Northlake Impact Fees by Project Type
Northlake: Single-Family Impact Fees
A new single-family home in Northlake pays at least $38,936.69 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (Town of Northlake) — South Service Area, 5/8" meter, Town + Fort Worth ($16,948.78), Roadway Impact Fee (Town of Northlake) — Zone 1 (NW Quadrant) ($14,628.14) and Wastewater Impact Fee (Town of Northlake) — 5/8" meter ($4,509.77).
Parkland Dedication Fee in Lieu (Town of Northlake) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Northlake Impact Fee Schedule
- Water Impact Fee (Town of Northlake) — South Service Area, 5/8" meter, Town + Fort Worth$16,948.78Town of NorthlakeSouth Service Area, the higher of Northlake's 2 water impact fee service areas: $13,958.78 Town water impact fee plus the City of Fort Worth's $2,990 pass-through at the standard 5/8" meter, $16,948.78 in all (Fort Worth part effective October 1, 2026 and set by Fort Worth). The North Service Area pays $2,792.56. Areas served by a municipal utility district may pay the district's fees instead.
- Water Tap Fee (Town of Northlake) — 3/4" or less$2,500.003/4" or less, Town-installedTown of NorthlakeWater tap fee of $2,500 for a 3/4" or smaller (or 1") service, charged only when the Town makes the tap; no tap fee where the owner provides it. A separate meter placement fee applies.
- Water Meter Placement Fee (Town of Northlake) — 3/4" or less$350.003/4" or less, with boxTown of NorthlakeWater meter placement fee: $350 for a 3/4" or smaller meter with box, $400 for 1", $550 for 1-1/2", $750 for a 2" simple meter.
- Wastewater Impact Fee (Town of Northlake) — 5/8" meter$4,509.77Town of NorthlakeWastewater impact fee of $4,509.77 at the standard 5/8" meter, the same in both service areas (effective October 1, 2025). Larger meters pay more. Areas served by a municipal utility district may pay the district's fees instead.
- Roadway Impact Fee (Town of Northlake) — Zone 1 (NW Quadrant)$14,628.14Town of NorthlakeRoadway impact fee per single-family home, by zone: $14,628.14 in Zone 1 (NW Quadrant), the highest of 4 zones; Zone 2 (NE) $4,276.80, Zone 3 (SW) $1,302.93, Zone 4 (SE) $2,318.12.
- Parkland Dedication Fee in Lieu (Town of Northlake)Requires confirmationTown of NorthlakeTown of Northlake requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- County Impact Fee (Denton County)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Northlake: Multifamily Impact Fees
A new multifamily unit in Northlake pays at least $32,250.51 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (Town of Northlake, MF) — South Service Area, 5/8" meter, Town + Fort Worth ($16,948.78), Roadway Impact Fee (Town of Northlake, MF) — Zone 1 (NW Quadrant) ($7,941.96) and Wastewater Impact Fee (Town of Northlake, MF) — 5/8" meter ($4,509.77).
Parkland Dedication Fee in Lieu (Town of Northlake, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Northlake Impact Fee Schedule
- Water Impact Fee (Town of Northlake, MF) — South Service Area, 5/8" meter, Town + Fort Worth$16,948.78Town of NorthlakeCharged by the building's meter size, not per unit. South Service Area, the higher of Northlake's 2 water impact fee service areas: $13,958.78 Town fee plus Fort Worth's $2,990 pass-through at a 5/8" meter ($16,948.78), rising to $134,965.22 at a 2" meter. A building on one meter pays once. The North Service Area is lower.
- Water Tap Fee (Town of Northlake, MF)$2,500.00Town of NorthlakeWater tap fee of $2,500 per connection (3/4" or smaller, or 1"), charged only when the Town makes the tap; larger taps at actual cost. A building on one connection pays once.
- Water Meter Placement Fee (Town of Northlake, MF)$350.00Town of NorthlakeWater meter placement fee per meter: $350 for 3/4" or smaller with box, up to $750 for a 2" simple meter and more for compound and larger meters. A building on one meter pays once.
- Wastewater Impact Fee (Town of Northlake, MF) — 5/8" meter$4,509.77Town of NorthlakeWastewater impact fee charged by the building's meter size, not per unit: $4,509.77 at a 5/8" meter, up to $35,876.23 at a 2" meter, the same in both service areas. A building on one meter pays once.
- Roadway Impact Fee (Town of Northlake, MF) — Zone 1 (NW Quadrant)$7,941.96Town of NorthlakeRoadway impact fee per multifamily unit, by zone: $7,941.96 in Zone 1 (NW Quadrant), the highest of 4 zones; Zone 2 (NE) $2,320.56, Zone 3 (SW) $705.87, Zone 4 (SE) $1,256.64.
