Cross Roads applies its own fee schedule. Denton County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $16,250.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Cross Roads Impact Fees by Project Type

Cross Roads: Single-Family Impact Fees

A new single-family home in Cross Roads pays at least $16,250.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Roadway Impact Fee (Town of Cross Roads) ($7,500.00), Water Connection Fee — Mustang SUD, 5/8" x 3/4" meter: $5,750 + $500 water resource ($6,250.00) and Park Improvement Fee (Town of Cross Roads) ($2,500.00).

Sewer Connection Fee — On-site septic system is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Cross Roads Impact Fee Schedule
Water$6,250.00
  • Water Connection Fee — Mustang SUD, 5/8" x 3/4" meter: $5,750 + $500 water resource
    Mustang Special Utility District
    Mustang Special Utility District serves Cross Roads and charges $5,750 (meter included) plus a $500 water resource fee to connect a home on an existing water line, under its Rate Order effective September 5, 2026. A lot in a new subdivision pays $5,750 plus a $750 meter installation and the $500 fee, and the developer pays a $3,000 service investigation fee per project.
    $6,250.00
Sewer$0.00
  • Sewer Connection Fee — On-site septic system
    Denton County (OSSF permit, not an impact fee)
    Most of Cross Roads uses private septic systems; where the Mustang Special Utility District provides wastewater, a connection fee set in its Rate Order applies.
    Requires confirmation
City$10,000.00
  • Roadway Impact Fee (Town of Cross Roads)
    Town of Cross Roads
    The Town of Cross Roads collects a roadway impact fee of $7,500 per single-family home at building permit, under Ordinance 2026-08 adopted July 20, 2026. The town has one roadway service area.
    $7,500.00
  • Park Improvement Fee (Town of Cross Roads)
    Town of Cross Roads
    The Town of Cross Roads charges a $2,500 park improvement fee per single-family lot at building permit.
    $2,500.00
County$0.00
  • County Impact Fee (Denton County)
    Denton County
    Texas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
    $0.00
Total (Cross Roads): $16,250.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cross Roads: Multifamily Impact Fees

A new multifamily unit in Cross Roads pays at least $7,318.55 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Roadway Impact Fee (Town of Cross Roads, MF) — 1.56 veh-mi × $2,688.17/veh-mi ($4,193.55) and Water Connection Fee (Mustang SUD, MF) — 0.5 ESFU × ($5,750 + $500) ($3,125.00).

Sewer Connection Fee (MF) — On-site septic system is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Cross Roads Impact Fee Schedule
Water$3,125.00
Sewer$0.00
City$4,193.55
County$0.00
  • County Impact Fee (Denton County, MF)
    Denton County
    Texas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
    $0.00
Total (Cross Roads): $7,318.55
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cross Roads: Commercial Impact Fees

Commercial development in Cross Roads pays $8.85 per square foot in impact fees, plus $19,375.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $462,002.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee — Mustang SUD, 1" meter: 2.5 LUE × ($5,750 + $500) + $750 meter + $3,000 investigation ($19,375.00 one-time) and Roadway Impact Fee (Town of Cross Roads, Commercial) — 6.54 veh-mi × $1,353.60/veh-mi ($8.85/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee — No public sewer (on-site septic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Cross Roads Impact Fee Schedule
Water$19,375.00 one-time
Sewer$0.00
  • Sewer Connection Fee — No public sewer (on-site septic)
    No public sewer (septic)
    Town of Cross Roads
    Much of Cross Roads relies on on-site septic systems, where no sewer connection fee applies. Where Mustang Special Utility District provides sewer, its wastewater connection fee applies by meter size.
    Requires confirmation
City$8.85/sq ft
  • Roadway Impact Fee (Town of Cross Roads, Commercial) — 6.54 veh-mi × $1,353.60/veh-mi
    Town of Cross Roads
    Cross Roads adopted a roadway impact fee on July 20, 2026, collected at $1,353.60 per vehicle-mile for nonresidential uses. A shopping center of 40,000 to 150,000 sq ft generates 6.54 vehicle-miles per 1,000 sq ft of gross leasable area. The fee is assessed at final plat and collected at building permit; other uses are charged at their own demand factor.
    $8.85/sq ft
County$0.00
  • County Impact Fee (Denton County, Commercial)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Cross Roads): $8.85/sq ft + $19,375.00 one-time (≈ $462,002.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Mustang Special Utility District Town of Cross Roads Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cross Roads: Industrial Impact Fees

Industrial development in Cross Roads pays $1.99 per square foot in impact fees, plus $19,375.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $118,864.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee — Mustang SUD, 1" meter: 2.5 LUE × ($5,750 + $500) + $750 meter + $3,000 investigation ($19,375.00 one-time) and Roadway Impact Fee (Town of Cross Roads, Industrial) — 1.47 veh-mi × $1,353.60/veh-mi ($1.99/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee — No public sewer (on-site septic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Cross Roads Impact Fee Schedule
Water$19,375.00 one-time
Sewer$0.00
  • Sewer Connection Fee — No public sewer (on-site septic)
    No public sewer (septic)
    Town of Cross Roads
    Much of Cross Roads relies on on-site septic systems, where no sewer connection fee applies. Where Mustang Special Utility District provides sewer, its wastewater connection fee applies by meter size.
    Requires confirmation
City$1.99/sq ft
County$0.00
  • County Impact Fee (Denton County, Industrial)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Cross Roads): $1.99/sq ft + $19,375.00 one-time (≈ $118,864.50 at 50,000 sq ft)
Sources last checked Official fee schedules:Mustang Special Utility District Town of Cross Roads Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cross Roads: Office Impact Fees

Office development in Cross Roads pays $4.79 per square foot in impact fees, plus $19,375.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to at least $139,168.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee — Mustang SUD, 1" meter: 2.5 LUE × ($5,750 + $500) + $750 meter + $3,000 investigation ($19,375.00 one-time) and Roadway Impact Fee (Town of Cross Roads, Office) — 3.54 veh-mi × $1,353.60/veh-mi ($4.79/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee — No public sewer (on-site septic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Cross Roads Impact Fee Schedule
Water$19,375.00 one-time
Sewer$0.00
  • Sewer Connection Fee — No public sewer (on-site septic)
    No public sewer (septic)
    Town of Cross Roads
    Much of Cross Roads relies on on-site septic systems, where no sewer connection fee applies. Where Mustang Special Utility District provides sewer, its wastewater connection fee applies by meter size.
    Requires confirmation
City$4.79/sq ft
County$0.00
  • County Impact Fee (Denton County, Office)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Cross Roads): $4.79/sq ft + $19,375.00 one-time (≈ $139,168.50 at 25,000 sq ft)
Sources last checked Official fee schedules:Mustang Special Utility District Town of Cross Roads Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cross Roads Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Cross Roads Impact Fee FAQs

What are the total impact fees for a single-family home in Cross Roads, Texas?

A new single-family home in Cross Roads pays at least $16,250.00 per unit in combined impact fees (rates sourced November 25, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Cross Roads?

Commercial development in Cross Roads pays $8.85 per square foot in impact fees, plus $19,375.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $462,002.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Cross Roads charge its own impact fees?

Yes. Cross Roads levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Cross Roads. The schedule on this page shows every fee that applies to development in Cross Roads.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Denton County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.