Impact fees in Tarrant County depend on where you build. This page details the rates for unincorporated Tarrant County: $13,088.00 per single-family unit as of . This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. Rendon is an unincorporated community. In Texas the city whose extraterritorial jurisdiction covers a site can charge water, wastewater and drainage impact fees there, and a utility district can charge its own fees, so new construction outside city limits may still owe them. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Tarrant County Impact Fees by Project Type

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County: Single-Family Impact Fees

A new single-family home in unincorporated Tarrant County pays $13,088.00 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Tap Fee — City of Fort Worth, 1" tap, asphalt street, short side ($3,000.00), Water Impact Fee — City of Fort Worth, 5/8" x 3/4" meter ($2,990.00) and Water Meter Set Fee (City of Fort Worth) ($60.00).

Sewer Tap Fee — City of Fort Worth, 4" tap, asphalt street, short side and Sewer Impact Fee — City of Fort Worth, 5/8" x 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Tarrant County Impact Fee Schedule
Water$6,050.00
  • Water Tap Fee — City of Fort Worth, 1" tap, asphalt street, short side
    1", asphalt, short side
    City of Fort Worth
    When City of Fort Worth crews tap an existing water main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,500 to $3,700 for a 1 in. tap, up to $4,600 for a 2 in. tap, plus pavement repair fees on asphalt streets. Taps in new subdivisions and in streets less than two years old are built by the developer under a Community Facilities Agreement instead.
    $3,000.00
  • Water Impact Fee — City of Fort Worth, 5/8" x 3/4" meter
    City of Fort Worth
    The City of Fort Worth holds the water service area covering the largest share of homes in unincorporated Tarrant County and charges new connections outside the city the same water impact fee as inside (City Code Sec. 35-60). A 5/8 x 3/4 in. meter pays $2,990 for permits or meter applications on or after October 1, 2026 (Ordinance 27745-06-2025, adopted June 10, 2025; $2,824 from October 1, 2025). Larger meters pay by meter equivalent. Lots on plats recorded before April 1, 2017 pay the fee in effect when the plat was recorded. Other parts of the unincorporated county are served by Bethesda Water Supply Corporation (around Rendon), Community Water Supply Corporation (near Briar), Aqua Texas, smaller private systems, or private wells, each with its own charges.
    $2,990.00
  • Water Meter Set Fee (City of Fort Worth)
    City of Fort Worth
    City of Fort Worth water customers pay a $60 new meter set fee for a meter 2 in. or smaller (City Code Sec. 35-56); larger meters are set under a developer agreement.
    $60.00
Sewer$7,038.00
  • Sewer Tap Fee — City of Fort Worth, 4" tap, asphalt street, short side
    4", asphalt, short side
    City of Fort Worth
    Where City of Fort Worth crews tap an existing sewer main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,600 to $7,900 for a standard 4 in. tap, more for 6 and 8 in. taps, which also require a $4,200 manhole. Taps in new subdivisions and in streets less than two years old are built by the developer instead. Homes on septic systems pay no sewer tap fee.
    $4,200.00Requires confirmation
  • Sewer Impact Fee — City of Fort Worth, 5/8" x 3/4" meter
    City of Fort Worth
    Where the City of Fort Worth provides sewer service outside the city, new connections pay its wastewater impact fee at the same rates as inside the city: $2,838 for a 5/8 x 3/4 in. meter for permits or meter applications on or after October 1, 2026 (Ordinance 27745-06-2025; $2,680 from October 1, 2025). Larger meters pay by meter equivalent. Many rural parts of unincorporated Tarrant County, including the Rendon, Pecan Acres and Briar areas, have no public sewer and use on-site septic systems instead.
    $2,838.00Requires confirmation
City$0.00
County$0.00
  • County Impact Fee (Tarrant County)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in unincorporated Tarrant County.
    $0.00
Total (unincorporated Tarrant County): $13,088.00
Sources last checked Official fee schedules:City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County: Multifamily Impact Fees

A new multifamily unit in unincorporated Tarrant County pays $13,088.00 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Tap Fee (MF) — City of Fort Worth, 1" tap, asphalt street, short side ($3,000.00), Water Impact Fee (MF) — City of Fort Worth, 5/8" x 3/4" meter ($2,990.00) and Water Meter Set Fee (City of Fort Worth, MF) ($60.00).

