Westworth Village Impact Fees by Project Type
Westworth Village: Single-Family Impact Fees
A new single-family home in Westworth Village pays $7,228.00 per unit in impact fees (rates sourced November 24, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Fort Worth, Westworth Village) — 5/8" x 3/4" meter ($2,990.00), Wastewater Impact Fee (City of Fort Worth, Westworth Village) — 5/8" x 3/4" meter ($2,838.00) and Sewer Connection Fee (City of Westworth Village) ($450.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Westworth Village Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Westworth Village) — 5/8" x 3/4" meter$2,990.00City of Fort Worth (collected by City of Westworth Village)Westworth Village collects the City of Fort Worth water impact fee on new connections under its wholesale water contract: $2,990 for a 5/8 x 3/4 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), $4,485 for a 3/4 x 3/4 in. meter, rising to $627,900 for a 10 in. meter.
- Water Connection Fee (City of Westworth Village)$250.00City of Westworth VillageWestworth Village charges a $250 water connection fee for a 3/4 in. meter, for connecting to the tap at the property line, in addition to the tap fee (Ord. 533, adopted October 13, 2026).
- Water Tap Fee (City of Westworth Village)$250.00City of Westworth VillageWestworth Village charges a $250 water tap fee plus the actual cost of the meter, materials and installation (Ord. 533, adopted October 13, 2026).
- Wastewater Impact Fee (City of Fort Worth, Westworth Village) — 5/8" x 3/4" meter$2,838.00City of Fort Worth (collected by City of Westworth Village)Westworth Village collects the City of Fort Worth wastewater impact fee on new sewer connections under its wholesale wastewater contract: $2,838 for a 5/8 x 3/4 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), rising to $595,980 for a 10 in. meter.
- Sewer Connection Fee (City of Westworth Village)$450.00City of Westworth VillageWestworth Village charges a $450 sewer connection fee in addition to the sewer tap fee (Ord. 533, adopted October 13, 2026).
- Sewer Tap Fee (City of Westworth Village)$450.00City of Westworth VillageWestworth Village charges a $450 sewer tap fee plus the actual cost of materials and installation (Ord. 533, adopted October 13, 2026).
- City Impact Fee (City of Westworth Village)$0.00City of Westworth VillageWestworth Village has no roadway impact fee and no parkland dedication fee.
- County Impact Fee (Tarrant County)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Westworth Village.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Westworth Village: Multifamily Impact Fees
A new multifamily unit in Westworth Village pays $7,228.00 per unit in impact fees (rates sourced November 24, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Fort Worth, Westworth Village, MF) — 5/8" x 3/4" meter ($2,990.00), Wastewater Impact Fee (City of Fort Worth, Westworth Village, MF) — 5/8" x 3/4" meter ($2,838.00) and Sewer Connection Fee (City of Westworth Village, MF) ($450.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Westworth Village Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Westworth Village, MF) — 5/8" x 3/4" meter$2,990.00City of Fort Worth (collected by City of Westworth Village)Westworth Village collects the City of Fort Worth water impact fee on new connections, priced by meter size only (building permits on or after October 1, 2026). The amount shown is the smallest meter, the floor for a unit with its own meter; a building on one master meter pays once at that meter's size, $23,920 for 2 in. and more for larger meters.
- Water Connection Fee (City of Westworth Village, MF)$250.00City of Westworth VillageWestworth Village charges a $250 water connection fee per tap (Ord. 533, adopted October 13, 2026); a building on one tap pays it once.
- Water Tap Fee (City of Westworth Village, MF)$250.00City of Westworth VillageWestworth Village charges a $250 water tap fee plus the actual cost of the meter, materials and installation (Ord. 533, adopted October 13, 2026); a building on one tap pays it once.
- Wastewater Impact Fee (City of Fort Worth, Westworth Village, MF) — 5/8" x 3/4" meter$2,838.00City of Fort Worth (collected by City of Westworth Village)Westworth Village collects the City of Fort Worth wastewater impact fee on new sewer connections, priced by meter size only. The amount shown is the smallest meter; a building on one master meter pays once at that meter's size, $22,704 for 2 in. and more for larger meters.
- Sewer Connection Fee (City of Westworth Village, MF)$450.00City of Westworth VillageWestworth Village charges a $450 sewer connection fee (Ord. 533, adopted October 13, 2026); a building on one connection pays it once.
- Sewer Tap Fee (City of Westworth Village, MF)$450.00City of Westworth VillageWestworth Village charges a $450 sewer tap fee plus the actual cost of materials and installation (Ord. 533, adopted October 13, 2026); a building on one tap pays it once.
