White Settlement Impact Fees by Project Type
White Settlement: Single-Family Impact Fees
A new single-family home in White Settlement pays at least $11,918.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (City of White Settlement) — 4" tap, paved alley or street ($4,000.00), Water Impact Fee (City of Fort Worth, White Settlement) — 5/8" x 3/4" meter ($2,990.00) and Wastewater Impact Fee (City of Fort Worth, White Settlement) — 5/8" x 3/4" meter ($2,838.00).
City Impact Fee (City of White Settlement) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full White Settlement Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, White Settlement) — 5/8" x 3/4" meter$2,990.00City of Fort Worth (collected by City of White Settlement)White Settlement collects the City of Fort Worth water impact fee on new connections. Fort Worth's schedule for building permits on or after October 1, 2026 (Ordinance 27745-06-2025) is $2,990 for a standard 5/8 x 3/4 in. residential meter, rising to $627,900 for a 10 in. meter; the city's posted table still shows Fort Worth's earlier rates.
- Water Tap Fee (City of White Settlement) — 1" tap, paved street$1,790.001", paved streetCity of White SettlementWhite Settlement water tap fee: $1,790 for a 1 in. tap under a paved street, $2,040 for 1.5 in. and $2,260 for 2 in.; under an unimproved street $890, $1,070 and $1,400. Each 3/4 in. branch adds $85 and each 1 in. branch $110. Taps over 2 in. are billed at cost. A meter set fee is charged in addition.
- Water Meter Set Fee (City of White Settlement) — 3/4" meter$300.00City of White SettlementWhite Settlement meter set fee: $300 for a 3/4 in. meter, $475 for 1 in., $1,050 for 1.5 in., $1,125 for 2 in., $1,300 for 3 in., $1,800 for 4 in. and $3,800 for 6 in.
- Sewer Tap Fee (City of White Settlement) — 4" tap, paved alley or street$4,000.004", paved alley or streetCity of White SettlementWhite Settlement sewer tap fee: $4,000 for a 4 in. tap under a paved alley or street ($6,000 for 6 in., $10,000 for 8 in.), $1,600 to $2,000 under a dirt street and $1,000 to $1,400 under an unimproved street. Where a tap already exists, a sewer tie-on fee of $150 (4 in.) to $450 (8 in.) applies instead.
- Wastewater Impact Fee (City of Fort Worth, White Settlement) — 5/8" x 3/4" meter$2,838.00City of Fort Worth (collected by City of White Settlement)White Settlement collects the City of Fort Worth wastewater impact fee on new sewer connections: $2,838 for a standard 5/8 x 3/4 in. residential meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), rising to $595,980 for a 10 in. meter.
- City Impact Fee (City of White Settlement)Requires confirmationCity of White SettlementWhite Settlement's fee schedule lists no roadway impact fee and no parkland dedication fee.
- County Impact Fee (Tarrant County)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in White Settlement.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
White Settlement: Multifamily Impact Fees
A new multifamily unit in White Settlement pays at least $11,918.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (City of White Settlement, MF) — 4" tap, paved alley or street ($4,000.00), Water Impact Fee (City of Fort Worth, White Settlement, MF) — 5/8" x 3/4" meter ($2,990.00) and Wastewater Impact Fee (City of Fort Worth, White Settlement, MF) — 5/8" x 3/4" meter ($2,838.00).
City Impact Fee (City of White Settlement, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full White Settlement Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, White Settlement, MF) — 5/8" x 3/4" meter$2,990.00City of Fort Worth (collected by City of White Settlement)White Settlement collects the City of Fort Worth water impact fee on new connections, priced by meter size only (building permits on or after October 1, 2026). The amount shown is the smallest meter, the floor for a unit with its own meter; a building on one master meter pays once at that meter's size, $23,920 for 2 in. and more for larger meters.
- Water Tap Fee (City of White Settlement, MF) — 1" tap, paved street$1,790.001", paved streetCity of White SettlementWhite Settlement water tap fee: $1,790 for a 1 in. tap under a paved street, the floor for a unit with its own tap; a building on one tap pays once at that size, up to $2,260 for 2 in. Unimproved-street taps are $890 to $1,400, and branches add $85 to $110 each.
- Water Meter Set Fee (City of White Settlement, MF) — 3/4" meter$300.00City of White SettlementWhite Settlement meter set fee: $300 for a 3/4 in. meter, the floor for a unit with its own meter; a building on one master meter pays once at that size, up to $1,125 for 2 in.
- Sewer Tap Fee (City of White Settlement, MF) — 4" tap, paved alley or street$4,000.004", paved alley or streetCity of White SettlementWhite Settlement sewer tap fee: $4,000 for a 4 in. tap under a paved alley or street; a building on one sewer tap pays it once. Larger taps, dirt and unimproved streets, and tie-ons to an existing tap ($150 to $450) are priced separately.
