Hurst, Texas Impact Fees

Hurst applies its own fee schedule. Tarrant County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $8,511.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Hurst Impact Fees by Project Type

Hurst: Single-Family Impact Fees

A new single-family home in Hurst pays at least $8,511.00 per unit in impact fees (rates sourced November 5, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Hurst) — 5/8" x 3/4" meter ($1,292.00) and Wastewater Impact Fee (City of Hurst) — 5/8" x 3/4" meter ($1,206.00).

Water Impact Fee (City of Fort Worth, Hurst) — 5/8" x 3/4" meter, Wastewater Impact Fee (City of Fort Worth, Hurst) — 5/8" x 3/4" meter, and Water Meter Fee (City of Hurst) — 5/8" x 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fee (City of Hurst) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Hurst Impact Fee Schedule
Water$4,467.00
  • Water Impact Fee (City of Fort Worth, Hurst) — 5/8" x 3/4" meter
    City of Fort Worth (collected by City of Hurst)
    Hurst buys its water from the City of Fort Worth and collects Fort Worth's water impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $2,990 for a 5/8 x 3/4 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025); larger meters pay by Fort Worth's meter equivalents. Hurst's posted 2023 fee sheet still shows Fort Worth's earlier $1,981 level.
    $2,990.00Requires confirmation
  • Water Impact Fee (City of Hurst) — 5/8" x 3/4" meter
    City of Hurst
    Hurst's own water impact fee is $1,292 for a 5/8 x 3/4 in. meter for building permits issued on or after January 1, 2023 (Ordinance 2524). Larger meters pay more by meter size. Hurst also collects the City of Fort Worth water impact fee on top of this fee.
    $1,292.00
  • Water Meter Fee (City of Hurst) — 5/8" x 3/4" meter
    City of Hurst
    Hurst charges a one-time domestic water meter fee by meter size: $185 for a 5/8 x 3/4 in. meter, per the city's 2023 water and wastewater fee sheet. Larger meters cost more.
    $185.00Requires confirmation
Sewer$4,044.00
  • Wastewater Impact Fee (City of Fort Worth, Hurst) — 5/8" x 3/4" meter
    City of Fort Worth (collected by City of Hurst)
    Fort Worth treats Hurst's wastewater, and Hurst collects Fort Worth's wastewater impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $2,838 for a 5/8 x 3/4 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025); larger meters pay by Fort Worth's meter equivalents. Hurst's posted 2023 fee sheet still shows Fort Worth's earlier $1,796 level.
    $2,838.00Requires confirmation
  • Wastewater Impact Fee (City of Hurst) — 5/8" x 3/4" meter
    City of Hurst
    Hurst's own wastewater impact fee is $1,206 for a 5/8 x 3/4 in. meter for building permits issued on or after January 1, 2023 (Ordinance 2524). Larger meters pay more by meter size. Hurst also collects the City of Fort Worth wastewater impact fee on top of this fee. A wastewater tap made by the city is billed at actual cost, with a $2,000 minimum on a parkway tap.
    $1,206.00
City$0.00
  • City Impact Fee (City of Hurst)
    City of Hurst
    Hurst has no roadway impact fee: its impact fee ordinance (Ordinance 2524) covers water and wastewater only.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Hurst.
    $0.00
Total (Hurst): $8,511.00
Sources last checked Official fee schedules:City of Fort Worth (collected by City of Hurst) City of Hurst Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hurst: Multifamily Impact Fees

A new multifamily unit in Hurst pays at least $8,511.00 per unit in impact fees (rates sourced November 5, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Hurst, MF) — 5/8" x 3/4" meter ($1,292.00) and Wastewater Impact Fee (City of Hurst, MF) — 5/8" x 3/4" meter ($1,206.00).

