Southlake Impact Fees by Project Type
Southlake: Single-Family Impact Fees
A new single-family home in Southlake pays $16,826.91 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Park Land Dedication Fee in Lieu (City of Southlake) ($6,500.00), Water Impact Fee (City of Fort Worth, Southlake) — 5/8" x 3/4" meter ($2,990.00) and Water Impact Fee (City of Southlake) — 1" meter ($2,815.28).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Southlake Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Southlake) — 5/8" x 3/4" meter$2,990.00City of Fort Worth (collected by City of Southlake)Southlake collects the City of Fort Worth water impact fee on new water connections, as Fort Worth supplies Southlake's water. Fort Worth's schedule for building permits on or after October 1, 2026 (Ordinance 27745-06-2025) is $2,990 for a 5/8 x 3/4 in. meter and $7,475 for a 1 in. meter, the smallest meter Southlake installs, rising to $627,900 for a 10 in. meter.
- Water Impact Fee (City of Southlake) — 1" meter$2,815.28City of SouthlakeSouthlake water impact fee (Ordinance 657-D, rates in effect since April 1, 2016), collected when the water tap is purchased: $2,815.28 for a 1 in. meter, the city's smallest standard meter, rising to $90,088.85 for an 8 in. meter. The City of Fort Worth water impact fee is collected in addition.
- Water Meter Fee (City of Southlake) — 1" meter$555.00City of SouthlakeSouthlake Water Utilities supplies and installs domestic meters for $555 (1 in., including transponder) or $2,205 (2 in. compound). Meters 4 in. and larger are bought by the property owner. Where the city makes the water tap, it is billed at actual cost plus a 15% administrative fee.
- Wastewater Impact Fee (City of Southlake) — 1" meter$1,674.63City of SouthlakeSouthlake wastewater impact fee (Ordinance 657-D, rates in effect since April 1, 2016), collected when the sewer tap is purchased: $1,674.63 for a 1 in. meter, rising to $53,588.30 for an 8 in. meter. The city's fee schedule also lists a $1,300 per lot sewer participation fee and an $80 sewer tap inspection; the sewer tap itself is billed at actual cost plus a 15% administrative fee.
- Park Land Dedication Fee in Lieu (City of Southlake)$6,500.00City of SouthlakeSouthlake requires park land dedication of one acre per 40 dwelling units; the fee in lieu of dedication is $6,500 per residential lot.
- Roadway Impact Fee (City of Southlake) — North Service Area$2,292.00City of SouthlakeSouthlake roadway impact fee per single-family home, collected with the building permit (Ordinance 657-D): $2,292 north of SH 114 (North Service Area), the highest of 2 service areas, and $1,640 in the South Service Area.
- County Impact Fee (Tarrant County)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Southlake.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Southlake: Multifamily Impact Fees
A new multifamily unit in Southlake pays $15,955.91 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Park Land Dedication Fee in Lieu (City of Southlake, MF) ($6,500.00), Water Impact Fee (City of Fort Worth, Southlake, MF) — 5/8" x 3/4" meter ($2,990.00) and Water Impact Fee (City of Southlake, MF) — 1" meter ($2,815.28).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Southlake Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Southlake, MF) — 5/8" x 3/4" meter$2,990.00City of Fort Worth (collected by City of Southlake)Southlake collects the City of Fort Worth water impact fee on new water connections, priced by meter size only (building permits on or after October 1, 2026, Ordinance 27745-06-2025). The amount shown is the smallest meter; Southlake's smallest city-installed meter is 1 in. ($7,475), and a building on one master meter pays once at that meter's size, $23,920 for 2 in. and more for larger meters.
- Water Impact Fee (City of Southlake, MF) — 1" meter$2,815.28City of SouthlakeSouthlake water impact fee (Ordinance 657-D), priced by meter size only: $2,815.28 for a 1 in. meter, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $9,008.89 for 2 in. and up to $90,088.85 for 8 in. The City of Fort Worth water impact fee is collected in addition.
- Water Meter Fee (City of Southlake, MF) — 1" meter$555.00City of SouthlakeSouthlake supplies and installs a 1 in. domestic meter for $555, the floor for a unit with its own meter; a building on one 2 in. compound meter pays $2,205 once. Water taps are billed at actual cost plus a 15% administrative fee.
- Wastewater Impact Fee (City of Southlake, MF) — 1" meter$1,674.63City of SouthlakeSouthlake wastewater impact fee (Ordinance 657-D), priced by meter size only: $1,674.63 for a 1 in. meter, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $5,358.83 for 2 in. and up to $53,588.30 for 8 in. The fee schedule also lists a $1,300 per lot sewer participation fee and an $80 sewer tap inspection; the tap is billed at actual cost plus 15%.
- Park Land Dedication Fee in Lieu (City of Southlake, MF)$6,500.00City of SouthlakeSouthlake requires park land dedication of one acre per 40 dwelling units; the fee in lieu of dedication is $6,500 per dwelling unit.