Sewer Impact Fee (MF) — City of Fort Worth, 5/8" x 3/4" meter and Sewer Tap Fee (MF) — City of Fort Worth, 4" tap, asphalt street, short side are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Tarrant County Impact Fee Schedule
Water$6,050.00
  • Water Tap Fee (MF) — City of Fort Worth, 1" tap, asphalt street, short side
    1", asphalt, short side
    City of Fort Worth
    When City of Fort Worth crews tap an existing water main, a 1 in. tap costs $2,500 to $3,700 depending on pavement and street side ($2,700 to $4,600 for 1.5 and 2 in. taps). A building on one connection pays once. Taps in new developments are built by the developer instead.
    $3,000.00
  • Water Impact Fee (MF) — City of Fort Worth, 5/8" x 3/4" meter
    City of Fort Worth
    The City of Fort Worth holds the water service area covering the largest share of homes in unincorporated Tarrant County and charges new connections outside the city the same water impact fee as inside. The fee is set by meter size, not by dwelling unit: $2,990 for a 5/8 x 3/4 in. meter for permits or meter applications on or after October 1, 2026 (Ordinance 27745-06-2025). An apartment building served by one larger master meter pays once at that meter's size (for example $65,033 for 3 in. or $112,125 for 4 in.). Other areas are served by Bethesda Water Supply Corporation, Community Water Supply Corporation, Aqua Texas, smaller systems or wells.
    $2,990.00
  • Water Meter Set Fee (City of Fort Worth, MF)
    City of Fort Worth
    City of Fort Worth water customers pay a $60 new meter set fee per meter 2 in. or smaller. A building on one meter pays it once.
    $60.00
Sewer$7,038.00
  • Sewer Tap Fee (MF) — City of Fort Worth, 4" tap, asphalt street, short side
    4", asphalt, short side
    City of Fort Worth
    Where City of Fort Worth crews tap an existing sewer main, a 4 in. tap costs $2,600 to $7,900 depending on pavement and street side; 6 and 8 in. taps cost more and require a $4,200 manhole. A building on one connection pays once, and taps in new developments are built by the developer instead.
    $4,200.00Requires confirmation
  • Sewer Impact Fee (MF) — City of Fort Worth, 5/8" x 3/4" meter
    City of Fort Worth
    Where the City of Fort Worth provides sewer service outside the city, new connections pay its wastewater impact fee by meter size: $2,838 for a 5/8 x 3/4 in. meter on or after October 1, 2026 (Ordinance 27745-06-2025). An apartment building on one master meter pays once at that meter's size. Many rural parts of unincorporated Tarrant County have no public sewer and use on-site septic systems.
    $2,838.00Requires confirmation
City$0.00
County$0.00
  • County Impact Fee (Tarrant County, MF)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in unincorporated Tarrant County.
    $0.00
Total (unincorporated Tarrant County): $13,088.00
Sources last checked Official fee schedules:City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*this pageIncludes unconfirmed fees
Arlington$79,996.13Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$779,981.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$1,344,710.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$619,398.63Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$387,250.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$182,057.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Unincorporated Tarrant County: Commercial Impact Fees

Commercial development in unincorporated Tarrant County pays no per-square-foot impact fees, but owes $21,830.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).

