Skip to content
IMPACTFEES.ORG

Mansfield, Texas Impact Fees

Mansfield applies its own fee schedule. Tarrant County does not currently add county-level impact fees inside city limits. A new single-family home pays $22,175.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Mansfield Impact Fees by Project Type

Mansfield: Single-Family Impact Fees

A new single-family home in Mansfield pays $22,175.00 per unit in impact fees (rates sourced November 10, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (City of Mansfield) — City-installed tap ($5,200.00), Roadway Impact Fee (City of Mansfield) ($4,900.00) and Water Impact Fee (City of Mansfield) — 3/4" meter ($3,500.00).

Park Land Fee in Lieu of Dedication (City of Mansfield) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Mansfield Impact Fee Schedule
Water$5,775.00
  • Water Impact Fee (City of Mansfield) — 3/4" meter
    City of Mansfield
    Mansfield's water impact fee is charged by water meter size under the 2024 Water and Wastewater Impact Fee Study (Ord. OR-2385-24, adopted September 23, 2024). A single-family home on the base 3/4 in. meter (1.0 living unit equivalent) pays the collection rate of $3,500; larger meters pay by meter equivalent.
    $3,500.00
  • Water Tap Fee (City of Mansfield) — 1" tap, behind curb, same side
    City of Mansfield
    When the City of Mansfield makes the water tap, the FY 2026-2027 fee schedule charges $1,875 for a 1 in. tap behind the curb on the same side as the main, $3,700 on the opposite side and $5,700 under pavement. Lots whose service was installed by the developer pay no city tap fee.
    $1,875.00
  • Water Meter Set Fee (City of Mansfield) — 3/4" meter
    City of Mansfield
    Mansfield's FY 2026-2027 Master Fee Schedule (effective October 1, 2026) charges $400 to set a 3/4 in. water meter; larger meters cost more. The meter set fee is separate from the water and sewer impact fees.
    $400.00
Sewer$8,200.00
  • Sewer Tap Fee (City of Mansfield) — City-installed tap
    City of Mansfield
    When the City of Mansfield makes the sewer tap, the FY 2026-2027 fee schedule charges $5,200. Lots whose sewer service was installed by the developer pay no city tap fee.
    $5,200.00
  • Sewer Impact Fee (City of Mansfield) — 3/4" meter
    City of Mansfield
    Mansfield's sewer impact fee is charged by water meter size under the 2024 Water and Wastewater Impact Fee Study (Ord. OR-2385-24, adopted September 23, 2024). A single-family home on the base 3/4 in. meter pays the collection rate of $3,000; larger meters pay by meter equivalent.
    $3,000.00
City$8,200.00
  • Roadway Impact Fee (City of Mansfield)
    City of Mansfield
    Mansfield charges a roadway impact fee of $4,900 per single-family detached home (3.76 vehicle-miles at $1,303.19 per vehicle-mile). The collected rate is the same in all four roadway service areas and is unchanged for FY 2027 (effective October 1, 2026) under Ord. OR-2398-24.
    $4,900.00
  • Park Development Fee (City of Mansfield)
    City of Mansfield
    Mansfield charges a park development fee of $1,900 per single-family dwelling unit as a condition of building permit issuance (Code Sec. 156.06, Exhibit B as adopted September 8, 2025 by Ord. OR-2420-25). Funds stay in the park quadrant where the development is located.
    $1,900.00
  • Park Land Fee in Lieu of Dedication (City of Mansfield)
    City of Mansfield
    Where park land is not dedicated, Mansfield requires a cash payment in lieu of land of $1,400 per single-family dwelling unit (Code Sec. 156.05(D), Exhibit B as adopted September 8, 2025), in addition to the park development fee.
    $1,400.00Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Mansfield.
    $0.00
Total (Mansfield): $22,175.00
Sources last checked Official fee schedules:City of Mansfield Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mansfield: Multifamily Impact Fees

A new multifamily unit in Mansfield pays $20,722.29 per unit in impact fees (rates sourced November 10, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (City of Mansfield, MF) — City-installed tap ($5,200.00), Water Impact Fee (City of Mansfield, MF) — 3/4" meter ($3,500.00) and Sewer Impact Fee (City of Mansfield, MF) — 3/4" meter ($3,000.00).

