Azle Impact Fees by Project Type
Azle: Single-Family Impact Fees
A new single-family home in Azle pays $16,269.72 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (City of Azle) ($5,616.72), Sewer Impact Fee (City of Azle) — 3/4" meter ($4,422.00) and Sewer Tap Fee (City of Azle) — 4" tap, paved area ($2,690.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Azle Impact Fee Schedule
- Water Tap Fee (City of Azle) — 5/8" x 3/4" meter, paved area$2,100.005/8" x 3/4", paved areaCity of AzleThe City of Azle charges a water tap fee by meter size when it installs a new service line: $2,100 for a standard 5/8 x 3/4 in. meter in a paved area or $1,100 in an unpaved area, up to $3,650 (paved) for a 2 in. meter. Where the service line is already installed at the tap location, the 5/8 x 3/4 in. tap is $375 and other sizes pay the actual cost of materials. Taps over 2 in. are priced by estimate. Set in the Appendix A fee schedule by Ordinance 2025-14 (September 16, 2025).
- Water Impact Fee (City of Azle) — 3/4" meter$1,441.00City of AzleThe City of Azle water utility serves the city. For property platted after March 21, 2023 the water impact fee is $1,441 for a 3/4 in. meter, the standard home meter and one meter unit equivalent; larger meters pay $2,406.47 (1 in.) up to $36,025 (6 in.). Earlier plats pay the schedule in force when platted: $1,578 at 3/4 in. for plats from January 1, 2018 and $822 for plats before 2018. Adopted in the Appendix A fee schedule by Ordinance 2025-14 (September 16, 2025). Paid before the water tap is made.
- Sewer Impact Fee (City of Azle) — 3/4" meter$4,422.00City of AzleThe City of Azle provides wastewater service in the city. For property platted after March 21, 2023 the wastewater impact fee is $4,422 for a 3/4 in. water meter, the standard home meter; larger meters pay $7,384.74 (1 in.) up to $110,550 (6 in.). Earlier plats pay the schedule in force when platted: $1,563 at 3/4 in. for plats from January 1, 2018 and $1,428 for plats before 2018. Adopted in the Appendix A fee schedule by Ordinance 2025-14 (September 16, 2025). Paid before the sewer tap is made.
- Sewer Tap Fee (City of Azle) — 4" tap, paved area$2,690.004", paved areaCity of AzleThe City of Azle charges a sewer tap fee by tap size: $2,690 for a standard 4 in. residential tap in a paved area or $1,760 in an unpaved area; 6 in. taps are $3,920 (paved) or $2,100 (unpaved) and 8 in. taps $4,220 or $2,400. Set in the Appendix A fee schedule by Ordinance 2025-14 (September 16, 2025).
- Roadway Impact Fee (City of Azle)$5,616.72City of AzleAzle charges a roadway impact fee of $5,616.72 per residential unit on property platted after June 20, 2023 (Appendix A fee schedule, Ordinance 2025-14, September 16, 2025; roadway impact fee program adopted by Ordinance 2023-07). One citywide residential rate applies. The fee is assessed at final plat approval and collected before the certificate of occupancy.
- County Impact Fee (Tarrant County)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Azle.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Azle: Multifamily Impact Fees
A new multifamily unit in Azle pays $16,269.72 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Impact Fee (City of Azle, MF) — 3/4" meter ($4,422.00), Sewer Tap Fee (City of Azle, MF) — 4" tap, paved area ($2,690.00) and Water Tap Fee (City of Azle, MF) — 5/8" x 3/4" meter, paved area ($2,100.00).
Roadway Impact Fee (City of Azle, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Azle Impact Fee Schedule
- Water Tap Fee (City of Azle, MF) — 5/8" x 3/4" meter, paved area$2,100.005/8" x 3/4", paved areaCity of AzleAzle's water tap fee is charged per tap by meter size, not per dwelling unit: $2,100 for a 5/8 x 3/4 in. meter in a paved area ($1,100 unpaved) up to $3,650 (paved) for a 2 in. meter, or $375 for a 5/8 x 3/4 in. tap where the service line is already installed. A building served by one connection pays once. Taps over 2 in. are priced by estimate. Set in the Appendix A fee schedule by Ordinance 2025-14 (September 16, 2025).
- Water Impact Fee (City of Azle, MF) — 3/4" meter$1,441.00City of AzleAzle charges water impact fees by water meter size, not per dwelling unit. For property platted after March 21, 2023 the fee is $1,441 for a 3/4 in. meter, the amount shown for a unit with its own meter; a building on one larger master meter pays once by that meter's size ($7,680.49 at 2 in., $14,140 at 3 in., $24,021.47 at 4 in., $36,025 at 6 in.). Earlier plats pay the schedule in force when platted. Adopted in the Appendix A fee schedule by Ordinance 2025-14 (September 16, 2025).
