Skip to content
IMPACTFEES.ORG

Trophy Club, Texas Impact Fees

Trophy Club applies its own fee schedule. Denton County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $3,378.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Trophy Club Impact Fees by Project Type

Trophy Club: Single-Family Impact Fees

A new single-family home in Trophy Club pays at least $3,378.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Meter Fee (Trophy Club MUD No. 1) — 5/8" meter ($388.00).

Water Impact Fee (City of Fort Worth via Trophy Club MUD No. 1) — 5/8" x 3/4" meter: 1 equiv is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Parkland Dedication Fee in Lieu (Town of Trophy Club) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Trophy Club Impact Fee Schedule
Water$3,378.00
  • Water Impact Fee (City of Fort Worth via Trophy Club MUD No. 1) — 5/8" x 3/4" meter: 1 equiv
    Trophy Club MUD No. 1 (City of Fort Worth impact fee)
    Water and sewer service is provided by Trophy Club Municipal Utility District No. 1, which collects the City of Fort Worth water impact fee on each new connection (Fort Worth is the wholesale water supplier): $2,990 for a 5/8 x 3/4 inch meter for building permits issued on or after October 1, 2026. Larger meters pay more. A District water meter fee is charged in addition.
    $2,990.00Requires confirmation
  • Water Meter Fee (Trophy Club MUD No. 1) — 5/8" meter
    Trophy Club MUD No. 1
    One-time Trophy Club MUD No. 1 water meter charge for a 5/8 inch meter, effective October 1, 2026, paid in addition to the Fort Worth water impact fee. Meters over 1 inch are priced at purchase.
    $388.00
Sewer$0.00
  • Sewer Impact Fee (Trophy Club MUD No. 1)
    Trophy Club MUD No. 1
    Trophy Club MUD No. 1 treats its own wastewater and charges no sewer impact fee; the Fort Worth impact fee it collects is for water only. Sewer taps made by the District are billed at actual cost plus 10%.
    $0.00
City$0.00
  • City (Trophy Club)
    Town of Trophy Club
    The Town of Trophy Club levies no roadway impact fee. Parkland dedication (1 acre per 44 dwelling units) with appraisal-based cash-in-lieu applies to residential plats (subdivision ordinance, not a Ch. 395 impact fee).
    $0.00
  • Parkland Dedication Fee in Lieu (Town of Trophy Club)
    Town of Trophy Club
    Town of Trophy Club requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
    Requires confirmation
County$0.00
  • County Impact Fee (Denton County)
    Denton County
    Texas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County (and Tarrant County, for the part of the town there) does not qualify, so no county impact fee applies.
    $0.00
Total (Trophy Club): $3,378.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Trophy Club: Multifamily Impact Fees

A new multifamily unit in Trophy Club pays at least $3,378.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Meter Fee (Trophy Club MUD No. 1, MF) — 5/8" meter ($388.00).

Water Impact Fee (City of Fort Worth via Trophy Club MUD No. 1, MF) — 5/8" x 3/4" meter: 1 equiv is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Parkland Dedication Fee in Lieu (Town of Trophy Club, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Trophy Club Impact Fee Schedule
Water$3,378.00
Sewer$0.00
  • Sewer Impact Fee (Trophy Club MUD No. 1, MF)
    Trophy Club MUD No. 1
    Trophy Club MUD No. 1 treats its own wastewater and charges no sewer impact fee; the Fort Worth impact fee it collects is for water only. Sewer taps made by the District are billed at actual cost plus 10%.
    $0.00
City$0.00
  • City (Trophy Club) (MF)
    Town of Trophy Club
    The Town of Trophy Club levies no roadway impact fee. Parkland dedication (1 acre per 44 dwelling units) with appraisal-based cash-in-lieu applies to residential plats (subdivision ordinance, not a Ch. 395 impact fee).
    $0.00
  • Parkland Dedication Fee in Lieu (Town of Trophy Club, MF)
    Town of Trophy Club
    Town of Trophy Club requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
    Requires confirmation
County$0.00
  • County Impact Fee (Denton County, MF)
    Denton County
    Texas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County (and Tarrant County, for the part of the town there) does not qualify, so no county impact fee applies.
    $0.00
Total (Trophy Club): $3,378.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Trophy Club: Commercial Impact Fees

Commercial development in Trophy Club pays no per-square-foot impact fees, but owes $8,090.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $8,090.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter Fee (Trophy Club MUD No. 1) — 1" meter ($615.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Impact Fee (City of Fort Worth via Trophy Club MUD No. 1) — 1" meter: 2.5 equiv is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Trophy Club Impact Fee Schedule
Water$8,090.00 one-time
  • Water Impact Fee (City of Fort Worth via Trophy Club MUD No. 1) — 1" meter: 2.5 equiv
    City of Fort Worth (collected by Trophy Club MUD No. 1)
    Fort Worth water impact fee collected by Trophy Club MUD No. 1 as a pass-through, for land platted on or after April 1, 2017, with building permits issued on or after October 1, 2026, using 2.5 equivalent units for a 1 inch meter. Land platted before April 1, 2017 pays the Fort Worth fee in effect when the plat was recorded. No Fort Worth wastewater impact fee applies because the MUD treats its own wastewater.
    $7,475.00 one-timeRequires confirmation
  • Water Meter Fee (Trophy Club MUD No. 1) — 1" meter
    Trophy Club MUD No. 1
    One-time water meter fee charged by Trophy Club MUD No. 1, effective October 1, 2026. Meters larger than 1 inch are priced when purchased. Taps installed by the MUD are billed at actual cost plus 10%.
    $615.00 one-time
Sewer$0.00
  • Sewer Impact Fee (Trophy Club MUD No. 1)
    Trophy Club MUD No. 1
    Trophy Club MUD No. 1 charges no sewer impact or capacity fee, and no Fort Worth wastewater impact fee applies because the MUD treats its own wastewater. A sewer tap installed by the MUD is billed at actual cost plus 10%, and each sewer connection pays a $150 inspection fee.
    $0.00
City$0.00
  • City Impact Fee (Town of Trophy Club, Commercial)
    Town of Trophy Club
    The Town of Trophy Club charges no roadway or drainage impact fee, and its parkland dedication applies only to residential subdivisions. Water and sewer service and their one-time fees come from Trophy Club MUD No. 1.
    $0.00
County$0.00
  • County Impact Fee (Denton County, Commercial)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Trophy Club): $8,090.00 one-time (≈ $8,090.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Trophy Club: Industrial Impact Fees

