Colleyville Impact Fees by Project Type
Colleyville: Single-Family Impact Fees
A new single-family home in Colleyville pays at least $15,080.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (City of Colleyville) — Service Area 2 ($8,645.00), Water Impact Fee (City of Colleyville) — 5/8" x 3/4" PD meter ($3,644.00) and Park Land Dedication Fee in Lieu (City of Colleyville) — plat of 2 or fewer lots ($1,802.00).
Sewer Tap Fee (City of Colleyville) and Water Tap Fee (City of Colleyville) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Colleyville Impact Fee Schedule
- Water Impact Fee (City of Colleyville) — 5/8" x 3/4" PD meter$3,644.00City of ColleyvilleColleyville collects its water impact fee at 50% of the maximum allowed under the 2022 five-year update (Ordinance O-22-2210, effective August 2, 2022). A 5/8 x 3/4 in. meter counts as 0.67 service units; larger meters pay by service unit equivalent. The fee is assessed at plat approval and paid at building permit.
- Water Tap Fee (City of Colleyville)Requires confirmationCity of Colleyville
- Wastewater Impact Fee (City of Colleyville) — 5/8" x 3/4" PD meter$989.00City of ColleyvilleColleyville collects its wastewater impact fee at 50% of the maximum allowed under the 2022 five-year update (Ordinance O-22-2210, effective August 2, 2022). A 5/8 x 3/4 in. meter counts as 0.67 service units; larger meters pay by service unit equivalent. The fee is assessed at plat approval and paid at building permit.
- Sewer Tap Fee (City of Colleyville)Requires confirmationCity of Colleyville
- Roadway Impact Fee (City of Colleyville) — Service Area 2$8,645.00City of ColleyvilleColleyville charges a roadway impact fee by service area at 100% of the maximum for residential uses (Ordinance O-22-2210, effective August 2, 2022): 3.96 vehicle-miles per single-family home. $8,645 in Service Area 2 is the highest of 2 service areas; Service Area 1 is $5,568. Paid at building permit.
- Park Land Dedication Fee in Lieu (City of Colleyville) — plat of 2 or fewer lots$1,802.00City of ColleyvilleColleyville charges a park land dedication fee in lieu of $1,802 per dwelling unit. On a plat of two or fewer lots it may be paid when the building permit is issued; larger subdivisions pay it before the final plat is recorded.
- County Impact Fee (Tarrant County)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Colleyville.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Colleyville: Multifamily Impact Fees
A new multifamily unit in Colleyville pays at least $11,325.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (City of Colleyville, MF) — Service Area 2 ($4,890.00), Water Impact Fee (City of Colleyville, MF) — 5/8" x 3/4" PD meter ($3,644.00) and Park Land Dedication Fee in Lieu (City of Colleyville, MF) ($1,802.00).
Water Tap Fee (City of Colleyville, MF) and Sewer Tap Fee (City of Colleyville, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Colleyville Impact Fee Schedule
- Water Impact Fee (City of Colleyville, MF) — 5/8" x 3/4" PD meter$3,644.00City of ColleyvilleColleyville prices its water impact fee by meter size only (50% of the maximum, Ordinance O-22-2210, effective August 2, 2022). The amount shown is the smallest meter, the floor for a unit with its own meter; a building served by one master meter pays once at that meter's size, which scales up to $29,152 to $36,440 for a 2 in. meter.
- Water Tap Fee (City of Colleyville, MF)Requires confirmationCity of Colleyville
- Wastewater Impact Fee (City of Colleyville, MF) — 5/8" x 3/4" PD meter$989.00City of ColleyvilleColleyville prices its wastewater impact fee by meter size only (50% of the maximum, Ordinance O-22-2210, effective August 2, 2022). The amount shown is the smallest meter, the floor for a unit with its own meter; a building served by one master meter pays once at that meter's size, which scales up to $7,907 to $9,884 for a 2 in. meter.
- Sewer Tap Fee (City of Colleyville, MF)Requires confirmationCity of Colleyville
- Roadway Impact Fee (City of Colleyville, MF) — Service Area 2$4,890.00City of ColleyvilleColleyville charges a roadway impact fee by service area at 100% of the maximum for residential uses (Ordinance O-22-2210, effective August 2, 2022): 2.24 vehicle-miles per apartment or multifamily unit. $4,890 per unit in Service Area 2 is the highest of 2 service areas; Service Area 1 is $3,149. Paid at building permit. A park land dedication fee in lieu of $1,802 per unit is paid before the final plat is recorded.
