Lake Worth Impact Fees by Project Type
Lake Worth: Single-Family Impact Fees
A new single-family home in Lake Worth pays $7,898.80 per unit in impact fees (rates sourced November 5, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Fort Worth, Lake Worth) — 5/8" x 3/4" meter, $2,990 × 1.10 ($3,289.00), Sewer Impact Fee (City of Fort Worth, Lake Worth) — 5/8" x 3/4" meter, $2,838 × 1.10 ($3,121.80) and Water System Connection Fee (City of Lake Worth) ($500.00).
Water Meter Fee (City of Lake Worth) — 3/4" meter, $196 + $292 endpoint is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lake Worth Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Lake Worth) — 5/8" x 3/4" meter, $2,990 × 1.10$3,289.005/8" x 5/8" or 5/8" x 3/4" meterCity of Fort Worth (collected by City of Lake Worth)Lake Worth buys its water from Fort Worth and charges the City of Fort Worth water impact fee on new connections plus 10% (Code Sec. A11.009). For building permits issued on or after October 1, 2026 the Fort Worth fee is $2,990 for a 5/8 x 3/4 in. meter; larger meters pay by meter equivalent. Lake Worth's fee schedule lists 3/4 in. as its smallest new meter.
- Water System Connection Fee (City of Lake Worth)$500.00City of Lake WorthEvery new water connection pays Lake Worth's $500 water system connection fee. New taps are 1 in. minimum; a city-installed tap is billed at cost plus 15%, and an owner- or contractor-installed tap adds a $75 utility inspection fee instead.
- Water Meter Fee (City of Lake Worth) — 3/4" meter, $196 + $292 endpoint$488.00Requires confirmationCity of Lake WorthLake Worth sells new meters up to 2 in. as electronically read Badger E-Series meters; the fee schedule adds a $292 cellular endpoint to the meter price ($196 for 3/4 in.).
- Sewer Impact Fee (City of Fort Worth, Lake Worth) — 5/8" x 3/4" meter, $2,838 × 1.10$3,121.805/8" x 5/8" or 5/8" x 3/4" meterCity of Fort Worth (collected by City of Lake Worth)Fort Worth treats Lake Worth's wastewater, and the city charges the City of Fort Worth wastewater impact fee on every new tap plus 10% (Code Sec. A11.007). For building permits issued on or after October 1, 2026 the Fort Worth fee is $2,838 for a 5/8 x 3/4 in. meter; larger meters pay by meter equivalent.
- Sewer System Connection Fee (City of Lake Worth)$500.00City of Lake WorthEvery new sewer connection pays Lake Worth's $500 sewer system connection fee. A city-installed 4 in. residential tap adds cost plus 15%; an owner- or contractor-installed tap adds a $75 utility inspection fee instead.
- City Impact Fee (City of Lake Worth)$0.00City of Lake WorthLake Worth has no roadway impact fee and no parkland dedication fee. Its only impact fees are the City of Fort Worth water and wastewater impact fees it collects on new connections.
- County Impact Fee (Tarrant County)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Lake Worth.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Worth: Multifamily Impact Fees
A new multifamily unit in Lake Worth pays $7,898.80 per unit in impact fees (rates sourced November 5, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Fort Worth, Lake Worth, MF) — 5/8" x 3/4" meter, $2,990 × 1.10 ($3,289.00), Sewer Impact Fee (City of Fort Worth, Lake Worth, MF) — 5/8" x 3/4" meter, $2,838 × 1.10 ($3,121.80) and Water System Connection Fee (City of Lake Worth, MF) ($500.00).
Water Meter Fee (City of Lake Worth, MF) — 3/4" meter, $196 + $292 endpoint is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lake Worth Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Lake Worth, MF) — 5/8" x 3/4" meter, $2,990 × 1.10$3,289.005/8" x 5/8" or 5/8" x 3/4" meterCity of Fort Worth (collected by City of Lake Worth)Lake Worth charges the City of Fort Worth water impact fee plus 10% by meter size (Code Sec. A11.009): $2,990 plus 10% for a 5/8 x 3/4 in. meter from October 1, 2026. A building served by one master meter pays once, at that meter's size.
- Water System Connection Fee (City of Lake Worth, MF)$500.00City of Lake WorthLake Worth charges a $500 water system connection fee per connection; a building on one connection pays it once. Developer-installed taps add a $75 utility inspection fee.
- Water Meter Fee (City of Lake Worth, MF) — 3/4" meter, $196 + $292 endpoint$488.00Requires confirmationCity of Lake WorthLake Worth sells new meters up to 2 in. as electronically read Badger E-Series meters, adding a $292 cellular endpoint to the meter price. A building on one meter pays once, at that meter's size.
