Haslet, Texas Impact Fees

Haslet applies its own fee schedule. Tarrant County does not currently add county-level impact fees inside city limits. A new single-family home pays $12,561.00 per unit (rates sourced ). The full breakdown is below.

Haslet Impact Fees by Project Type

Haslet: Single-Family Impact Fees

A new single-family home in Haslet pays $12,561.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection and Tap Fee (City of Haslet) — up to 1" meter, $1,200 connection + $2,500 tap ($3,700.00), Water Impact Fee (City of Fort Worth, Haslet) — 5/8" x 3/4" meter ($2,990.00) and Wastewater Impact Fee (City of Haslet) — 5/8" x 3/4" meter ($2,304.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Haslet Impact Fee Schedule
Water$8,982.00
  • Water Connection and Tap Fee (City of Haslet) — up to 1" meter, $1,200 connection + $2,500 tap
    Up to 1" meter, code schedule
    City of Haslet
    City of Haslet water connection fee ($1,200) and tap fee ($2,500) for up to a 1 in. meter under Code Appendix A Sec. A-2.400, each plus the actual cost of additional materials. Recent city permit reports show new homes charged a $450 residential water tapping fee instead (listed as an option).
    $3,700.00
  • Water Impact Fee (City of Fort Worth, Haslet) — 5/8" x 3/4" meter
    City of Fort Worth
    Haslet collects the City of Fort Worth water impact fee on new water taps for properties platted after January 1, 2022, in addition to its own fees: $2,990 for a 5/8 x 3/4 in. meter for building permits issued from October 1, 2026 through September 30, 2027 (Haslet Code Appendix A Sec. A-8.200). Larger meters pay by meter equivalent.
    $2,990.00
  • Water Impact Fee (City of Haslet) — 5/8" x 3/4" meter
    City of Haslet
    Haslet charges its own water impact fee by meter size (Ord. 015-2021), collected at building permit: $2,292 for a 5/8 x 3/4 in. meter, rising to $332,398 for a 10 in. meter. The City of Fort Worth water impact fee is charged on top. Some developments pay different amounts under development agreements (LeTara).
    $2,292.00
Sewer$2,579.00
  • Wastewater Impact Fee (City of Haslet) — 5/8" x 3/4" meter
    City of Haslet
    Haslet charges a wastewater impact fee by water meter size (Ord. 015-2021), collected at building permit: $2,304 for a 5/8 x 3/4 in. meter, rising with meter size. Some developments pay different amounts under development agreements (LeTara).
    $2,304.00
  • Sewer Tap Fee (City of Haslet)
    City of Haslet
    Haslet charges a residential sewer tap fee of $275 per new service (Haslet Code Appendix A Sec. A-3.500).
    $275.00
City$1,000.00
  • Parkland Development Fee (City of Haslet)
    City of Haslet
    Haslet charges a parkland development fee of $1,000 per dwelling unit at building permit application for lots in developments whose preliminary plat was approved by August 15, 2016. Newer developments instead dedicate park land (1 acre per 30 units) or pay a fee in lieu, based on appraised land value, before the final plat is recorded. Haslet has no roadway impact fee.
    $1,000.00
County$0.00
  • County Impact Fee (Tarrant County)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Haslet.
    $0.00
Total (Haslet): $12,561.00
Sources last checked Official fee schedules:City of Haslet City of Fort Worth Tarrant County

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Haslet: Multifamily Impact Fees

A new multifamily unit in Haslet pays $12,561.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection and Tap Fee (City of Haslet, MF) — up to 1" meter, $1,200 connection + $2,500 tap ($3,700.00), Water Impact Fee (City of Fort Worth, Haslet, MF) — 5/8" x 3/4" meter ($2,990.00) and Wastewater Impact Fee (City of Haslet, MF) — 5/8" x 3/4" meter ($2,304.00).

