The Colony applies its own fee schedule. Denton County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $9,158.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

The Colony Impact Fees by Project Type

The Colony: Single-Family Impact Fees

A new single-family home in The Colony pays at least $9,158.00 per unit in impact fees (rates sourced November 26, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of The Colony) — 5/8" meter ($4,034.00), Roadway Impact Fee (City of The Colony) — SH 121 Corridor ($3,561.00) and Sewer Tap Fee (City of The Colony) — 4" tap ($570.00).

Park Land Fee in Lieu (City of The Colony) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full The Colony Impact Fee Schedule
Water$993.00
  • Water Impact Fee (City of The Colony) — 5/8" meter
    City of The Colony
    Water impact fee for property final platted after December 1, 2020 (Ord. 2020-2411), charged by meter size; $518 at the standard 5/8" meter. Older plats pay earlier, plat-date tables. Irrigation meters pay the water fee only. Austin Ranch is excluded under a 1998 development agreement.
    $518.00
  • Water Tap and Meter Fee (City of The Colony) — 5/8" meter
    City of The Colony
    One-time water tap and meter fee, paid in addition to the water impact fee: $475 for the standard 5/8" meter. It includes the service connection from the main to the meter.
    $475.00
Sewer$4,604.00
  • Wastewater Impact Fee (City of The Colony) — 5/8" meter
    City of The Colony
    Wastewater impact fee for property final platted after December 1, 2020 (Ord. 2020-2411), charged by meter size; $4,034 at the standard 5/8" meter. Older plats pay earlier, plat-date tables. Austin Ranch is excluded under a 1998 development agreement.
    $4,034.00
  • Sewer Tap Fee (City of The Colony) — 4" tap
    City of The Colony
    One-time sewer tap fee, paid in addition to the wastewater impact fee: $570 for the standard 4" residential tap.
    $570.00
City$3,561.00
  • Roadway Impact Fee (City of The Colony) — SH 121 Corridor
    SH 121 Corridor Service Area
    City of The Colony
    Roadway impact fee applies only inside the SH 121 Corridor Service Area, the city's only roadway service area: $3,561 per single-family home there (2025 update, collected at 90% of the maximum, schedule effective October 1, 2026). Development elsewhere in the city pays no roadway impact fee.
    $3,561.00
  • Drainage Impact Fee (City of The Colony) — outside Office Creek watershed
    City of The Colony
    No drainage impact fee is charged outside the Office Creek watershed; inside it the fee is $154.87 per home.
    $0.00
  • Park Land Fee in Lieu (City of The Colony)
    City of The Colony
    City of The Colony requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat or at the building permit. Dedicating land may replace it.
    Requires confirmation
County$0.00
  • County Impact Fee (Denton County)
    Denton County
    Texas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
    $0.00
Total (The Colony): $9,158.00
Sources last checked Official fee schedules:City of The Colony Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

The Colony: Multifamily Impact Fees

A new multifamily unit in The Colony pays at least $7,074.00 per unit in impact fees (rates sourced November 26, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of The Colony, MF) — 5/8" meter ($4,034.00), Roadway Impact Fee (City of The Colony, MF) — SH 121 Corridor, Mid-Rise ($1,477.00) and Sewer Tap Fee (City of The Colony, MF) ($570.00).