- Parkland Dedication Fee in Lieu (Town of Northlake, MF)Requires confirmationTown of NorthlakeTown of Northlake requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- County Impact Fee (Denton County, MF)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Northlake: Commercial Impact Fees
Commercial development in Northlake pays $52.84 per square foot in impact fees, plus $56,408.55 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $2,698,637.55. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Town of Northlake) — South Service Area, 1" meter: $34,792.78 Northlake + $7,475 Fort Worth ($42,267.78 one-time), Wastewater Impact Fee (Town of Northlake) — 1" meter: 1.67 EF ($11,240.77 one-time) and Water Meter Tap Fee (Town of Northlake) — 1" ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Northlake Impact Fee Schedule
- Water Impact Fee (Town of Northlake) — South Service Area, 1" meter: $34,792.78 Northlake + $7,475 Fort Worth$42,267.78 one-timeTown of NorthlakeTown water impact fee plus the City of Fort Worth water impact fee the Town collects as a pass-through, for a 1 inch meter (1.67 equivalency factor) in the South Service Area: $34,792.78 Town plus $7,475 Fort Worth (Fort Worth part effective October 1, 2026 and subject to change by Fort Worth). Highest of 2 water service areas; the North Service Area pays the Town fee only ($6,960.56 at 1 inch).
- Water Meter Tap Fee (Town of Northlake) — 1"$2,500.00 one-timeTown of NorthlakeWater tap fee of $2,500 including the meter box, charged only when the Town makes the tap; 1-1/2 inch and larger taps are billed at actual cost.
- Water Meter Placement Fee (Town of Northlake) — 1" simple meter$400.00 one-timeTown of NorthlakeWater meter placement fee for a 1 inch meter. A refundable meter deposit is also required.
- Water Meter Tap Fee (Town of Northlake) — 1-1/2" and larger: actual cost$0.00Town of NorthlakeWater taps of 1-1/2 inches and larger are billed at the Town's actual cost, including the box or vault, when the Town makes the tap.
- Wastewater Impact Fee (Town of Northlake) — 1" meter: 1.67 EF$11,240.77 one-timeTown of NorthlakeTown wastewater impact fee for a 1 inch meter (1.67 equivalency factor); the same in both Town service areas. Assessed at final plat recordation.
- Sewer Tap Fee (Town of Northlake) — actual cost$0.00Town of NorthlakeNo published sewer tap fee for meters up to 3 inches; for 4 and 6 inch services the Town bills its actual cost when it makes the tap.
- Roadway Impact Fee (Town of Northlake, Commercial) — Zone 1 (NW Quadrant)$52.84/sq ftTown of NorthlakeRoadway impact fee per 1,000 sq ft of commercial floor area in Zone 1 (NW Quadrant), the highest of 4 roadway zones; Zone 2 is $15,459.84, Zone 3 $4,715.10 and Zone 4 $8,382.36 per 1,000 sq ft. Assessed at final plat recordation and collected at building permit.
- County Impact Fee (Denton County, Commercial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Northlake: Industrial Impact Fees
Industrial development in Northlake pays $5.29 per square foot in impact fees, plus $56,408.55 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $321,140.55. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Town of Northlake) — South Service Area, 1" meter: $34,792.78 Northlake + $7,475 Fort Worth ($42,267.78 one-time), Wastewater Impact Fee (Town of Northlake) — 1" meter: 1.67 EF ($11,240.77 one-time) and Water Meter Tap Fee (Town of Northlake) — 1" ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Northlake Impact Fee Schedule
- Water Impact Fee (Town of Northlake) — South Service Area, 1" meter: $34,792.78 Northlake + $7,475 Fort Worth$42,267.78 one-timeTown of NorthlakeTown water impact fee plus the City of Fort Worth water impact fee the Town collects as a pass-through, for a 1 inch meter (1.67 equivalency factor) in the South Service Area: $34,792.78 Town plus $7,475 Fort Worth (Fort Worth part effective October 1, 2026 and subject to change by Fort Worth). Highest of 2 water service areas; the North Service Area pays the Town fee only ($6,960.56 at 1 inch).
- Water Meter Tap Fee (Town of Northlake) — 1"$2,500.00 one-timeTown of NorthlakeWater tap fee of $2,500 including the meter box, charged only when the Town makes the tap; 1-1/2 inch and larger taps are billed at actual cost.
- Water Meter Placement Fee (Town of Northlake) — 1" simple meter$400.00 one-timeTown of NorthlakeWater meter placement fee for a 1 inch meter. A refundable meter deposit is also required.