- Sewer Impact Fee (City of Azle, MF) — 3/4" meter$4,422.00City of AzleAzle charges wastewater impact fees by water meter size, not per dwelling unit. For property platted after March 21, 2023 the fee is $4,422 for a 3/4 in. meter, the amount shown for a unit with its own meter; a building on one larger master meter pays once by that meter's size ($23,569.15 at 2 in., $44,220 at 3 in., $73,714.74 at 4 in., $110,550 at 6 in.). Earlier plats pay the schedule in force when platted. Adopted in the Appendix A fee schedule by Ordinance 2025-14 (September 16, 2025).
- Sewer Tap Fee (City of Azle, MF) — 4" tap, paved area$2,690.004", paved areaCity of AzleAzle's sewer tap fee is charged per tap by size, not per dwelling unit: $2,690 for a 4 in. tap in a paved area or $1,760 unpaved. A building served by one connection pays once; larger building taps are $3,920 (6 in., paved) or $4,220 (8 in., paved), less in unpaved areas. Set in the Appendix A fee schedule by Ordinance 2025-14 (September 16, 2025).
- Roadway Impact Fee (City of Azle, MF)$5,616.72Requires confirmationCity of AzleAzle's fee schedule sets the roadway impact fee at $5,616.72 per residential unit on property platted after June 20, 2023 (Appendix A, Ordinance 2025-14, September 16, 2025), with no separate multifamily rate. The fee is assessed at final plat approval and collected before the certificate of occupancy.
- County Impact Fee (Tarrant County, MF)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Azle.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Azle: Commercial Impact Fees
Commercial development in Azle pays no per-square-foot impact fees, but owes $14,796.21 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to at least $14,796.21. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Azle) — 1" meter ($7,384.74 one-time), Sewer Tap Fee (City of Azle) — 4" tap, paved area ($2,690.00 one-time) and Water Impact Fee (City of Azle) — 1" meter ($2,406.47 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Impact Fee (City of Azle, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Azle Impact Fee Schedule
- Water Impact Fee (City of Azle) — 1" meter$2,406.47 one-timeCity of AzleCity of Azle water impact fee for property platted after March 21, 2023: $2,406.47 for a 1 in. meter, by meter size from $1,441 (3/4 in.) to $36,025 (6 in.) (Fee Schedule Appendix A, Ordinance 2025-14). Property platted earlier pays the table in effect for its plat date (for a 1 in. meter, $1,372.74 if platted before 2018 and $2,635.26 if platted from January 1, 2018). A separate water tap fee applies.
- Water Tap Fee (City of Azle) — 1" meter, paved area$2,315.00 one-time1", paved areaCity of AzleCity of Azle water tap fee where the service line is not yet installed: $2,315 for a 1 in. meter in a paved area ($1,315 unpaved), up to $3,650 for a 2 in. meter; larger taps are estimated by the city. Where the service line is already installed, a 5/8 x 3/4 in. tap is $375 and other sizes pay the cost of materials.
- Sewer Impact Fee (City of Azle) — 1" meter$7,384.74 one-timeCity of AzleCity of Azle wastewater impact fee for property platted after March 21, 2023: $7,384.74 for a 1 in. meter, by meter size from $4,422 (3/4 in.) to $110,550 (6 in.) (Fee Schedule Appendix A, Ordinance 2025-14). Property platted earlier pays the table in effect for its plat date (for a 1 in. meter, $2,384.76 if platted before 2018 and $2,610.21 if platted from January 1, 2018). A separate sewer tap fee applies.
- Sewer Tap Fee (City of Azle) — 4" tap, paved area$2,690.00 one-time4", paved areaCity of AzleCity of Azle sewer tap fee by tap size and surface: $2,690 for a 4 in. tap in a paved area ($1,760 unpaved), up to $4,220 for an 8 in. tap.
- Roadway Impact Fee (City of Azle, Commercial)Requires confirmationCity of AzleThe City of Azle charges a roadway impact fee on nonresidential development on property platted after June 20, 2023, computed from the land use equivalency table adopted with Ordinance 2023-07; the city provides commercial estimates on request. Texas law allows no city park, fire or police impact fee.
- County Impact Fee (Tarrant County, Commercial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Azle: Industrial Impact Fees
Industrial development in Azle pays no per-square-foot impact fees, but owes $14,796.21 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to at least $14,796.21. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Azle) — 1" meter ($7,384.74 one-time), Sewer Tap Fee (City of Azle) — 4" tap, paved area ($2,690.00 one-time) and Water Impact Fee (City of Azle) — 1" meter ($2,406.47 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Impact Fee (City of Azle, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Azle Impact Fee Schedule
- Water Impact Fee (City of Azle) — 1" meter$2,406.47 one-timeCity of AzleCity of Azle water impact fee for property platted after March 21, 2023: $2,406.47 for a 1 in. meter, by meter size from $1,441 (3/4 in.) to $36,025 (6 in.) (Fee Schedule Appendix A, Ordinance 2025-14). Property platted earlier pays the table in effect for its plat date (for a 1 in. meter, $1,372.74 if platted before 2018 and $2,635.26 if platted from January 1, 2018). A separate water tap fee applies.
