Skip to content
IMPACTFEES.ORG

North Richland Hills, Texas Impact Fees

North Richland Hills applies its own fee schedule. Tarrant County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $6,007.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

North Richland Hills Impact Fees by Project Type

North Richland Hills: Single-Family Impact Fees

A new single-family home in North Richland Hills pays at least $6,007.00 per unit in impact fees (rates sourced November 10, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Park Development Fee (City of North Richland Hills) ($600.00), Sewer Connection Charge (City of North Richland Hills) — City-installed sewer facilities ($400.00) and Water Connection Charge (City of North Richland Hills) ($150.00).

Wastewater Impact Fee (City of North Richland Hills) — 3/4" meter, Wastewater Access Fee (City of Fort Worth, North Richland Hills) — 5/8" x 3/4" meter, and Water Impact Fee (City of North Richland Hills) — 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Access Fee (City of Fort Worth, North Richland Hills) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full North Richland Hills Impact Fee Schedule
Water$2,001.00
  • Water Impact Fee (City of North Richland Hills) — 3/4" meter
    City of North Richland Hills
    North Richland Hills charges a water impact fee of $1,851 per service unit, priced by meter size: $1,851 for a 3/4 in. meter (the smallest residential meter, 1.0 service unit) rising to $111,060 for an 8 in. meter. The city also collects a Fort Worth water access fee and its own wastewater fees separately.
    $1,851.00Requires confirmation
  • Water Connection Charge (City of North Richland Hills)
    City of North Richland Hills
    North Richland Hills charges a $150 water connection charge on each new service, plus the city's estimated cost of the connection where the city installs it.
    $150.00
  • Water Access Fee (City of Fort Worth, North Richland Hills)
    City of Fort Worth (collected by City of North Richland Hills)
    North Richland Hills also collects a Fort Worth water access fee on new service: Fort Worth's base rate ($1,981 per service unit for permits issued from January 1, 2023 through December 31, 2026) multiplied by the share of the city's water bought from Fort Worth, a ratio set each year and not printed in the fee schedule.
    Requires confirmation
Sewer$3,406.00
City$600.00
  • Park Development Fee (City of North Richland Hills)
    City of North Richland Hills
    North Richland Hills charges a park development fee of $600 per dwelling unit, collected before the building permit is issued. Parkland dedication accepted at final plat can be credited against it. The city has no roadway impact fee.
    $600.00
County$0.00
  • County Impact Fee (Tarrant County)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in North Richland Hills.
    $0.00
Total (North Richland Hills): $6,007.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

North Richland Hills: Multifamily Impact Fees

A new multifamily unit in North Richland Hills pays at least $6,007.00 per unit in impact fees (rates sourced November 10, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Park Development Fee (City of North Richland Hills, MF) ($600.00), Sewer Connection Charge (City of North Richland Hills, MF) — City-installed sewer facilities ($400.00) and Water Connection Charge (City of North Richland Hills, MF) ($150.00).

Wastewater Impact Fee (City of North Richland Hills, MF) — 3/4" meter, Water Impact Fee (City of North Richland Hills, MF) — 3/4" meter, and Wastewater Access Fee (City of Fort Worth, North Richland Hills, MF) — 5/8" x 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Access Fee (City of Fort Worth, North Richland Hills, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full North Richland Hills Impact Fee Schedule
Water$2,001.00
  • Water Impact Fee (City of North Richland Hills, MF) — 3/4" meter
    City of North Richland Hills
    North Richland Hills prices its water impact fee by meter size only ($1,851 per service unit). The amount shown is the smallest meter, the floor for a unit with its own meter; a building on one master meter pays once at that meter's size, $9,865.83 for a 2 in. meter and up to $111,060 for an 8 in. meter.
    $1,851.00Requires confirmation
  • Water Connection Charge (City of North Richland Hills, MF)
    City of North Richland Hills
    North Richland Hills charges a $150 water connection charge per service connection, plus the city's estimated cost where the city installs it; a building on one connection pays once.
    $150.00
  • Water Access Fee (City of Fort Worth, North Richland Hills, MF)
    City of Fort Worth (collected by City of North Richland Hills)
    North Richland Hills also collects a Fort Worth water access fee on new service: Fort Worth's base rate ($1,981 per service unit for permits issued from January 1, 2023 through December 31, 2026) multiplied by the share of the city's water bought from Fort Worth, a ratio set each year and not printed in the fee schedule.
    Requires confirmation
Sewer$3,406.00
  • Wastewater Access Fee (City of Fort Worth, North Richland Hills, MF) — 5/8" x 3/4" meter
    City of Fort Worth (collected by City of North Richland Hills)
    North Richland Hills collects the City of Fort Worth wastewater access fee by meter size only: $1,796 for a 5/8 x 3/4 in. meter, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $14,368 for a 2 in. meter and more for larger meters (schedule for permits issued through December 31, 2026).
    $1,796.00Requires confirmation
  • Wastewater Impact Fee (City of North Richland Hills, MF) — 3/4" meter
    City of North Richland Hills
    North Richland Hills prices its wastewater impact fee by meter size only ($1,210 per service unit). The amount shown is the smallest meter, the floor for a unit with its own meter; a building on one master meter pays once at that meter's size, $6,449.30 for a 2 in. meter and up to $72,600 for an 8 in. meter.
    $1,210.00Requires confirmation
  • Sewer Connection Charge (City of North Richland Hills, MF) — City-installed sewer facilities
    City of North Richland Hills
    North Richland Hills charges $400 for the right to connect to the sewer system, or $50 where the developer paid for installing the sewer facilities; a building on one connection pays once.
    $400.00
City$600.00
  • Park Development Fee (City of North Richland Hills, MF)
    City of North Richland Hills
    North Richland Hills charges a park development fee of $600 per dwelling unit, collected before the building permit is issued. Parkland dedication accepted at final plat can be credited against it. The city has no roadway impact fee.
    $600.00
County$0.00
  • County Impact Fee (Tarrant County, MF)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in North Richland Hills.
    $0.00
Total (North Richland Hills): $6,007.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

