Denton Impact Fees by Project Type
Denton: Single-Family Impact Fees
A new single-family home in Denton pays $35,546.44 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Impact Fee (City of Denton) — Clear Creek, 5/8" x 3/4" meter ($13,437.00), Water Impact Fee (City of Denton) — Zone 2, 5/8" x 3/4" meter ($9,104.25) and Water Tap Fee (City of Denton) — 5/8" x 3/4" meter ($6,048.66).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Denton Impact Fee Schedule
- Water Impact Fee (City of Denton) — Zone 2, 5/8" x 3/4" meter$9,104.25City of DentonDenton water impact fee for a home on a 5/8 inch x 3/4 inch meter in water Zone 2: $9,104.25 (1 service unit), for property platted on or after June 1, 2026 or unplatted (Ordinance 25-1143). This is the highest of 3 water impact fee zones: Zone 1B charges $8,058.75 and Zone 1A $1,365 per service unit. Property platted from January 29, 2019 through May 31, 2026 pays $7,638 per service unit in Zone 2. A home under 1,300 square feet on a lot under 6,000 square feet is charged half a service unit. Separate tap and meter fees also apply.
- Water Tap Fee (City of Denton) — 5/8" x 3/4" meter$6,048.66City of DentonDenton water tap fee for a 5/8 inch x 3/4 inch meter: $6,048.66 when the city makes the tap (a 1 inch tap), effective October 1, 2026. Where the developer installs the service line in a new subdivision, no city tap fee applies. Pavement restoration and engineering are extra, and a separate meter fee applies.
- Water Meter Fee (City of Denton) — 5/8" x 3/4" meter$333.28City of DentonDenton water meter fee for a 5/8 inch x 3/4 inch meter: $333.28, effective October 1, 2026, in addition to any tap fee and the water impact fee.
- Wastewater Impact Fee (City of Denton) — Clear Creek, 5/8" x 3/4" meter$13,437.00City of DentonDenton wastewater impact fee for a home on a 5/8 inch x 3/4 inch meter in the Clear Creek wastewater service area: $13,437 (1 service unit), for property platted on or after June 1, 2026 or unplatted (Ordinance 25-1143). This is the highest of 3 wastewater service areas: Hickory Creek charges $9,593.25 and Pecan Creek $8,711.25 per service unit. Property platted from January 29, 2019 through May 31, 2026 pays $4,716 per service unit. A home under 1,300 square feet on a lot under 6,000 square feet is charged half a service unit. Sewer taps are billed at actual cost plus 20%.
- Roadway Impact Fee (City of Denton)$3,673.25Roadway impact fee for a single-family detached home: $3,673.25 per dwelling unit (collected rate of $796.80 per service unit × 4.61 vehicle-miles). This is the rate for lots platted on or after January 1, 2025 (lots platted earlier pay the prior $408.16-per-service-unit rate). The collected rate is uniform across the city's five roadway service areas.
- Park Development Fee (City of Denton)$2,515.00Park development fee of $2,515 per single-family dwelling unit, paid at building permit issuance. This is in addition to any park land dedication or fee-in-lieu. Effective under Ordinance 22-254 (2022).
- Park Land Dedication Fee-in-Lieu (City of Denton)$435.00Park land dedication fee-in-lieu of $435 per single-family dwelling unit, charged (at the City's discretion) instead of dedicating park land, paid at final plat. A separate park development fee also applies. Effective under Ordinance 22-254 (2022).
- County Impact Fee (Denton County)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Denton: Multifamily Impact Fees
A new multifamily unit in Denton pays $21,667.28 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Impact Fee (City of Denton, MF) — Clear Creek ($6,987.24), Water Tap Fee (City of Denton, MF) — 5/8" x 3/4" meter ($6,048.66) and Water Impact Fee (City of Denton, MF) — Zone 2 ($4,734.21).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Denton Impact Fee Schedule
- Water Tap Fee (City of Denton, MF) — 5/8" x 3/4" meter$6,048.66City of DentonDenton water tap fee of $6,048.66 for the smallest tap when the city makes it, effective October 1, 2026. A building on one connection pays once; larger taps cost $6,537.70 (1 inch meter) or $7,485.24 (1-1/2 and 2 inch meters), and taps of 4 inches and larger are billed at actual cost plus 20%.
- Water Impact Fee (City of Denton, MF) — Zone 2$4,734.21City of DentonDenton water impact fee for a 2 bedroom apartment unit in water Zone 2: $4,734.21 (0.26 service unit per bedroom in projects of 8 or more units), for property platted on or after June 1, 2026 or unplatted (Ordinance 25-1143). This is the highest of 3 water impact fee zones. Projects with fewer than 8 units pay by meter size.
- Water Meter Fee (City of Denton, MF)$333.28City of DentonDenton water meter fee of $333.28 for a 5/8 inch x 3/4 inch meter, effective October 1, 2026. A building on one meter pays once; meters up to 2 inches cost up to $743.05.
