Pilot Point Impact Fees by Project Type
Pilot Point: Single-Family Impact Fees
A new single-family home in Pilot Point pays $37,619.08 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Impact Fee (City of Pilot Point) — 3/4" meter ($14,137.00), Roadway Impact Fee (City of Pilot Point) — 2.79 veh-mi × $3,252/veh-mi ($9,073.08) and Water Impact Fee (City of Pilot Point) — 3/4" meter ($6,809.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Pilot Point Impact Fee Schedule
- Water Impact Fee (City of Pilot Point) — 3/4" meter$6,809.00City of Pilot PointWater impact fee of $6,809 for a 3/4 in. water meter, effective September 10, 2026 (Ordinance 651-17-2026), collected at 100% of the adopted maximum; larger meters pay more by meter size.
- Water Access Fee (City of Pilot Point) — 3/4" meter$1,400.00City of Pilot PointWater access fee of $1,400 for a 3/4 in. meter, paid before the water connection is made (1 in. $1,650; 2 in. $1,950, plus $500 for each inch above 2 in.). Boring and street cuts are extra.
- Water Meter Fee (City of Pilot Point) — 3/4" meter$1,000.00City of Pilot PointWater meter charge of $1,000 for a 3/4 in. meter, paid before the meter is installed with a new water connection (1 in. $1,500; 2 in. $1,400; 3 in. $1,800; 4 in. $2,500).
- Wastewater Impact Fee (City of Pilot Point) — 3/4" meter$14,137.00City of Pilot PointWastewater impact fee of $14,137 for a 3/4 in. water meter, effective September 10, 2026 (Ordinance 651-17-2026), collected at 100% of the adopted maximum; larger meters pay more by meter size.
- Sewer Access Fee (City of Pilot Point)$1,950.00City of Pilot PointSewer access fee of $1,950 for a 4 in. sewer service, paid before the sewer connection is made; larger services add $200 per inch.
- Roadway Impact Fee (City of Pilot Point) — 2.79 veh-mi × $3,252/veh-mi$9,073.08Service Area 1City of Pilot PointRoadway impact fee in Service Area 1 (west of FM 1385), the highest of 2 service areas: 2.79 vehicle-miles per single-family home at $3,252 per vehicle-mile, effective September 10, 2026 (100% of the adopted maximum). Service Area 2 (east of FM 1385) is $2,196 per vehicle-mile.
- Parkland Dedication Fee in Lieu (City of Pilot Point)$1,750.00City of Pilot PointCity of Pilot Point charges $1,750 per lot as money in lieu of parkland dedication. It is paid at final plat or at the building permit. Dedicating land may replace it.
- Park Improvement Fee (City of Pilot Point)$1,500.00City of Pilot PointPark improvement fee of $1,500 per single-family or two-family home, paid when the building permit is issued. Parkland dedication, or a payment in lieu where the council allows it, is handled at the subdivision plat.
- County Impact Fee (Denton County)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Pilot Point: Multifamily Impact Fees
A new multifamily unit in Pilot Point pays $31,753.28 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Impact Fee (City of Pilot Point, MF) — 3/4" meter ($14,137.00), Water Impact Fee (City of Pilot Point, MF) — 3/4" meter ($6,809.00) and Roadway Impact Fee (City of Pilot Point, MF) — 1.14 veh-mi × $3,252/veh-mi ($3,707.28).
Parkland Dedication Fee in Lieu (City of Pilot Point, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Pilot Point Impact Fee Schedule
- Water Impact Fee (City of Pilot Point, MF) — 3/4" meter$6,809.00City of Pilot PointWater impact fee of $6,809 for a 3/4 in. water meter, effective September 10, 2026, collected at 100% of the adopted maximum. Charged by meter size, so a building on one meter pays once by its meter size.
- Water Access Fee (City of Pilot Point, MF) — 3/4" meter$1,400.00City of Pilot PointWater access fee of $1,400 for a 3/4 in. meter, paid before the water connection is made. A building on one connection pays once.
- Water Meter Fee (City of Pilot Point, MF) — 3/4" meter$1,000.00City of Pilot PointWater meter charge of $1,000 for a 3/4 in. meter, paid before the meter is installed with a new water connection. A building on one meter pays once.
- Wastewater Impact Fee (City of Pilot Point, MF) — 3/4" meter$14,137.00City of Pilot PointWastewater impact fee of $14,137 for a 3/4 in. water meter, effective September 10, 2026, collected at 100% of the adopted maximum. Charged by meter size, so a building on one meter pays once by its meter size.
- Sewer Access Fee (City of Pilot Point, MF)$1,950.00City of Pilot PointSewer access fee of $1,950 for a 4 in. sewer service, paid before the sewer connection is made; larger services add $200 per inch. A building on one connection pays once.