- Park Land Dedication Fee in Lieu (City of Colleyville, MF)$1,802.00City of ColleyvilleCity of Colleyville charges $1,802 per dwelling unit as money in lieu of parkland dedication. It is paid at final plat or at the building permit. Dedicating land may replace it.
- County Impact Fee (Tarrant County, MF)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Colleyville.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Colleyville: Commercial Impact Fees
Commercial development in Colleyville pays $15.37 per square foot in impact fees, plus $11,581.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $779,981.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Colleyville) — 1" PD meter ($9,110.00 one-time) and Wastewater Impact Fee (City of Colleyville) — 1" PD meter ($2,471.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Impact Fee (City of Colleyville, Commercial) — Service Area 2 is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Tap Fee (City of Colleyville) and Water Tap Fee (City of Colleyville) are set by the utility and not published online. Parkland Fee (City of Colleyville, Commercial) — per acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Colleyville Impact Fee Schedule
- Water Impact Fee (City of Colleyville) — 1" PD meter$9,110.00 one-timeCity of ColleyvilleColleyville collects its water impact fee at 50% of the maximum allowed under the 2022 five-year update (Ordinance O-22-2210, effective August 2, 2022). A 1 in. positive displacement meter counts as 1.67 service units and pays $9,110; larger compound and turbine meters pay by service unit equivalent. The fee is paid at building permit, and no water tap or building permit issues until it is paid.
- Water Tap Fee (City of Colleyville)Requires confirmationCity of Colleyville
- Wastewater Impact Fee (City of Colleyville) — 1" PD meter$2,471.00 one-timeCity of ColleyvilleColleyville collects its wastewater impact fee at 50% of the maximum allowed under the 2022 five-year update (Ordinance O-22-2210, effective August 2, 2022). A 1 in. positive displacement meter counts as 1.67 service units and pays $2,471; larger compound and turbine meters pay by service unit equivalent. The fee is paid at building permit.
- Sewer Tap Fee (City of Colleyville)Requires confirmationCity of Colleyville
- Roadway Impact Fee (City of Colleyville, Commercial) — Service Area 2$15.37/sq ftRequires confirmationCity of ColleyvilleColleyville's roadway impact fee for retail uses is $15,368 per 1,000 sq ft of gross leasable area in Service Area 2 and $9,898 in Service Area 1 under the 2022 update (Ordinance O-22-2210, effective August 2, 2022), shown here at the higher of 2 rate districts. The fee is paid at building permit.
- Parkland Fee (City of Colleyville, Commercial) — per acreContact jurisdiction/utility to verifyCity of ColleyvilleColleyville charges a parkland fee of $800 per acre of nonresidential land, paid when the property is platted (Land Development Code Ch. 11). It is charged on land area, not building area, so it is not included in per-square-foot totals.
- County Impact Fee (Tarrant County, Commercial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Colleyville: Industrial Impact Fees
Industrial development in Colleyville pays $5.50 per square foot in impact fees, plus $11,581.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $286,631.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Colleyville) — 1" PD meter ($9,110.00 one-time), Wastewater Impact Fee (City of Colleyville) — 1" PD meter ($2,471.00 one-time) and Roadway Impact Fee (City of Colleyville, Industrial) — Service Area 2 ($5.50/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (City of Colleyville) and Water Tap Fee (City of Colleyville) are set by the utility and not published online. Parkland Fee (City of Colleyville, Industrial) — per acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Colleyville Impact Fee Schedule
- Water Impact Fee (City of Colleyville) — 1" PD meter$9,110.00 one-timeCity of ColleyvilleColleyville collects its water impact fee at 50% of the maximum allowed under the 2022 five-year update (Ordinance O-22-2210, effective August 2, 2022). A 1 in. positive displacement meter counts as 1.67 service units and pays $9,110; larger compound and turbine meters pay by service unit equivalent. The fee is paid at building permit, and no water tap or building permit issues until it is paid.