Water Impact Fee (City of Fort Worth, Hurst, MF) — 5/8" x 3/4" meter, Wastewater Impact Fee (City of Fort Worth, Hurst, MF) — 5/8" x 3/4" meter, and Water Meter Fee (City of Hurst, MF) — 5/8" x 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fee (City of Hurst, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Hurst Impact Fee Schedule
Water$4,467.00
  • Water Impact Fee (City of Fort Worth, Hurst, MF) — 5/8" x 3/4" meter
    City of Fort Worth (collected by City of Hurst)
    Hurst collects the City of Fort Worth water impact fee on new connections, priced by meter size only: $2,990 for a 5/8 x 3/4 in. meter from October 1, 2026, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $23,920 for a 2 in. meter and more for larger meters. Hurst's posted 2023 fee sheet still shows Fort Worth's earlier level.
    $2,990.00Requires confirmation
  • Water Impact Fee (City of Hurst, MF) — 5/8" x 3/4" meter
    City of Hurst
    Hurst's own water impact fee is priced by meter size only: $1,292 for a 5/8 x 3/4 in. meter from January 1, 2023 (Ordinance 2524), the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $6,886 for a 2 in. meter and more for larger meters. Hurst also collects the City of Fort Worth water impact fee.
    $1,292.00
  • Water Meter Fee (City of Hurst, MF) — 5/8" x 3/4" meter
    City of Hurst
    Hurst charges a one-time domestic water meter fee by meter size: $185 for a 5/8 x 3/4 in. meter, per the city's 2023 fee sheet. A building on one master meter pays once at that meter's size, $1,570 for a 2 in. meter.
    $185.00Requires confirmation
Sewer$4,044.00
  • Wastewater Impact Fee (City of Fort Worth, Hurst, MF) — 5/8" x 3/4" meter
    City of Fort Worth (collected by City of Hurst)
    Hurst collects the City of Fort Worth wastewater impact fee on new connections, priced by meter size only: $2,838 for a 5/8 x 3/4 in. meter from October 1, 2026, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $22,704 for a 2 in. meter and more for larger meters. Hurst's posted 2023 fee sheet still shows Fort Worth's earlier level.
    $2,838.00Requires confirmation
  • Wastewater Impact Fee (City of Hurst, MF) — 5/8" x 3/4" meter
    City of Hurst
    Hurst's own wastewater impact fee is priced by meter size only: $1,206 for a 5/8 x 3/4 in. meter from January 1, 2023 (Ordinance 2524), the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $6,428 for a 2 in. meter and more for larger meters. Hurst also collects the City of Fort Worth wastewater impact fee.
    $1,206.00
City$0.00
  • City Impact Fee (City of Hurst, MF)
    City of Hurst
    Hurst has no roadway impact fee: its impact fee ordinance (Ordinance 2524) covers water and wastewater only.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, MF)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Hurst.
    $0.00
Total (Hurst): $8,511.00
Sources last checked Official fee schedules:City of Fort Worth (collected by City of Hurst) City of Hurst Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hurst: Commercial Impact Fees

Commercial development in Hurst pays no per-square-foot impact fees, but owes $18,987.00 in one-time water and sewer connection fees (rates sourced November 5, 2026).

For a 50,000 sq ft building, that comes to about $18,987.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Hurst) — 1" meter ($2,158.00 one-time) and Wastewater Impact Fee (City of Hurst) — 1" meter ($2,014.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Meter Fee (City of Hurst) — 1" meter, Water Impact Fee (City of Fort Worth, Hurst) — 1" meter, and Wastewater Impact Fee (City of Fort Worth, Hurst) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Hurst Impact Fee Schedule
Water$9,878.00 one-time
  • Water Impact Fee (City of Fort Worth, Hurst) — 1" meter
    City of Fort Worth
    Hurst buys its water from the City of Fort Worth and collects Fort Worth's water impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $7,475 for a 1 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), from $2,990 for a 5/8 x 3/4 in. meter. Hurst's posted 2023 fee sheet still shows Fort Worth's earlier $4,953 level for a 1 in. meter.
    $7,475.00 one-timeRequires confirmation
  • Water Impact Fee (City of Hurst) — 1" meter
    City of Hurst
    Hurst's own water impact fee is $2,158 for a 1 in. meter for building permits issued on or after January 1, 2023 (Ordinance 2524), from $1,292 for a 5/8 x 3/4 in. meter to $163,658 for a 10 in. meter. The same table applies to commercial connections. Hurst also collects the City of Fort Worth water impact fee on top of this fee.
    $2,158.00 one-time
  • Water Meter Fee (City of Hurst) — 1" meter
    City of Hurst
    Hurst charges a one-time domestic water meter fee by meter size: $245 for a 1 in. meter, from $185 for a 5/8 x 3/4 in. meter to $5,800 for a 6 in. meter, per the city's 2023 water and wastewater fee sheet. A wastewater tap made by the city is billed at actual cost, with a $2,000 minimum on a parkway tap.
    $245.00 one-timeRequires confirmation
Sewer$9,109.00 one-time
  • Wastewater Impact Fee (City of Fort Worth, Hurst) — 1" meter
    City of Fort Worth
    Fort Worth treats Hurst's wastewater, and Hurst collects Fort Worth's wastewater impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $7,095 for a 1 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), from $2,838 for a 5/8 x 3/4 in. meter. Hurst's posted 2023 fee sheet still shows Fort Worth's earlier $4,490 level for a 1 in. meter.
    $7,095.00 one-timeRequires confirmation
  • Wastewater Impact Fee (City of Hurst) — 1" meter
    City of Hurst
    Hurst's own wastewater impact fee is $2,014 for a 1 in. meter for building permits issued on or after January 1, 2023 (Ordinance 2524), from $1,206 for a 5/8 x 3/4 in. meter to $152,764 for a 10 in. meter. The same table applies to commercial connections. Hurst also collects the City of Fort Worth wastewater impact fee on top of this fee.
    $2,014.00 one-time
City$0.00
  • City Impact Fee (City of Hurst, Commercial)
    City of Hurst
    Hurst has no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its impact fees cover water and wastewater only.
    $0.00
County$0.00
  • County Impact Fee (Tarrant County, Commercial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Hurst): $18,987.00 one-time (≈ $18,987.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth City of Hurst Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$79,996.13Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$779,981.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$1,344,710.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed fees
Hurst$18,987.00*this pageIncludes unconfirmed fees
Keller$619,398.63Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$387,250.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$182,057.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Hurst: Industrial Impact Fees

