The Belmont and Canyon Falls developments are outside the Town's wastewater impact fee service area. Ordinance 2026-52 (adopted October 27, 2026) replaces these fees for plats approved after October 27, 2026 with building permits issued on or after January 1, 2027: the 2026 update creates two wastewater service areas, TRA at $3,407 and Denton at $9,375 per service unit, with a 1 inch meter at 2.5 service units ($8,517 TRA, $23,437 Denton). Land platted before October 27, 2026 keeps the fee assessed at final plat.
- Sewer Installation Fee (Town of Argyle)Requires confirmationTown of ArgyleThe Town of Argyle collects a wastewater installation fee when a sewer service is installed, in addition to the wastewater impact fee; the amount is not published in the Town's fee schedules.
- Roadway Impact Fee (Town of Argyle, Commercial) — ITE retail/shopping center, 4.50 veh-mi × $1,305.60/veh-mi$5.88/sq ftTown of ArgyleArgyle's roadway impact fee for general retail is 4.50 vehicle-miles per 1,000 sq ft of gross floor area at the nonresidential collection rate of $1,305.60 per vehicle-mile (40% of the maximum), effective for building permits from January 1, 2021 under Ordinance 2020-10. Ordinance 2026-52 (adopted October 27, 2026) replaces these fees for plats approved after October 27, 2026 with building permits issued on or after January 1, 2027: the 2026 update sets the fee at $3,692 per vehicle-mile with new vehicle-mile rates per land use (16.48 per 1,000 sq ft for a 40,000 to 150,000 sq ft shopping plaza). Land platted before October 27, 2026 keeps the fee assessed at final plat.
- County Impact Fee (Denton County, Commercial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Argyle: Industrial Impact Fees
Industrial development in Argyle pays $3.96 per square foot in impact fees, plus $31,045.40 in one-time water and sewer connection fees (rates sourced November 26, 2026).
For a 50,000 sq ft building, that comes to at least $228,843.90. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (Town of Argyle) — 1" meter, 2.7 SU × $2,452/SU ($6,620.40 one-time) and Roadway Impact Fee (Town of Argyle, Industrial) — ITE general light industrial, 3.03 veh-mi × $1,305.60/veh-mi ($3.96/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (Argyle Water Supply Corporation) — 1" meter: 2.5 ESU × ($9,595 capital + $175 membership) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Installation Fee (Town of Argyle) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Argyle Impact Fee Schedule
- Water Connection Fee (Argyle Water Supply Corporation) — 1" meter: 2.5 ESU × ($9,595 capital + $175 membership)$24,425.00 one-timeRequires confirmationArgyle Water Supply CorporationArgyle Water Supply Corporation charges a capital recovery fee of $9,595 (as of January 1, 2026) and a membership fee of $175 per service unit; a 1 inch meter counts as 2.5 service units, and a nonresidential site is served through a master meter sized by the corporation's engineer. Meter installation is charged at cost. The Town charges no water impact fee.
- Wastewater Impact Fee (Town of Argyle) — 1" meter, 2.7 SU × $2,452/SU$6,620.40 one-timeTown of ArgyleArgyle charges a wastewater impact fee by water meter size: $2,452 per service unit (50% of the maximum), with a 1 inch meter at 2.7 service units. Effective for building permits from January 1, 2021 under Ordinance 2020-10. The Belmont and Canyon Falls developments are outside the Town's wastewater impact fee service area. Ordinance 2026-52 (adopted October 27, 2026) replaces these fees for plats approved after October 27, 2026 with building permits issued on or after January 1, 2027: the 2026 update creates two wastewater service areas, TRA at $3,407 and Denton at $9,375 per service unit, with a 1 inch meter at 2.5 service units ($8,517 TRA, $23,437 Denton). Land platted before October 27, 2026 keeps the fee assessed at final plat.
- Sewer Installation Fee (Town of Argyle)Requires confirmationTown of ArgyleThe Town of Argyle collects a wastewater installation fee when a sewer service is installed, in addition to the wastewater impact fee; the amount is not published in the Town's fee schedules.