- Wastewater Impact Fee (City of Denton, MF) — Clear Creek$6,987.24City of DentonDenton wastewater impact fee for a 2 bedroom apartment unit in the Clear Creek wastewater service area: $6,987.24 (0.26 service unit per bedroom in projects of 8 or more units), for property platted on or after June 1, 2026 or unplatted (Ordinance 25-1143). This is the highest of 3 wastewater service areas. Projects with fewer than 8 units pay by meter size.
- Park Development Fee (City of Denton, MF)$1,741.00Park development fee of $1,741 per multifamily dwelling unit, paid at building permit issuance, in addition to any park land dedication or fee-in-lieu. Effective under Ordinance 22-254 (2022).
- Roadway Impact Fee (City of Denton, MF) — Mid-Rise$1,521.89Mid-Rise (3-10 floors, ITE 221)Roadway impact fee for a mid-rise (3–10 floor) apartment unit: $1,521.89 per dwelling unit (for lots platted on/after 1/1/2025). Low-rise apartments pay $1,992.00 and high-rise $1,250.98 per unit.
- Park Land Dedication Fee-in-Lieu (City of Denton, MF)$301.00Park land dedication fee-in-lieu of $301 per multifamily dwelling unit, charged (at the City's discretion) instead of dedicating park land. A separate park development fee also applies. Effective under Ordinance 22-254 (2022).
- County Impact Fee (Denton County, MF)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Denton: Commercial Impact Fees
Commercial development in Denton pays $3.82 per square foot in impact fees, plus $63,300.98 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $254,532.98. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Denton) — Clear Creek, 1" meter ($33,592.50 one-time), Water Impact Fee (City of Denton) — Zone 2, 1" meter ($22,761.00 one-time) and Water Tap Fee (City of Denton) — 1" meter ($6,537.70 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Denton Impact Fee Schedule
- Water Impact Fee (City of Denton) — Zone 2, 1" meter$22,761.00 one-timeCity of DentonDenton water impact fee for a 1 inch meter in water Zone 2: $22,761 (2.5 service units at $9,104.25), for property platted on or after June 1, 2026 or unplatted (Ordinance 25-1143). This is the highest of 3 water impact fee zones: Zone 1B charges $8,058.75 and Zone 1A $1,365 per service unit. Property platted from January 29, 2019 through May 31, 2026 pays the earlier rate of $7,638 per service unit in Zone 2. Separate tap and meter fees also apply.
- Water Tap Fee (City of Denton) — 1" meter$6,537.70 one-timeCity of DentonDenton water tap fee for a 1 inch meter: $6,537.70 when the city makes the tap, effective October 1, 2026. Taps of 4 inches and larger are billed at actual cost plus 20%. Pavement restoration and engineering are extra, and a separate meter fee applies.
- Water Meter Fee (City of Denton) — 1" meter$409.78 one-timeCity of DentonDenton water meter fee for a 1 inch meter: $409.78, effective October 1, 2026, in addition to any tap fee and the water impact fee.
- Wastewater Impact Fee (City of Denton) — Clear Creek, 1" meter$33,592.50 one-timeCity of DentonDenton wastewater impact fee for a 1 inch meter in the Clear Creek wastewater service area: $33,592.50 (2.5 service units at $13,437), for property platted on or after June 1, 2026 or unplatted (Ordinance 25-1143). This is the highest of 3 wastewater service areas: Hickory Creek charges $9,593.25 and Pecan Creek $8,711.25 per service unit. Property platted from January 29, 2019 through May 31, 2026 pays $4,716 per service unit. Sewer taps are billed at actual cost plus 20%.
- Roadway Impact Fee (City of Denton, Commercial) — 9.60 veh-mi × $398.40/veh-mi$3.82/sq ftCity of DentonDenton charges a roadway impact fee of $398.40 per vehicle-mile for nonresidential development on property platted on or after January 1, 2025 (Ordinance 24-1125); the chart lists $306.12 for property platted earlier. A shopping plaza of 40,000 to 150,000 sq ft generates 9.60 vehicle-miles per 1,000 sq ft. The rate is the same in all five roadway service areas. The fee is assessed at plat and paid at building permit.
- County Impact Fee (Denton County, Commercial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Denton: Industrial Impact Fees
Industrial development in Denton pays $0.76 per square foot in impact fees, plus $63,300.98 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $101,547.48. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Denton) — Clear Creek, 1" meter ($33,592.50 one-time), Water Impact Fee (City of Denton) — Zone 2, 1" meter ($22,761.00 one-time) and Water Tap Fee (City of Denton) — 1" meter ($6,537.70 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Denton Impact Fee Schedule
- Water Impact Fee (City of Denton) — Zone 2, 1" meter$22,761.00 one-timeCity of DentonDenton water impact fee for a 1 inch meter in water Zone 2: $22,761 (2.5 service units at $9,104.25), for property platted on or after June 1, 2026 or unplatted (Ordinance 25-1143). This is the highest of 3 water impact fee zones: Zone 1B charges $8,058.75 and Zone 1A $1,365 per service unit. Property platted from January 29, 2019 through May 31, 2026 pays the earlier rate of $7,638 per service unit in Zone 2. Separate tap and meter fees also apply.
