Fort Worth Impact Fees by Project Type
Fort Worth: Single-Family Impact Fees
A new single-family home in Fort Worth pays $33,466.72 per unit in impact fees (rates sourced November 5, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Transportation Impact Fee (City of Fort Worth) — Service Area M, 4.61 veh-mi × $4,138.55/veh-mi ($19,078.72), Sewer Tap Fee (City of Fort Worth) — 4" tap, asphalt street, short side ($4,200.00) and Water Tap Fee (City of Fort Worth) — 1" tap, asphalt street, short side ($3,000.00).
Park Dedication Fee (City of Fort Worth) — Central City flat fee is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Fort Worth Impact Fee Schedule
- Water Tap Fee (City of Fort Worth) — 1" tap, asphalt street, short side$3,000.001", asphalt, short sideCity of Fort WorthWhen City of Fort Worth crews tap an existing water main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,500 to $3,700 for a 1 in. tap, up to $4,600 for a 2 in. tap, plus pavement repair fees on older asphalt streets. Services in new subdivisions and in streets less than two years old are built by the developer under a Community Facilities Agreement instead.
- Water Impact Fee (City of Fort Worth) — 5/8" x 3/4" meter$2,990.00City of Fort WorthThe City of Fort Worth water impact fee for a 5/8 x 3/4 in. meter is $2,990 for building permits issued on or after October 1, 2026 (Ordinance 27745-06-2025, adopted June 10, 2025; $2,824 from October 1, 2025). Larger meters pay by meter equivalent, up to $627,900 for a 10 in. meter. Lots on plats recorded before April 1, 2017 pay the fee in effect when the plat was recorded. These rates stay in effect until the next impact fee study.
- Water Meter Set Fee (City of Fort Worth)$60.00City of Fort WorthCity of Fort Worth water customers pay a $60 new meter set fee for a meter 2 in. or smaller (City Code Sec. 35-56); larger meters are set under a developer agreement.
- Sewer Tap Fee (City of Fort Worth) — 4" tap, asphalt street, short side$4,200.004", asphalt, short sideCity of Fort WorthWhere City of Fort Worth crews tap an existing sewer main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,600 to $7,900 for a standard 4 in. tap, more for 6 and 8 in. taps, which also require a $4,200 manhole. Services in new subdivisions and in streets less than two years old are built by the developer instead.
- Sewer Impact Fee (City of Fort Worth) — 5/8" x 3/4" meter$2,838.00City of Fort WorthThe City of Fort Worth wastewater impact fee for a 5/8 x 3/4 in. meter is $2,838 for building permits issued on or after October 1, 2026 (Ordinance 27745-06-2025, adopted June 10, 2025; $2,680 from October 1, 2025). Larger meters pay by meter equivalent, up to $595,980 for a 10 in. meter. Lots on plats recorded before April 1, 2017 pay the fee in effect when the plat was recorded.
- Transportation Impact Fee (City of Fort Worth) — Service Area M, 4.61 veh-mi × $4,138.55/veh-mi$19,078.72City of Fort WorthFort Worth charges a transportation impact fee by service area, collected at building permit. For a single-family home on a lot platted on or after November 1, 2022, the fee is 4.61 vehicle-miles times the area's collection rate, which rose to 65% of the 2022 maximum on June 1, 2026 (Ordinance 26099-04-2023; 60% before). Service Area M is the highest of 19 fee service areas, so this amount is a ceiling, not a citywide rate; Service Areas H, I, J, K, L, P, Q, R and W charge no transportation impact fee. Lots platted earlier pay rates tied to the study in effect when they were platted, and discounts for adequate public facilities, mixed use or neighborhood empowerment zones can reduce the fee.
- Park Dedication Fee (City of Fort Worth) — Central City flat fee$1,300.00Requires confirmationCentral City (Park Planning District 4)City of Fort WorthFort Worth's park dedication policy charges each new single-family or two-family home in the Central City (Park Planning District 4) a flat park fee, $1,300 in the policy's 2023 step, paid at building permit; the Park and Recreation Department may raise it each year by up to the change in the Consumer Price Index. Outside the Central City, subdivisions instead dedicate parkland or pay a fee in lieu at the land's market value, plus a park development fee of $115,000 per required acre (2023 rate). This is the higher of the two printed per-home amounts.
