Skip to content
IMPACTFEES.ORG

Keller, Texas Impact Fees

Keller applies its own fee schedule. Tarrant County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $16,876.61 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Keller Impact Fees by Project Type

Keller: Single-Family Impact Fees

A new single-family home in Keller pays at least $16,876.61 per unit in impact fees (rates sourced November 5, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Roadway Impact Fee (City of Keller) — Service Area 2 (South), 3.76 veh-mi × $1,498.50/veh-mi ($5,634.36), Water Impact Fee (City of Keller) — 5/8" meter ($4,904.25) and Water Impact Fee (City of Fort Worth, Keller) — 5/8" meter ($2,990.00).

Park Land Dedication Fee in Lieu (City of Keller) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Public Art Development Fee (City of Keller) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Keller Impact Fee Schedule
Water$8,169.25
  • Water Impact Fee (City of Keller) — 5/8" meter
    City of Keller
    Keller's own water impact fee is $4,904.25 per service unit (one 5/8 in. meter), set at 75% of the maximum by Ordinance 2099, effective November 2022. Larger meters pay by meter equivalent. Keller also collects the City of Fort Worth water impact fee. Keller began an impact fee study update in late 2026.
    $4,904.25
  • Water Impact Fee (City of Fort Worth, Keller) — 5/8" meter
    City of Fort Worth (collected by City of Keller)
    Keller buys water from the City of Fort Worth and collects Fort Worth's water impact fee on new construction in addition to its own water impact fee: $2,990 for a 5/8 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025). Larger meters pay by Fort Worth's meter equivalents.
    $2,990.00
  • Water Meter Installation Fee (City of Keller) — 5/8" meter
    City of Keller
    Keller charges a meter installation fee of $275 for a 5/8 in. meter under its FY 2026-27 fee schedule; larger meters cost more, and 3 in. and larger meters are billed at actual cost. A water service tap made by the city is billed at actual cost.
    $275.00
Sewer$2,073.00
  • Wastewater Impact Fee (City of Keller) — 5/8" meter
    City of Keller
    Keller's wastewater impact fee is $2,073 per service unit (one 5/8 in. meter), set at 75% of the maximum by Ordinance 2099, effective November 2022. Larger meters pay by meter equivalent. A sewer tap made by the city is billed at actual cost.
    $2,073.00
City$6,634.36
  • Roadway Impact Fee (City of Keller) — Service Area 2 (South), 3.76 veh-mi × $1,498.50/veh-mi
    City of Keller
    Keller's roadway impact fee for a single-family home is $5,634.36 south of FM 1709 (Keller Parkway), the higher of 2 service areas: 3.76 vehicle-miles per home at $1,498.50 per vehicle-mile (Ordinance 2099, effective November 2022, collected at 75% of the maximum). North of FM 1709 the fee is $4,929.36.
    $5,634.36
  • Park Land Dedication Fee in Lieu (City of Keller)
    City of Keller
    Keller requires one acre of park land per 30 dwelling units, or a payment in lieu based on the tract's appraised land value: at least $30,000 and at most $50,000 per acre, which is $1,000 to $1,666.67 per dwelling unit. The amount shown is the minimum.
    $1,000.00Requires confirmation
  • Public Art Development Fee (City of Keller)
    City of Keller
    Keller's fee schedule lists a public art development fee of 0.25% of construction value where it applies.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Keller.
    $0.00
Total (Keller): $16,876.61
Sources last checked Official fee schedules:City of Keller City of Fort Worth (collected by City of Keller) Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Keller: Multifamily Impact Fees

A new multifamily unit in Keller pays at least $13,579.91 per unit in impact fees (rates sourced November 5, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Keller, MF) — 5/8" meter ($4,904.25), Water Impact Fee (City of Fort Worth, Keller, MF) — 5/8" meter ($2,990.00) and Roadway Impact Fee (City of Keller, MF) — Service Area 2 (South), 1.56 veh-mi × $1,498.50/veh-mi ($2,337.66).

