Oak Point Impact Fees by Project Type
Oak Point: Single-Family Impact Fees
A new single-family home in Oak Point pays at least $6,250.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee — Mustang SUD, 5/8" x 3/4" meter: $5,750 + $500 water resource ($6,250.00).
Sewer Connection Fee — No public sewer (on-site septic) is set by the utility and not published online. Drainage Impact Fee (City of Oak Point), Parkland Dedication Fee in Lieu (City of Oak Point), and Roadway Impact Fee (City of Oak Point) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Oak Point Impact Fee Schedule
- Water Connection Fee — Mustang SUD, 5/8" x 3/4" meter: $5,750 + $500 water resource$6,250.00Mustang Special Utility DistrictMustang Special Utility District serves most of Oak Point and charges $5,750 (meter included) plus a $500 water resource fee to connect a home on an existing water line, under its Rate Order effective September 5, 2026; a developer pays a $3,000 service investigation fee per new project. Gates of Waters Edge, Wellington Trace and nearby streets east of Yacht Club Road are served by Undine Texas instead.
- Sewer Connection Fee — No public sewer (on-site septic)Requires confirmationNo public sewer (septic)City of Oak PointOak Point has no city sewer. Most properties use on-site septic systems, where no sewer connection fee applies; Woodridge Estates, Gates of Waters Edge and Wellington Trace are sewered through Mustang Special Utility District, whose wastewater connection fee applies.
- Drainage Impact Fee (City of Oak Point)Requires confirmationCity of Oak PointThe City of Oak Point collects a drainage impact fee through its Impact Fee Fund; the rate and its basis are not published in the City's code or on its website.
- Parkland Dedication Fee in Lieu (City of Oak Point)Requires confirmationCity of Oak PointCity of Oak Point requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- Roadway Impact Fee (City of Oak Point)Requires confirmationCity of Oak PointThe City of Oak Point collects a roadway impact fee through its Impact Fee Fund; the adopted rate schedule is not published in the City's code or on its website. Water and sewer are provided by other utilities.
- County Impact Fee (Denton County)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oak Point: Multifamily Impact Fees
A new multifamily unit in Oak Point pays at least $3,125.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (MF) — Mustang SUD: 0.5 ESFU × ($5,750 + $500) ($3,125.00).
Sewer Connection Fee (MF) — No public sewer (on-site septic) is set by the utility and not published online. Drainage Impact Fee (City of Oak Point, MF), Roadway Impact Fee (City of Oak Point, MF), and Parkland Dedication Fee in Lieu (City of Oak Point, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Oak Point Impact Fee Schedule
- Water Connection Fee (MF) — Mustang SUD: 0.5 ESFU × ($5,750 + $500)$3,125.00Mustang Special Utility DistrictMustang Special Utility District serves most of Oak Point and charges multifamily projects 0.5 equivalent unit per apartment: $2,875 connection plus a $250 water resource fee per unit. Some subdivisions east of Yacht Club Road are served by Undine Texas instead.
- Sewer Connection Fee (MF) — No public sewer (on-site septic)Requires confirmationNo public sewer (septic)City of Oak PointOak Point has no city sewer. Most properties use on-site septic systems; Woodridge Estates, Gates of Waters Edge and Wellington Trace are sewered through Mustang Special Utility District, whose wastewater connection fee applies.
- Drainage Impact Fee (City of Oak Point, MF)Requires confirmationCity of Oak PointThe City of Oak Point collects a drainage impact fee through its Impact Fee Fund; the rate and its basis are not published in the City's code or on its website.
- Roadway Impact Fee (City of Oak Point, MF)Requires confirmationCity of Oak PointThe City of Oak Point collects a roadway impact fee through its Impact Fee Fund; the adopted rate schedule is not published in the City's code or on its website. Water and sewer are provided by other utilities.
- Parkland Dedication Fee in Lieu (City of Oak Point, MF)Requires confirmationCity of Oak PointCity of Oak Point requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- County Impact Fee (Denton County, MF)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oak Point: Commercial Impact Fees
Commercial development in Oak Point pays no per-square-foot impact fees, but owes $19,375.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $19,375.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee — Mustang SUD, 1" meter: 2.5 LUE × ($5,750 + $500) + $750 meter + $3,000 investigation ($19,375.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee — No public sewer (on-site septic) is set by the utility and not published online. Drainage Impact Fee (City of Oak Point, Commercial) and Roadway Impact Fee (City of Oak Point, Commercial) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Oak Point Impact Fee Schedule
- Water Connection Fee — Mustang SUD, 1" meter: 2.5 LUE × ($5,750 + $500) + $750 meter + $3,000 investigation$19,375.00 one-timeMustang Special Utility DistrictMustang Special Utility District, which serves most of Oak Point, treats most nonresidential service as non-standard: $5,750 per LUE connection fee plus a $500 per LUE water resource fee, a $750 meter installation and a $3,000 service investigation fee per project. A 1 inch meter is 2.5 LUEs. Rate Order effective September 5, 2026; line extensions and road bores are billed at cost. Gates of Waters Edge, Wellington Trace and nearby streets east of Yacht Club Road are served by Undine Texas instead.
- Sewer Connection Fee — No public sewer (on-site septic)Requires confirmationNo public sewer (septic)City of Oak PointOak Point has no city sewer. Most properties use on-site septic systems, where no sewer connection fee applies; Woodridge Estates, Gates of Waters Edge and Wellington Trace are sewered through Mustang Special Utility District, whose wastewater connection fee applies by meter size.