- Wastewater Impact Fee (City of Fort Worth, White Settlement, MF) — 5/8" x 3/4" meter$2,838.00City of Fort Worth (collected by City of White Settlement)White Settlement collects the City of Fort Worth wastewater impact fee on new sewer connections, priced by meter size only. The amount shown is the smallest meter; a building on one master meter pays once at that meter's size, $22,704 for 2 in. and more for larger meters.
- City Impact Fee (City of White Settlement, MF)Requires confirmationCity of White SettlementWhite Settlement's fee schedule lists no roadway impact fee and no parkland dedication fee.
- County Impact Fee (Tarrant County, MF)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in White Settlement.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
White Settlement: Commercial Impact Fees
Commercial development in White Settlement pays no per-square-foot impact fees, but owes $20,835.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to at least $20,835.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth, White Settlement) — 1" meter ($7,475.00 one-time), Wastewater Impact Fee (City of Fort Worth, White Settlement) — 1" meter ($7,095.00 one-time) and Sewer Tap Fee (City of White Settlement) — 4" tap, paved alley or street ($4,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
City Impact Fee (City of White Settlement, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full White Settlement Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, White Settlement) — 1" meter$7,475.00 one-timeCity of Fort WorthWhite Settlement collects the City of Fort Worth water impact fee on new connections. For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,475; other sizes range from $2,990 for a 5/8 in. meter to $627,900 for a 10 in. meter. The city's posted table still shows Fort Worth's earlier rates.
- Water Tap Fee (City of White Settlement) — 1" tap, paved street$1,790.00 one-time1", paved streetCity of White SettlementWhite Settlement water tap fee: $1,790 for a 1 in. tap under a paved street, $2,040 for 1.5 in. and $2,260 for 2 in.; under an unimproved street $890, $1,070 and $1,400. Each 3/4 in. branch adds $85 and each 1 in. branch $110. Taps over 2 in. are billed at cost. A meter set fee and the City of Fort Worth water impact fee are charged in addition.
- Water Meter Set Fee (City of White Settlement) — 1" meter$475.00 one-timeCity of White SettlementWhite Settlement meter set fee: $475 for a 1 in. meter; $300 for 3/4 in., $1,050 for 1.5 in., $1,125 for 2 in., $1,300 for 3 in., $1,800 for 4 in. and $3,800 for 6 in.
- Wastewater Impact Fee (City of Fort Worth, White Settlement) — 1" meter$7,095.00 one-timeCity of Fort WorthWhite Settlement collects the City of Fort Worth wastewater impact fee on new sewer connections. For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,095; other sizes range from $2,838 for a 5/8 in. meter to $595,980 for a 10 in. meter. The city's posted table still shows Fort Worth's earlier rates.
- Sewer Tap Fee (City of White Settlement) — 4" tap, paved alley or street$4,000.00 one-time4", paved alley or streetCity of White SettlementWhite Settlement sewer tap fee: $4,000 for a 4 in. tap under a paved alley or street ($6,000 for 6 in., $10,000 for 8 in.), $1,600 to $2,000 under a dirt street and $1,000 to $1,400 under an unimproved street. Where a tap already exists, a sewer tie-on fee of $150 (4 in.) to $450 (8 in.) applies instead. The City of Fort Worth wastewater impact fee is charged in addition.
- City Impact Fee (City of White Settlement, Commercial)Requires confirmationCity of White SettlementWhite Settlement's fee schedule lists no roadway impact fee and no parkland dedication fee, and Texas law allows no city impact fee for parks, fire, police or general government.
- County Impact Fee (Tarrant County, Commercial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
White Settlement: Industrial Impact Fees
Industrial development in White Settlement pays no per-square-foot impact fees, but owes $20,835.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to at least $20,835.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth, White Settlement) — 1" meter ($7,475.00 one-time), Wastewater Impact Fee (City of Fort Worth, White Settlement) — 1" meter ($7,095.00 one-time) and Sewer Tap Fee (City of White Settlement) — 4" tap, paved alley or street ($4,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
City Impact Fee (City of White Settlement, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full White Settlement Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, White Settlement) — 1" meter$7,475.00 one-timeCity of Fort WorthWhite Settlement collects the City of Fort Worth water impact fee on new connections. For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,475; other sizes range from $2,990 for a 5/8 in. meter to $627,900 for a 10 in. meter. The city's posted table still shows Fort Worth's earlier rates.
- Water Tap Fee (City of White Settlement) — 1" tap, paved street$1,790.00 one-time1", paved streetCity of White SettlementWhite Settlement water tap fee: $1,790 for a 1 in. tap under a paved street, $2,040 for 1.5 in. and $2,260 for 2 in.; under an unimproved street $890, $1,070 and $1,400. Each 3/4 in. branch adds $85 and each 1 in. branch $110. Taps over 2 in. are billed at cost. A meter set fee and the City of Fort Worth water impact fee are charged in addition.
