Skip to content
IMPACTFEES.ORG

Copper Canyon, Texas Impact Fees

Copper Canyon applies its own fee schedule. Denton County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $9,780.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Copper Canyon Impact Fees by Project Type

Copper Canyon: Single-Family Impact Fees

A new single-family home in Copper Canyon pays at least $9,780.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee — Cross Timbers WSC, 5/8" x 3/4" meter: $8,380 capital + $150 membership + $1,250 installation ($9,780.00).

Park Development Fee (Town of Copper Canyon) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Copper Canyon Impact Fee Schedule
Water$9,780.00
Sewer$0.00
City$0.00
  • City Impact Fee (Town of Copper Canyon)
    The Town of Copper Canyon does not levy municipal impact fees on new homes. Developers of new residential subdivisions provide open space or pay a park development fee of $3,000 per required open space before the final plat is filed.
    $0.00
  • Park Development Fee (Town of Copper Canyon)
    Town of Copper Canyon
    Copper Canyon charges a park development fee of $3,000 for each open space a subdivision must provide (one space for up to 5 lots of 1/3 acre; none for lots of 2 acres or more), paid when the town accepts the public improvements before the final plat is filed. Developers may build approved park improvements instead. The amount per home depends on lot size and count, so no fixed per-home amount is shown.
    Requires confirmation
County$0.00
  • County Impact Fee (Denton County)
    Denton County
    Texas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
    $0.00
Total (Copper Canyon): $9,780.00
Sources last checked Official fee schedules:Cross Timbers Water Supply Corporation Town of Copper Canyon Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Copper Canyon: Multifamily Impact Fees

A new multifamily unit in Copper Canyon pays at least $9,780.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (Cross Timbers WSC, MF) — $8,380 capital + $150 membership + $1,250 installation ($9,780.00).

Park Development Fee (Town of Copper Canyon, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Copper Canyon Impact Fee Schedule
Water$9,780.00
Sewer$0.00
City$0.00
  • City Impact Fee (Town of Copper Canyon, MF)
    The Town of Copper Canyon does not levy municipal impact fees on new homes. Developers of new residential subdivisions provide open space or pay a park development fee of $3,000 per required open space before the final plat is filed.
    $0.00
  • Park Development Fee (Town of Copper Canyon, MF)
    Town of Copper Canyon
    Copper Canyon charges a park development fee of $3,000 for each open space a subdivision must provide (one space for up to 5 lots of 1/3 acre; none for lots of 2 acres or more), paid when the town accepts the public improvements before the final plat is filed. Developers may build approved park improvements instead. The amount per home depends on lot size and count, so no fixed per-home amount is shown.
    Requires confirmation
County$0.00
  • County Impact Fee (Denton County, MF)
    Denton County
    Texas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
    $0.00
Total (Copper Canyon): $9,780.00
Sources last checked Official fee schedules:Cross Timbers Water Supply Corporation Town of Copper Canyon Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Copper Canyon: Commercial Impact Fees

Commercial development in Copper Canyon pays no per-square-foot impact fees, but owes $22,600.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $22,600.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Fee — Cross Timbers WSC, 1" meter: $20,950 capital + $150 membership + $1,500 installation is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Copper Canyon Impact Fee Schedule
Water$22,600.00 one-time
  • Water Connection Fee — Cross Timbers WSC, 1" meter: $20,950 capital + $150 membership + $1,500 installation
    Cross Timbers Water Supply Corporation
    Cross Timbers Water Supply Corporation, which serves Copper Canyon, charges $22,600 for a new 1 inch meter: a $20,950 capital improvement fee, the $150 membership fee and $1,500 for installation, effective July 1, 2025. A road bore adds about $750 to $1,500. Its published pricing covers 5/8 inch and 1 inch meters only; larger meters are priced by the corporation.
    $22,600.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee — No public sewer (on-site septic)
    Outside town center (septic)
    Town of Copper Canyon
    Outside the town center, Copper Canyon has no public sewer and property uses on-site septic systems, so no sewer connection or impact fee applies. The town center sewer system carries the Flower Mound wastewater impact fee.
    $0.00
City$0.00
  • City Impact Fee (Town of Copper Canyon, Commercial)
    Town of Copper Canyon
    The Town of Copper Canyon charges no roadway, water or drainage impact fee. Its only impact fee is the Flower Mound wastewater impact fee it collects for development connecting to the town center sewer system.
    $0.00
County$0.00
  • County Impact Fee (Denton County, Commercial)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Copper Canyon): $22,600.00 one-time (≈ $22,600.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Cross Timbers Water Supply Corporation Town of Copper Canyon Denton County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Copper Canyon: Industrial Impact Fees

