Lake Dallas Impact Fees by Project Type
Lake Dallas: Single-Family Impact Fees
A new single-family home in Lake Dallas pays at least $14,672.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (Lake Cities Municipal Utility Authority) — 5/8" x 3/4" meter ($4,257.00), Water Tap Fee (Lake Cities Municipal Utility Authority) — New 5/8" x 3/4" tap ($4,000.00) and Sewer Impact Fee (Lake Cities Municipal Utility Authority) — 5/8" x 3/4" meter ($3,415.00).
City Impact Fee (City of Lake Dallas) and Park Improvement Fee (City of Lake Dallas) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lake Dallas Impact Fee Schedule
- Water Impact Fee (Lake Cities Municipal Utility Authority) — 5/8" x 3/4" meter$4,257.00Lake Cities Municipal Utility AuthorityOne-time water impact fee for a 5/8 in. x 3/4 in. meter under the Master Fee Schedule effective January 5, 2026. LCMUA provides water and sewer service in Lake Dallas, Hickory Creek and Shady Shores. A new connection also pays the LCMUA water tap fee.
- Water Tap Fee (Lake Cities Municipal Utility Authority) — New 5/8" x 3/4" tap$4,000.00Lake Cities Municipal Utility AuthorityLCMUA water tap fee for a new 5/8 in. x 3/4 in. service, Master Fee Schedule effective January 5, 2026. Where a tap already exists the fee is $1,000. Taps of 1 in. and larger are quoted by LCMUA. Paid in addition to the water impact fee.
- Sewer Impact Fee (Lake Cities Municipal Utility Authority) — 5/8" x 3/4" meter$3,415.00Lake Cities Municipal Utility AuthorityOne-time sewer impact fee for a 5/8 in. x 3/4 in. meter under the Master Fee Schedule effective January 5, 2026. LCMUA provides water and sewer service in Lake Dallas, Hickory Creek and Shady Shores. A new connection also pays the LCMUA sewer tap fee.
- Sewer Tap Fee (Lake Cities Municipal Utility Authority) — New 4" gravity tap$3,000.00Lake Cities Municipal Utility AuthorityLCMUA sewer tap fee for a new 4 in. gravity service, Master Fee Schedule effective January 5, 2026. Where a sewer tap already exists the fee is $150. Larger taps are charged at cost. Paid in addition to the sewer impact fee.
- City Impact Fee (City of Lake Dallas)Requires confirmationCity of Lake DallasThe City of Lake Dallas levies no water, wastewater, roadway or drainage impact fee; water and sewer are provided by Lake Cities Municipal Utility Authority.
- Park Improvement Fee (City of Lake Dallas)Requires confirmationCity of Lake DallasThe City's master fee schedule (Ordinance 2021-15, effective October 1, 2021) lists a park improvement charge on new residential construction equal to 10% of the residential building permit fee. The City's 2026-27 budget closes the park improvement fund as of September 30, 2026.
- County Impact Fee (Denton County)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Dallas: Multifamily Impact Fees
A new multifamily unit in Lake Dallas pays at least $14,672.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (Lake Cities Municipal Utility Authority, MF) — 5/8" x 3/4" meter ($4,257.00), Water Tap Fee (Lake Cities Municipal Utility Authority, MF) — New 5/8" x 3/4" tap ($4,000.00) and Sewer Impact Fee (Lake Cities Municipal Utility Authority, MF) — 5/8" x 3/4" meter ($3,415.00).
Park Improvement Fee (City of Lake Dallas, MF) and City Impact Fee (City of Lake Dallas, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lake Dallas Impact Fee Schedule
- Water Impact Fee (Lake Cities Municipal Utility Authority, MF) — 5/8" x 3/4" meter$4,257.00Lake Cities Municipal Utility AuthorityOne-time water impact fee for a 5/8 in. x 3/4 in. meter under the Master Fee Schedule effective January 5, 2026. LCMUA provides water and sewer service in Lake Dallas, Hickory Creek and Shady Shores. A new connection also pays the LCMUA water tap fee. Charged per meter, not per dwelling unit: a building on one connection pays once, by its meter size. Meters up to 2 in. are listed here; the schedule continues to 10 in.
- Water Tap Fee (Lake Cities Municipal Utility Authority, MF) — New 5/8" x 3/4" tap$4,000.00Lake Cities Municipal Utility AuthorityLCMUA water tap fee for a new 5/8 in. x 3/4 in. service, Master Fee Schedule effective January 5, 2026. Where a tap already exists the fee is $1,000; taps of 1 in. and larger are quoted by LCMUA. A building on one connection pays once.