- County Impact Fee (Tarrant County, Fort Worth)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no Tarrant County impact fee applies in Fort Worth.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Worth: Multifamily Impact Fees
A new multifamily unit in Fort Worth pays at least $20,992.63 per unit in impact fees (rates sourced November 5, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Transportation Impact Fee (City of Fort Worth, MF) — Service Area M, 1.91 veh-mi × $4,138.55/veh-mi ($7,904.63), Sewer Tap Fee (City of Fort Worth, MF) — 4" tap, asphalt street, short side ($4,200.00) and Water Tap Fee (City of Fort Worth, MF) — 1" tap, asphalt street, short side ($3,000.00).
Park Dedication Fee (City of Fort Worth, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Fort Worth Impact Fee Schedule
- Water Tap Fee (City of Fort Worth, MF) — 1" tap, asphalt street, short side$3,000.001", asphalt, short sideCity of Fort WorthWhen City of Fort Worth crews tap an existing water main, the tap fee is charged per connection, not per apartment: $2,500 to $3,700 for a 1 in. tap depending on pavement and street side, more for larger taps. A building on one connection pays once. Services in new developments are usually built by the developer instead.
- Water Impact Fee (City of Fort Worth, MF) — 5/8" x 3/4" meter$2,990.00City of Fort WorthFort Worth charges its water impact fee by meter size, not per apartment: a building pays for each meter it sets, $2,990 for a 5/8 x 3/4 in. meter for building permits on or after October 1, 2026 (Ordinance 27745-06-2025; $2,824 from October 1, 2025), up to $23,920 for a 2 in. meter. A building on one larger master meter pays once, by that meter's equivalent ($627,900 for a 10 in. meter).
- Water Meter Set Fee (City of Fort Worth, MF)$60.00City of Fort WorthCity of Fort Worth water customers pay a $60 new meter set fee per meter 2 in. or smaller (City Code Sec. 35-56); a building on one meter pays it once, and larger meters are set under a developer agreement.
- Sewer Tap Fee (City of Fort Worth, MF) — 4" tap, asphalt street, short side$4,200.004", asphalt, short sideCity of Fort WorthWhere City of Fort Worth crews tap an existing sewer main, the tap fee is charged per connection, not per apartment: $2,600 to $7,900 for a 4 in. tap depending on pavement and street side; 6 and 8 in. taps cost more and need a $4,200 manhole. A building on one connection pays once. Services in new developments are usually built by the developer instead.
- Sewer Impact Fee (City of Fort Worth, MF) — 5/8" x 3/4" meter$2,838.00City of Fort WorthFort Worth charges its wastewater impact fee by meter size, not per apartment: $2,838 for a 5/8 x 3/4 in. meter for building permits on or after October 1, 2026 (Ordinance 27745-06-2025; $2,680 from October 1, 2025), up to $22,704 for a 2 in. meter. A building on one larger master meter pays once, by that meter's equivalent.
- Transportation Impact Fee (City of Fort Worth, MF) — Service Area M, 1.91 veh-mi × $4,138.55/veh-mi$7,904.63City of Fort WorthFort Worth charges a transportation impact fee by service area, collected at building permit. For an apartment in a mid-rise building (four to ten floors) on land platted on or after November 1, 2022, the fee is 1.91 vehicle-miles per unit times the area's collection rate, 65% of the 2022 maximum since June 1, 2026 (Ordinance 26099-04-2023). Low-rise apartments use 2.50 and high-rise 1.57 vehicle-miles per unit. Service Area M is the highest of 19 fee service areas, so this is a ceiling, not a citywide rate; Service Areas H, I, J, K, L, P, Q, R and W charge no transportation impact fee.
- Park Dedication Fee (City of Fort Worth, MF)Requires confirmationCity of Fort WorthFort Worth sets its multifamily park dedication fee project by project under state law: up to 0.005 acre per unit times the area's average land value, divided by 4 in urban areas and 40 downtown, with affordable units excluded. It is collected before the final certificate of occupancy.
