DISH Impact Fees by Project Type
DISH: Single-Family Impact Fees
A new single-family home in DISH pays $2,800.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee — Town of Ponder, 3/4" meter (undeveloped lot) ($1,400.00) and Park Land Fee in Lieu of Dedication (Town of DISH) ($1,400.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full DISH Impact Fee Schedule
- Water Connection Fee — Town of Ponder, 3/4" meter (undeveloped lot)$1,400.00Town of Ponder, 3/4" (undeveloped lot)Town of PonderMost of DISH lies in the Town of Ponder water service area. Ponder charges $1,400 for a 3/4 inch residential connection where no tap or meter box is in place yet, plus any street bore cost, or $800 where the tap is already in place. Homes in the Longhorn Meadows and Meadow Ranch water systems are served by Lone Star Water Company instead.
- Sewer (Town of DISH, homes on septic)$0.00DISH has no public sewer system; homes use private septic systems and no sewer impact or connection fee applies.
- Park Land Fee in Lieu of Dedication (Town of DISH)$1,400.00Town of DISHTown of DISH DISH charges $1,400 per dwelling unit as money in lieu of parkland dedication. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- City Impact Fee (Town of DISH)$0.00The Town of DISH charges no impact fee at the building permit. New residential subdivisions dedicate parkland or pay $1,400 per lot in lieu of land when the final plat is recorded.
- County Impact Fee (Denton County)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
DISH: Multifamily Impact Fees
A new multifamily unit in DISH pays $2,800.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (MF) — Town of Ponder, 3/4" meter (undeveloped lot) ($1,400.00) and Park Land Fee in Lieu of Dedication (Town of DISH, MF) ($1,400.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full DISH Impact Fee Schedule
- Water Connection Fee (MF) — Town of Ponder, 3/4" meter (undeveloped lot)$1,400.00Town of Ponder, 3/4" (undeveloped lot)Town of PonderMost of DISH lies in the Town of Ponder water service area. Ponder charges per meter connection with no apartment rate: $1,400 for a 3/4 inch connection where no tap is in place, plus any street bore cost, or $800 where it is; a building on one connection pays once.
- Sewer (Town of DISH, homes on septic, MF)$0.00DISH has no public sewer system; properties use private septic systems and no sewer impact or connection fee applies.
- Park Land Fee in Lieu of Dedication (Town of DISH, MF)$1,400.00Town of DISHTown of DISH DISH charges $1,400 per dwelling unit as money in lieu of parkland dedication. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- City Impact Fee (Town of DISH, MF)$0.00The Town of DISH charges no impact fee at the building permit. New residential developments dedicate parkland or pay $1,400 per unit in lieu of land when the final plat is recorded.
- County Impact Fee (Denton County, MF)$0.00Denton CountyTexas law lets a county charge an impact fee only for drainage, and only where the county has at least 3.3 million residents or borders one that does. Denton County does not qualify, so no county impact fee applies.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
DISH: Commercial Impact Fees
Commercial development in DISH pays no per-square-foot impact fees (rates sourced November 25, 2026).
Water Connection Fee (Town of DISH) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full DISH Impact Fee Schedule
- Water Connection Fee (Town of DISH)Requires confirmationTown of DISHThe Town of DISH does not run a water utility; the water provider and its connection charges for a new commercial site depend on location.
- Sewer Connection Fee (Town of DISH, on-site sewage)$0.00Town of DISHDISH has no public sewer system; development uses on-site sewage facilities permitted under the town's OSSF rules, so no sewer connection or impact fee applies.
- City Impact Fee (Town of DISH, Commercial)$0.00Town of DISHThe Town of DISH has not adopted impact fees, so no town impact fee applies to commercial, office or industrial development.
- County Impact Fee (Denton County, Commercial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
DISH: Industrial Impact Fees
Industrial development in DISH pays no per-square-foot impact fees (rates sourced November 25, 2026).
Water Connection Fee (Town of DISH) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full DISH Impact Fee Schedule
- Water Connection Fee (Town of DISH)Requires confirmationTown of DISHThe Town of DISH does not run a water utility; the water provider and its connection charges for a new commercial site depend on location.
- Sewer Connection Fee (Town of DISH, on-site sewage)$0.00Town of DISHDISH has no public sewer system; development uses on-site sewage facilities permitted under the town's OSSF rules, so no sewer connection or impact fee applies.
- City Impact Fee (Town of DISH, Industrial)$0.00Town of DISHThe Town of DISH has not adopted impact fees, so no town impact fee applies to commercial, office or industrial development.
- County Impact Fee (Denton County, Industrial)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
DISH: Office Impact Fees
Office development in DISH pays no per-square-foot impact fees (rates sourced November 25, 2026).
Water Connection Fee (Town of DISH) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full DISH Impact Fee Schedule
- Water Connection Fee (Town of DISH)Requires confirmationTown of DISHThe Town of DISH does not run a water utility; the water provider and its connection charges for a new commercial site depend on location.
- Sewer Connection Fee (Town of DISH, on-site sewage)$0.00Town of DISHDISH has no public sewer system; development uses on-site sewage facilities permitted under the town's OSSF rules, so no sewer connection or impact fee applies.
- City Impact Fee (Town of DISH, Office)$0.00Town of DISHThe Town of DISH has not adopted impact fees, so no town impact fee applies to commercial, office or industrial development.
- County Impact Fee (Denton County, Office)$0.00Denton CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Denton County charges no county impact fee on commercial, office or industrial development.
Where in Denton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
DISH Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
DISH Impact Fee FAQs
What are the total impact fees for a single-family home in DISH, Texas?
A new single-family home in DISH pays $2,800.00 per unit in combined impact fees (rates sourced November 25, 2026).
How much are commercial impact fees in DISH?
DISH does not currently levy impact fees on commercial development.
Does DISH charge its own impact fees?
Yes. DISH levies its own municipal impact or utility fees. Denton County does not currently add county-level impact fees inside DISH. The schedule on this page shows every fee that applies to development in DISH.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Denton County impact fees page.