- Sewer Impact Fee (Lake Cities Municipal Utility Authority, MF) — 5/8" x 3/4" meter$3,415.00Lake Cities Municipal Utility AuthorityOne-time sewer impact fee for a 5/8 in. x 3/4 in. meter under the Master Fee Schedule effective January 5, 2026. LCMUA provides water and sewer service in Lake Dallas, Hickory Creek and Shady Shores. A new connection also pays the LCMUA sewer tap fee. Charged per meter, not per dwelling unit: a building on one connection pays once, by its meter size. Meters up to 2 in. are listed here; the schedule continues to 10 in.
- Sewer Tap Fee (Lake Cities Municipal Utility Authority, MF) — New 4" gravity tap$3,000.00Lake Cities Municipal Utility AuthorityLCMUA sewer tap fee for a new 4 in. gravity service, Master Fee Schedule effective January 5, 2026. Where a sewer tap already exists the fee is $150; larger taps are charged at cost. A building on one connection pays once.
- Park Improvement Fee (City of Lake Dallas, MF)Requires confirmationCity of Lake DallasThe City's master fee schedule (Ordinance 2021-15, effective October 1, 2021) lists a park improvement charge on new residential construction equal to 10% of the residential building permit fee. The City's 2026-27 budget closes the park improvement fund as of September 30, 2026.
- City Impact Fee (City of Lake Dallas, MF)Requires confirmationCity of Lake DallasThe City of Lake Dallas levies no water, wastewater, roadway or drainage impact fee; water and sewer are provided by Lake Cities Municipal Utility Authority.
- County Impact Fee (Denton County, MF)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Dallas: Commercial Impact Fees
Commercial development in Lake Dallas pays no per-square-foot impact fees, but owes $22,181.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $22,181.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Lake Cities MUA) — 1" meter ($10,643.00 one-time), Sewer Impact Fee (Lake Cities MUA) — 1" meter ($8,538.00 one-time) and Sewer Tap Fee (Lake Cities MUA) — 4" gravity, new tap ($3,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (Lake Cities MUA) — 1" and larger, new tap is set by the utility and not published online. City Impact Fee (City of Lake Dallas, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Lake Dallas Impact Fee Schedule
- Water Impact Fee (Lake Cities MUA) — 1" meter$10,643.00 one-timeLake Cities Municipal Utility AuthorityLake Cities Municipal Utility Authority water impact fee for a 1 inch meter: $10,643, effective January 5, 2026. Larger meters pay more, from $21,285 for 1 1/2 inch to $617,265 for 10 inch. A water tap fee is also charged.
- Water Tap Fee (Lake Cities MUA) — 1" and larger, new tapRequires confirmationLake Cities Municipal Utility AuthorityLake Cities Municipal Utility Authority quotes water taps of 1 inch and larger per job. A new 3/4 inch tap is $4,000, and work on an existing 3/4 inch tap is $1,000. This is in addition to the water impact fee.
- Sewer Impact Fee (Lake Cities MUA) — 1" meter$8,538.00 one-timeLake Cities Municipal Utility AuthorityLake Cities Municipal Utility Authority sewer impact fee for a 1 inch meter: $8,538, effective January 5, 2026. Larger meters pay more, from $17,075 for 1 1/2 inch to $495,175 for 10 inch. A sewer tap fee is also charged.
- Sewer Tap Fee (Lake Cities MUA) — 4" gravity, new tap$3,000.00 one-timeLake Cities Municipal Utility AuthorityLake Cities Municipal Utility Authority sewer tap fee for a new 4 inch gravity connection: $3,000, effective January 5, 2026. Connections of 6 inches and larger are charged the cost of materials and personnel, and work on an existing tap is $150. This is in addition to the sewer impact fee.
- City Impact Fee (City of Lake Dallas, Commercial)Requires confirmationCity of Lake DallasNo City of Lake Dallas impact fee appears in the City's master fee schedule for commercial, office or industrial development. Water and wastewater impact fees are charged by the Lake Cities Municipal Utility Authority.
- County Impact Fee (Denton County, Commercial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Dallas: Industrial Impact Fees
Industrial development in Lake Dallas pays no per-square-foot impact fees, but owes $22,181.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $22,181.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Lake Cities MUA) — 1" meter ($10,643.00 one-time), Sewer Impact Fee (Lake Cities MUA) — 1" meter ($8,538.00 one-time) and Sewer Tap Fee (Lake Cities MUA) — 4" gravity, new tap ($3,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (Lake Cities MUA) — 1" and larger, new tap is set by the utility and not published online. City Impact Fee (City of Lake Dallas, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Lake Dallas Impact Fee Schedule
- Water Impact Fee (Lake Cities MUA) — 1" meter$10,643.00 one-timeLake Cities Municipal Utility AuthorityLake Cities Municipal Utility Authority water impact fee for a 1 inch meter: $10,643, effective January 5, 2026. Larger meters pay more, from $21,285 for 1 1/2 inch to $617,265 for 10 inch. A water tap fee is also charged.