- County Impact Fee (Tarrant County, Fort Worth, MF)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no Tarrant County impact fee applies in Fort Worth.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Worth: Commercial Impact Fees
Commercial development in Fort Worth pays $26.46 per square foot in impact fees, plus $21,830.00 in one-time water and sewer connection fees (rates sourced November 5, 2026).
For a 50,000 sq ft building, that comes to about $1,344,710.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth) — 1" meter ($7,475.00 one-time), Sewer Impact Fee (City of Fort Worth) — 1" meter ($7,095.00 one-time) and Sewer Tap Fee (City of Fort Worth) — 4" tap, asphalt street, short side ($4,200.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Fort Worth Impact Fee Schedule
- Water Impact Fee (City of Fort Worth) — 1" meter$7,475.00 one-timeCity of Fort WorthThe City of Fort Worth water impact fee is set by meter size for every new connection: $7,475 for a 1 in. meter for building permits issued on or after October 1, 2026 (Ordinance 27745-06-2025; $7,060 from October 1, 2025), from $2,990 for a 5/8 x 3/4 in. meter to $627,900 for a 10 in. meter. Lots on plats recorded before April 1, 2017 pay the fee in effect when the plat was recorded. These rates stay in effect until the next impact fee study.
- Water Tap Fee (City of Fort Worth) — 1" tap, asphalt street, short side$3,000.00 one-time1", asphalt, short sideCity of Fort WorthWhen City of Fort Worth crews tap an existing water main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,500 to $3,700 for a 1 in. tap, up to $4,600 for a 2 in. tap, plus pavement repair fees on older asphalt streets. Services in new developments and in streets less than two years old are built by the developer under a Community Facilities Agreement instead.
- Water Meter Set Fee (City of Fort Worth)$60.00 one-timeCity of Fort WorthCity of Fort Worth water customers pay a $60 new meter set fee for a meter 2 in. or smaller (City Code Sec. 35-56); larger meters are set under a developer agreement.
- Sewer Impact Fee (City of Fort Worth) — 1" meter$7,095.00 one-timeCity of Fort WorthThe City of Fort Worth wastewater impact fee is set by water meter size for every new connection: $7,095 for a 1 in. meter for building permits issued on or after October 1, 2026 (Ordinance 27745-06-2025; $6,700 from October 1, 2025), from $2,838 for a 5/8 x 3/4 in. meter to $595,980 for a 10 in. meter. Lots on plats recorded before April 1, 2017 pay the fee in effect when the plat was recorded. These rates stay in effect until the next impact fee study.
- Sewer Tap Fee (City of Fort Worth) — 4" tap, asphalt street, short side$4,200.00 one-time4", asphalt, short sideCity of Fort WorthWhere City of Fort Worth crews tap an existing sewer main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,600 to $7,900 for a 4 in. tap, more for 6 and 8 in. taps, which also require a $4,200 manhole. Services in new developments and in streets less than two years old are built by the developer instead.
- Transportation Impact Fee (City of Fort Worth, Commercial) — Service Area PI, 9.60 veh-mi × $2,756/veh-mi$26.46/sq ftService Area PI (Panther Island)City of Fort WorthFort Worth charges a transportation impact fee by service area, collected at building permit. For retail on a lot platted on or after November 1, 2022, the fee is 9.60 vehicle-miles per 1,000 sq ft of leasable area (shopping plaza of 40,000 to 150,000 sq ft) times the area's non-residential collection rate: 40% of the 2022 maximum in most areas, 100% in Service Areas AA, D, F and Panther Island (Ordinance 26099-04-2023). Panther Island is the highest of 19 fee service areas, so this amount is a ceiling, not a citywide rate; Service Areas H, I, J, K, L, P, Q, R and W charge no transportation impact fee. Lots platted earlier pay rates tied to the study in effect when they were platted. A change of use that adds no floor area is exempt, and discounts for adequate public facilities, mixed use, major job-creating investment or neighborhood empowerment zones can reduce the fee.