- Water Meter Set Fee (City of White Settlement) — 1" meter$475.00 one-timeCity of White SettlementWhite Settlement meter set fee: $475 for a 1 in. meter; $300 for 3/4 in., $1,050 for 1.5 in., $1,125 for 2 in., $1,300 for 3 in., $1,800 for 4 in. and $3,800 for 6 in.
- Wastewater Impact Fee (City of Fort Worth, White Settlement) — 1" meter$7,095.00 one-timeCity of Fort WorthWhite Settlement collects the City of Fort Worth wastewater impact fee on new sewer connections. For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,095; other sizes range from $2,838 for a 5/8 in. meter to $595,980 for a 10 in. meter. The city's posted table still shows Fort Worth's earlier rates.
- Sewer Tap Fee (City of White Settlement) — 4" tap, paved alley or street$4,000.00 one-time4", paved alley or streetCity of White SettlementWhite Settlement sewer tap fee: $4,000 for a 4 in. tap under a paved alley or street ($6,000 for 6 in., $10,000 for 8 in.), $1,600 to $2,000 under a dirt street and $1,000 to $1,400 under an unimproved street. Where a tap already exists, a sewer tie-on fee of $150 (4 in.) to $450 (8 in.) applies instead. The City of Fort Worth wastewater impact fee is charged in addition.
- City Impact Fee (City of White Settlement, Industrial)Requires confirmationCity of White SettlementWhite Settlement's fee schedule lists no roadway impact fee and no parkland dedication fee, and Texas law allows no city impact fee for parks, fire, police or general government.
- County Impact Fee (Tarrant County, Industrial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
White Settlement: Office Impact Fees
Office development in White Settlement pays no per-square-foot impact fees, but owes $20,835.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 25,000 sq ft building, that comes to at least $20,835.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth, White Settlement) — 1" meter ($7,475.00 one-time), Wastewater Impact Fee (City of Fort Worth, White Settlement) — 1" meter ($7,095.00 one-time) and Sewer Tap Fee (City of White Settlement) — 4" tap, paved alley or street ($4,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
City Impact Fee (City of White Settlement, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full White Settlement Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, White Settlement) — 1" meter$7,475.00 one-timeCity of Fort WorthWhite Settlement collects the City of Fort Worth water impact fee on new connections. For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,475; other sizes range from $2,990 for a 5/8 in. meter to $627,900 for a 10 in. meter. The city's posted table still shows Fort Worth's earlier rates.
- Water Tap Fee (City of White Settlement) — 1" tap, paved street$1,790.00 one-time1", paved streetCity of White SettlementWhite Settlement water tap fee: $1,790 for a 1 in. tap under a paved street, $2,040 for 1.5 in. and $2,260 for 2 in.; under an unimproved street $890, $1,070 and $1,400. Each 3/4 in. branch adds $85 and each 1 in. branch $110. Taps over 2 in. are billed at cost. A meter set fee and the City of Fort Worth water impact fee are charged in addition.
- Water Meter Set Fee (City of White Settlement) — 1" meter$475.00 one-timeCity of White SettlementWhite Settlement meter set fee: $475 for a 1 in. meter; $300 for 3/4 in., $1,050 for 1.5 in., $1,125 for 2 in., $1,300 for 3 in., $1,800 for 4 in. and $3,800 for 6 in.
- Wastewater Impact Fee (City of Fort Worth, White Settlement) — 1" meter$7,095.00 one-timeCity of Fort WorthWhite Settlement collects the City of Fort Worth wastewater impact fee on new sewer connections. For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,095; other sizes range from $2,838 for a 5/8 in. meter to $595,980 for a 10 in. meter. The city's posted table still shows Fort Worth's earlier rates.
- Sewer Tap Fee (City of White Settlement) — 4" tap, paved alley or street$4,000.00 one-time4", paved alley or streetCity of White SettlementWhite Settlement sewer tap fee: $4,000 for a 4 in. tap under a paved alley or street ($6,000 for 6 in., $10,000 for 8 in.), $1,600 to $2,000 under a dirt street and $1,000 to $1,400 under an unimproved street. Where a tap already exists, a sewer tie-on fee of $150 (4 in.) to $450 (8 in.) applies instead. The City of Fort Worth wastewater impact fee is charged in addition.
- City Impact Fee (City of White Settlement, Office)Requires confirmationCity of White SettlementWhite Settlement's fee schedule lists no roadway impact fee and no parkland dedication fee, and Texas law allows no city impact fee for parks, fire, police or general government.
- County Impact Fee (Tarrant County, Office)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
White Settlement Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
White Settlement Impact Fee FAQs
What are the total impact fees for a single-family home in White Settlement, Texas?
A new single-family home in White Settlement pays at least $11,918.00 per unit in combined impact fees (rates sourced November 11, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in White Settlement?
Commercial development in White Settlement pays no per-square-foot impact fees, but owes $20,835.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does White Settlement charge its own impact fees?
Yes. White Settlement levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside White Settlement. The schedule on this page shows every fee that applies to development in White Settlement.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Tarrant County impact fees page.