Industrial development in Hurst pays no per-square-foot impact fees, but owes $18,987.00 in one-time water and sewer connection fees (rates sourced November 5, 2026).

For a 50,000 sq ft building, that comes to about $18,987.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Hurst) — 1" meter ($2,158.00 one-time) and Wastewater Impact Fee (City of Hurst) — 1" meter ($2,014.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Meter Fee (City of Hurst) — 1" meter, Water Impact Fee (City of Fort Worth, Hurst) — 1" meter, and Wastewater Impact Fee (City of Fort Worth, Hurst) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Hurst Impact Fee Schedule
Water$9,878.00 one-time
  • Water Impact Fee (City of Fort Worth, Hurst) — 1" meter
    City of Fort Worth
    Hurst buys its water from the City of Fort Worth and collects Fort Worth's water impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $7,475 for a 1 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), from $2,990 for a 5/8 x 3/4 in. meter. Hurst's posted 2023 fee sheet still shows Fort Worth's earlier $4,953 level for a 1 in. meter.
    $7,475.00 one-timeRequires confirmation
  • Water Impact Fee (City of Hurst) — 1" meter
    City of Hurst
    Hurst's own water impact fee is $2,158 for a 1 in. meter for building permits issued on or after January 1, 2023 (Ordinance 2524), from $1,292 for a 5/8 x 3/4 in. meter to $163,658 for a 10 in. meter. The same table applies to commercial connections. Hurst also collects the City of Fort Worth water impact fee on top of this fee.
    $2,158.00 one-time
  • Water Meter Fee (City of Hurst) — 1" meter
    City of Hurst
    Hurst charges a one-time domestic water meter fee by meter size: $245 for a 1 in. meter, from $185 for a 5/8 x 3/4 in. meter to $5,800 for a 6 in. meter, per the city's 2023 water and wastewater fee sheet. A wastewater tap made by the city is billed at actual cost, with a $2,000 minimum on a parkway tap.
    $245.00 one-timeRequires confirmation
Sewer$9,109.00 one-time
  • Wastewater Impact Fee (City of Fort Worth, Hurst) — 1" meter
    City of Fort Worth
    Fort Worth treats Hurst's wastewater, and Hurst collects Fort Worth's wastewater impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $7,095 for a 1 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), from $2,838 for a 5/8 x 3/4 in. meter. Hurst's posted 2023 fee sheet still shows Fort Worth's earlier $4,490 level for a 1 in. meter.
    $7,095.00 one-timeRequires confirmation
  • Wastewater Impact Fee (City of Hurst) — 1" meter
    City of Hurst
    Hurst's own wastewater impact fee is $2,014 for a 1 in. meter for building permits issued on or after January 1, 2023 (Ordinance 2524), from $1,206 for a 5/8 x 3/4 in. meter to $152,764 for a 10 in. meter. The same table applies to commercial connections. Hurst also collects the City of Fort Worth wastewater impact fee on top of this fee.
    $2,014.00 one-time
City$0.00
  • City Impact Fee (City of Hurst, Industrial)
    City of Hurst
    Hurst has no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its impact fees cover water and wastewater only.
    $0.00
County$0.00
  • County Impact Fee (Tarrant County, Industrial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Hurst): $18,987.00 one-time (≈ $18,987.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth City of Hurst Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$31,402.63Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$286,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$533,068.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed fees
Hurst$18,987.00*this pageIncludes unconfirmed fees
Keller$220,048.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$187,350.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$95,882.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Hurst: Office Impact Fees

Office development in Hurst pays no per-square-foot impact fees, but owes $18,987.00 in one-time water and sewer connection fees (rates sourced November 5, 2026).

