Highland Village Impact Fees by Project Type
Highland Village: Single-Family Impact Fees
A new single-family home in Highland Village pays at least $5,621.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (City of Highland Village) ($375.00) and Water Tap Fee (City of Highland Village) ($250.00).
Wastewater Impact Fee (City of Highland Village) — 3/4" meter and Water Impact Fee (City of Highland Village) — 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Park Fee (City of Highland Village) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Highland Village Impact Fee Schedule
- Water Impact Fee (City of Highland Village) — 3/4" meter$2,495.00Requires confirmation3/4" simple meterCity of Highland VillageWater impact fee by meter size, shown at the City's posted maximum: $2,495 for a 3/4" meter. The City says council adopted a collected rate below the maximum; that lower schedule is not posted, so the amount due may be less.
- Water Tap Fee (City of Highland Village)$250.00City of Highland VillageWater tapping charge of $250 for a standard residential meter, plus the City's actual labor and material costs (meter, box, fittings, tubing and excavation). Larger meters are priced by negotiation.
- Wastewater Impact Fee (City of Highland Village) — 3/4" meter$2,501.00Requires confirmation3/4" simple meterCity of Highland VillageWastewater impact fee by meter size, shown at the City's posted maximum: $2,501 for a 3/4" meter. The City says council adopted a collected rate below the maximum; that lower schedule is not posted, so the amount due may be less.
- Sewer Tap Fee (City of Highland Village)$375.00City of Highland VillageSewer tapping charge of $375 for a standard residential line at the property line.
- Park Fee (City of Highland Village)Requires confirmationCity of Highland VillageHighland Village charges a park fee on every new home, per dwelling unit by park benefit area, collected at final plat approval. The adopted rate schedule is not posted. The City has no roadway impact fee.
- County Impact Fee (Denton County)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Highland Village: Multifamily Impact Fees
A new multifamily unit in Highland Village pays at least $5,621.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (City of Highland Village, MF) ($375.00) and Water Tap Fee (City of Highland Village, MF) ($250.00).
Water Impact Fee (City of Highland Village, MF) — 3/4" meter and Wastewater Impact Fee (City of Highland Village, MF) — 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Park Fee (City of Highland Village, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Highland Village Impact Fee Schedule
- Water Impact Fee (City of Highland Village, MF) — 3/4" meter$2,495.00Requires confirmation3/4" simple meterCity of Highland VillageWater impact fee by the building's meter size, not per unit, shown at the City's posted maximum: $2,495 for a 3/4" meter, up to $13,307 for a 2" meter. The City says council adopted a lower collected rate that is not posted. A building on one meter pays once.
- Water Tap Fee (City of Highland Village, MF)$250.00City of Highland VillageWater tapping charge of $250 per standard residential meter, plus the City's actual labor and material costs; larger meters are priced by negotiation. A building on one connection pays once.
- Wastewater Impact Fee (City of Highland Village, MF) — 3/4" meter$2,501.00Requires confirmation3/4" simple meterCity of Highland VillageWastewater impact fee by the building's meter size, not per unit, shown at the City's posted maximum: $2,501 for a 3/4" meter, up to $13,339 for a 2" meter. The City says council adopted a lower collected rate that is not posted. A building on one meter pays once.
- Sewer Tap Fee (City of Highland Village, MF)$375.00City of Highland VillageSewer tapping charge of $375 for a standard residential line. A building on one connection pays once.
- Park Fee (City of Highland Village, MF)Requires confirmationCity of Highland VillageHighland Village charges a park fee on every new dwelling unit, by park benefit area, collected at final plat approval. The adopted rate schedule is not posted. The City has no roadway impact fee.
- County Impact Fee (Denton County, MF)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Highland Village: Commercial Impact Fees
Commercial development in Highland Village pays no per-square-foot impact fees, but owes $8,701.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $8,701.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Impact Fee (City of Highland Village) — 1" Simple meter, Water Impact Fee (City of Highland Village) — 1" Simple meter, and Sewer Tap Fee (City of Highland Village) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Tap Fee (City of Highland Village) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Highland Village Impact Fee Schedule
- Water Impact Fee (City of Highland Village) — 1" Simple meter$4,158.00 one-timeRequires confirmationCity of Highland VillageHighland Village maximum water impact fee for a 1 inch meter: $4,158 (1.7 service units at $2,495 each). Larger meters pay more, from $8,317 for 1 1/2 inch to $266,133 for an 8 inch turbine meter. The fee is collected at building permit or utility connection, whichever comes first.
- Water Tap Fee (City of Highland Village)Requires confirmationCity of Highland VillageHighland Village negotiates the water tap charge for meters larger than the standard residential size. This is in addition to the water impact fee.
- Wastewater Impact Fee (City of Highland Village) — 1" Simple meter$4,168.00 one-timeRequires confirmationCity of Highland VillageHighland Village maximum wastewater impact fee for a 1 inch meter: $4,168 (1.7 service units at $2,501 each). Larger meters pay more, from $8,337 for 1 1/2 inch to $266,773 for an 8 inch turbine meter. Irrigation meters pay no wastewater impact fee.