- Water Tap Fee (City of Azle) — 1" meter, paved area$2,315.00 one-time1", paved areaCity of AzleCity of Azle water tap fee where the service line is not yet installed: $2,315 for a 1 in. meter in a paved area ($1,315 unpaved), up to $3,650 for a 2 in. meter; larger taps are estimated by the city. Where the service line is already installed, a 5/8 x 3/4 in. tap is $375 and other sizes pay the cost of materials.
- Sewer Impact Fee (City of Azle) — 1" meter$7,384.74 one-timeCity of AzleCity of Azle wastewater impact fee for property platted after March 21, 2023: $7,384.74 for a 1 in. meter, by meter size from $4,422 (3/4 in.) to $110,550 (6 in.) (Fee Schedule Appendix A, Ordinance 2025-14). Property platted earlier pays the table in effect for its plat date (for a 1 in. meter, $2,384.76 if platted before 2018 and $2,610.21 if platted from January 1, 2018). A separate sewer tap fee applies.
- Sewer Tap Fee (City of Azle) — 4" tap, paved area$2,690.00 one-time4", paved areaCity of AzleCity of Azle sewer tap fee by tap size and surface: $2,690 for a 4 in. tap in a paved area ($1,760 unpaved), up to $4,220 for an 8 in. tap.
- Roadway Impact Fee (City of Azle, Industrial)Requires confirmationCity of AzleThe City of Azle roadway impact fee applies to new development on property platted after June 20, 2023, by the land use equivalency table adopted with Ordinance 2023-07; the city provides nonresidential estimates on request.
- County Impact Fee (Tarrant County, Industrial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Azle: Office Impact Fees
Office development in Azle pays no per-square-foot impact fees, but owes $14,796.21 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 25,000 sq ft building, that comes to at least $14,796.21. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Azle) — 1" meter ($7,384.74 one-time), Sewer Tap Fee (City of Azle) — 4" tap, paved area ($2,690.00 one-time) and Water Impact Fee (City of Azle) — 1" meter ($2,406.47 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Impact Fee (City of Azle, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Azle Impact Fee Schedule
- Water Impact Fee (City of Azle) — 1" meter$2,406.47 one-timeCity of AzleCity of Azle water impact fee for property platted after March 21, 2023: $2,406.47 for a 1 in. meter, by meter size from $1,441 (3/4 in.) to $36,025 (6 in.) (Fee Schedule Appendix A, Ordinance 2025-14). Property platted earlier pays the table in effect for its plat date (for a 1 in. meter, $1,372.74 if platted before 2018 and $2,635.26 if platted from January 1, 2018). A separate water tap fee applies.
- Water Tap Fee (City of Azle) — 1" meter, paved area$2,315.00 one-time1", paved areaCity of AzleCity of Azle water tap fee where the service line is not yet installed: $2,315 for a 1 in. meter in a paved area ($1,315 unpaved), up to $3,650 for a 2 in. meter; larger taps are estimated by the city. Where the service line is already installed, a 5/8 x 3/4 in. tap is $375 and other sizes pay the cost of materials.
- Sewer Impact Fee (City of Azle) — 1" meter$7,384.74 one-timeCity of AzleCity of Azle wastewater impact fee for property platted after March 21, 2023: $7,384.74 for a 1 in. meter, by meter size from $4,422 (3/4 in.) to $110,550 (6 in.) (Fee Schedule Appendix A, Ordinance 2025-14). Property platted earlier pays the table in effect for its plat date (for a 1 in. meter, $2,384.76 if platted before 2018 and $2,610.21 if platted from January 1, 2018). A separate sewer tap fee applies.
- Sewer Tap Fee (City of Azle) — 4" tap, paved area$2,690.00 one-time4", paved areaCity of AzleCity of Azle sewer tap fee by tap size and surface: $2,690 for a 4 in. tap in a paved area ($1,760 unpaved), up to $4,220 for an 8 in. tap.
- Roadway Impact Fee (City of Azle, Office)Requires confirmationCity of AzleThe City of Azle charges a roadway impact fee on nonresidential development on property platted after June 20, 2023, computed from the land use equivalency table adopted with Ordinance 2023-07; the city provides commercial estimates on request.
- County Impact Fee (Tarrant County, Office)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Azle Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Azle Impact Fee FAQs
What are the total impact fees for a single-family home in Azle, Texas?
A new single-family home in Azle pays $16,269.72 per unit in combined impact fees (rates sourced November 4, 2026).
How much are commercial impact fees in Azle?
Commercial development in Azle pays no per-square-foot impact fees, but owes $14,796.21 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Azle charge its own impact fees?
Yes. Azle levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Azle. The schedule on this page shows every fee that applies to development in Azle.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Tarrant County impact fees page.