Park Land Fee in Lieu (City of The Colony, MF) and Drainage Impact Fee (City of The Colony, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full The Colony Impact Fee Schedule
Water$993.00
  • Water Impact Fee (City of The Colony, MF) — 5/8" meter
    City of The Colony
    Water impact fee for property final platted after December 1, 2020 (Ord. 2020-2411), charged by the building's meter size, not per unit; $518 at the standard 5/8" meter and up to $4,144 at a 2" meter. A building on one meter pays once. Older plats pay earlier tables. Austin Ranch is excluded under a 1998 development agreement.
    $518.00
  • Water Tap and Meter Fee (City of The Colony, MF)
    City of The Colony
    One-time water tap and meter fee per connection, paid in addition to the water impact fee: $475 for a 5/8" meter, up to $1,200 for a 2" meter. A building on one connection pays once.
    $475.00
Sewer$4,604.00
  • Wastewater Impact Fee (City of The Colony, MF) — 5/8" meter
    City of The Colony
    Wastewater impact fee for property final platted after December 1, 2020 (Ord. 2020-2411), charged by the building's meter size, not per unit; $4,034 at the standard 5/8" meter and up to $32,272 at a 2" meter. A building on one meter pays once. Older plats pay earlier tables. Austin Ranch is excluded under a 1998 development agreement.
    $4,034.00
  • Sewer Tap Fee (City of The Colony, MF)
    City of The Colony
    One-time sewer tap fee per connection, paid in addition to the wastewater impact fee: $570 for a 4" tap, up to $2,220 for a 10" tap. A building on one connection pays once.
    $570.00
City$1,477.00
  • Roadway Impact Fee (City of The Colony, MF) — SH 121 Corridor, Mid-Rise
    SH 121 Corridor, Mid-Rise (ITE 221)
    City of The Colony
    Roadway impact fee applies only inside the SH 121 Corridor Service Area: $1,477 per mid-rise (3 to 10 story) apartment unit there (2025 update, collected at 90% of the maximum, schedule effective October 1, 2026). Development elsewhere in the city pays no roadway impact fee.
    $1,477.00
  • Park Land Fee in Lieu (City of The Colony, MF)
    City of The Colony
    City of The Colony requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat or at the building permit. Dedicating land may replace it.
    Requires confirmation
  • Drainage Impact Fee (City of The Colony, MF)
    City of The Colony
    Inside the Office Creek watershed, multifamily development pays a drainage impact fee of $154.87 per 3,406 sq ft of impervious area, set by the site plan rather than per unit. Outside the watershed no drainage impact fee is charged.
    Requires confirmation
County$0.00
  • County Impact Fee (Denton County, MF)
    Denton County
    Texas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
    $0.00
Total (The Colony): $7,074.00
Sources last checked Official fee schedules:City of The Colony Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

The Colony: Commercial Impact Fees

Commercial development in The Colony pays $9.48 per square foot in impact fees, plus $12,680.00 in one-time water and sewer connection fees (rates sourced November 26, 2026).

For a 50,000 sq ft building, that comes to at least $486,730.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of The Colony) — 1" PD meter ($10,085.00 one-time), Water Impact Fee (City of The Colony) — 1" PD meter ($1,295.00 one-time) and Water Tap and Meter Fee (City of The Colony) — 1" ($730.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Drainage Impact Fee (City of The Colony, Commercial) — per impervious area is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full The Colony Impact Fee Schedule
Water$2,025.00 one-time
  • Water Impact Fee (City of The Colony) — 1" PD meter
    City of The Colony
    Water impact fee for property final platted after December 1, 2020: $518 per service unit, scaled by meter size (a 1 inch positive displacement meter is 2.5 service units). Property final platted from October 1, 2007 to December 1, 2020 pays the earlier schedule ($4,133 for a 1 inch meter), and property platted before September 30, 2007 pays $1,920 for a 1 inch meter. Turbine meters are for irrigation only. Development in the Austin Ranch area covered by the 1998 developer agreement pays that agreement's schedule instead.
    $1,295.00 one-time
  • Water Tap and Meter Fee (City of The Colony) — 1"
    City of The Colony
    Tap and meter fee for a 1 inch meter, effective October 1, 2026. Through 2 inches the price covers the tap, the meter and a service connection up to 50 feet from the main; longer connections add $20 per foot, and a tap that requires boring a paved road adds $500. Meters 3 inches and larger are charged for the tap only.
    $730.00 one-time
Sewer$10,655.00 one-time
  • Wastewater Impact Fee (City of The Colony) — 1" PD meter
    City of The Colony
    Wastewater impact fee for property final platted after December 1, 2020: $4,034 per service unit, scaled by meter size (a 1 inch positive displacement meter is 2.5 service units). Property final platted from October 1, 2007 to December 1, 2020 pays the earlier schedule ($2,038 for a 1 inch meter), and property platted before September 30, 2007 pays $1,782 for a 1 inch meter. Irrigation (turbine) meters pay no wastewater impact fee. Development in the Austin Ranch area covered by the 1998 developer agreement pays that agreement's schedule instead.
    $10,085.00 one-time
  • Sewer Tap Fee (City of The Colony) — 4" line
    City of The Colony
    Sewer tap fee for a 4 inch sewer line, effective October 1, 2026; larger lines cost more (6 inch $865, 8 inch $1,410, 10 inch $2,220). A separate fire line tap fee applies to fire service lines ($1,895 to $5,000 by size).
    $570.00 one-time
City$9.48/sq ft
  • Roadway Impact Fee (City of The Colony, Commercial) — SH 121 Corridor Service Area
    City of The Colony
    Roadway impact fee in the SH 121 Corridor Service Area for a shopping plaza of 40,000 to 150,000 sq ft (ITE 821, 10.01 vehicle-miles per 1,000 sq ft of gross floor area). The December 16, 2025 update set collection at 90% of the $1,052 maximum per vehicle-mile. A shopping center over 150,000 sq ft pays $7,350 and a strip retail plaza under 40,000 sq ft pays $12,038 per 1,000 sq ft. No roadway impact fee applies outside the SH 121 Corridor Service Area.
    $9.48/sq ft
  • Drainage Impact Fee (City of The Colony, Commercial) — per impervious area
    City of The Colony
    Office Creek drainage impact fee: $154.87 per equivalent residential unit (ERU), where one ERU is 3,406 sq ft of impervious area. It is charged only within the Office Creek watershed and was adopted December 16, 2025 at 100% of the maximum. Example from the city's study: a 5-acre commercial site with 178,596 sq ft of impervious area is 52.4 ERUs, or $8,115.19.
    Requires confirmation
County$0.00
  • County Impact Fee (Denton County, Commercial)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (The Colony): $9.48/sq ft + $12,680.00 one-time (≈ $486,730.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of The Colony Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