North Richland Hills: Commercial Impact Fees

Commercial development in North Richland Hills pays no per-square-foot impact fees, but owes $10,151.87 in one-time water and sewer connection fees (rates sourced November 10, 2026).

For a 50,000 sq ft building, that comes to at least $10,151.87. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Charge (City of North Richland Hills) — City-installed sewer facilities ($400.00 one-time) and Water Connection Charge (City of North Richland Hills) ($150.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Access Fee (City of Fort Worth, North Richland Hills) — 1" meter, Water Impact Fee (City of North Richland Hills) — 1" meter, and Wastewater Impact Fee (City of North Richland Hills) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Access Fee (City of Fort Worth, North Richland Hills) is set by the utility and not published online. Park Development Fee (City of North Richland Hills, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full North Richland Hills Impact Fee Schedule
Water$3,241.17 one-time
  • Water Impact Fee (City of North Richland Hills) — 1" meter
    City of North Richland Hills
    North Richland Hills charges a water impact fee of $1,851 per service unit, priced by meter size: $3,091.17 for a 1-inch meter (1.67 service units), from $1,851 (3/4 inch) to $111,060 (8 inch). Fort Worth water and wastewater access fees and the city's wastewater impact fee are collected separately, all at building permit.
    $3,091.17 one-timeRequires confirmation
  • Water Connection Charge (City of North Richland Hills)
    City of North Richland Hills
    North Richland Hills charges a $150 water connection charge on each new service, plus the city's estimated cost of the connection where the city installs it.
    $150.00 one-time
  • Water Access Fee (City of Fort Worth, North Richland Hills)
    City of Fort Worth
    North Richland Hills also collects a Fort Worth water access fee on new service: Fort Worth's base rate by meter size ($4,953 for a 1-inch meter for permits issued from January 1, 2023 through December 31, 2026) multiplied by the share of the city's water bought from Fort Worth, a ratio set each year and not printed in the fee schedule.
    Requires confirmation
Sewer$6,910.70 one-time
City$0.00
  • Park Development Fee (City of North Richland Hills, Commercial)
    City of North Richland Hills
    North Richland Hills charges nonresidential development a park development fee of $1,000 per acre of site area (prorated for partial acres), collected before the building permit is issued. The city has no roadway impact fee.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, Commercial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (North Richland Hills): $10,151.87 one-time (≈ $10,151.87 at 50,000 sq ft)
Sources last checked Official fee schedules:City of North Richland Hills City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$79,996.13Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$779,981.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$1,344,710.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$619,398.63Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$387,250.00
North Richland Hills$10,151.87*this pageIncludes unconfirmed fees
Pantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$182,057.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

North Richland Hills: Industrial Impact Fees

Industrial development in North Richland Hills pays no per-square-foot impact fees, but owes $10,151.87 in one-time water and sewer connection fees (rates sourced November 10, 2026).