Industrial development in Copper Canyon pays no per-square-foot impact fees, but owes $22,600.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $22,600.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Fee — Cross Timbers WSC, 1" meter: $20,950 capital + $150 membership + $1,500 installation is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Copper Canyon Impact Fee Schedule
Water$22,600.00 one-time
  • Water Connection Fee — Cross Timbers WSC, 1" meter: $20,950 capital + $150 membership + $1,500 installation
    Cross Timbers Water Supply Corporation
    Cross Timbers Water Supply Corporation, which serves Copper Canyon, charges $22,600 for a new 1 inch meter: a $20,950 capital improvement fee, the $150 membership fee and $1,500 for installation, effective July 1, 2025. A road bore adds about $750 to $1,500. Its published pricing covers 5/8 inch and 1 inch meters only; larger meters are priced by the corporation.
    $22,600.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee — No public sewer (on-site septic)
    Outside town center (septic)
    Town of Copper Canyon
    Outside the town center, Copper Canyon has no public sewer and property uses on-site septic systems, so no sewer connection or impact fee applies. The town center sewer system carries the Flower Mound wastewater impact fee.
    $0.00
City$0.00
  • City Impact Fee (Town of Copper Canyon, Industrial)
    Town of Copper Canyon
    The Town of Copper Canyon charges no roadway, water or drainage impact fee. Its only impact fee is the Flower Mound wastewater impact fee it collects for development connecting to the town center sewer system.
    $0.00
County$0.00
  • County Impact Fee (Denton County, Industrial)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Copper Canyon): $22,600.00 one-time (≈ $22,600.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Cross Timbers Water Supply Corporation Town of Copper Canyon Denton County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Copper Canyon: Office Impact Fees

Office development in Copper Canyon pays no per-square-foot impact fees, but owes $22,600.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $22,600.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Fee — Cross Timbers WSC, 1" meter: $20,950 capital + $150 membership + $1,500 installation is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Copper Canyon Impact Fee Schedule
Water$22,600.00 one-time
  • Water Connection Fee — Cross Timbers WSC, 1" meter: $20,950 capital + $150 membership + $1,500 installation
    Cross Timbers Water Supply Corporation
    Cross Timbers Water Supply Corporation, which serves Copper Canyon, charges $22,600 for a new 1 inch meter: a $20,950 capital improvement fee, the $150 membership fee and $1,500 for installation, effective July 1, 2025. A road bore adds about $750 to $1,500. Its published pricing covers 5/8 inch and 1 inch meters only; larger meters are priced by the corporation.
    $22,600.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee — No public sewer (on-site septic)
    Outside town center (septic)
    Town of Copper Canyon
    Outside the town center, Copper Canyon has no public sewer and property uses on-site septic systems, so no sewer connection or impact fee applies. The town center sewer system carries the Flower Mound wastewater impact fee.
    $0.00
City$0.00
  • City Impact Fee (Town of Copper Canyon, Office)
    Town of Copper Canyon
    The Town of Copper Canyon charges no roadway, water or drainage impact fee. Its only impact fee is the Flower Mound wastewater impact fee it collects for development connecting to the town center sewer system.
    $0.00
County$0.00
  • County Impact Fee (Denton County, Office)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Copper Canyon): $22,600.00 one-time (≈ $22,600.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Cross Timbers Water Supply Corporation Town of Copper Canyon Denton County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Copper Canyon Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Copper Canyon Impact Fee FAQs

What are the total impact fees for a single-family home in Copper Canyon, Texas?

A new single-family home in Copper Canyon pays at least $9,780.00 per unit in combined impact fees (rates sourced November 25, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Copper Canyon?

Commercial development in Copper Canyon pays no per-square-foot impact fees, but owes $22,600.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Copper Canyon charge its own impact fees?

Yes. Copper Canyon levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Copper Canyon. The schedule on this page shows every fee that applies to development in Copper Canyon.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Denton County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.