- Roadway Impact Fee (Town of Argyle, Industrial) — ITE general light industrial, 3.03 veh-mi × $1,305.60/veh-mi$3.96/sq ftTown of ArgyleArgyle's roadway impact fee for general light industrial is 3.03 vehicle-miles per 1,000 sq ft of gross floor area at $1,305.60 per vehicle-mile, effective for building permits from January 1, 2021 under Ordinance 2020-10. Ordinance 2026-52 (adopted October 27, 2026) replaces these fees for plats approved after October 27, 2026 with building permits issued on or after January 1, 2027: the 2026 update sets the fee at $3,692 per vehicle-mile and general light industrial at 2.45 vehicle-miles per 1,000 sq ft. Land platted before October 27, 2026 keeps the fee assessed at final plat.
- County Impact Fee (Denton County, Industrial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Argyle: Office Impact Fees
Office development in Argyle pays $6.01 per square foot in impact fees, plus $31,045.40 in one-time water and sewer connection fees (rates sourced November 26, 2026).
For a 25,000 sq ft building, that comes to at least $181,189.40. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (Town of Argyle) — 1" meter, 2.7 SU × $2,452/SU ($6,620.40 one-time) and Roadway Impact Fee (Town of Argyle, Office) — ITE general office, 4.60 veh-mi × $1,305.60/veh-mi ($6.01/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (Argyle Water Supply Corporation) — 1" meter: 2.5 ESU × ($9,595 capital + $175 membership) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Installation Fee (Town of Argyle) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Argyle Impact Fee Schedule
- Water Connection Fee (Argyle Water Supply Corporation) — 1" meter: 2.5 ESU × ($9,595 capital + $175 membership)$24,425.00 one-timeRequires confirmationArgyle Water Supply CorporationArgyle Water Supply Corporation charges a capital recovery fee of $9,595 (as of January 1, 2026) and a membership fee of $175 per service unit; a 1 inch meter counts as 2.5 service units, and a nonresidential site is served through a master meter sized by the corporation's engineer. Meter installation is charged at cost. The Town charges no water impact fee.
- Wastewater Impact Fee (Town of Argyle) — 1" meter, 2.7 SU × $2,452/SU$6,620.40 one-timeTown of ArgyleArgyle charges a wastewater impact fee by water meter size: $2,452 per service unit (50% of the maximum), with a 1 inch meter at 2.7 service units. Effective for building permits from January 1, 2021 under Ordinance 2020-10. The Belmont and Canyon Falls developments are outside the Town's wastewater impact fee service area. Ordinance 2026-52 (adopted October 27, 2026) replaces these fees for plats approved after October 27, 2026 with building permits issued on or after January 1, 2027: the 2026 update creates two wastewater service areas, TRA at $3,407 and Denton at $9,375 per service unit, with a 1 inch meter at 2.5 service units ($8,517 TRA, $23,437 Denton). Land platted before October 27, 2026 keeps the fee assessed at final plat.
- Sewer Installation Fee (Town of Argyle)Requires confirmationTown of ArgyleThe Town of Argyle collects a wastewater installation fee when a sewer service is installed, in addition to the wastewater impact fee; the amount is not published in the Town's fee schedules.
- Roadway Impact Fee (Town of Argyle, Office) — ITE general office, 4.60 veh-mi × $1,305.60/veh-mi$6.01/sq ftTown of ArgyleArgyle's roadway impact fee for general office is 4.60 vehicle-miles per 1,000 sq ft of gross floor area at $1,305.60 per vehicle-mile, effective for building permits from January 1, 2021 under Ordinance 2020-10. Ordinance 2026-52 (adopted October 27, 2026) replaces these fees for plats approved after October 27, 2026 with building permits issued on or after January 1, 2027: the 2026 update sets the fee at $3,692 per vehicle-mile and general office at 5.90 vehicle-miles per 1,000 sq ft. Land platted before October 27, 2026 keeps the fee assessed at final plat.
- County Impact Fee (Denton County, Office)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Argyle Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Argyle Impact Fee FAQs
What are the total impact fees for a single-family home in Argyle, Texas?
A new single-family home in Argyle pays at least $18,313.84 per unit in combined impact fees (rates sourced November 26, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Argyle?
Commercial development in Argyle pays $5.88 per square foot in impact fees, plus $31,045.40 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $324,805.40 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Argyle charge its own impact fees?
Yes. Argyle levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Argyle. The schedule on this page shows every fee that applies to development in Argyle.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.