- Drainage Impact Fee (City of Oak Point, Commercial)Requires confirmationCity of Oak PointThe City of Oak Point collects a drainage impact fee through its Impact Fee Fund; the rate and its basis are not published in the City's code or on its website.
- Roadway Impact Fee (City of Oak Point, Commercial)Requires confirmationCity of Oak PointThe City of Oak Point collects a roadway impact fee through its Impact Fee Fund; the adopted rate schedule is not published in the City's code or on its website. Water and sewer are provided by other utilities.
- County Impact Fee (Denton County, Commercial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oak Point: Industrial Impact Fees
Industrial development in Oak Point pays no per-square-foot impact fees, but owes $19,375.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $19,375.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee — Mustang SUD, 1" meter: 2.5 LUE × ($5,750 + $500) + $750 meter + $3,000 investigation ($19,375.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee — No public sewer (on-site septic) is set by the utility and not published online. Roadway Impact Fee (City of Oak Point, Industrial) and Drainage Impact Fee (City of Oak Point, Industrial) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Oak Point Impact Fee Schedule
- Water Connection Fee — Mustang SUD, 1" meter: 2.5 LUE × ($5,750 + $500) + $750 meter + $3,000 investigation$19,375.00 one-timeMustang Special Utility DistrictMustang Special Utility District, which serves most of Oak Point, treats most nonresidential service as non-standard: $5,750 per LUE connection fee plus a $500 per LUE water resource fee, a $750 meter installation and a $3,000 service investigation fee per project. A 1 inch meter is 2.5 LUEs. Rate Order effective September 5, 2026; line extensions and road bores are billed at cost. Gates of Waters Edge, Wellington Trace and nearby streets east of Yacht Club Road are served by Undine Texas instead.
- Sewer Connection Fee — No public sewer (on-site septic)Requires confirmationNo public sewer (septic)City of Oak PointOak Point has no city sewer. Most properties use on-site septic systems, where no sewer connection fee applies; Woodridge Estates, Gates of Waters Edge and Wellington Trace are sewered through Mustang Special Utility District, whose wastewater connection fee applies by meter size.
- Roadway Impact Fee (City of Oak Point, Industrial)Requires confirmationCity of Oak PointThe City of Oak Point collects a roadway impact fee through its Impact Fee Fund; the adopted rate schedule is not published in the City's code or on its website. Water and sewer are provided by other utilities.
- Drainage Impact Fee (City of Oak Point, Industrial)Requires confirmationCity of Oak PointThe City of Oak Point collects a drainage impact fee through its Impact Fee Fund; the rate and its basis are not published in the City's code or on its website.
- County Impact Fee (Denton County, Industrial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oak Point: Office Impact Fees
Office development in Oak Point pays no per-square-foot impact fees, but owes $19,375.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to at least $19,375.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee — Mustang SUD, 1" meter: 2.5 LUE × ($5,750 + $500) + $750 meter + $3,000 investigation ($19,375.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee — No public sewer (on-site septic) is set by the utility and not published online. Roadway Impact Fee (City of Oak Point, Office) and Drainage Impact Fee (City of Oak Point, Office) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Oak Point Impact Fee Schedule
- Water Connection Fee — Mustang SUD, 1" meter: 2.5 LUE × ($5,750 + $500) + $750 meter + $3,000 investigation$19,375.00 one-timeMustang Special Utility DistrictMustang Special Utility District, which serves most of Oak Point, treats most nonresidential service as non-standard: $5,750 per LUE connection fee plus a $500 per LUE water resource fee, a $750 meter installation and a $3,000 service investigation fee per project. A 1 inch meter is 2.5 LUEs. Rate Order effective September 5, 2026; line extensions and road bores are billed at cost. Gates of Waters Edge, Wellington Trace and nearby streets east of Yacht Club Road are served by Undine Texas instead.
- Sewer Connection Fee — No public sewer (on-site septic)Requires confirmationNo public sewer (septic)City of Oak PointOak Point has no city sewer. Most properties use on-site septic systems, where no sewer connection fee applies; Woodridge Estates, Gates of Waters Edge and Wellington Trace are sewered through Mustang Special Utility District, whose wastewater connection fee applies by meter size.
- Roadway Impact Fee (City of Oak Point, Office)Requires confirmationCity of Oak PointThe City of Oak Point collects a roadway impact fee through its Impact Fee Fund; the adopted rate schedule is not published in the City's code or on its website. Water and sewer are provided by other utilities.
- Drainage Impact Fee (City of Oak Point, Office)Requires confirmationCity of Oak PointThe City of Oak Point collects a drainage impact fee through its Impact Fee Fund; the rate and its basis are not published in the City's code or on its website.
- County Impact Fee (Denton County, Office)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oak Point Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Oak Point Impact Fee FAQs
What are the total impact fees for a single-family home in Oak Point, Texas?
A new single-family home in Oak Point pays at least $6,250.00 per unit in combined impact fees (rates sourced November 25, 2026). 4 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Oak Point?
Commercial development in Oak Point pays no per-square-foot impact fees, but owes $19,375.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Oak Point charge its own impact fees?
Yes. Oak Point levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Oak Point. The schedule on this page shows every fee that applies to development in Oak Point.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Denton County impact fees page.