For a 50,000 sq ft building, that comes to about $21,830.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee — City of Fort Worth, 1" meter ($7,475.00 one-time), Water Tap Fee — City of Fort Worth, 1" tap, asphalt street, short side ($3,000.00 one-time) and Water Meter Set Fee (City of Fort Worth) ($60.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Impact Fee — City of Fort Worth, 1" meter and Sewer Tap Fee — City of Fort Worth, 4" tap, asphalt street, short side are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Tarrant County Impact Fee Schedule
Water$10,535.00 one-time
  • Water Impact Fee — City of Fort Worth, 1" meter
    City of Fort Worth
    The City of Fort Worth holds the largest water service area in unincorporated Tarrant County and charges new connections outside the city the same water impact fee as inside (City Code Sec. 35-60). A 1 in. meter (2.5 meter equivalents) pays $7,475 for permits or meter applications on or after October 1, 2026 (Ordinance 27745-06-2025, adopted June 10, 2025), in effect until the next impact fee study; other meter sizes pay by meter equivalent. Lots on plats recorded before April 1, 2017 pay the fee in effect when the plat was recorded. Other areas are served by Bethesda Water Supply Corporation (around Rendon), Community Water Supply Corporation (near Briar), Aqua Texas, smaller private systems or private wells.
    $7,475.00 one-time
  • Water Tap Fee — City of Fort Worth, 1" tap, asphalt street, short side
    1", asphalt, short side
    City of Fort Worth
    When City of Fort Worth crews tap an existing water main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,500 to $3,700 for a 1 in. tap, up to $4,600 for a 2 in. tap, plus pavement repair fees on asphalt streets. Larger taps, taps in new developments and taps in streets less than two years old are built by the developer under a Community Facilities Agreement instead.
    $3,000.00 one-time
  • Water Meter Set Fee (City of Fort Worth)
    City of Fort Worth
    City of Fort Worth water customers pay a $60 new meter set fee for a meter 2 in. or smaller (City Code Sec. 35-56); larger meters are set under a developer agreement or contract.
    $60.00 one-time
Sewer$11,295.00 one-time
  • Sewer Impact Fee — City of Fort Worth, 1" meter
    City of Fort Worth
    Where the City of Fort Worth provides sewer service outside the city, new connections pay its wastewater impact fee at the same rates as inside the city (City Code Sec. 35-60): $7,095 for a 1 in. meter (2.5 meter equivalents) for permits or meter applications on or after October 1, 2026 (Ordinance 27745-06-2025), in effect until the next impact fee study; other meter sizes pay by meter equivalent. Many rural parts of unincorporated Tarrant County, including the Rendon, Pecan Acres and Briar areas, have no public sewer and use on-site septic systems instead.
    $7,095.00 one-timeRequires confirmation
  • Sewer Tap Fee — City of Fort Worth, 4" tap, asphalt street, short side
    4", asphalt, short side
    City of Fort Worth
    Where City of Fort Worth crews tap an existing sewer main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,600 to $7,900 for a 4 in. tap, more for 6 and 8 in. taps, which also require a $4,200 manhole. Taps in new developments and in streets less than two years old are built by the developer instead. Sites on septic systems pay no sewer tap fee.
    $4,200.00 one-timeRequires confirmation
City$0.00
County$0.00
  • County Impact Fee (Tarrant County, Commercial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (unincorporated Tarrant County): $21,830.00 one-time (≈ $21,830.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*this pageIncludes unconfirmed fees
Arlington$31,402.63Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$286,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$533,068.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$220,048.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$187,350.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$95,882.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Unincorporated Tarrant County: Industrial Impact Fees

Industrial development in unincorporated Tarrant County pays no per-square-foot impact fees, but owes $21,830.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).