The Colony: Industrial Impact Fees

Industrial development in The Colony pays $2.46 per square foot in impact fees, plus $12,680.00 in one-time water and sewer connection fees (rates sourced November 26, 2026).

For a 50,000 sq ft building, that comes to at least $135,780.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of The Colony) — 1" PD meter ($10,085.00 one-time), Water Impact Fee (City of The Colony) — 1" PD meter ($1,295.00 one-time) and Water Tap and Meter Fee (City of The Colony) — 1" ($730.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Drainage Impact Fee (City of The Colony, Industrial) — per impervious area is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full The Colony Impact Fee Schedule
Water$2,025.00 one-time
  • Water Impact Fee (City of The Colony) — 1" PD meter
    City of The Colony
    Water impact fee for property final platted after December 1, 2020: $518 per service unit, scaled by meter size (a 1 inch positive displacement meter is 2.5 service units). Property final platted from October 1, 2007 to December 1, 2020 pays the earlier schedule ($4,133 for a 1 inch meter), and property platted before September 30, 2007 pays $1,920 for a 1 inch meter. Turbine meters are for irrigation only. Development in the Austin Ranch area covered by the 1998 developer agreement pays that agreement's schedule instead.
    $1,295.00 one-time
  • Water Tap and Meter Fee (City of The Colony) — 1"
    City of The Colony
    Tap and meter fee for a 1 inch meter, effective October 1, 2026. Through 2 inches the price covers the tap, the meter and a service connection up to 50 feet from the main; longer connections add $20 per foot, and a tap that requires boring a paved road adds $500. Meters 3 inches and larger are charged for the tap only.
    $730.00 one-time
Sewer$10,655.00 one-time
  • Wastewater Impact Fee (City of The Colony) — 1" PD meter
    City of The Colony
    Wastewater impact fee for property final platted after December 1, 2020: $4,034 per service unit, scaled by meter size (a 1 inch positive displacement meter is 2.5 service units). Property final platted from October 1, 2007 to December 1, 2020 pays the earlier schedule ($2,038 for a 1 inch meter), and property platted before September 30, 2007 pays $1,782 for a 1 inch meter. Irrigation (turbine) meters pay no wastewater impact fee. Development in the Austin Ranch area covered by the 1998 developer agreement pays that agreement's schedule instead.
    $10,085.00 one-time
  • Sewer Tap Fee (City of The Colony) — 4" line
    City of The Colony
    Sewer tap fee for a 4 inch sewer line, effective October 1, 2026; larger lines cost more (6 inch $865, 8 inch $1,410, 10 inch $2,220). A separate fire line tap fee applies to fire service lines ($1,895 to $5,000 by size).
    $570.00 one-time
City$2.46/sq ft
County$0.00
  • County Impact Fee (Denton County, Industrial)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (The Colony): $2.46/sq ft + $12,680.00 one-time (≈ $135,780.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of The Colony Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

The Colony: Office Impact Fees

Office development in The Colony pays $5.46 per square foot in impact fees, plus $12,680.00 in one-time water and sewer connection fees (rates sourced November 26, 2026).