- Sewer Impact Fee (City of Fort Worth, Lake Worth, MF) — 5/8" x 3/4" meter, $2,838 × 1.10$3,121.805/8" x 5/8" or 5/8" x 3/4" meterCity of Fort Worth (collected by City of Lake Worth)Lake Worth charges the City of Fort Worth wastewater impact fee plus 10% by meter size (Code Sec. A11.007): $2,838 plus 10% for a 5/8 x 3/4 in. meter from October 1, 2026. A building served by one master meter pays once, at that meter's size.
- Sewer System Connection Fee (City of Lake Worth, MF)$500.00City of Lake WorthLake Worth charges a $500 sewer system connection fee per connection; a building on one connection pays it once. Developer-installed taps add a $75 utility inspection fee.
- City Impact Fee (City of Lake Worth, MF)$0.00City of Lake WorthLake Worth has no roadway impact fee and no parkland dedication fee. Its only impact fees are the City of Fort Worth water and wastewater impact fees it collects on new connections.
- County Impact Fee (Tarrant County, MF)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Lake Worth.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Worth: Commercial Impact Fees
Commercial development in Lake Worth pays no per-square-foot impact fees, but owes $17,729.00 in one-time water and sewer connection fees (rates sourced November 5, 2026).
For a 50,000 sq ft building, that comes to about $17,729.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth, Lake Worth) — 1" meter, $7,475 × 1.10 ($8,222.50 one-time), Sewer Impact Fee (City of Fort Worth, Lake Worth) — 1" meter, $7,095 × 1.10 ($7,804.50 one-time) and Sewer System Connection Fee (City of Lake Worth) — $500 connection + $75 inspection ($575.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter Fee (City of Lake Worth) — 1" meter, $260 + $292 endpoint is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Lake Worth Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Lake Worth) — 1" meter, $7,475 × 1.10$8,222.50 one-timeCity of Lake WorthLake Worth charges the City of Fort Worth water impact fee plus 10% on new water connections (City Code Appendix A, Ordinance 1281): $8,222.50 for a 1 in. meter for building permits on or after October 1, 2026, rising with meter size by Fort Worth's meter equivalents. All new water taps are at least 1 in.
- Water System Connection Fee (City of Lake Worth) — $500 connection + $75 inspection$575.00 one-timeCity of Lake WorthLake Worth charges a commercial water connection $575: the $500 system connection fee plus the $75 utility inspection fee. The developer or contractor installs the commercial tap.
- Water Meter Fee (City of Lake Worth) — 1" meter, $260 + $292 endpoint$552.00 one-timeRequires confirmationCity of Lake WorthLake Worth charges for each new water meter: $552 for a 1 in. meter ($260 meter plus a $292 cellular endpoint), $892 for 1-1/2 in. and $1,107 for 2 in. Larger meters are priced from the meter base plus a $72 encoder and the endpoint, from $2,173 for a 3 in. compound meter base.
- Sewer Impact Fee (City of Fort Worth, Lake Worth) — 1" meter, $7,095 × 1.10$7,804.50 one-timeCity of Lake WorthLake Worth charges the City of Fort Worth wastewater impact fee plus 10% on all new sewer taps (City Code Appendix A, Ordinance 1281): $7,804.50 for a 1 in. meter for building permits on or after October 1, 2026, rising with meter size by Fort Worth's meter equivalents.
- Sewer System Connection Fee (City of Lake Worth) — $500 connection + $75 inspection$575.00 one-timeCity of Lake WorthLake Worth charges a commercial sewer connection $575: the $500 system connection fee plus the $75 utility inspection fee. The developer or contractor installs the 6 in. commercial tap.
- City Impact Fee (City of Lake Worth, Commercial)$0.00City of Lake WorthLake Worth has no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its impact fees are the Fort Worth water and wastewater fees it collects.
- County Impact Fee (Tarrant County, Commercial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Worth: Industrial Impact Fees
Industrial development in Lake Worth pays no per-square-foot impact fees, but owes $17,729.00 in one-time water and sewer connection fees (rates sourced November 5, 2026).
For a 50,000 sq ft building, that comes to about $17,729.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth, Lake Worth) — 1" meter, $7,475 × 1.10 ($8,222.50 one-time), Sewer Impact Fee (City of Fort Worth, Lake Worth) — 1" meter, $7,095 × 1.10 ($7,804.50 one-time) and Sewer System Connection Fee (City of Lake Worth) — $500 connection + $75 inspection ($575.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter Fee (City of Lake Worth) — 1" meter, $260 + $292 endpoint is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Lake Worth Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Lake Worth) — 1" meter, $7,475 × 1.10$8,222.50 one-timeCity of Lake WorthLake Worth charges the City of Fort Worth water impact fee plus 10% on new water connections (City Code Appendix A, Ordinance 1281): $8,222.50 for a 1 in. meter for building permits on or after October 1, 2026, rising with meter size by Fort Worth's meter equivalents. All new water taps are at least 1 in.