- County Impact Fee (Tarrant County, Commercial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Worth: Industrial Impact Fees
Industrial development in Fort Worth pays $10.22 per square foot in impact fees, plus $21,830.00 in one-time water and sewer connection fees (rates sourced November 5, 2026).
For a 50,000 sq ft building, that comes to about $533,068.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth) — 1" meter ($7,475.00 one-time), Sewer Impact Fee (City of Fort Worth) — 1" meter ($7,095.00 one-time) and Sewer Tap Fee (City of Fort Worth) — 4" tap, asphalt street, short side ($4,200.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Fort Worth Impact Fee Schedule
- Water Impact Fee (City of Fort Worth) — 1" meter$7,475.00 one-timeCity of Fort WorthThe City of Fort Worth water impact fee is set by meter size for every new connection: $7,475 for a 1 in. meter for building permits issued on or after October 1, 2026 (Ordinance 27745-06-2025; $7,060 from October 1, 2025), from $2,990 for a 5/8 x 3/4 in. meter to $627,900 for a 10 in. meter. Lots on plats recorded before April 1, 2017 pay the fee in effect when the plat was recorded. These rates stay in effect until the next impact fee study.
- Water Tap Fee (City of Fort Worth) — 1" tap, asphalt street, short side$3,000.00 one-time1", asphalt, short sideCity of Fort WorthWhen City of Fort Worth crews tap an existing water main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,500 to $3,700 for a 1 in. tap, up to $4,600 for a 2 in. tap, plus pavement repair fees on older asphalt streets. Services in new developments and in streets less than two years old are built by the developer under a Community Facilities Agreement instead.
- Water Meter Set Fee (City of Fort Worth)$60.00 one-timeCity of Fort WorthCity of Fort Worth water customers pay a $60 new meter set fee for a meter 2 in. or smaller (City Code Sec. 35-56); larger meters are set under a developer agreement.
- Sewer Impact Fee (City of Fort Worth) — 1" meter$7,095.00 one-timeCity of Fort WorthThe City of Fort Worth wastewater impact fee is set by water meter size for every new connection: $7,095 for a 1 in. meter for building permits issued on or after October 1, 2026 (Ordinance 27745-06-2025; $6,700 from October 1, 2025), from $2,838 for a 5/8 x 3/4 in. meter to $595,980 for a 10 in. meter. Lots on plats recorded before April 1, 2017 pay the fee in effect when the plat was recorded. These rates stay in effect until the next impact fee study.
- Sewer Tap Fee (City of Fort Worth) — 4" tap, asphalt street, short side$4,200.00 one-time4", asphalt, short sideCity of Fort WorthWhere City of Fort Worth crews tap an existing sewer main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,600 to $7,900 for a 4 in. tap, more for 6 and 8 in. taps, which also require a $4,200 manhole. Services in new developments and in streets less than two years old are built by the developer instead.
- Transportation Impact Fee (City of Fort Worth, Industrial) — Service Area PI, 3.71 veh-mi × $2,756/veh-mi$10.22/sq ftService Area PI (Panther Island)City of Fort WorthFort Worth charges a transportation impact fee by service area, collected at building permit. For a general light industrial building on a lot platted on or after November 1, 2022, the fee is 3.71 vehicle-miles per 1,000 sq ft of floor area times the area's non-residential collection rate: 40% of the 2022 maximum in most areas, 100% in Service Areas AA, D, F and Panther Island (Ordinance 26099-04-2023). Panther Island is the highest of 19 fee service areas, so this amount is a ceiling, not a citywide rate; Service Areas H, I, J, K, L, P, Q, R and W charge no transportation impact fee. Lots platted earlier pay rates tied to the study in effect when they were platted. A change of use that adds no floor area is exempt, and discounts for adequate public facilities, mixed use, major job-creating investment or neighborhood empowerment zones can reduce the fee.
- County Impact Fee (Tarrant County, Industrial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Worth: Office Impact Fees
Office development in Fort Worth pays $25.13 per square foot in impact fees, plus $21,830.00 in one-time water and sewer connection fees (rates sourced November 5, 2026).