For a 50,000 sq ft building, that comes to at least $10,151.87. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Charge (City of North Richland Hills) — City-installed sewer facilities ($400.00 one-time) and Water Connection Charge (City of North Richland Hills) ($150.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Access Fee (City of Fort Worth, North Richland Hills) — 1" meter, Water Impact Fee (City of North Richland Hills) — 1" meter, and Wastewater Impact Fee (City of North Richland Hills) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Access Fee (City of Fort Worth, North Richland Hills) is set by the utility and not published online. Park Development Fee (City of North Richland Hills, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full North Richland Hills Impact Fee Schedule
Water$3,241.17 one-time
  • Water Impact Fee (City of North Richland Hills) — 1" meter
    City of North Richland Hills
    North Richland Hills charges a water impact fee of $1,851 per service unit, priced by meter size: $3,091.17 for a 1-inch meter (1.67 service units), from $1,851 (3/4 inch) to $111,060 (8 inch). Fort Worth water and wastewater access fees and the city's wastewater impact fee are collected separately, all at building permit.
    $3,091.17 one-timeRequires confirmation
  • Water Connection Charge (City of North Richland Hills)
    City of North Richland Hills
    North Richland Hills charges a $150 water connection charge on each new service, plus the city's estimated cost of the connection where the city installs it.
    $150.00 one-time
  • Water Access Fee (City of Fort Worth, North Richland Hills)
    City of Fort Worth
    North Richland Hills also collects a Fort Worth water access fee on new service: Fort Worth's base rate by meter size ($4,953 for a 1-inch meter for permits issued from January 1, 2023 through December 31, 2026) multiplied by the share of the city's water bought from Fort Worth, a ratio set each year and not printed in the fee schedule.
    Requires confirmation
Sewer$6,910.70 one-time
City$0.00
  • Park Development Fee (City of North Richland Hills, Industrial)
    City of North Richland Hills
    North Richland Hills charges nonresidential development a park development fee of $1,000 per acre of site area (prorated for partial acres), collected before the building permit is issued. The city has no roadway impact fee.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, Industrial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (North Richland Hills): $10,151.87 one-time (≈ $10,151.87 at 50,000 sq ft)
Sources last checked Official fee schedules:City of North Richland Hills City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$31,402.63Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$286,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$533,068.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$220,048.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$187,350.00
North Richland Hills$10,151.87*this pageIncludes unconfirmed fees
Pantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$95,882.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

North Richland Hills: Office Impact Fees

Office development in North Richland Hills pays no per-square-foot impact fees, but owes $10,151.87 in one-time water and sewer connection fees (rates sourced November 10, 2026).

For a 25,000 sq ft building, that comes to at least $10,151.87. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Charge (City of North Richland Hills) — City-installed sewer facilities ($400.00 one-time) and Water Connection Charge (City of North Richland Hills) ($150.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Access Fee (City of Fort Worth, North Richland Hills) — 1" meter, Water Impact Fee (City of North Richland Hills) — 1" meter, and Wastewater Impact Fee (City of North Richland Hills) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Access Fee (City of Fort Worth, North Richland Hills) is set by the utility and not published online. Park Development Fee (City of North Richland Hills, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full North Richland Hills Impact Fee Schedule
Water$3,241.17 one-time
  • Water Impact Fee (City of North Richland Hills) — 1" meter
    City of North Richland Hills
    North Richland Hills charges a water impact fee of $1,851 per service unit, priced by meter size: $3,091.17 for a 1-inch meter (1.67 service units), from $1,851 (3/4 inch) to $111,060 (8 inch). Fort Worth water and wastewater access fees and the city's wastewater impact fee are collected separately, all at building permit.
    $3,091.17 one-timeRequires confirmation
  • Water Connection Charge (City of North Richland Hills)
    City of North Richland Hills
    North Richland Hills charges a $150 water connection charge on each new service, plus the city's estimated cost of the connection where the city installs it.
    $150.00 one-time
  • Water Access Fee (City of Fort Worth, North Richland Hills)
    City of Fort Worth
    North Richland Hills also collects a Fort Worth water access fee on new service: Fort Worth's base rate by meter size ($4,953 for a 1-inch meter for permits issued from January 1, 2023 through December 31, 2026) multiplied by the share of the city's water bought from Fort Worth, a ratio set each year and not printed in the fee schedule.
    Requires confirmation
Sewer$6,910.70 one-time
City$0.00
  • Park Development Fee (City of North Richland Hills, Office)
    City of North Richland Hills
    North Richland Hills charges nonresidential development a park development fee of $1,000 per acre of site area (prorated for partial acres), collected before the building permit is issued. The city has no roadway impact fee.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, Office)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (North Richland Hills): $10,151.87 one-time (≈ $10,151.87 at 25,000 sq ft)
Sources last checked Official fee schedules:City of North Richland Hills City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$38,824.38Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$262,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$650,198.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$241,027.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$121,175.00
North Richland Hills$10,151.87*this pageIncludes unconfirmed fees
Pantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$76,551.16Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

North Richland Hills Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

North Richland Hills Impact Fee FAQs

What are the total impact fees for a single-family home in North Richland Hills, Texas?

A new single-family home in North Richland Hills pays at least $6,007.00 per unit in combined impact fees (rates sourced November 10, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in North Richland Hills?

Commercial development in North Richland Hills pays no per-square-foot impact fees, but owes $10,151.87 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does North Richland Hills charge its own impact fees?

Yes. North Richland Hills levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside North Richland Hills. The schedule on this page shows every fee that applies to development in North Richland Hills.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Tarrant County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.