For a 50,000 sq ft building, that comes to about $21,830.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee — City of Fort Worth, 1" meter ($7,475.00 one-time), Water Tap Fee — City of Fort Worth, 1" tap, asphalt street, short side ($3,000.00 one-time) and Water Meter Set Fee (City of Fort Worth) ($60.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Impact Fee — City of Fort Worth, 1" meter and Sewer Tap Fee — City of Fort Worth, 4" tap, asphalt street, short side are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Tarrant County Impact Fee Schedule
Water$10,535.00 one-time
  • Water Impact Fee — City of Fort Worth, 1" meter
    City of Fort Worth
    The City of Fort Worth holds the largest water service area in unincorporated Tarrant County and charges new connections outside the city the same water impact fee as inside (City Code Sec. 35-60). A 1 in. meter (2.5 meter equivalents) pays $7,475 for permits or meter applications on or after October 1, 2026 (Ordinance 27745-06-2025, adopted June 10, 2025), in effect until the next impact fee study; other meter sizes pay by meter equivalent. Lots on plats recorded before April 1, 2017 pay the fee in effect when the plat was recorded. Other areas are served by Bethesda Water Supply Corporation (around Rendon), Community Water Supply Corporation (near Briar), Aqua Texas, smaller private systems or private wells.
    $7,475.00 one-time
  • Water Tap Fee — City of Fort Worth, 1" tap, asphalt street, short side
    1", asphalt, short side
    City of Fort Worth
    When City of Fort Worth crews tap an existing water main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,500 to $3,700 for a 1 in. tap, up to $4,600 for a 2 in. tap, plus pavement repair fees on asphalt streets. Larger taps, taps in new developments and taps in streets less than two years old are built by the developer under a Community Facilities Agreement instead.
    $3,000.00 one-time
  • Water Meter Set Fee (City of Fort Worth)
    City of Fort Worth
    City of Fort Worth water customers pay a $60 new meter set fee for a meter 2 in. or smaller (City Code Sec. 35-56); larger meters are set under a developer agreement or contract.
    $60.00 one-time
Sewer$11,295.00 one-time
  • Sewer Impact Fee — City of Fort Worth, 1" meter
    City of Fort Worth
    Where the City of Fort Worth provides sewer service outside the city, new connections pay its wastewater impact fee at the same rates as inside the city (City Code Sec. 35-60): $7,095 for a 1 in. meter (2.5 meter equivalents) for permits or meter applications on or after October 1, 2026 (Ordinance 27745-06-2025), in effect until the next impact fee study; other meter sizes pay by meter equivalent. Many rural parts of unincorporated Tarrant County, including the Rendon, Pecan Acres and Briar areas, have no public sewer and use on-site septic systems instead.
    $7,095.00 one-timeRequires confirmation
  • Sewer Tap Fee — City of Fort Worth, 4" tap, asphalt street, short side
    4", asphalt, short side
    City of Fort Worth
    Where City of Fort Worth crews tap an existing sewer main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,600 to $7,900 for a 4 in. tap, more for 6 and 8 in. taps, which also require a $4,200 manhole. Taps in new developments and in streets less than two years old are built by the developer instead. Sites on septic systems pay no sewer tap fee.
    $4,200.00 one-timeRequires confirmation
City$0.00
County$0.00
  • County Impact Fee (Tarrant County, Industrial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (unincorporated Tarrant County): $21,830.00 one-time (≈ $21,830.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*this pageIncludes unconfirmed fees
Arlington$38,824.38Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$262,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$650,198.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$241,027.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$121,175.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$76,551.16Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Unincorporated Tarrant County: Office Impact Fees

Office development in unincorporated Tarrant County pays no per-square-foot impact fees, but owes $21,830.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).