- Roadway Impact Fee (City of Southlake, MF) — North Service Area$1,421.00City of SouthlakeSouthlake roadway impact fee per apartment unit, collected with the building permit (Ordinance 657-D): $1,421 north of SH 114 (North Service Area), the highest of 2 service areas, and $1,017 in the South Service Area.
- County Impact Fee (Tarrant County, MF)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Southlake.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Southlake: Commercial Impact Fees
Commercial development in Southlake pays $3.39 per square foot in impact fees, plus $12,519.91 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to at least $182,057.41. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth, Southlake) — 1" meter ($7,475.00 one-time), Water Impact Fee (City of Southlake) — 1" meter ($2,815.28 one-time) and Wastewater Impact Fee (City of Southlake) — 1" meter ($1,674.63 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Park Land Dedication Fee in Lieu (City of Southlake, Commercial) — per gross acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Southlake Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Southlake) — 1" meter$7,475.00 one-timeCity of Fort WorthSouthlake collects the City of Fort Worth water impact fee on new water connections and meter upgrades, in addition to its own water impact fee. For plats recorded on or after April 1, 2017 and building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,475; other sizes range from $2,990 for a 5/8 in. meter to $627,900 for a 10 in. meter. Earlier plats pay Fort Worth's lower plat-date rates.
- Water Impact Fee (City of Southlake) — 1" meter$2,815.28 one-timeCity of SouthlakeSouthlake's water impact fee (Ordinance 657-D, fees effective April 1, 2016) is set by meter size: $2,815.28 for a 1 in. meter (1.0 living unit equivalent), rising to $90,088.85 for an 8 in. meter. It is collected when the water tap is purchased, separately from the City of Fort Worth water impact fee Southlake also collects.
- Water Meter Fee (City of Southlake) — 1" meter$555.00 one-timeCity of SouthlakeSouthlake supplies and installs 1 in. and 2 in. compound domestic water meters for $555 and $2,205 (2026 fee schedule, transponder included). Meters 4 in. and larger are purchased by the property owner (the city schedule lists $5,000 for 4 in., $7,605 for 6 in. and $10,775 for 8 in.). Water and sewer taps installed by the city are billed at actual cost plus a 15% administrative fee.
- Wastewater Impact Fee (City of Southlake) — 1" meter$1,674.63 one-timeCity of SouthlakeSouthlake's wastewater impact fee (Ordinance 657-D, fees effective April 1, 2016) is set by water meter size: $1,674.63 for a 1 in. meter, rising to $53,588.30 for an 8 in. meter. It is collected when the sewer tap is purchased.
- Roadway Impact Fee (City of Southlake, Commercial) — North Service Area$3.39/sq ftCity of SouthlakeSouthlake's roadway impact fee for a shopping center (ITE 820) is $3,390.75 per 1,000 sq ft of gross floor area in the North service area, the higher of the city's two service areas, and $2,426.25 in the South service area (Ordinance 657-D, fees effective April 1, 2016). It is collected when the building permit application is submitted; other retail uses pay their own rates.
- Park Land Dedication Fee in Lieu (City of Southlake, Commercial) — per gross acreRequires confirmationCity of SouthlakeSouthlake requires nonresidential park land dedication of one acre per 50 gross acres, or a fee in lieu of $8,700 per gross acre of the development (2026 fee schedule).
- County Impact Fee (Tarrant County, Commercial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Southlake: Industrial Impact Fees
Industrial development in Southlake pays $1.67 per square foot in impact fees, plus $12,519.91 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to at least $95,882.41. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth, Southlake) — 1" meter ($7,475.00 one-time), Water Impact Fee (City of Southlake) — 1" meter ($2,815.28 one-time) and Wastewater Impact Fee (City of Southlake) — 1" meter ($1,674.63 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Park Land Dedication Fee in Lieu (City of Southlake, Industrial) — per gross acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Southlake Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Southlake) — 1" meter$7,475.00 one-timeCity of Fort WorthSouthlake collects the City of Fort Worth water impact fee on new water connections and meter upgrades, in addition to its own water impact fee. For plats recorded on or after April 1, 2017 and building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,475; other sizes range from $2,990 for a 5/8 in. meter to $627,900 for a 10 in. meter. Earlier plats pay Fort Worth's lower plat-date rates.
- Water Impact Fee (City of Southlake) — 1" meter$2,815.28 one-timeCity of SouthlakeSouthlake's water impact fee (Ordinance 657-D, fees effective April 1, 2016) is set by meter size: $2,815.28 for a 1 in. meter (1.0 living unit equivalent), rising to $90,088.85 for an 8 in. meter. It is collected when the water tap is purchased, separately from the City of Fort Worth water impact fee Southlake also collects.