- Water Tap Fee (City of Colleyville)Requires confirmationCity of Colleyville
- Wastewater Impact Fee (City of Colleyville) — 1" PD meter$2,471.00 one-timeCity of ColleyvilleColleyville collects its wastewater impact fee at 50% of the maximum allowed under the 2022 five-year update (Ordinance O-22-2210, effective August 2, 2022). A 1 in. positive displacement meter counts as 1.67 service units and pays $2,471; larger compound and turbine meters pay by service unit equivalent. The fee is paid at building permit.
- Sewer Tap Fee (City of Colleyville)Requires confirmationCity of Colleyville
- Roadway Impact Fee (City of Colleyville, Industrial) — Service Area 2$5.50/sq ftCity of ColleyvilleColleyville's roadway impact fee for general light industrial is $5,501 per 1,000 sq ft of gross floor area in Service Area 2 and $3,543 in Service Area 1, collected at 100% of the maximum under the 2022 update (Ordinance O-22-2210, effective August 2, 2022), shown here at the higher of 2 rate districts. The fee is paid at building permit.
- Parkland Fee (City of Colleyville, Industrial) — per acreContact jurisdiction/utility to verifyCity of ColleyvilleColleyville charges a parkland fee of $800 per acre of nonresidential land, paid when the property is platted (Land Development Code Ch. 11). It is charged on land area, not building area, so it is not included in per-square-foot totals.
- County Impact Fee (Tarrant County, Industrial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Colleyville: Office Impact Fees
Office development in Colleyville pays $10.04 per square foot in impact fees, plus $11,581.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to at least $262,631.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Colleyville) — 1" PD meter ($9,110.00 one-time) and Wastewater Impact Fee (City of Colleyville) — 1" PD meter ($2,471.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Impact Fee (City of Colleyville, Office) — Service Area 2 is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Tap Fee (City of Colleyville) and Water Tap Fee (City of Colleyville) are set by the utility and not published online. Parkland Fee (City of Colleyville, Office) — per acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Colleyville Impact Fee Schedule
- Water Impact Fee (City of Colleyville) — 1" PD meter$9,110.00 one-timeCity of ColleyvilleColleyville collects its water impact fee at 50% of the maximum allowed under the 2022 five-year update (Ordinance O-22-2210, effective August 2, 2022). A 1 in. positive displacement meter counts as 1.67 service units and pays $9,110; larger compound and turbine meters pay by service unit equivalent. The fee is paid at building permit, and no water tap or building permit issues until it is paid.
- Water Tap Fee (City of Colleyville)Requires confirmationCity of Colleyville
- Wastewater Impact Fee (City of Colleyville) — 1" PD meter$2,471.00 one-timeCity of ColleyvilleColleyville collects its wastewater impact fee at 50% of the maximum allowed under the 2022 five-year update (Ordinance O-22-2210, effective August 2, 2022). A 1 in. positive displacement meter counts as 1.67 service units and pays $2,471; larger compound and turbine meters pay by service unit equivalent. The fee is paid at building permit.
- Sewer Tap Fee (City of Colleyville)Requires confirmationCity of Colleyville
- Roadway Impact Fee (City of Colleyville, Office) — Service Area 2$10.04/sq ftRequires confirmationCity of ColleyvilleColleyville's roadway impact fee for general office is $10,042 per 1,000 sq ft of gross floor area in Service Area 2 and $6,468 in Service Area 1 under the 2022 update (Ordinance O-22-2210, effective August 2, 2022), shown here at the higher of 2 rate districts. The fee is paid at building permit.
- Parkland Fee (City of Colleyville, Office) — per acreContact jurisdiction/utility to verifyCity of ColleyvilleColleyville charges a parkland fee of $800 per acre of nonresidential land, paid when the property is platted (Land Development Code Ch. 11). It is charged on land area, not building area, so it is not included in per-square-foot totals.
- County Impact Fee (Tarrant County, Office)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Colleyville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Colleyville Impact Fee FAQs
What are the total impact fees for a single-family home in Colleyville, Texas?
A new single-family home in Colleyville pays at least $15,080.00 per unit in combined impact fees (rates sourced November 25, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Colleyville?
Commercial development in Colleyville pays $15.37 per square foot in impact fees, plus $11,581.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $779,981.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Colleyville charge its own impact fees?
Yes. Colleyville levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Colleyville. The schedule on this page shows every fee that applies to development in Colleyville.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Tarrant County impact fees page.