Skip to content
IMPACTFEES.ORG

Krugerville, Texas Impact Fees

Krugerville applies its own fee schedule. Denton County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $7,250.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Krugerville Impact Fees by Project Type

Krugerville: Single-Family Impact Fees

A new single-family home in Krugerville pays at least $7,250.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee — Mustang SUD, 5/8" x 3/4" meter: $5,750 + $500 water resource ($6,250.00) and Park Land Cash in Lieu of Dedication (City of Krugerville) ($1,000.00).

Sewer Connection Fee (No Public Sewer, On-Site Septic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Krugerville Impact Fee Schedule
Water$6,250.00
  • Water Connection Fee — Mustang SUD, 5/8" x 3/4" meter: $5,750 + $500 water resource
    Mustang Special Utility District
    Mustang Special Utility District serves Krugerville and charges $5,750 (meter included) plus a $500 water resource fee to connect a home on an existing water line, under its Rate Order effective September 5, 2026. A lot in a new subdivision pays $5,750 plus a $750 meter installation and the $500 fee, and the developer pays a $3,000 service investigation fee per project.
    $6,250.00
Sewer$0.00
  • Sewer Connection Fee (No Public Sewer, On-Site Septic)
    City of Krugerville
    Krugerville properties use on-site septic systems, where no sewer connection fee applies. The City is building a sanitary sewer main along US 377, and connection charges for it have not been published.
    Requires confirmation
City$1,000.00
  • Park Land Cash in Lieu of Dedication (City of Krugerville)
    City of Krugerville
    City of Krugerville charges $1,000 per dwelling unit as money in lieu of parkland dedication. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
    $1,000.00
  • City Impact Fee (City of Krugerville)
    City of Krugerville
    The City of Krugerville charges no impact fee on new homes. Its park land payment in lieu of dedication ($1,000 per dwelling unit) is due when a subdivision plat is approved, before any building permit.
    $0.00
County$0.00
  • County Impact Fee (Denton County)
    Denton County
    Texas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
    $0.00
Total (Krugerville): $7,250.00
Sources last checked Official fee schedules:Mustang Special Utility District City of Krugerville Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Krugerville: Multifamily Impact Fees

A new multifamily unit in Krugerville pays at least $4,125.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (Mustang SUD, MF) — 0.5 ESFU × ($5,750 + $500) ($3,125.00) and Park Land Cash in Lieu of Dedication (City of Krugerville, MF) ($1,000.00).

Sewer Connection Fee (No Public Sewer, On-Site Septic, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Krugerville Impact Fee Schedule
Water$3,125.00
Sewer$0.00
  • Sewer Connection Fee (No Public Sewer, On-Site Septic, MF)
    City of Krugerville
    Krugerville properties use on-site septic systems, where no sewer connection fee applies. The City is building a sanitary sewer main along US 377, and connection charges for it have not been published.
    Requires confirmation
City$1,000.00
  • Park Land Cash in Lieu of Dedication (City of Krugerville, MF)
    City of Krugerville
    City of Krugerville charges $1,000 per dwelling unit as money in lieu of parkland dedication. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
    $1,000.00
  • City Impact Fee (City of Krugerville, MF)
    City of Krugerville
    The City of Krugerville charges no impact fee on apartments. Its park land payment in lieu of dedication ($1,000 per dwelling unit) is due when a subdivision plat is approved, before any building permit.
    $0.00
County$0.00
  • County Impact Fee (Denton County, MF)
    Denton County
    Texas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
    $0.00
Total (Krugerville): $4,125.00
Sources last checked Official fee schedules:Mustang Special Utility District City of Krugerville Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Krugerville: Commercial Impact Fees

Commercial development in Krugerville pays no per-square-foot impact fees, but owes $19,375.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $19,375.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee — Mustang SUD, 1" meter: 2.5 LUE × ($5,750 + $500) + $750 meter + $3,000 investigation ($19,375.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (No Public Sewer, On-Site Septic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Krugerville Impact Fee Schedule
Water$19,375.00 one-time
Sewer$0.00
  • Sewer Connection Fee (No Public Sewer, On-Site Septic)
    City of Krugerville
    Krugerville properties use on-site septic systems, where no sewer connection fee applies. The City is building a sanitary sewer main along US 377, and connection charges for it have not been published.
    Requires confirmation
City$0.00
County$0.00
  • County Impact Fee (Denton County, Commercial)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Krugerville): $19,375.00 one-time (≈ $19,375.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Mustang Special Utility District City of Krugerville Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Krugerville: Industrial Impact Fees

Industrial development in Krugerville pays no per-square-foot impact fees, but owes $19,375.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $19,375.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee — Mustang SUD, 1" meter: 2.5 LUE × ($5,750 + $500) + $750 meter + $3,000 investigation ($19,375.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (No Public Sewer, On-Site Septic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Krugerville Impact Fee Schedule
Water$19,375.00 one-time
Sewer$0.00
  • Sewer Connection Fee (No Public Sewer, On-Site Septic)
    City of Krugerville
    Krugerville properties use on-site septic systems, where no sewer connection fee applies. The City is building a sanitary sewer main along US 377, and connection charges for it have not been published.
    Requires confirmation
City$0.00
County$0.00
  • County Impact Fee (Denton County, Industrial)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Krugerville): $19,375.00 one-time (≈ $19,375.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Mustang Special Utility District City of Krugerville Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Krugerville: Office Impact Fees

Office development in Krugerville pays no per-square-foot impact fees, but owes $19,375.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to at least $19,375.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee — Mustang SUD, 1" meter: 2.5 LUE × ($5,750 + $500) + $750 meter + $3,000 investigation ($19,375.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (No Public Sewer, On-Site Septic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Krugerville Impact Fee Schedule
Water$19,375.00 one-time
Sewer$0.00
  • Sewer Connection Fee (No Public Sewer, On-Site Septic)
    City of Krugerville
    Krugerville properties use on-site septic systems, where no sewer connection fee applies. The City is building a sanitary sewer main along US 377, and connection charges for it have not been published.
    Requires confirmation
City$0.00
  • City Impact Fee (City of Krugerville, Office)
    City of Krugerville
    The City of Krugerville charges no impact fee on commercial, office or industrial development. Water service is provided by Mustang Special Utility District.
    $0.00
County$0.00
  • County Impact Fee (Denton County, Office)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Krugerville): $19,375.00 one-time (≈ $19,375.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Mustang Special Utility District City of Krugerville Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Krugerville Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Krugerville Impact Fee FAQs

What are the total impact fees for a single-family home in Krugerville, Texas?

A new single-family home in Krugerville pays at least $7,250.00 per unit in combined impact fees (rates sourced November 25, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Krugerville?

Commercial development in Krugerville pays no per-square-foot impact fees, but owes $19,375.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Krugerville charge its own impact fees?

Yes. Krugerville levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Krugerville. The schedule on this page shows every fee that applies to development in Krugerville.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Denton County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.