Park Land Fee in Lieu of Dedication (City of Mansfield, MF) — $140,000 / 70 units and Park Development Fee (City of Mansfield, MF) — $190,000 / 70 units are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Mansfield Impact Fee Schedule
Water$5,775.00
  • Water Impact Fee (City of Mansfield, MF) — 3/4" meter
    City of Mansfield
    Mansfield sets water impact fees by meter size, not per dwelling unit (Ord. OR-2385-24, adopted September 23, 2024). An individually metered unit on a 3/4 in. meter pays $3,500; a master-metered building pays once, at the rate for its meter size.
    $3,500.00
  • Water Tap Fee (City of Mansfield, MF) — 1" tap, behind curb, same side
    City of Mansfield
    When the City of Mansfield makes the water tap, the FY 2026-2027 fee schedule charges $1,875 for a 1 in. tap behind the curb on the same side as the main ($3,700 opposite side, $5,700 under pavement). A building on one connection pays once; developer-installed services pay no city tap fee.
    $1,875.00
  • Water Meter Set Fee (City of Mansfield, MF) — 3/4" meter
    City of Mansfield
    Mansfield's FY 2026-2027 fee schedule charges $400 to set a 3/4 in. water meter. A building served by one master meter pays the set fee once, by meter size.
    $400.00
Sewer$8,200.00
  • Sewer Tap Fee (City of Mansfield, MF) — City-installed tap
    City of Mansfield
    When the City of Mansfield makes the sewer tap, the FY 2026-2027 fee schedule charges $5,200. A building on one connection pays once; developer-installed services pay no city tap fee.
    $5,200.00
  • Sewer Impact Fee (City of Mansfield, MF) — 3/4" meter
    City of Mansfield
    Mansfield sets sewer impact fees by water meter size, not per dwelling unit (Ord. OR-2385-24, adopted September 23, 2024). An individually metered unit on a 3/4 in. meter pays $3,000; a master-metered building pays once, at the rate for its meter size.
    $3,000.00
City$6,747.29
  • Park Development Fee (City of Mansfield, MF) — $190,000 / 70 units
    City of Mansfield
    Mansfield charges a park development fee per multifamily dwelling unit as a condition of building permit issuance (Code Sec. 156.06). The September 8, 2025 ordinance set it at $190,000 per acre spread over 70 units, about $2,714 per unit. Funds stay in the park quadrant where the development is located.
    $2,714.29Requires confirmation
  • Roadway Impact Fee (City of Mansfield, MF)
    City of Mansfield
    Mansfield charges a roadway impact fee of $2,033 per mid-rise multifamily unit (1.56 vehicle-miles at $1,303.19). Low-rise units pay $2,659 and high-rise units $1,668. Rates are the same in all four service areas and unchanged for FY 2027 (effective October 1, 2026) under Ord. OR-2398-24.
    $2,033.00
  • Park Land Fee in Lieu of Dedication (City of Mansfield, MF) — $140,000 / 70 units
    City of Mansfield
    Where park land is not dedicated, Mansfield requires a cash payment in lieu of land per multifamily dwelling unit (Code Sec. 156.05(D)); the September 8, 2025 ordinance set it at $140,000 per acre spread over 70 units, $2,000 per unit.
    $2,000.00Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, MF)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Mansfield.
    $0.00
Total (Mansfield): $20,722.29
Sources last checked Official fee schedules:City of Mansfield Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mansfield: Commercial Impact Fees

Commercial development in Mansfield pays $7.39 per square foot in impact fees, plus $17,950.00 in one-time water and sewer connection fees (rates sourced November 10, 2026).