- Roadway Impact Fee (City of Pilot Point, MF) — 1.14 veh-mi × $3,252/veh-mi$3,707.28Service Area 1City of Pilot PointRoadway impact fee in Service Area 1 (west of FM 1385), the highest of 2 service areas: 1.14 vehicle-miles per mid-rise apartment unit at $3,252 per vehicle-mile, effective September 10, 2026. Service Area 2 (east of FM 1385) is $2,196 per vehicle-mile.
- Parkland Dedication Fee in Lieu (City of Pilot Point, MF)$1,750.00Requires confirmationCity of Pilot PointCity of Pilot Point charges $1,750 per lot as money in lieu of parkland dedication. It is paid at final plat or at the building permit. Dedicating land may replace it. The city prices it per lot; a multifamily building on one lot likely pays once.
- Park Improvement Fee (City of Pilot Point, MF)$1,000.00City of Pilot PointPark improvement fee of $1,000 per multifamily unit, paid when the building permit is issued.
- County Impact Fee (Denton County, MF)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Pilot Point: Commercial Impact Fees
Commercial development in Pilot Point pays $19.00 per square foot in impact fees, plus $40,080.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $990,069.50. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Pilot Point) — 1" meter ($23,609.00 one-time), Water Impact Fee (City of Pilot Point) — 1" meter ($11,371.00 one-time) and Sewer Access Fee (City of Pilot Point) ($1,950.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Pilot Point Impact Fee Schedule
- Water Impact Fee (City of Pilot Point) — 1" meter$11,371.00 one-timeCity of Pilot PointCity of Pilot Point water impact fee for a 1 inch meter: $11,371 (1.67 service unit equivalents), collected at 100% of the maximum under Ordinance 651-17-2026, effective September 10, 2026. A separate water access fee and meter fee also apply.
- Water Access Fee (City of Pilot Point) — 1" meter$1,650.00 one-timeCity of Pilot PointCity of Pilot Point water access (tap) fee for a 1 inch meter: $1,650, under the fee schedule effective September 24, 2026. Street cuts (from $500) and bores (actual cost) are extra, and compound meters pay twice the access fee. This is in addition to the water impact fee and the meter fee.
- Water Meter Fee (City of Pilot Point) — 1" meter$1,500.00 one-timeCity of Pilot PointCity of Pilot Point meter fee for a 1 inch meter: $1,500, charged before installation with a new water access. Meters larger than 4 inches are priced on request.
- Wastewater Impact Fee (City of Pilot Point) — 1" meter$23,609.00 one-timeCity of Pilot PointCity of Pilot Point wastewater impact fee for a 1 inch water meter: $23,609 (1.67 service unit equivalents), collected at 100% of the maximum under Ordinance 651-17-2026, effective September 10, 2026. A separate sewer access fee also applies.
- Sewer Access Fee (City of Pilot Point)$1,950.00 one-timeCity of Pilot PointCity of Pilot Point sewer access fee for a 4 inch sewer service: $1,950, plus $200 for each inch above 4 inches. This is in addition to the wastewater impact fee.
- Roadway Impact Fee (City of Pilot Point, Commercial) — $1,317.60 × 14.42 veh-mi$19.00/sq ftCity of Pilot PointCity of Pilot Point roadway impact fee for a shopping plaza (40,000 to 150,000 sq ft): 14.42 vehicle-miles per 1,000 sq ft of gross leasable area at $1,317.60 per vehicle-mile, for permits from September 11, 2026 to September 10, 2027. The nonresidential rate steps to $1,427.40 per vehicle-mile ($20,583.11 per 1,000 sq ft) on September 11, 2027 and $1,537.20 ($22,166.42) after September 10, 2028, under Ordinance 651-17-2026. Assessed at plat and collected at building permit.
- County Impact Fee (Denton County, Commercial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Pilot Point: Industrial Impact Fees
Industrial development in Pilot Point pays $3.23 per square foot in impact fees, plus $40,080.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $201,486.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Pilot Point) — 1" meter ($23,609.00 one-time), Water Impact Fee (City of Pilot Point) — 1" meter ($11,371.00 one-time) and Sewer Access Fee (City of Pilot Point) ($1,950.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Pilot Point Impact Fee Schedule
- Water Impact Fee (City of Pilot Point) — 1" meter$11,371.00 one-timeCity of Pilot PointCity of Pilot Point water impact fee for a 1 inch meter: $11,371 (1.67 service unit equivalents), collected at 100% of the maximum under Ordinance 651-17-2026, effective September 10, 2026. A separate water access fee and meter fee also apply.
- Water Access Fee (City of Pilot Point) — 1" meter$1,650.00 one-timeCity of Pilot PointCity of Pilot Point water access (tap) fee for a 1 inch meter: $1,650, under the fee schedule effective September 24, 2026. Street cuts (from $500) and bores (actual cost) are extra, and compound meters pay twice the access fee. This is in addition to the water impact fee and the meter fee.