- Water Tap Fee (City of Denton) — 1" meter$6,537.70 one-timeCity of DentonDenton water tap fee for a 1 inch meter: $6,537.70 when the city makes the tap, effective October 1, 2026. Taps of 4 inches and larger are billed at actual cost plus 20%. Pavement restoration and engineering are extra, and a separate meter fee applies.
- Water Meter Fee (City of Denton) — 1" meter$409.78 one-timeCity of DentonDenton water meter fee for a 1 inch meter: $409.78, effective October 1, 2026, in addition to any tap fee and the water impact fee.
- Wastewater Impact Fee (City of Denton) — Clear Creek, 1" meter$33,592.50 one-timeCity of DentonDenton wastewater impact fee for a 1 inch meter in the Clear Creek wastewater service area: $33,592.50 (2.5 service units at $13,437), for property platted on or after June 1, 2026 or unplatted (Ordinance 25-1143). This is the highest of 3 wastewater service areas: Hickory Creek charges $9,593.25 and Pecan Creek $8,711.25 per service unit. Property platted from January 29, 2019 through May 31, 2026 pays $4,716 per service unit. Sewer taps are billed at actual cost plus 20%.
- Roadway Impact Fee (City of Denton, Industrial) — 1.92 veh-mi cap × $398.40/veh-mi$0.76/sq ftCity of DentonDenton charges a roadway impact fee of $398.40 per vehicle-mile for nonresidential development on property platted on or after January 1, 2025 (Ordinance 24-1125). General light industrial is capped at 1.92 vehicle-miles per 1,000 sq ft of gross floor area, below its 3.26 table rate. The fee is assessed at plat and paid at building permit.
- County Impact Fee (Denton County, Industrial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Denton: Office Impact Fees
Office development in Denton pays $3.44 per square foot in impact fees, plus $63,300.98 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to about $149,355.48. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Denton) — Clear Creek, 1" meter ($33,592.50 one-time), Water Impact Fee (City of Denton) — Zone 2, 1" meter ($22,761.00 one-time) and Water Tap Fee (City of Denton) — 1" meter ($6,537.70 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Denton Impact Fee Schedule
- Water Impact Fee (City of Denton) — Zone 2, 1" meter$22,761.00 one-timeCity of DentonDenton water impact fee for a 1 inch meter in water Zone 2: $22,761 (2.5 service units at $9,104.25), for property platted on or after June 1, 2026 or unplatted (Ordinance 25-1143). This is the highest of 3 water impact fee zones: Zone 1B charges $8,058.75 and Zone 1A $1,365 per service unit. Property platted from January 29, 2019 through May 31, 2026 pays the earlier rate of $7,638 per service unit in Zone 2. Separate tap and meter fees also apply.
- Water Tap Fee (City of Denton) — 1" meter$6,537.70 one-timeCity of DentonDenton water tap fee for a 1 inch meter: $6,537.70 when the city makes the tap, effective October 1, 2026. Taps of 4 inches and larger are billed at actual cost plus 20%. Pavement restoration and engineering are extra, and a separate meter fee applies.
- Water Meter Fee (City of Denton) — 1" meter$409.78 one-timeCity of DentonDenton water meter fee for a 1 inch meter: $409.78, effective October 1, 2026, in addition to any tap fee and the water impact fee.
- Wastewater Impact Fee (City of Denton) — Clear Creek, 1" meter$33,592.50 one-timeCity of DentonDenton wastewater impact fee for a 1 inch meter in the Clear Creek wastewater service area: $33,592.50 (2.5 service units at $13,437), for property platted on or after June 1, 2026 or unplatted (Ordinance 25-1143). This is the highest of 3 wastewater service areas: Hickory Creek charges $9,593.25 and Pecan Creek $8,711.25 per service unit. Property platted from January 29, 2019 through May 31, 2026 pays $4,716 per service unit. Sewer taps are billed at actual cost plus 20%.
- Roadway Impact Fee (City of Denton, Office) — 8.64 veh-mi × $398.40/veh-mi$3.44/sq ftCity of DentonDenton charges a roadway impact fee of $398.40 per vehicle-mile for nonresidential development on property platted on or after January 1, 2025 (Ordinance 24-1125). A general office building generates 8.64 vehicle-miles per 1,000 sq ft of gross floor area. The rate is the same in all five roadway service areas. The fee is assessed at plat and paid at building permit.
- County Impact Fee (Denton County, Office)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Denton Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Denton Impact Fee FAQs
What are the total impact fees for a single-family home in Denton, Texas?
A new single-family home in Denton pays $35,546.44 per unit in combined impact fees (rates sourced November 25, 2026).
How much are commercial impact fees in Denton?
Commercial development in Denton pays $3.82 per square foot in impact fees, plus $63,300.98 in one-time water and sewer connection fees (assuming a 1-inch meter), about $254,532.98 for a 50,000 sq ft building.
Does Denton charge its own impact fees?
Yes. Denton levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Denton. The schedule on this page shows every fee that applies to development in Denton.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.