For a 50,000 sq ft building, that comes to about $387,250.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Mansfield) — 1" meter ($5,600.00 one-time), Sewer Tap Fee (City of Mansfield) — City-installed tap ($5,200.00 one-time) and Sewer Impact Fee (City of Mansfield) — 1" meter ($4,800.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Mansfield Impact Fee Schedule
Water$7,950.00 one-time
  • Water Impact Fee (City of Mansfield) — 1" meter
    City of Mansfield
    Mansfield's water impact fee is set by meter size under Code Sec. 51.098 (Ord. OR-2385-24, September 23, 2024): $5,600 for a 1-inch meter (1.6 living unit equivalents), the collected rate below the $5,998 maximum. A meter set fee and a tap fee are charged separately.
    $5,600.00 one-time
  • Water Tap Fee (City of Mansfield) — 1" tap, behind curb, same side
    City of Mansfield
    Mansfield's FY 2026-2027 fee schedule prices a city-made 1-inch water tap at $1,875 behind the curb on the same side of the street, $3,700 on the opposite side and $5,700 under pavement. No larger tap size is priced, and a developer-installed service pays no city tap fee.
    $1,875.00 one-time
  • Water Meter Set Fee (City of Mansfield) — 1" meter
    City of Mansfield
    Mansfield charges a meter set fee by meter size (FY 2026-2027 fee schedule, effective October 1, 2026): $475 for a 1-inch meter, from $400 (3/4 inch) to $5,500 (6 inch).
    $475.00 one-time
Sewer$10,000.00 one-time
  • Sewer Tap Fee (City of Mansfield) — City-installed tap
    City of Mansfield
    When the City of Mansfield makes the sewer tap, the FY 2026-2027 fee schedule charges $5,200. Sites whose sewer service was installed by the developer pay no city tap fee.
    $5,200.00 one-time
  • Sewer Impact Fee (City of Mansfield) — 1" meter
    City of Mansfield
    Mansfield's sewer impact fee is set by the water meter size under Code Sec. 51.099 (Ord. OR-2385-24, September 23, 2024): $4,800 for a 1-inch meter (1.6 living unit equivalents), the collected rate below the $5,846 maximum.
    $4,800.00 one-time
City$7.39/sq ft
  • Roadway Impact Fee (City of Mansfield, Commercial)
    City of Mansfield
    Mansfield's roadway impact fee for a shopping plaza (40,000 to 150,000 sq ft) is $7,386 per 1,000 sq ft of gross floor area from October 1, 2026 (8.72 vehicle-miles at $847.07, 65% of the full $1,303.19 rate under the city's economic development policy). The rate is the same in all four roadway service areas. FY 2025 and FY 2026 rate: $6,250.
    $7.39/sq ft
County$0.00
  • County Impact Fee (Tarrant County, Commercial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Mansfield): $7.39/sq ft + $17,950.00 one-time (≈ $387,250.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Mansfield Tarrant County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$79,996.13Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$779,981.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$1,344,710.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$619,398.63Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed fees
Mansfield$387,250.00this page
North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$182,057.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Mansfield: Industrial Impact Fees

Industrial development in Mansfield pays $3.39 per square foot in impact fees, plus $17,950.00 in one-time water and sewer connection fees (rates sourced November 10, 2026).

For a 50,000 sq ft building, that comes to about $187,350.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Mansfield) — 1" meter ($5,600.00 one-time), Sewer Tap Fee (City of Mansfield) — City-installed tap ($5,200.00 one-time) and Sewer Impact Fee (City of Mansfield) — 1" meter ($4,800.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Mansfield Impact Fee Schedule
Water$7,950.00 one-time
  • Water Impact Fee (City of Mansfield) — 1" meter
    City of Mansfield
    Mansfield's water impact fee is set by meter size under Code Sec. 51.098 (Ord. OR-2385-24, September 23, 2024): $5,600 for a 1-inch meter (1.6 living unit equivalents), the collected rate below the $5,998 maximum. A meter set fee and a tap fee are charged separately.
    $5,600.00 one-time
  • Water Tap Fee (City of Mansfield) — 1" tap, behind curb, same side
    City of Mansfield
    Mansfield's FY 2026-2027 fee schedule prices a city-made 1-inch water tap at $1,875 behind the curb on the same side of the street, $3,700 on the opposite side and $5,700 under pavement. No larger tap size is priced, and a developer-installed service pays no city tap fee.
    $1,875.00 one-time
  • Water Meter Set Fee (City of Mansfield) — 1" meter
    City of Mansfield
    Mansfield charges a meter set fee by meter size (FY 2026-2027 fee schedule, effective October 1, 2026): $475 for a 1-inch meter, from $400 (3/4 inch) to $5,500 (6 inch).
    $475.00 one-time
Sewer$10,000.00 one-time
  • Sewer Tap Fee (City of Mansfield) — City-installed tap
    City of Mansfield
    When the City of Mansfield makes the sewer tap, the FY 2026-2027 fee schedule charges $5,200. Sites whose sewer service was installed by the developer pay no city tap fee.
    $5,200.00 one-time
  • Sewer Impact Fee (City of Mansfield) — 1" meter
    City of Mansfield
    Mansfield's sewer impact fee is set by the water meter size under Code Sec. 51.099 (Ord. OR-2385-24, September 23, 2024): $4,800 for a 1-inch meter (1.6 living unit equivalents), the collected rate below the $5,846 maximum.
    $4,800.00 one-time
City$3.39/sq ft
  • Roadway Impact Fee (City of Mansfield, Industrial)
    City of Mansfield
    Mansfield's roadway impact fee for general light industrial space is $3,388 per 1,000 sq ft of gross floor area (2.60 vehicle-miles at $1,303.19), unchanged for FY 2027 and the same in all four roadway service areas.
    $3.39/sq ft
County$0.00
  • County Impact Fee (Tarrant County, Industrial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Mansfield): $3.39/sq ft + $17,950.00 one-time (≈ $187,350.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Mansfield Tarrant County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$31,402.63Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$286,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$533,068.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$220,048.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed fees
Mansfield$187,350.00this page
North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$95,882.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Mansfield: Office Impact Fees