- Water System Connection Fee (City of Lake Worth) — $500 connection + $75 inspection$575.00 one-timeCity of Lake WorthLake Worth charges a commercial water connection $575: the $500 system connection fee plus the $75 utility inspection fee. The developer or contractor installs the commercial tap.
- Water Meter Fee (City of Lake Worth) — 1" meter, $260 + $292 endpoint$552.00 one-timeRequires confirmationCity of Lake WorthLake Worth charges for each new water meter: $552 for a 1 in. meter ($260 meter plus a $292 cellular endpoint), $892 for 1-1/2 in. and $1,107 for 2 in. Larger meters are priced from the meter base plus a $72 encoder and the endpoint, from $2,173 for a 3 in. compound meter base.
- Sewer Impact Fee (City of Fort Worth, Lake Worth) — 1" meter, $7,095 × 1.10$7,804.50 one-timeCity of Lake WorthLake Worth charges the City of Fort Worth wastewater impact fee plus 10% on all new sewer taps (City Code Appendix A, Ordinance 1281): $7,804.50 for a 1 in. meter for building permits on or after October 1, 2026, rising with meter size by Fort Worth's meter equivalents.
- Sewer System Connection Fee (City of Lake Worth) — $500 connection + $75 inspection$575.00 one-timeCity of Lake WorthLake Worth charges a commercial sewer connection $575: the $500 system connection fee plus the $75 utility inspection fee. The developer or contractor installs the 6 in. commercial tap.
- City Impact Fee (City of Lake Worth, Industrial)$0.00City of Lake WorthLake Worth has no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its impact fees are the Fort Worth water and wastewater fees it collects.
- County Impact Fee (Tarrant County, Industrial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Worth: Office Impact Fees
Office development in Lake Worth pays no per-square-foot impact fees, but owes $17,729.00 in one-time water and sewer connection fees (rates sourced November 5, 2026).
For a 25,000 sq ft building, that comes to about $17,729.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth, Lake Worth) — 1" meter, $7,475 × 1.10 ($8,222.50 one-time), Sewer Impact Fee (City of Fort Worth, Lake Worth) — 1" meter, $7,095 × 1.10 ($7,804.50 one-time) and Sewer System Connection Fee (City of Lake Worth) — $500 connection + $75 inspection ($575.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter Fee (City of Lake Worth) — 1" meter, $260 + $292 endpoint is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Lake Worth Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Lake Worth) — 1" meter, $7,475 × 1.10$8,222.50 one-timeCity of Lake WorthLake Worth charges the City of Fort Worth water impact fee plus 10% on new water connections (City Code Appendix A, Ordinance 1281): $8,222.50 for a 1 in. meter for building permits on or after October 1, 2026, rising with meter size by Fort Worth's meter equivalents. All new water taps are at least 1 in.
- Water System Connection Fee (City of Lake Worth) — $500 connection + $75 inspection$575.00 one-timeCity of Lake WorthLake Worth charges a commercial water connection $575: the $500 system connection fee plus the $75 utility inspection fee. The developer or contractor installs the commercial tap.
- Water Meter Fee (City of Lake Worth) — 1" meter, $260 + $292 endpoint$552.00 one-timeRequires confirmationCity of Lake WorthLake Worth charges for each new water meter: $552 for a 1 in. meter ($260 meter plus a $292 cellular endpoint), $892 for 1-1/2 in. and $1,107 for 2 in. Larger meters are priced from the meter base plus a $72 encoder and the endpoint, from $2,173 for a 3 in. compound meter base.
- Sewer Impact Fee (City of Fort Worth, Lake Worth) — 1" meter, $7,095 × 1.10$7,804.50 one-timeCity of Lake WorthLake Worth charges the City of Fort Worth wastewater impact fee plus 10% on all new sewer taps (City Code Appendix A, Ordinance 1281): $7,804.50 for a 1 in. meter for building permits on or after October 1, 2026, rising with meter size by Fort Worth's meter equivalents.
- Sewer System Connection Fee (City of Lake Worth) — $500 connection + $75 inspection$575.00 one-timeCity of Lake WorthLake Worth charges a commercial sewer connection $575: the $500 system connection fee plus the $75 utility inspection fee. The developer or contractor installs the 6 in. commercial tap.
- City Impact Fee (City of Lake Worth, Office)$0.00City of Lake WorthLake Worth has no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its impact fees are the Fort Worth water and wastewater fees it collects.
- County Impact Fee (Tarrant County, Office)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Worth Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Lake Worth Impact Fee FAQs
What are the total impact fees for a single-family home in Lake Worth, Texas?
A new single-family home in Lake Worth pays $7,898.80 per unit in combined impact fees (rates sourced November 5, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Lake Worth?
Commercial development in Lake Worth pays no per-square-foot impact fees, but owes $17,729.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Lake Worth charge its own impact fees?
Yes. Lake Worth levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Lake Worth. The schedule on this page shows every fee that applies to development in Lake Worth.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Tarrant County impact fees page.