- City Impact Fee (City of Westworth Village, MF)$0.00City of Westworth VillageWestworth Village has no roadway impact fee and no parkland dedication fee.
- County Impact Fee (Tarrant County, MF)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Westworth Village.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Westworth Village: Commercial Impact Fees
Commercial development in Westworth Village pays no per-square-foot impact fees, but owes $15,970.00 in one-time water and sewer connection fees (rates sourced November 24, 2026).
For a 50,000 sq ft building, that comes to about $15,970.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth, Westworth Village) — 1" meter ($7,475.00 one-time), Wastewater Impact Fee (City of Fort Worth, Westworth Village) — 1" meter ($7,095.00 one-time) and Sewer Connection Fee (City of Westworth Village) ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (City of Westworth Village) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Westworth Village Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Westworth Village) — 1" meter$7,475.00 one-timeCity of Fort WorthWestworth Village collects the City of Fort Worth water impact fee on new connections for residential and other customer classes under its wholesale water contract (City Code Sec. 13.02.094). For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,475; other sizes range from $2,990 for a 5/8 in. meter to $627,900 for a 10 in. meter.
- Water Tap Fee (City of Westworth Village)$250.00 one-timeCity of Westworth VillageWestworth Village charges a $250 water tap fee plus the actual cost of the meter, materials and installation (fee schedule replaced by Ordinance 533, adopted October 13, 2026; the earlier tap fee was $150).
- Water Connection Fee (City of Westworth Village)$250.00 one-timeRequires confirmationCity of Westworth VillageWestworth Village charges a $250 water connection fee for connecting to the tap at the property line (the fee schedule prices a 3/4 in. meter), in addition to the tap fee and the Fort Worth water impact fee (Ordinance 533, adopted October 13, 2026; the earlier fee was $150).
- Wastewater Impact Fee (City of Fort Worth, Westworth Village) — 1" meter$7,095.00 one-timeCity of Fort WorthWestworth Village collects the City of Fort Worth wastewater impact fee on new sewer connections for residential and other customer classes under its wholesale wastewater contract (City Code Sec. 13.02.094). For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,095; other sizes range from $2,838 for a 5/8 in. meter to $595,980 for a 10 in. meter.
- Sewer Connection Fee (City of Westworth Village)$450.00 one-timeCity of Westworth VillageWestworth Village charges a $450 sewer connection fee in addition to the sewer tap fee and the Fort Worth wastewater impact fee (Ordinance 533, adopted October 13, 2026; the earlier fee was $125).
- Sewer Tap Fee (City of Westworth Village)$450.00 one-timeCity of Westworth VillageWestworth Village charges a $450 sewer tap fee plus the actual cost of materials and installation (fee schedule replaced by Ordinance 533, adopted October 13, 2026; the earlier tap fee was $350).
- City Impact Fee (City of Westworth Village, Commercial)$0.00City of Westworth VillageWestworth Village has not adopted a roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. The only impact fees collected are the City of Fort Worth water and wastewater impact fees on new utility connections.
- County Impact Fee (Tarrant County, Commercial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Westworth Village: Industrial Impact Fees
Industrial development in Westworth Village pays no per-square-foot impact fees, but owes $15,970.00 in one-time water and sewer connection fees (rates sourced November 24, 2026).
For a 50,000 sq ft building, that comes to about $15,970.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth, Westworth Village) — 1" meter ($7,475.00 one-time), Wastewater Impact Fee (City of Fort Worth, Westworth Village) — 1" meter ($7,095.00 one-time) and Sewer Connection Fee (City of Westworth Village) ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (City of Westworth Village) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Westworth Village Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Westworth Village) — 1" meter$7,475.00 one-timeCity of Fort WorthWestworth Village collects the City of Fort Worth water impact fee on new connections for residential and other customer classes under its wholesale water contract (City Code Sec. 13.02.094). For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,475; other sizes range from $2,990 for a 5/8 in. meter to $627,900 for a 10 in. meter.
- Water Tap Fee (City of Westworth Village)$250.00 one-timeCity of Westworth VillageWestworth Village charges a $250 water tap fee plus the actual cost of the meter, materials and installation (fee schedule replaced by Ordinance 533, adopted October 13, 2026; the earlier tap fee was $150).
- Water Connection Fee (City of Westworth Village)$250.00 one-timeRequires confirmationCity of Westworth VillageWestworth Village charges a $250 water connection fee for connecting to the tap at the property line (the fee schedule prices a 3/4 in. meter), in addition to the tap fee and the Fort Worth water impact fee (Ordinance 533, adopted October 13, 2026; the earlier fee was $150).