- Water Meter Fee (City of Pilot Point) — 1" meter$1,500.00 one-timeCity of Pilot PointCity of Pilot Point meter fee for a 1 inch meter: $1,500, charged before installation with a new water access. Meters larger than 4 inches are priced on request.
- Wastewater Impact Fee (City of Pilot Point) — 1" meter$23,609.00 one-timeCity of Pilot PointCity of Pilot Point wastewater impact fee for a 1 inch water meter: $23,609 (1.67 service unit equivalents), collected at 100% of the maximum under Ordinance 651-17-2026, effective September 10, 2026. A separate sewer access fee also applies.
- Sewer Access Fee (City of Pilot Point)$1,950.00 one-timeCity of Pilot PointCity of Pilot Point sewer access fee for a 4 inch sewer service: $1,950, plus $200 for each inch above 4 inches. This is in addition to the wastewater impact fee.
- Roadway Impact Fee (City of Pilot Point, Industrial) — $1,317.60 × 2.45 veh-mi$3.23/sq ftCity of Pilot PointCity of Pilot Point roadway impact fee for general light industrial: 2.45 vehicle-miles per 1,000 sq ft of gross floor area at $1,317.60 per vehicle-mile, for permits from September 11, 2026 to September 10, 2027. The rate steps to $1,427.40 per vehicle-mile ($3,497.13 per 1,000 sq ft) on September 11, 2027 and $1,537.20 ($3,766.14) after September 10, 2028, under Ordinance 651-17-2026. Assessed at plat and collected at building permit.
- County Impact Fee (Denton County, Industrial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Pilot Point: Office Impact Fees
Office development in Pilot Point pays $4.66 per square foot in impact fees, plus $40,080.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to about $156,687.50. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Pilot Point) — 1" meter ($23,609.00 one-time), Water Impact Fee (City of Pilot Point) — 1" meter ($11,371.00 one-time) and Sewer Access Fee (City of Pilot Point) ($1,950.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Pilot Point Impact Fee Schedule
- Water Impact Fee (City of Pilot Point) — 1" meter$11,371.00 one-timeCity of Pilot PointCity of Pilot Point water impact fee for a 1 inch meter: $11,371 (1.67 service unit equivalents), collected at 100% of the maximum under Ordinance 651-17-2026, effective September 10, 2026. A separate water access fee and meter fee also apply.
- Water Access Fee (City of Pilot Point) — 1" meter$1,650.00 one-timeCity of Pilot PointCity of Pilot Point water access (tap) fee for a 1 inch meter: $1,650, under the fee schedule effective September 24, 2026. Street cuts (from $500) and bores (actual cost) are extra, and compound meters pay twice the access fee. This is in addition to the water impact fee and the meter fee.
- Water Meter Fee (City of Pilot Point) — 1" meter$1,500.00 one-timeCity of Pilot PointCity of Pilot Point meter fee for a 1 inch meter: $1,500, charged before installation with a new water access. Meters larger than 4 inches are priced on request.
- Wastewater Impact Fee (City of Pilot Point) — 1" meter$23,609.00 one-timeCity of Pilot PointCity of Pilot Point wastewater impact fee for a 1 inch water meter: $23,609 (1.67 service unit equivalents), collected at 100% of the maximum under Ordinance 651-17-2026, effective September 10, 2026. A separate sewer access fee also applies.
- Sewer Access Fee (City of Pilot Point)$1,950.00 one-timeCity of Pilot PointCity of Pilot Point sewer access fee for a 4 inch sewer service: $1,950, plus $200 for each inch above 4 inches. This is in addition to the wastewater impact fee.
- Roadway Impact Fee (City of Pilot Point, Office) — $1,317.60 × 3.54 veh-mi$4.66/sq ftCity of Pilot PointCity of Pilot Point roadway impact fee for general office: 3.54 vehicle-miles per 1,000 sq ft of gross floor area at $1,317.60 per vehicle-mile, for permits from September 11, 2026 to September 10, 2027. The rate steps to $1,427.40 per vehicle-mile ($5,053.00 per 1,000 sq ft) on September 11, 2027 and $1,537.20 ($5,441.69) after September 10, 2028, under Ordinance 651-17-2026. Assessed at plat and collected at building permit.
- County Impact Fee (Denton County, Office)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Pilot Point Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Pilot Point Impact Fee FAQs
What are the total impact fees for a single-family home in Pilot Point, Texas?
A new single-family home in Pilot Point pays $37,619.08 per unit in combined impact fees (rates sourced November 25, 2026).
How much are commercial impact fees in Pilot Point?
Commercial development in Pilot Point pays $19.00 per square foot in impact fees, plus $40,080.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $990,069.50 for a 50,000 sq ft building.
Does Pilot Point charge its own impact fees?
Yes. Pilot Point levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Pilot Point. The schedule on this page shows every fee that applies to development in Pilot Point.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Denton County impact fees page.