Skip to content
IMPACTFEES.ORG

Ponder, Texas Impact Fees

Ponder applies its own fee schedule. Denton County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $2,800.00 per unit (rates sourced ). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Ponder Impact Fees by Project Type

Ponder: Single-Family Impact Fees

A new single-family home in Ponder pays at least $2,800.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (Town of Ponder) — 3/4" meter, undeveloped lot ($1,400.00) and Sewer Connection Fee (Town of Ponder) — undeveloped lot ($1,400.00).

Water Impact Fee (Town of Ponder) and Wastewater Impact Fee (Town of Ponder) are set by the utility and not published online. City Impact Fee (Town of Ponder) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Ponder Impact Fee Schedule
Water$1,400.00
  • Water Connection Fee (Town of Ponder) — 3/4" meter, undeveloped lot
    Town of Ponder
    Town of Ponder water connection for a 3/4 inch residential meter where the main tap, service line and meter box are not yet in place: $1,400 plus any street bore cost the Town incurs. Where they are already in place (a developed lot) the fee is $800. Larger meters cost more. Fee schedule readopted by Ordinance 26-06, effective June 8, 2026.
    $1,400.00
  • Water Impact Fee (Town of Ponder)
    Town of Ponder
    The Town of Ponder collects a water impact fee by meter size, in addition to the connection fee, payable at building permit. The amount in force has not been published online.
    Requires confirmation
Sewer$1,400.00
  • Sewer Connection Fee (Town of Ponder) — undeveloped lot
    Town of Ponder
    Town of Ponder residential sewer connection where the connection is not yet in place: $1,400 plus any street bore cost the Town incurs; $800 where it is already in place (a developed lot). Fee schedule readopted by Ordinance 26-06, effective June 8, 2026.
    $1,400.00
  • Wastewater Impact Fee (Town of Ponder)
    Town of Ponder
    The Town of Ponder collects a wastewater impact fee by meter size, in addition to the connection fee, payable at building permit. The amount in force has not been published online.
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Ponder)
    Town of Ponder
    No roadway, drainage or park impact fee appears in the Town of Ponder fee schedule readopted by Ordinance 26-06 (June 8, 2026).
    Requires confirmation
County$0.00
  • County Impact Fee (Denton County)
    Denton County
    Texas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
    $0.00
Total (Ponder): $2,800.00
Sources last checked Official fee schedules:Town of Ponder Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponder: Multifamily Impact Fees

A new multifamily unit in Ponder pays at least $2,800.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (Town of Ponder, MF) — 3/4" meter, undeveloped lot ($1,400.00) and Sewer Connection Fee (Town of Ponder, MF) — undeveloped lot ($1,400.00).

Water Impact Fee (Town of Ponder, MF) and Wastewater Impact Fee (Town of Ponder, MF) are set by the utility and not published online. City Impact Fee (Town of Ponder, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Ponder Impact Fee Schedule
Water$1,400.00
  • Water Connection Fee (Town of Ponder, MF) — 3/4" meter, undeveloped lot
    Town of Ponder
    Town of Ponder water connection for a 3/4 inch residential meter where the main tap, service line and meter box are not yet in place: $1,400 plus any street bore cost the Town incurs. Where they are already in place (a developed lot) the fee is $800. Larger meters cost more. Fee schedule readopted by Ordinance 26-06, effective June 8, 2026. Charged per meter connection, so a multifamily building on one connection pays once.
    $1,400.00
  • Water Impact Fee (Town of Ponder, MF)
    Town of Ponder
    The Town of Ponder collects a water impact fee by meter size, in addition to the connection fee, payable at building permit. The amount in force has not been published online.
    Requires confirmation
Sewer$1,400.00
  • Sewer Connection Fee (Town of Ponder, MF) — undeveloped lot
    Town of Ponder
    Town of Ponder residential sewer connection where the connection is not yet in place: $1,400 plus any street bore cost the Town incurs; $800 where it is already in place (a developed lot). Fee schedule readopted by Ordinance 26-06, effective June 8, 2026. Charged per connection, so a multifamily building on one connection pays once.
    $1,400.00
  • Wastewater Impact Fee (Town of Ponder, MF)
    Town of Ponder
    The Town of Ponder collects a wastewater impact fee by meter size, in addition to the connection fee, payable at building permit. The amount in force has not been published online.
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Ponder, MF)
    Town of Ponder
    No roadway, drainage or park impact fee appears in the Town of Ponder fee schedule readopted by Ordinance 26-06 (June 8, 2026).
    Requires confirmation
County$0.00
  • County Impact Fee (Denton County, MF)
    Denton County
    Texas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
    $0.00
Total (Ponder): $2,800.00
Sources last checked Official fee schedules:Town of Ponder Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponder: Commercial Impact Fees