- Water Tap Fee (Lake Cities MUA) — 1" and larger, new tapRequires confirmationLake Cities Municipal Utility AuthorityLake Cities Municipal Utility Authority quotes water taps of 1 inch and larger per job. A new 3/4 inch tap is $4,000, and work on an existing 3/4 inch tap is $1,000. This is in addition to the water impact fee.
- Sewer Impact Fee (Lake Cities MUA) — 1" meter$8,538.00 one-timeLake Cities Municipal Utility AuthorityLake Cities Municipal Utility Authority sewer impact fee for a 1 inch meter: $8,538, effective January 5, 2026. Larger meters pay more, from $17,075 for 1 1/2 inch to $495,175 for 10 inch. A sewer tap fee is also charged.
- Sewer Tap Fee (Lake Cities MUA) — 4" gravity, new tap$3,000.00 one-timeLake Cities Municipal Utility AuthorityLake Cities Municipal Utility Authority sewer tap fee for a new 4 inch gravity connection: $3,000, effective January 5, 2026. Connections of 6 inches and larger are charged the cost of materials and personnel, and work on an existing tap is $150. This is in addition to the sewer impact fee.
- City Impact Fee (City of Lake Dallas, Industrial)Requires confirmationCity of Lake DallasNo City of Lake Dallas impact fee appears in the City's master fee schedule for commercial, office or industrial development. Water and wastewater impact fees are charged by the Lake Cities Municipal Utility Authority.
- County Impact Fee (Denton County, Industrial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Dallas: Office Impact Fees
Office development in Lake Dallas pays no per-square-foot impact fees, but owes $22,181.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to at least $22,181.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Lake Cities MUA) — 1" meter ($10,643.00 one-time), Sewer Impact Fee (Lake Cities MUA) — 1" meter ($8,538.00 one-time) and Sewer Tap Fee (Lake Cities MUA) — 4" gravity, new tap ($3,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (Lake Cities MUA) — 1" and larger, new tap is set by the utility and not published online. City Impact Fee (City of Lake Dallas, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Lake Dallas Impact Fee Schedule
- Water Impact Fee (Lake Cities MUA) — 1" meter$10,643.00 one-timeLake Cities Municipal Utility AuthorityLake Cities Municipal Utility Authority water impact fee for a 1 inch meter: $10,643, effective January 5, 2026. Larger meters pay more, from $21,285 for 1 1/2 inch to $617,265 for 10 inch. A water tap fee is also charged.
- Water Tap Fee (Lake Cities MUA) — 1" and larger, new tapRequires confirmationLake Cities Municipal Utility AuthorityLake Cities Municipal Utility Authority quotes water taps of 1 inch and larger per job. A new 3/4 inch tap is $4,000, and work on an existing 3/4 inch tap is $1,000. This is in addition to the water impact fee.
- Sewer Impact Fee (Lake Cities MUA) — 1" meter$8,538.00 one-timeLake Cities Municipal Utility AuthorityLake Cities Municipal Utility Authority sewer impact fee for a 1 inch meter: $8,538, effective January 5, 2026. Larger meters pay more, from $17,075 for 1 1/2 inch to $495,175 for 10 inch. A sewer tap fee is also charged.
- Sewer Tap Fee (Lake Cities MUA) — 4" gravity, new tap$3,000.00 one-timeLake Cities Municipal Utility AuthorityLake Cities Municipal Utility Authority sewer tap fee for a new 4 inch gravity connection: $3,000, effective January 5, 2026. Connections of 6 inches and larger are charged the cost of materials and personnel, and work on an existing tap is $150. This is in addition to the sewer impact fee.
- City Impact Fee (City of Lake Dallas, Office)Requires confirmationCity of Lake DallasNo City of Lake Dallas impact fee appears in the City's master fee schedule for commercial, office or industrial development. Water and wastewater impact fees are charged by the Lake Cities Municipal Utility Authority.
- County Impact Fee (Denton County, Office)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Dallas Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Lake Dallas Impact Fee FAQs
What are the total impact fees for a single-family home in Lake Dallas, Texas?
A new single-family home in Lake Dallas pays at least $14,672.00 per unit in combined impact fees (rates sourced November 25, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Lake Dallas?
Commercial development in Lake Dallas pays no per-square-foot impact fees, but owes $22,181.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Lake Dallas charge its own impact fees?
Yes. Lake Dallas levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Lake Dallas. The schedule on this page shows every fee that applies to development in Lake Dallas.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Denton County impact fees page.