For a 25,000 sq ft building, that comes to about $650,198.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Fort Worth) — 1" meter ($7,475.00 one-time), Sewer Impact Fee (City of Fort Worth) — 1" meter ($7,095.00 one-time) and Sewer Tap Fee (City of Fort Worth) — 4" tap, asphalt street, short side ($4,200.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Fort Worth Impact Fee Schedule
- Water Impact Fee (City of Fort Worth) — 1" meter$7,475.00 one-timeCity of Fort WorthThe City of Fort Worth water impact fee is set by meter size for every new connection: $7,475 for a 1 in. meter for building permits issued on or after October 1, 2026 (Ordinance 27745-06-2025; $7,060 from October 1, 2025), from $2,990 for a 5/8 x 3/4 in. meter to $627,900 for a 10 in. meter. Lots on plats recorded before April 1, 2017 pay the fee in effect when the plat was recorded. These rates stay in effect until the next impact fee study.
- Water Tap Fee (City of Fort Worth) — 1" tap, asphalt street, short side$3,000.00 one-time1", asphalt, short sideCity of Fort WorthWhen City of Fort Worth crews tap an existing water main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,500 to $3,700 for a 1 in. tap, up to $4,600 for a 2 in. tap, plus pavement repair fees on older asphalt streets. Services in new developments and in streets less than two years old are built by the developer under a Community Facilities Agreement instead.
- Water Meter Set Fee (City of Fort Worth)$60.00 one-timeCity of Fort WorthCity of Fort Worth water customers pay a $60 new meter set fee for a meter 2 in. or smaller (City Code Sec. 35-56); larger meters are set under a developer agreement.
- Sewer Impact Fee (City of Fort Worth) — 1" meter$7,095.00 one-timeCity of Fort WorthThe City of Fort Worth wastewater impact fee is set by water meter size for every new connection: $7,095 for a 1 in. meter for building permits issued on or after October 1, 2026 (Ordinance 27745-06-2025; $6,700 from October 1, 2025), from $2,838 for a 5/8 x 3/4 in. meter to $595,980 for a 10 in. meter. Lots on plats recorded before April 1, 2017 pay the fee in effect when the plat was recorded. These rates stay in effect until the next impact fee study.
- Sewer Tap Fee (City of Fort Worth) — 4" tap, asphalt street, short side$4,200.00 one-time4", asphalt, short sideCity of Fort WorthWhere City of Fort Worth crews tap an existing sewer main, the tap fee depends on tap size, street pavement and which side of the street the main is on: $2,600 to $7,900 for a 4 in. tap, more for 6 and 8 in. taps, which also require a $4,200 manhole. Services in new developments and in streets less than two years old are built by the developer instead.
- Transportation Impact Fee (City of Fort Worth, Office) — Service Area PI, 9.12 veh-mi × $2,756/veh-mi$25.13/sq ftService Area PI (Panther Island)City of Fort WorthFort Worth charges a transportation impact fee by service area, collected at building permit. For a general office building on a lot platted on or after November 1, 2022, the fee is 9.12 vehicle-miles per 1,000 sq ft of floor area times the area's non-residential collection rate: 40% of the 2022 maximum in most areas, 100% in Service Areas AA, D, F and Panther Island (Ordinance 26099-04-2023). Panther Island is the highest of 19 fee service areas, so this amount is a ceiling, not a citywide rate; Service Areas H, I, J, K, L, P, Q, R and W charge no transportation impact fee. Lots platted earlier pay rates tied to the study in effect when they were platted. A change of use that adds no floor area is exempt, and discounts for adequate public facilities, mixed use, major job-creating investment or neighborhood empowerment zones can reduce the fee.
- County Impact Fee (Tarrant County, Office)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Worth Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Fort Worth Impact Fee FAQs
What are the total impact fees for a single-family home in Fort Worth, Texas?
A new single-family home in Fort Worth pays $33,466.72 per unit in combined impact fees (rates sourced November 5, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Fort Worth?
Commercial development in Fort Worth pays $26.46 per square foot in impact fees, plus $21,830.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $1,344,710.00 for a 50,000 sq ft building.
Does Fort Worth charge its own impact fees?
Yes. Fort Worth levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Fort Worth. The schedule on this page shows every fee that applies to development in Fort Worth.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.