- Water Meter Fee (City of Southlake) — 1" meter$555.00 one-timeCity of SouthlakeSouthlake supplies and installs 1 in. and 2 in. compound domestic water meters for $555 and $2,205 (2026 fee schedule, transponder included). Meters 4 in. and larger are purchased by the property owner (the city schedule lists $5,000 for 4 in., $7,605 for 6 in. and $10,775 for 8 in.). Water and sewer taps installed by the city are billed at actual cost plus a 15% administrative fee.
- Wastewater Impact Fee (City of Southlake) — 1" meter$1,674.63 one-timeCity of SouthlakeSouthlake's wastewater impact fee (Ordinance 657-D, fees effective April 1, 2016) is set by water meter size: $1,674.63 for a 1 in. meter, rising to $53,588.30 for an 8 in. meter. It is collected when the sewer tap is purchased.
- Roadway Impact Fee (City of Southlake, Industrial) — North Service Area$1.67/sq ftCity of SouthlakeSouthlake's roadway impact fee for general light industrial space (ITE 110) is $1,667.25 per 1,000 sq ft of gross floor area in the North service area, the higher of the city's two service areas, and $1,193.25 in the South service area (Ordinance 657-D, fees effective April 1, 2016). It is collected when the building permit application is submitted.
- Park Land Dedication Fee in Lieu (City of Southlake, Industrial) — per gross acreRequires confirmationCity of SouthlakeSouthlake requires nonresidential park land dedication of one acre per 50 gross acres, or a fee in lieu of $8,700 per gross acre of the development (2026 fee schedule).
- County Impact Fee (Tarrant County, Industrial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Southlake: Office Impact Fees
Office development in Southlake pays $2.56 per square foot in impact fees, plus $12,519.91 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 25,000 sq ft building, that comes to at least $76,551.16. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth, Southlake) — 1" meter ($7,475.00 one-time), Water Impact Fee (City of Southlake) — 1" meter ($2,815.28 one-time) and Wastewater Impact Fee (City of Southlake) — 1" meter ($1,674.63 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Park Land Dedication Fee in Lieu (City of Southlake, Office) — per gross acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Southlake Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Southlake) — 1" meter$7,475.00 one-timeCity of Fort WorthSouthlake collects the City of Fort Worth water impact fee on new water connections and meter upgrades, in addition to its own water impact fee. For plats recorded on or after April 1, 2017 and building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,475; other sizes range from $2,990 for a 5/8 in. meter to $627,900 for a 10 in. meter. Earlier plats pay Fort Worth's lower plat-date rates.
- Water Impact Fee (City of Southlake) — 1" meter$2,815.28 one-timeCity of SouthlakeSouthlake's water impact fee (Ordinance 657-D, fees effective April 1, 2016) is set by meter size: $2,815.28 for a 1 in. meter (1.0 living unit equivalent), rising to $90,088.85 for an 8 in. meter. It is collected when the water tap is purchased, separately from the City of Fort Worth water impact fee Southlake also collects.
- Water Meter Fee (City of Southlake) — 1" meter$555.00 one-timeCity of SouthlakeSouthlake supplies and installs 1 in. and 2 in. compound domestic water meters for $555 and $2,205 (2026 fee schedule, transponder included). Meters 4 in. and larger are purchased by the property owner (the city schedule lists $5,000 for 4 in., $7,605 for 6 in. and $10,775 for 8 in.). Water and sewer taps installed by the city are billed at actual cost plus a 15% administrative fee.
- Wastewater Impact Fee (City of Southlake) — 1" meter$1,674.63 one-timeCity of SouthlakeSouthlake's wastewater impact fee (Ordinance 657-D, fees effective April 1, 2016) is set by water meter size: $1,674.63 for a 1 in. meter, rising to $53,588.30 for an 8 in. meter. It is collected when the sewer tap is purchased.
- Roadway Impact Fee (City of Southlake, Office) — North Service Area$2.56/sq ftCity of SouthlakeSouthlake's roadway impact fee for a general office building (ITE 710) is $2,561.25 per 1,000 sq ft of gross floor area in the North service area, the higher of the city's two service areas, and $1,833.00 in the South service area (Ordinance 657-D, fees effective April 1, 2016). It is collected when the building permit application is submitted.
- Park Land Dedication Fee in Lieu (City of Southlake, Office) — per gross acreRequires confirmationCity of SouthlakeSouthlake requires nonresidential park land dedication of one acre per 50 gross acres, or a fee in lieu of $8,700 per gross acre of the development (2026 fee schedule).
- County Impact Fee (Tarrant County, Office)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Southlake Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Southlake Impact Fee FAQs
What are the total impact fees for a single-family home in Southlake, Texas?
A new single-family home in Southlake pays $16,826.91 per unit in combined impact fees (rates sourced November 11, 2026).
How much are commercial impact fees in Southlake?
Commercial development in Southlake pays $3.39 per square foot in impact fees, plus $12,519.91 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $182,057.41 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Southlake charge its own impact fees?
Yes. Southlake levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Southlake. The schedule on this page shows every fee that applies to development in Southlake.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.