Office development in Mansfield pays $4.13 per square foot in impact fees, plus $17,950.00 in one-time water and sewer connection fees (rates sourced November 10, 2026).

For a 25,000 sq ft building, that comes to about $121,175.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Mansfield) — 1" meter ($5,600.00 one-time), Sewer Tap Fee (City of Mansfield) — City-installed tap ($5,200.00 one-time) and Sewer Impact Fee (City of Mansfield) — 1" meter ($4,800.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Mansfield Impact Fee Schedule
Water$7,950.00 one-time
  • Water Impact Fee (City of Mansfield) — 1" meter
    City of Mansfield
    Mansfield's water impact fee is set by meter size under Code Sec. 51.098 (Ord. OR-2385-24, September 23, 2024): $5,600 for a 1-inch meter (1.6 living unit equivalents), the collected rate below the $5,998 maximum. A meter set fee and a tap fee are charged separately.
    $5,600.00 one-time
  • Water Tap Fee (City of Mansfield) — 1" tap, behind curb, same side
    City of Mansfield
    Mansfield's FY 2026-2027 fee schedule prices a city-made 1-inch water tap at $1,875 behind the curb on the same side of the street, $3,700 on the opposite side and $5,700 under pavement. No larger tap size is priced, and a developer-installed service pays no city tap fee.
    $1,875.00 one-time
  • Water Meter Set Fee (City of Mansfield) — 1" meter
    City of Mansfield
    Mansfield charges a meter set fee by meter size (FY 2026-2027 fee schedule, effective October 1, 2026): $475 for a 1-inch meter, from $400 (3/4 inch) to $5,500 (6 inch).
    $475.00 one-time
Sewer$10,000.00 one-time
  • Sewer Tap Fee (City of Mansfield) — City-installed tap
    City of Mansfield
    When the City of Mansfield makes the sewer tap, the FY 2026-2027 fee schedule charges $5,200. Sites whose sewer service was installed by the developer pay no city tap fee.
    $5,200.00 one-time
  • Sewer Impact Fee (City of Mansfield) — 1" meter
    City of Mansfield
    Mansfield's sewer impact fee is set by the water meter size under Code Sec. 51.099 (Ord. OR-2385-24, September 23, 2024): $4,800 for a 1-inch meter (1.6 living unit equivalents), the collected rate below the $5,846 maximum.
    $4,800.00 one-time
City$4.13/sq ft
  • Roadway Impact Fee (City of Mansfield, Office)
    City of Mansfield
    Mansfield's roadway impact fee for a general office building is $4,129 per 1,000 sq ft of gross floor area from October 1, 2026 (5.76 vehicle-miles at $716.75, 55% of the full rate). It was $3,378 in FY 2025 and $3,753 in FY 2026. The rate is the same in all four roadway service areas.
    $4.13/sq ft
County$0.00
  • County Impact Fee (Tarrant County, Office)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Mansfield): $4.13/sq ft + $17,950.00 one-time (≈ $121,175.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Mansfield Tarrant County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$38,824.38Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$262,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$650,198.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$241,027.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed fees
Mansfield$121,175.00this page
North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$76,551.16Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Mansfield Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Mansfield Impact Fee FAQs

What are the total impact fees for a single-family home in Mansfield, Texas?

A new single-family home in Mansfield pays $22,175.00 per unit in combined impact fees (rates sourced November 10, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Mansfield?

Commercial development in Mansfield pays $7.39 per square foot in impact fees, plus $17,950.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $387,250.00 for a 50,000 sq ft building.

Does Mansfield charge its own impact fees?

Yes. Mansfield levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Mansfield. The schedule on this page shows every fee that applies to development in Mansfield.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Tarrant County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.