For a 25,000 sq ft building, that comes to at least $149,055.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of The Colony) — 1" PD meter ($10,085.00 one-time), Water Impact Fee (City of The Colony) — 1" PD meter ($1,295.00 one-time) and Water Tap and Meter Fee (City of The Colony) — 1" ($730.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Drainage Impact Fee (City of The Colony, Office) — per impervious area is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full The Colony Impact Fee Schedule
Water$2,025.00 one-time
  • Water Impact Fee (City of The Colony) — 1" PD meter
    City of The Colony
    Water impact fee for property final platted after December 1, 2020: $518 per service unit, scaled by meter size (a 1 inch positive displacement meter is 2.5 service units). Property final platted from October 1, 2007 to December 1, 2020 pays the earlier schedule ($4,133 for a 1 inch meter), and property platted before September 30, 2007 pays $1,920 for a 1 inch meter. Turbine meters are for irrigation only. Development in the Austin Ranch area covered by the 1998 developer agreement pays that agreement's schedule instead.
    $1,295.00 one-time
  • Water Tap and Meter Fee (City of The Colony) — 1"
    City of The Colony
    Tap and meter fee for a 1 inch meter, effective October 1, 2026. Through 2 inches the price covers the tap, the meter and a service connection up to 50 feet from the main; longer connections add $20 per foot, and a tap that requires boring a paved road adds $500. Meters 3 inches and larger are charged for the tap only.
    $730.00 one-time
Sewer$10,655.00 one-time
  • Wastewater Impact Fee (City of The Colony) — 1" PD meter
    City of The Colony
    Wastewater impact fee for property final platted after December 1, 2020: $4,034 per service unit, scaled by meter size (a 1 inch positive displacement meter is 2.5 service units). Property final platted from October 1, 2007 to December 1, 2020 pays the earlier schedule ($2,038 for a 1 inch meter), and property platted before September 30, 2007 pays $1,782 for a 1 inch meter. Irrigation (turbine) meters pay no wastewater impact fee. Development in the Austin Ranch area covered by the 1998 developer agreement pays that agreement's schedule instead.
    $10,085.00 one-time
  • Sewer Tap Fee (City of The Colony) — 4" line
    City of The Colony
    Sewer tap fee for a 4 inch sewer line, effective October 1, 2026; larger lines cost more (6 inch $865, 8 inch $1,410, 10 inch $2,220). A separate fire line tap fee applies to fire service lines ($1,895 to $5,000 by size).
    $570.00 one-time
City$5.46/sq ft
  • Roadway Impact Fee (City of The Colony, Office) — SH 121 Corridor Service Area
    City of The Colony
    Roadway impact fee in the SH 121 Corridor Service Area for general office (ITE 710, 5.76 vehicle-miles per 1,000 sq ft of gross floor area). The December 16, 2025 update set collection at 90% of the $1,052 maximum per vehicle-mile. No roadway impact fee applies outside the SH 121 Corridor Service Area.
    $5.46/sq ft
  • Drainage Impact Fee (City of The Colony, Office) — per impervious area
    City of The Colony
    Office Creek drainage impact fee: $154.87 per equivalent residential unit (ERU), where one ERU is 3,406 sq ft of impervious area. It is charged only within the Office Creek watershed and was adopted December 16, 2025 at 100% of the maximum.
    Requires confirmation
County$0.00
  • County Impact Fee (Denton County, Office)
    Denton County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (The Colony): $5.46/sq ft + $12,680.00 one-time (≈ $149,055.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of The Colony Denton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Denton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

The Colony Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

The Colony Impact Fee FAQs

What are the total impact fees for a single-family home in The Colony, Texas?

A new single-family home in The Colony pays at least $9,158.00 per unit in combined impact fees (rates sourced November 26, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in The Colony?

Commercial development in The Colony pays $9.48 per square foot in impact fees, plus $12,680.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $486,730.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does The Colony charge its own impact fees?

Yes. The Colony levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside The Colony. The schedule on this page shows every fee that applies to development in The Colony.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Denton County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.