- Wastewater Impact Fee (City of Fort Worth, Westworth Village) — 1" meter$7,095.00 one-timeCity of Fort WorthWestworth Village collects the City of Fort Worth wastewater impact fee on new sewer connections for residential and other customer classes under its wholesale wastewater contract (City Code Sec. 13.02.094). For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,095; other sizes range from $2,838 for a 5/8 in. meter to $595,980 for a 10 in. meter.
- Sewer Connection Fee (City of Westworth Village)$450.00 one-timeCity of Westworth VillageWestworth Village charges a $450 sewer connection fee in addition to the sewer tap fee and the Fort Worth wastewater impact fee (Ordinance 533, adopted October 13, 2026; the earlier fee was $125).
- Sewer Tap Fee (City of Westworth Village)$450.00 one-timeCity of Westworth VillageWestworth Village charges a $450 sewer tap fee plus the actual cost of materials and installation (fee schedule replaced by Ordinance 533, adopted October 13, 2026; the earlier tap fee was $350).
- City Impact Fee (City of Westworth Village, Industrial)$0.00City of Westworth VillageWestworth Village has not adopted a roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. The only impact fees collected are the City of Fort Worth water and wastewater impact fees on new utility connections.
- County Impact Fee (Tarrant County, Industrial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Westworth Village: Office Impact Fees
Office development in Westworth Village pays no per-square-foot impact fees, but owes $15,970.00 in one-time water and sewer connection fees (rates sourced November 24, 2026).
For a 25,000 sq ft building, that comes to about $15,970.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth, Westworth Village) — 1" meter ($7,475.00 one-time), Wastewater Impact Fee (City of Fort Worth, Westworth Village) — 1" meter ($7,095.00 one-time) and Sewer Connection Fee (City of Westworth Village) ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (City of Westworth Village) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Westworth Village Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Westworth Village) — 1" meter$7,475.00 one-timeCity of Fort WorthWestworth Village collects the City of Fort Worth water impact fee on new connections for residential and other customer classes under its wholesale water contract (City Code Sec. 13.02.094). For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,475; other sizes range from $2,990 for a 5/8 in. meter to $627,900 for a 10 in. meter.
- Water Tap Fee (City of Westworth Village)$250.00 one-timeCity of Westworth VillageWestworth Village charges a $250 water tap fee plus the actual cost of the meter, materials and installation (fee schedule replaced by Ordinance 533, adopted October 13, 2026; the earlier tap fee was $150).
- Water Connection Fee (City of Westworth Village)$250.00 one-timeRequires confirmationCity of Westworth VillageWestworth Village charges a $250 water connection fee for connecting to the tap at the property line (the fee schedule prices a 3/4 in. meter), in addition to the tap fee and the Fort Worth water impact fee (Ordinance 533, adopted October 13, 2026; the earlier fee was $150).
- Wastewater Impact Fee (City of Fort Worth, Westworth Village) — 1" meter$7,095.00 one-timeCity of Fort WorthWestworth Village collects the City of Fort Worth wastewater impact fee on new sewer connections for residential and other customer classes under its wholesale wastewater contract (City Code Sec. 13.02.094). For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,095; other sizes range from $2,838 for a 5/8 in. meter to $595,980 for a 10 in. meter.
- Sewer Connection Fee (City of Westworth Village)$450.00 one-timeCity of Westworth VillageWestworth Village charges a $450 sewer connection fee in addition to the sewer tap fee and the Fort Worth wastewater impact fee (Ordinance 533, adopted October 13, 2026; the earlier fee was $125).
- Sewer Tap Fee (City of Westworth Village)$450.00 one-timeCity of Westworth VillageWestworth Village charges a $450 sewer tap fee plus the actual cost of materials and installation (fee schedule replaced by Ordinance 533, adopted October 13, 2026; the earlier tap fee was $350).
- City Impact Fee (City of Westworth Village, Office)$0.00City of Westworth VillageWestworth Village has not adopted a roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. The only impact fees collected are the City of Fort Worth water and wastewater impact fees on new utility connections.
- County Impact Fee (Tarrant County, Office)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Westworth Village Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Westworth Village Impact Fee FAQs
What are the total impact fees for a single-family home in Westworth Village, Texas?
A new single-family home in Westworth Village pays $7,228.00 per unit in combined impact fees (rates sourced November 24, 2026).
How much are commercial impact fees in Westworth Village?
Commercial development in Westworth Village pays no per-square-foot impact fees, but owes $15,970.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Westworth Village charge its own impact fees?
Yes. Westworth Village levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Westworth Village. The schedule on this page shows every fee that applies to development in Westworth Village.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Tarrant County impact fees page.