- Water Meter Tap Fee (Town of Northlake) — 1-1/2" and larger: actual cost$0.00Town of NorthlakeWater taps of 1-1/2 inches and larger are billed at the Town's actual cost, including the box or vault, when the Town makes the tap.
- Wastewater Impact Fee (Town of Northlake) — 1" meter: 1.67 EF$11,240.77 one-timeTown of NorthlakeTown wastewater impact fee for a 1 inch meter (1.67 equivalency factor); the same in both Town service areas. Assessed at final plat recordation.
- Sewer Tap Fee (Town of Northlake) — actual cost$0.00Town of NorthlakeNo published sewer tap fee for meters up to 3 inches; for 4 and 6 inch services the Town bills its actual cost when it makes the tap.
- Roadway Impact Fee (Town of Northlake, Industrial) — Zone 1 (NW Quadrant)$5.29/sq ftTown of NorthlakeRoadway impact fee per 1,000 sq ft of industrial or warehouse floor area in Zone 1 (NW Quadrant), the highest of 4 roadway zones; Zone 2 is $1,544.40, Zone 3 $471.51 and Zone 4 $837.76 per 1,000 sq ft. Assessed at final plat recordation and collected at building permit.
- County Impact Fee (Denton County, Industrial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Northlake: Office Impact Fees
Office development in Northlake pays no per-square-foot impact fees, but owes $56,408.55 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to at least $56,408.55. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Town of Northlake) — South Service Area, 1" meter: $34,792.78 Northlake + $7,475 Fort Worth ($42,267.78 one-time), Wastewater Impact Fee (Town of Northlake) — 1" meter: 1.67 EF ($11,240.77 one-time) and Water Meter Tap Fee (Town of Northlake) — 1" ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Impact Fee (Town of Northlake, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Northlake Impact Fee Schedule
- Water Impact Fee (Town of Northlake) — South Service Area, 1" meter: $34,792.78 Northlake + $7,475 Fort Worth$42,267.78 one-timeTown of NorthlakeTown water impact fee plus the City of Fort Worth water impact fee the Town collects as a pass-through, for a 1 inch meter (1.67 equivalency factor) in the South Service Area: $34,792.78 Town plus $7,475 Fort Worth (Fort Worth part effective October 1, 2026 and subject to change by Fort Worth). Highest of 2 water service areas; the North Service Area pays the Town fee only ($6,960.56 at 1 inch).
- Water Meter Tap Fee (Town of Northlake) — 1"$2,500.00 one-timeTown of NorthlakeWater tap fee of $2,500 including the meter box, charged only when the Town makes the tap; 1-1/2 inch and larger taps are billed at actual cost.
- Water Meter Placement Fee (Town of Northlake) — 1" simple meter$400.00 one-timeTown of NorthlakeWater meter placement fee for a 1 inch meter. A refundable meter deposit is also required.
- Water Meter Tap Fee (Town of Northlake) — 1-1/2" and larger: actual cost$0.00Town of NorthlakeWater taps of 1-1/2 inches and larger are billed at the Town's actual cost, including the box or vault, when the Town makes the tap.
- Wastewater Impact Fee (Town of Northlake) — 1" meter: 1.67 EF$11,240.77 one-timeTown of NorthlakeTown wastewater impact fee for a 1 inch meter (1.67 equivalency factor); the same in both Town service areas. Assessed at final plat recordation.
- Sewer Tap Fee (Town of Northlake) — actual cost$0.00Town of NorthlakeNo published sewer tap fee for meters up to 3 inches; for 4 and 6 inch services the Town bills its actual cost when it makes the tap.
- Roadway Impact Fee (Town of Northlake, Office)Requires confirmationTown of NorthlakeNorthlake's adopted roadway impact fee schedule (Code Appendix A Sec. A6.003) prints no office row; office fees are computed from the service units in the Town's 2022 roadway impact fee study. Roadway fees are assessed at final plat recordation and collected at building permit.
- County Impact Fee (Denton County, Office)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Northlake Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Northlake Impact Fee FAQs
What are the total impact fees for a single-family home in Northlake, Texas?
A new single-family home in Northlake pays at least $38,936.69 per unit in combined impact fees (rates sourced November 25, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Northlake?
Commercial development in Northlake pays $52.84 per square foot in impact fees, plus $56,408.55 in one-time water and sewer connection fees (assuming a 1-inch meter), about $2,698,637.55 for a 50,000 sq ft building.
Does Northlake charge its own impact fees?
Yes. Northlake levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside Northlake. The schedule on this page shows every fee that applies to development in Northlake.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Denton County impact fees page.