For a 25,000 sq ft building, that comes to about $21,830.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee — City of Fort Worth, 1" meter ($7,475.00 one-time), Water Tap Fee — City of Fort Worth, 1" tap, asphalt street, short side ($3,000.00 one-time) and Water Meter Set Fee (City of Fort Worth) ($60.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Impact Fee — City of Fort Worth, 1" meter and Sewer Tap Fee — City of Fort Worth, 4" tap, asphalt street, short side are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Tarrant County Impact Fee Schedule
Water$10,535.00 one-time
  • Water Impact Fee — City of Fort Worth, 1" meter
    City of Fort Worth
    The City of Fort Worth holds the largest water service area in unincorporated Tarrant County and charges new connections outside the city the same water impact fee as inside (City Code Sec. 35-60). A 1 in. meter (2.5 meter equivalents) pays $7,475 for permits or meter applications on or after October 1, 2026 (Ordinance 27745-06-2025, adopted June 10, 2025), in effect until the next impact fee study; other meter sizes pay by meter equivalent. Lots on plats recorded before April 1, 2017 pay the fee in effect when the plat was recorded. Other areas are served by Bethesda Water Supply Corporation (around Rendon), Community Water Supply Corporation (near Briar), Aqua Texas, smaller private systems or private wells.
    $7,475.00 one-time
  • Water Tap Fee — City of Fort Worth, 1" tap, asphalt street, short side
    1", asphalt, short side
    City of Fort Worth
    When City of Fort Worth crews tap an existing water main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,500 to $3,700 for a 1 in. tap, up to $4,600 for a 2 in. tap, plus pavement repair fees on asphalt streets. Larger taps, taps in new developments and taps in streets less than two years old are built by the developer under a Community Facilities Agreement instead.
    $3,000.00 one-time
  • Water Meter Set Fee (City of Fort Worth)
    City of Fort Worth
    City of Fort Worth water customers pay a $60 new meter set fee for a meter 2 in. or smaller (City Code Sec. 35-56); larger meters are set under a developer agreement or contract.
    $60.00 one-time
Sewer$11,295.00 one-time
  • Sewer Impact Fee — City of Fort Worth, 1" meter
    City of Fort Worth
    Where the City of Fort Worth provides sewer service outside the city, new connections pay its wastewater impact fee at the same rates as inside the city (City Code Sec. 35-60): $7,095 for a 1 in. meter (2.5 meter equivalents) for permits or meter applications on or after October 1, 2026 (Ordinance 27745-06-2025), in effect until the next impact fee study; other meter sizes pay by meter equivalent. Many rural parts of unincorporated Tarrant County, including the Rendon, Pecan Acres and Briar areas, have no public sewer and use on-site septic systems instead.
    $7,095.00 one-timeRequires confirmation
  • Sewer Tap Fee — City of Fort Worth, 4" tap, asphalt street, short side
    4", asphalt, short side
    City of Fort Worth
    Where City of Fort Worth crews tap an existing sewer main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,600 to $7,900 for a 4 in. tap, more for 6 and 8 in. taps, which also require a $4,200 manhole. Taps in new developments and in streets less than two years old are built by the developer instead. Sites on septic systems pay no sewer tap fee.
    $4,200.00 one-timeRequires confirmation
City$0.00
County$0.00
  • County Impact Fee (Tarrant County, Office)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (unincorporated Tarrant County): $21,830.00 one-time (≈ $21,830.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Tarrant County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Tarrant County Impact Fee FAQs

What are single-family impact fees in Tarrant County, Texas?

A new single-family home in unincorporated Tarrant County pays $13,088.00 per unit in impact fees (rates sourced November 4, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Tarrant County?

Multifamily development in unincorporated Tarrant County pays $13,088.00 per unit in impact fees (rates sourced November 4, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Tarrant County?

Commercial development in unincorporated Tarrant County pays no per-square-foot impact fees, but owes $21,830.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Rendon pay Tarrant County impact fees?

Rendon is unincorporated, so the Tarrant County charges on this page apply there. In Texas the city whose extraterritorial jurisdiction covers a site can charge water, wastewater and drainage impact fees there, and a utility district can charge its own fees, so new construction outside city limits may still owe them. Search a specific address in the calculator below to confirm it sits outside every city limit.

Do cities in Tarrant County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 34 of 35 cities in Tarrant County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction, or want to sponsor one?