Park Land Dedication Fee in Lieu (City of Keller, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Public Art Development Fee (City of Keller, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Keller Impact Fee Schedule
Water$8,169.25
  • Water Impact Fee (City of Keller, MF) — 5/8" meter
    City of Keller
    Keller's own water impact fee is priced by meter size only: $4,904.25 for a 5/8 in. meter (Ordinance 2099, effective November 2022), the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $39,234 for a 2 in. meter and more for larger meters. Keller also collects the City of Fort Worth water impact fee.
    $4,904.25
  • Water Impact Fee (City of Fort Worth, Keller, MF) — 5/8" meter
    City of Fort Worth (collected by City of Keller)
    Keller collects the City of Fort Worth water impact fee on new construction, priced by meter size only: $2,990 for a 5/8 in. meter from October 1, 2026, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $23,920 for a 2 in. meter and more for larger meters.
    $2,990.00
  • Water Meter Installation Fee (City of Keller, MF) — 5/8" meter
    City of Keller
    Keller charges a meter installation fee of $275 for a 5/8 in. meter under its FY 2026-27 fee schedule. A building on one master meter pays once at that meter's size, $775 for a 2 in. turbine or disc meter or $2,075 for a 2 in. compound meter.
    $275.00
Sewer$2,073.00
  • Wastewater Impact Fee (City of Keller, MF) — 5/8" meter
    City of Keller
    Keller's wastewater impact fee is priced by meter size only: $2,073 for a 5/8 in. meter (Ordinance 2099, effective November 2022), the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $16,584 for a 2 in. meter and more for larger meters.
    $2,073.00
City$3,337.66
County$0.00
  • County Impact Fee (Tarrant County, MF)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Keller.
    $0.00
Total (Keller): $13,579.91
Sources last checked Official fee schedules:City of Keller City of Fort Worth (collected by City of Keller) Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Keller: Commercial Impact Fees

Commercial development in Keller pays $11.88 per square foot in impact fees, plus $25,243.13 in one-time water and sewer connection fees (rates sourced November 5, 2026).

For a 50,000 sq ft building, that comes to at least $619,398.63. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Keller) — 1" meter, 2.5 SU × $4,904.25/SU ($12,260.63 one-time), Water Impact Fee (City of Fort Worth, Keller) — 1" meter ($7,475.00 one-time) and Wastewater Impact Fee (City of Keller) — 1" meter, 2.5 SU × $2,073/SU ($5,182.50 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Public Art Development Fee (City of Keller, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Keller Impact Fee Schedule
Water$20,060.63 one-time
  • Water Impact Fee (City of Keller) — 1" meter, 2.5 SU × $4,904.25/SU
    City of Keller
    Keller's own water impact fee is $4,904.25 per service unit, set at 75% of the maximum by Ordinance 2099 (effective November 2022). A 1 in. meter counts as 2.5 service units ($12,260.63); meters run from 1 unit (5/8 in.) to 90 units (8 in.). Keller also collects the City of Fort Worth water impact fee. Keller began an impact fee study update in late 2026.
    $12,260.63 one-time
  • Water Impact Fee (City of Fort Worth, Keller) — 1" meter
    City of Fort Worth
    Keller buys water from the City of Fort Worth and collects Fort Worth's water impact fee on new construction in addition to its own water impact fee: $7,475 for a 1 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), from $2,990 for a 5/8 in. meter. Larger meters pay by Fort Worth's meter equivalents.
    $7,475.00 one-time
  • Water Meter Installation Fee (City of Keller) — 1" meter
    City of Keller
    Keller charges a meter installation fee of $325 for a 1 in. meter under its FY 2026-27 fee schedule, from $275 for a 5/8 in. meter to $2,075 for a 2 in. compound meter; 3 in. and larger meters are billed at actual cost. Water and sewer taps made by the city are billed at actual cost.
    $325.00 one-time
Sewer$5,182.50 one-time
City$11.88/sq ft
County$0.00
  • County Impact Fee (Tarrant County, Commercial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Keller): $11.88/sq ft + $25,243.13 one-time (≈ $619,398.63 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Keller City of Fort Worth Tarrant County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$79,996.13Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$779,981.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$1,344,710.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed fees
Keller$619,398.63this pageIncludes unconfirmed fees
Kennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$387,250.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$182,057.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Keller: Industrial Impact Fees

Industrial development in Keller pays $3.90 per square foot in impact fees, plus $25,243.13 in one-time water and sewer connection fees (rates sourced November 5, 2026).