For a 25,000 sq ft building, that comes to about $18,987.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Hurst) — 1" meter ($2,158.00 one-time) and Wastewater Impact Fee (City of Hurst) — 1" meter ($2,014.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Meter Fee (City of Hurst) — 1" meter, Water Impact Fee (City of Fort Worth, Hurst) — 1" meter, and Wastewater Impact Fee (City of Fort Worth, Hurst) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Hurst Impact Fee Schedule
Water$9,878.00 one-time
  • Water Impact Fee (City of Fort Worth, Hurst) — 1" meter
    City of Fort Worth
    Hurst buys its water from the City of Fort Worth and collects Fort Worth's water impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $7,475 for a 1 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), from $2,990 for a 5/8 x 3/4 in. meter. Hurst's posted 2023 fee sheet still shows Fort Worth's earlier $4,953 level for a 1 in. meter.
    $7,475.00 one-timeRequires confirmation
  • Water Impact Fee (City of Hurst) — 1" meter
    City of Hurst
    Hurst's own water impact fee is $2,158 for a 1 in. meter for building permits issued on or after January 1, 2023 (Ordinance 2524), from $1,292 for a 5/8 x 3/4 in. meter to $163,658 for a 10 in. meter. The same table applies to commercial connections. Hurst also collects the City of Fort Worth water impact fee on top of this fee.
    $2,158.00 one-time
  • Water Meter Fee (City of Hurst) — 1" meter
    City of Hurst
    Hurst charges a one-time domestic water meter fee by meter size: $245 for a 1 in. meter, from $185 for a 5/8 x 3/4 in. meter to $5,800 for a 6 in. meter, per the city's 2023 water and wastewater fee sheet. A wastewater tap made by the city is billed at actual cost, with a $2,000 minimum on a parkway tap.
    $245.00 one-timeRequires confirmation
Sewer$9,109.00 one-time
  • Wastewater Impact Fee (City of Fort Worth, Hurst) — 1" meter
    City of Fort Worth
    Fort Worth treats Hurst's wastewater, and Hurst collects Fort Worth's wastewater impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $7,095 for a 1 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), from $2,838 for a 5/8 x 3/4 in. meter. Hurst's posted 2023 fee sheet still shows Fort Worth's earlier $4,490 level for a 1 in. meter.
    $7,095.00 one-timeRequires confirmation
  • Wastewater Impact Fee (City of Hurst) — 1" meter
    City of Hurst
    Hurst's own wastewater impact fee is $2,014 for a 1 in. meter for building permits issued on or after January 1, 2023 (Ordinance 2524), from $1,206 for a 5/8 x 3/4 in. meter to $152,764 for a 10 in. meter. The same table applies to commercial connections. Hurst also collects the City of Fort Worth wastewater impact fee on top of this fee.
    $2,014.00 one-time
City$0.00
  • City Impact Fee (City of Hurst, Office)
    City of Hurst
    Hurst has no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its impact fees cover water and wastewater only.
    $0.00
County$0.00
  • County Impact Fee (Tarrant County, Office)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Hurst): $18,987.00 one-time (≈ $18,987.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth City of Hurst Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$38,824.38Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$262,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$650,198.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed fees
Hurst$18,987.00*this pageIncludes unconfirmed fees
Keller$241,027.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$121,175.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$76,551.16Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Hurst Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Hurst Impact Fee FAQs

What are the total impact fees for a single-family home in Hurst, Texas?

A new single-family home in Hurst pays at least $8,511.00 per unit in combined impact fees (rates sourced November 5, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Hurst?

Commercial development in Hurst pays no per-square-foot impact fees, but owes $18,987.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Hurst charge its own impact fees?

Yes. Hurst levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Hurst. The schedule on this page shows every fee that applies to development in Hurst.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Tarrant County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.