Corral City Impact Fees by Project Type
Corral City: Single-Family Impact Fees
A new single-family home in Corral City pays at least $9,770.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
Water Connection Fee — Argyle WSC, 3/4" x 5/8" meter: 1.0 ESU × ($9,595 capital + $175 membership) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer (Corral City, no town sewer) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Corral City Impact Fee Schedule
- Water Connection Fee — Argyle WSC, 3/4" x 5/8" meter: 1.0 ESU × ($9,595 capital + $175 membership)$9,770.00Requires confirmationArgyle Water Supply CorporationArgyle Water Supply Corporation serves Corral City. A standard 3/4 by 5/8 inch home meter pays a $9,595 capital recovery fee (as of January 1, 2026) and a $175 membership fee, plus an installation charge quoted for each tap.
- Sewer (Corral City, no town sewer)Requires confirmationCorral City has no sewer system of its own. The town lies inside the Town of Argyle's state-approved sewer service area; Argyle has not published whether its sewer lines or fees reach Corral City homes.
- City Impact Fee (Town of Corral City)$0.00Corral City does not levy any municipal development impact fees.
- County Impact Fee (Denton County)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Corral City: Multifamily Impact Fees
A new multifamily unit in Corral City pays at least $9,770.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
Water Connection Fee (Argyle Water Supply Corporation, MF) — 1.0 LUE × ($9,595 capital + $175 membership) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer (Corral City, no town sewer, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Corral City Impact Fee Schedule
- Water Connection Fee (Argyle Water Supply Corporation, MF) — 1.0 LUE × ($9,595 capital + $175 membership)$9,770.00Requires confirmationArgyle Water Supply CorporationArgyle Water Supply Corporation serves Corral City and counts each apartment unit as one service unit: a $9,595 capital recovery fee (as of January 1, 2026) and a $175 membership fee per unit, plus installation.
- Sewer (Corral City, no town sewer, MF)Requires confirmationCorral City has no sewer system of its own. The town lies inside the Town of Argyle's state-approved sewer service area; Argyle has not published whether its sewer lines or fees reach Corral City homes.
- City Impact Fee (Town of Corral City, MF)$0.00Corral City does not levy any municipal development impact fees.
- County Impact Fee (Denton County, MF)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Corral City: Commercial Impact Fees
Commercial development in Corral City pays no per-square-foot impact fees, but owes $24,425.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $24,425.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (Argyle Water Supply Corporation) — 1" meter: 2.5 ESU × ($9,595 capital + $175 membership) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Corral City Impact Fee Schedule
- Water Connection Fee (Argyle Water Supply Corporation) — 1" meter: 2.5 ESU × ($9,595 capital + $175 membership)$24,425.00 one-timeRequires confirmationArgyle Water Supply CorporationWater in Corral City is provided by Argyle Water Supply Corporation, which charges a capital recovery fee of $9,595 (as of January 1, 2026) and a membership fee of $175 per service unit; a 1 inch meter counts as 2.5 service units, and a nonresidential site is served through a master meter sized by the corporation's engineer. Meter installation is charged at cost.
- Sewer Connection Fee — No public sewer (on-site septic)$0.00Town of Corral CityCorral City has no public sewer system; property uses on-site septic systems, so no sewer connection or impact fee applies.
- City Impact Fee (Town of Corral City, Commercial)$0.00Town of Corral CityThe Town of Corral City charges no impact fees. It runs no water or sewer utility; water service comes from Argyle Water Supply Corporation.
- County Impact Fee (Denton County, Commercial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Corral City: Industrial Impact Fees
Industrial development in Corral City pays no per-square-foot impact fees, but owes $24,425.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $24,425.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (Argyle Water Supply Corporation) — 1" meter: 2.5 ESU × ($9,595 capital + $175 membership) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Corral City Impact Fee Schedule
- Water Connection Fee (Argyle Water Supply Corporation) — 1" meter: 2.5 ESU × ($9,595 capital + $175 membership)$24,425.00 one-timeRequires confirmationArgyle Water Supply CorporationWater in Corral City is provided by Argyle Water Supply Corporation, which charges a capital recovery fee of $9,595 (as of January 1, 2026) and a membership fee of $175 per service unit; a 1 inch meter counts as 2.5 service units, and a nonresidential site is served through a master meter sized by the corporation's engineer. Meter installation is charged at cost.
- Sewer Connection Fee — No public sewer (on-site septic)$0.00Town of Corral CityCorral City has no public sewer system; property uses on-site septic systems, so no sewer connection or impact fee applies.
- City Impact Fee (Town of Corral City, Industrial)$0.00Town of Corral CityThe Town of Corral City charges no impact fees. It runs no water or sewer utility; water service comes from Argyle Water Supply Corporation.
- County Impact Fee (Denton County, Industrial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Corral City: Office Impact Fees
Office development in Corral City pays no per-square-foot impact fees, but owes $24,425.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to about $24,425.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (Argyle Water Supply Corporation) — 1" meter: 2.5 ESU × ($9,595 capital + $175 membership) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Corral City Impact Fee Schedule
- Water Connection Fee (Argyle Water Supply Corporation) — 1" meter: 2.5 ESU × ($9,595 capital + $175 membership)$24,425.00 one-timeRequires confirmationArgyle Water Supply CorporationWater in Corral City is provided by Argyle Water Supply Corporation, which charges a capital recovery fee of $9,595 (as of January 1, 2026) and a membership fee of $175 per service unit; a 1 inch meter counts as 2.5 service units, and a nonresidential site is served through a master meter sized by the corporation's engineer. Meter installation is charged at cost.
- Sewer Connection Fee — No public sewer (on-site septic)$0.00Town of Corral CityCorral City has no public sewer system; property uses on-site septic systems, so no sewer connection or impact fee applies.
- City Impact Fee (Town of Corral City, Office)$0.00Town of Corral CityThe Town of Corral City charges no impact fees. It runs no water or sewer utility; water service comes from Argyle Water Supply Corporation.
- County Impact Fee (Denton County, Office)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Corral City Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Corral City Impact Fee FAQs
What are the total impact fees for a single-family home in Corral City, Texas?
A new single-family home in Corral City pays at least $9,770.00 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Corral City?
Commercial development in Corral City pays no per-square-foot impact fees, but owes $24,425.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Corral City charge its own impact fees?
Yes. Corral City levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Corral City. The schedule on this page shows every fee that applies to development in Corral City.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Denton County impact fees page.