For a 50,000 sq ft building, that comes to at least $220,048.13. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Keller) — 1" meter, 2.5 SU × $4,904.25/SU ($12,260.63 one-time), Water Impact Fee (City of Fort Worth, Keller) — 1" meter ($7,475.00 one-time) and Wastewater Impact Fee (City of Keller) — 1" meter, 2.5 SU × $2,073/SU ($5,182.50 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Roadway Impact Fee (City of Keller, Industrial) — Service Area 2 (South), 2.60 veh-mi × $1,498.50/veh-mi is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Public Art Development Fee (City of Keller, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Keller Impact Fee Schedule
Water$20,060.63 one-time
  • Water Impact Fee (City of Keller) — 1" meter, 2.5 SU × $4,904.25/SU
    City of Keller
    Keller's own water impact fee is $4,904.25 per service unit, set at 75% of the maximum by Ordinance 2099 (effective November 2022). A 1 in. meter counts as 2.5 service units ($12,260.63); meters run from 1 unit (5/8 in.) to 90 units (8 in.). Keller also collects the City of Fort Worth water impact fee. Keller began an impact fee study update in late 2026.
    $12,260.63 one-time
  • Water Impact Fee (City of Fort Worth, Keller) — 1" meter
    City of Fort Worth
    Keller buys water from the City of Fort Worth and collects Fort Worth's water impact fee on new construction in addition to its own water impact fee: $7,475 for a 1 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), from $2,990 for a 5/8 in. meter. Larger meters pay by Fort Worth's meter equivalents.
    $7,475.00 one-time
  • Water Meter Installation Fee (City of Keller) — 1" meter
    City of Keller
    Keller charges a meter installation fee of $325 for a 1 in. meter under its FY 2026-27 fee schedule, from $275 for a 5/8 in. meter to $2,075 for a 2 in. compound meter; 3 in. and larger meters are billed at actual cost. Water and sewer taps made by the city are billed at actual cost.
    $325.00 one-time
Sewer$5,182.50 one-time
City$3.90/sq ft
County$0.00
  • County Impact Fee (Tarrant County, Industrial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Keller): $3.90/sq ft + $25,243.13 one-time (≈ $220,048.13 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Keller City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$31,402.63Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$286,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$533,068.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed fees
Keller$220,048.13this pageIncludes unconfirmed fees
Kennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$187,350.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$95,882.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Keller: Office Impact Fees

Office development in Keller pays $8.63 per square foot in impact fees, plus $25,243.13 in one-time water and sewer connection fees (rates sourced November 5, 2026).

For a 25,000 sq ft building, that comes to at least $241,027.13. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Keller) — 1" meter, 2.5 SU × $4,904.25/SU ($12,260.63 one-time), Water Impact Fee (City of Fort Worth, Keller) — 1" meter ($7,475.00 one-time) and Wastewater Impact Fee (City of Keller) — 1" meter, 2.5 SU × $2,073/SU ($5,182.50 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Public Art Development Fee (City of Keller, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Keller Impact Fee Schedule
Water$20,060.63 one-time
  • Water Impact Fee (City of Keller) — 1" meter, 2.5 SU × $4,904.25/SU
    City of Keller
    Keller's own water impact fee is $4,904.25 per service unit, set at 75% of the maximum by Ordinance 2099 (effective November 2022). A 1 in. meter counts as 2.5 service units ($12,260.63); meters run from 1 unit (5/8 in.) to 90 units (8 in.). Keller also collects the City of Fort Worth water impact fee. Keller began an impact fee study update in late 2026.
    $12,260.63 one-time
  • Water Impact Fee (City of Fort Worth, Keller) — 1" meter
    City of Fort Worth
    Keller buys water from the City of Fort Worth and collects Fort Worth's water impact fee on new construction in addition to its own water impact fee: $7,475 for a 1 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), from $2,990 for a 5/8 in. meter. Larger meters pay by Fort Worth's meter equivalents.
    $7,475.00 one-time
  • Water Meter Installation Fee (City of Keller) — 1" meter
    City of Keller
    Keller charges a meter installation fee of $325 for a 1 in. meter under its FY 2026-27 fee schedule, from $275 for a 5/8 in. meter to $2,075 for a 2 in. compound meter; 3 in. and larger meters are billed at actual cost. Water and sewer taps made by the city are billed at actual cost.
    $325.00 one-time
Sewer$5,182.50 one-time
City$8.63/sq ft
County$0.00
  • County Impact Fee (Tarrant County, Office)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Keller): $8.63/sq ft + $25,243.13 one-time (≈ $241,027.13 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Keller City of Fort Worth Tarrant County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$38,824.38Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$262,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$650,198.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed fees
Keller$241,027.13this pageIncludes unconfirmed fees
Kennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$121,175.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$76,551.16Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Keller Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Keller Impact Fee FAQs

What are the total impact fees for a single-family home in Keller, Texas?

A new single-family home in Keller pays at least $16,876.61 per unit in combined impact fees (rates sourced November 5, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Keller?

Commercial development in Keller pays $11.88 per square foot in impact fees, plus $25,243.13 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $619,398.63 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Keller charge its own impact fees?

Yes. Keller levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Keller. The schedule on this page shows every fee that applies to development in Keller.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Tarrant County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.