Commercial development in Ponder pays no per-square-foot impact fees, but owes $3,800.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $3,800.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of Ponder) — 1" meter, new tap ($1,900.00 one-time) and Sewer Connection Fee (Town of Ponder) — new tap ($1,900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Impact Fee (Town of Ponder) and Water Impact Fee (Town of Ponder) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Ponder Impact Fee Schedule
Water$1,900.00 one-time
  • Water Connection Fee (Town of Ponder) — 1" meter, new tap
    1", new tap
    Town of Ponder
    One-time commercial water connection fee charged by the Town of Ponder when the Town installs the tap, service line and meter box, plus street bore costs where a street crossing is needed. Where the tap, service line and meter box are already in place the fee is $1,200 for a 1 inch meter.
    $1,900.00 one-time
  • Water Impact Fee (Town of Ponder)
    Town of Ponder
    The Town of Ponder has a water and sewer impact fee schedule set by meter size (Ordinance 21-11, 2021); the adopted amounts are not published online. Charged in addition to the water connection fee.
    Requires confirmation
Sewer$1,900.00 one-time
  • Sewer Connection Fee (Town of Ponder) — new tap
    Town of Ponder
    One-time commercial sewer connection fee charged per connection by the Town of Ponder when the Town installs the connection, plus street bore costs where needed. Where the connection is already in place the fee is $1,200.
    $1,900.00 one-time
  • Wastewater Impact Fee (Town of Ponder)
    Town of Ponder
    The Town of Ponder has a water and sewer impact fee schedule set by meter size (Ordinance 21-11, 2021); the adopted amounts are not published online. Charged in addition to the sewer connection fee.
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Ponder, Commercial)
    Town of Ponder
    The Town of Ponder charges no roadway or drainage impact fee. Its parkland fee in lieu of dedication applies only to residential units. Water and sewer connection fees are charged by meter size.
    $0.00
County$0.00
  • County Impact Fee (Denton County, Commercial)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Ponder): $3,800.00 one-time (≈ $3,800.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Ponder Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponder: Industrial Impact Fees

Industrial development in Ponder pays no per-square-foot impact fees, but owes $3,800.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $3,800.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of Ponder) — 1" meter, new tap ($1,900.00 one-time) and Sewer Connection Fee (Town of Ponder) — new tap ($1,900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Impact Fee (Town of Ponder) and Water Impact Fee (Town of Ponder) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Ponder Impact Fee Schedule
Water$1,900.00 one-time
  • Water Connection Fee (Town of Ponder) — 1" meter, new tap
    1", new tap
    Town of Ponder
    One-time commercial water connection fee charged by the Town of Ponder when the Town installs the tap, service line and meter box, plus street bore costs where a street crossing is needed. Where the tap, service line and meter box are already in place the fee is $1,200 for a 1 inch meter.
    $1,900.00 one-time
  • Water Impact Fee (Town of Ponder)
    Town of Ponder
    The Town of Ponder has a water and sewer impact fee schedule set by meter size (Ordinance 21-11, 2021); the adopted amounts are not published online. Charged in addition to the water connection fee.
    Requires confirmation
Sewer$1,900.00 one-time
  • Sewer Connection Fee (Town of Ponder) — new tap
    Town of Ponder
    One-time commercial sewer connection fee charged per connection by the Town of Ponder when the Town installs the connection, plus street bore costs where needed. Where the connection is already in place the fee is $1,200.
    $1,900.00 one-time
  • Wastewater Impact Fee (Town of Ponder)
    Town of Ponder
    The Town of Ponder has a water and sewer impact fee schedule set by meter size (Ordinance 21-11, 2021); the adopted amounts are not published online. Charged in addition to the sewer connection fee.
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Ponder, Industrial)
    Town of Ponder
    The Town of Ponder charges no roadway or drainage impact fee. Its parkland fee in lieu of dedication applies only to residential units. Water and sewer connection fees are charged by meter size.
    $0.00
County$0.00
  • County Impact Fee (Denton County, Industrial)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Ponder): $3,800.00 one-time (≈ $3,800.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Ponder Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponder: Office Impact Fees

Office development in Ponder pays no per-square-foot impact fees, but owes $3,800.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to at least $3,800.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of Ponder) — 1" meter, new tap ($1,900.00 one-time) and Sewer Connection Fee (Town of Ponder) — new tap ($1,900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Impact Fee (Town of Ponder) and Water Impact Fee (Town of Ponder) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Ponder Impact Fee Schedule
Water$1,900.00 one-time
  • Water Connection Fee (Town of Ponder) — 1" meter, new tap
    1", new tap
    Town of Ponder
    One-time commercial water connection fee charged by the Town of Ponder when the Town installs the tap, service line and meter box, plus street bore costs where a street crossing is needed. Where the tap, service line and meter box are already in place the fee is $1,200 for a 1 inch meter.
    $1,900.00 one-time
  • Water Impact Fee (Town of Ponder)
    Town of Ponder
    The Town of Ponder has a water and sewer impact fee schedule set by meter size (Ordinance 21-11, 2021); the adopted amounts are not published online. Charged in addition to the water connection fee.
    Requires confirmation
Sewer$1,900.00 one-time
  • Sewer Connection Fee (Town of Ponder) — new tap
    Town of Ponder
    One-time commercial sewer connection fee charged per connection by the Town of Ponder when the Town installs the connection, plus street bore costs where needed. Where the connection is already in place the fee is $1,200.
    $1,900.00 one-time
  • Wastewater Impact Fee (Town of Ponder)
    Town of Ponder
    The Town of Ponder has a water and sewer impact fee schedule set by meter size (Ordinance 21-11, 2021); the adopted amounts are not published online. Charged in addition to the sewer connection fee.
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Ponder, Office)
    Town of Ponder
    The Town of Ponder charges no roadway or drainage impact fee. Its parkland fee in lieu of dedication applies only to residential units. Water and sewer connection fees are charged by meter size.
    $0.00
County$0.00
  • County Impact Fee (Denton County, Office)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Ponder): $3,800.00 one-time (≈ $3,800.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Ponder Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponder Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Ponder Impact Fee FAQs

What are the total impact fees for a single-family home in Ponder, Texas?

A new single-family home in Ponder pays at least $2,800.00 per unit in combined impact fees (rates sourced November 25, 2026). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Ponder?

Commercial development in Ponder pays no per-square-foot impact fees, but owes $3,800.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Ponder charge its own impact fees?

Yes. Ponder levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Ponder. The schedule on this page shows every fee that applies to development in Ponder.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Denton County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.