Industrial development in Trophy Club pays no per-square-foot impact fees, but owes $8,090.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $8,090.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter Fee (Trophy Club MUD No. 1) — 1" meter ($615.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Impact Fee (City of Fort Worth via Trophy Club MUD No. 1) — 1" meter: 2.5 equiv is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Trophy Club Impact Fee Schedule
Water$8,090.00 one-time
  • Water Impact Fee (City of Fort Worth via Trophy Club MUD No. 1) — 1" meter: 2.5 equiv
    City of Fort Worth (collected by Trophy Club MUD No. 1)
    Fort Worth water impact fee collected by Trophy Club MUD No. 1 as a pass-through, for land platted on or after April 1, 2017, with building permits issued on or after October 1, 2026, using 2.5 equivalent units for a 1 inch meter. Land platted before April 1, 2017 pays the Fort Worth fee in effect when the plat was recorded. No Fort Worth wastewater impact fee applies because the MUD treats its own wastewater.
    $7,475.00 one-timeRequires confirmation
  • Water Meter Fee (Trophy Club MUD No. 1) — 1" meter
    Trophy Club MUD No. 1
    One-time water meter fee charged by Trophy Club MUD No. 1, effective October 1, 2026. Meters larger than 1 inch are priced when purchased. Taps installed by the MUD are billed at actual cost plus 10%.
    $615.00 one-time
Sewer$0.00
  • Sewer Impact Fee (Trophy Club MUD No. 1)
    Trophy Club MUD No. 1
    Trophy Club MUD No. 1 charges no sewer impact or capacity fee, and no Fort Worth wastewater impact fee applies because the MUD treats its own wastewater. A sewer tap installed by the MUD is billed at actual cost plus 10%, and each sewer connection pays a $150 inspection fee.
    $0.00
City$0.00
  • City Impact Fee (Town of Trophy Club, Industrial)
    Town of Trophy Club
    The Town of Trophy Club charges no roadway or drainage impact fee, and its parkland dedication applies only to residential subdivisions. Water and sewer service and their one-time fees come from Trophy Club MUD No. 1.
    $0.00
County$0.00
  • County Impact Fee (Denton County, Industrial)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Trophy Club): $8,090.00 one-time (≈ $8,090.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Trophy Club: Office Impact Fees

Office development in Trophy Club pays no per-square-foot impact fees, but owes $8,090.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $8,090.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter Fee (Trophy Club MUD No. 1) — 1" meter ($615.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Impact Fee (City of Fort Worth via Trophy Club MUD No. 1) — 1" meter: 2.5 equiv is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Trophy Club Impact Fee Schedule
Water$8,090.00 one-time
  • Water Impact Fee (City of Fort Worth via Trophy Club MUD No. 1) — 1" meter: 2.5 equiv
    City of Fort Worth (collected by Trophy Club MUD No. 1)
    Fort Worth water impact fee collected by Trophy Club MUD No. 1 as a pass-through, for land platted on or after April 1, 2017, with building permits issued on or after October 1, 2026, using 2.5 equivalent units for a 1 inch meter. Land platted before April 1, 2017 pays the Fort Worth fee in effect when the plat was recorded. No Fort Worth wastewater impact fee applies because the MUD treats its own wastewater.
    $7,475.00 one-timeRequires confirmation
  • Water Meter Fee (Trophy Club MUD No. 1) — 1" meter
    Trophy Club MUD No. 1
    One-time water meter fee charged by Trophy Club MUD No. 1, effective October 1, 2026. Meters larger than 1 inch are priced when purchased. Taps installed by the MUD are billed at actual cost plus 10%.
    $615.00 one-time
Sewer$0.00
  • Sewer Impact Fee (Trophy Club MUD No. 1)
    Trophy Club MUD No. 1
    Trophy Club MUD No. 1 charges no sewer impact or capacity fee, and no Fort Worth wastewater impact fee applies because the MUD treats its own wastewater. A sewer tap installed by the MUD is billed at actual cost plus 10%, and each sewer connection pays a $150 inspection fee.
    $0.00
City$0.00
  • City Impact Fee (Town of Trophy Club, Office)
    Town of Trophy Club
    The Town of Trophy Club charges no roadway or drainage impact fee, and its parkland dedication applies only to residential subdivisions. Water and sewer service and their one-time fees come from Trophy Club MUD No. 1.
    $0.00
County$0.00
  • County Impact Fee (Denton County, Office)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Trophy Club): $8,090.00 one-time (≈ $8,090.00 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Trophy Club Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Trophy Club Impact Fee FAQs

What are the total impact fees for a single-family home in Trophy Club, Texas?

A new single-family home in Trophy Club pays at least $3,378.00 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Trophy Club?

Commercial development in Trophy Club pays no per-square-foot impact fees, but owes $8,090.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Trophy Club charge its own impact fees?

Yes. Trophy Club levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Trophy Club. The schedule on this page shows every fee that applies to development in Trophy Club.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Denton County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.