- Sewer Tap Fee (City of Highland Village)$375.00 one-timeRequires confirmationCity of Highland VillageHighland Village sewer tap charge for a standard size line at the property line: $375. This is in addition to the wastewater impact fee.
- City Impact Fee (City of Highland Village, Commercial)$0.00City of Highland VillageThe City of Highland Village charges impact fees for water and wastewater only, so no city roadway or other impact fee applies to commercial, office or industrial development.
- County Impact Fee (Denton County, Commercial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Highland Village: Industrial Impact Fees
Industrial development in Highland Village pays no per-square-foot impact fees, but owes $8,701.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $8,701.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Impact Fee (City of Highland Village) — 1" Simple meter, Water Impact Fee (City of Highland Village) — 1" Simple meter, and Sewer Tap Fee (City of Highland Village) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Tap Fee (City of Highland Village) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Highland Village Impact Fee Schedule
- Water Impact Fee (City of Highland Village) — 1" Simple meter$4,158.00 one-timeRequires confirmationCity of Highland VillageHighland Village maximum water impact fee for a 1 inch meter: $4,158 (1.7 service units at $2,495 each). Larger meters pay more, from $8,317 for 1 1/2 inch to $266,133 for an 8 inch turbine meter. The fee is collected at building permit or utility connection, whichever comes first.
- Water Tap Fee (City of Highland Village)Requires confirmationCity of Highland VillageHighland Village negotiates the water tap charge for meters larger than the standard residential size. This is in addition to the water impact fee.
- Wastewater Impact Fee (City of Highland Village) — 1" Simple meter$4,168.00 one-timeRequires confirmationCity of Highland VillageHighland Village maximum wastewater impact fee for a 1 inch meter: $4,168 (1.7 service units at $2,501 each). Larger meters pay more, from $8,337 for 1 1/2 inch to $266,773 for an 8 inch turbine meter. Irrigation meters pay no wastewater impact fee.
- Sewer Tap Fee (City of Highland Village)$375.00 one-timeRequires confirmationCity of Highland VillageHighland Village sewer tap charge for a standard size line at the property line: $375. This is in addition to the wastewater impact fee.
- City Impact Fee (City of Highland Village, Industrial)$0.00City of Highland VillageThe City of Highland Village charges impact fees for water and wastewater only, so no city roadway or other impact fee applies to commercial, office or industrial development.
- County Impact Fee (Denton County, Industrial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Highland Village: Office Impact Fees
Office development in Highland Village pays no per-square-foot impact fees, but owes $8,701.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to at least $8,701.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Impact Fee (City of Highland Village) — 1" Simple meter, Water Impact Fee (City of Highland Village) — 1" Simple meter, and Sewer Tap Fee (City of Highland Village) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Tap Fee (City of Highland Village) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Highland Village Impact Fee Schedule
- Water Impact Fee (City of Highland Village) — 1" Simple meter$4,158.00 one-timeRequires confirmationCity of Highland VillageHighland Village maximum water impact fee for a 1 inch meter: $4,158 (1.7 service units at $2,495 each). Larger meters pay more, from $8,317 for 1 1/2 inch to $266,133 for an 8 inch turbine meter. The fee is collected at building permit or utility connection, whichever comes first.
- Water Tap Fee (City of Highland Village)Requires confirmationCity of Highland VillageHighland Village negotiates the water tap charge for meters larger than the standard residential size. This is in addition to the water impact fee.
- Wastewater Impact Fee (City of Highland Village) — 1" Simple meter$4,168.00 one-timeRequires confirmationCity of Highland VillageHighland Village maximum wastewater impact fee for a 1 inch meter: $4,168 (1.7 service units at $2,501 each). Larger meters pay more, from $8,337 for 1 1/2 inch to $266,773 for an 8 inch turbine meter. Irrigation meters pay no wastewater impact fee.
- Sewer Tap Fee (City of Highland Village)$375.00 one-timeRequires confirmationCity of Highland VillageHighland Village sewer tap charge for a standard size line at the property line: $375. This is in addition to the wastewater impact fee.
- City Impact Fee (City of Highland Village, Office)$0.00City of Highland VillageThe City of Highland Village charges impact fees for water and wastewater only, so no city roadway or other impact fee applies to commercial, office or industrial development.
- County Impact Fee (Denton County, Office)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Highland Village Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Highland Village Impact Fee FAQs
What are the total impact fees for a single-family home in Highland Village, Texas?
A new single-family home in Highland Village pays at least $5,621.00 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Highland Village?
Commercial development in Highland Village pays no per-square-foot impact fees, but owes $8,701.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Highland Village charge its own impact fees?
Yes. Highland Village levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Highland Village. The schedule on this page shows every fee that applies to development in Highland Village.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Denton County impact fees page.