Parkland Development Fee (City of Haslet, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Haslet Impact Fee Schedule
Water$8,982.00
  • Water Connection and Tap Fee (City of Haslet, MF) — up to 1" meter, $1,200 connection + $2,500 tap
    Up to 1" meter, code schedule
    City of Haslet
    City of Haslet water connection fee ($1,200) and tap fee ($2,500) for up to a 1 in. meter under Code Appendix A Sec. A-2.400, each plus the actual cost of additional materials. Recent city permit reports show new homes charged a $450 residential water tapping fee instead (listed as an option).
    $3,700.00
  • Water Impact Fee (City of Fort Worth, Haslet, MF) — 5/8" x 3/4" meter
    City of Fort Worth
    Haslet collects the City of Fort Worth water impact fee on new water taps for properties platted after January 1, 2022, priced by meter size only: $2,990 for a 5/8 x 3/4 in. meter for permits from October 1, 2026, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $23,920 for a 2 in. meter and more for larger meters.
    $2,990.00
  • Water Impact Fee (City of Haslet, MF) — 5/8" x 3/4" meter
    City of Haslet
    Haslet charges its own water impact fee by meter size only (Ord. 015-2021), collected at building permit: $2,292 for a 5/8 x 3/4 in. meter, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $18,339 for a 2 in. meter and more for larger meters. The City of Fort Worth water impact fee is charged on top.
    $2,292.00
Sewer$2,579.00
  • Wastewater Impact Fee (City of Haslet, MF) — 5/8" x 3/4" meter
    City of Haslet
    Haslet charges a wastewater impact fee by water meter size only (Ord. 015-2021), collected at building permit: $2,304 for a 5/8 x 3/4 in. meter, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $18,432 for a 2 in. meter and more for larger meters.
    $2,304.00
  • Sewer Tap Fee (City of Haslet, MF)
    City of Haslet
    Haslet charges a residential sewer tap fee of $275 per new service (Haslet Code Appendix A Sec. A-3.500); a building served by one connection pays once.
    $275.00
City$1,000.00
  • Parkland Development Fee (City of Haslet, MF)
    City of Haslet
    Haslet charges a parkland development fee of $1,000 per dwelling unit at building permit application for developments whose preliminary plat was approved by August 15, 2016. Newer developments, multifamily included, instead dedicate park land (1 acre per 30 units) or pay a fee in lieu, based on appraised land value, before the final plat is recorded. Haslet has no roadway impact fee.
    $1,000.00Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, MF)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Haslet.
    $0.00
Total (Haslet): $12,561.00
Sources last checked Official fee schedules:City of Haslet City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Haslet: Commercial Impact Fees

Commercial development in Haslet pays no per-square-foot impact fees, but owes $22,941.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $22,941.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Fort Worth, Haslet) — 1" meter ($7,475.00 one-time), Wastewater Impact Fee (City of Haslet) — 1" meter ($5,760.00 one-time) and Water Impact Fee (City of Haslet) — 1" meter ($5,731.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap Fee (City of Haslet) and Water Connection Fee (City of Haslet) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Haslet Impact Fee Schedule
Water$16,906.00 one-time
  • Water Impact Fee (City of Fort Worth, Haslet) — 1" meter
    City of Fort Worth
    Haslet buys water from the City of Fort Worth and collects Fort Worth's water impact fee when the water tap is purchased, in addition to its own fee: $7,475 for a 1 in. meter for building permits issued October 1, 2026 through September 30, 2027 (City Code Sec. A-8.200), from $2,990 for a 5/8 x 3/4 in. meter to $627,900 for a 10 in. meter. It applies to property platted after January 1, 2022.
    $7,475.00 one-time
  • Water Impact Fee (City of Haslet) — 1" meter
    City of Haslet
    Haslet charges a water impact fee by meter size, collected at 40% of the maximum allowed (Ordinance 015-2021): $5,731 for a 1 in. meter, from $2,292 for a 5/8 or 5/8 x 3/4 in. meter to $332,398 for a 10 in. meter. The same table applies to commercial connections. Haslet also collects the City of Fort Worth water impact fee when the water tap is purchased.
    $5,731.00 one-time
  • Water Tap Fee (City of Haslet)
    City of Haslet
    Haslet's code sets a water tap fee of $2,500 for a tap up to 1 in., plus the actual cost of additional materials. The water connection fee and impact fees are charged separately.
    $2,500.00 one-timeRequires confirmation
  • Water Connection Fee (City of Haslet)
    City of Haslet
    Haslet's code sets a water connection fee of $1,200 for a meter up to 1 in., plus the actual cost of additional materials. A separate water tap fee applies.
    $1,200.00 one-timeRequires confirmation
Sewer$6,035.00 one-time
  • Wastewater Impact Fee (City of Haslet) — 1" meter
    City of Haslet
    Haslet charges a wastewater impact fee by water meter size, collected at 100% of the maximum allowed (Ordinance 015-2021): $5,760 for a 1 in. meter, from $2,304 for a 5/8 or 5/8 x 3/4 in. meter. The same table applies to commercial connections.
    $5,760.00 one-time
  • Sewer Tap Fee (City of Haslet)
    City of Haslet
    Haslet charges $275 for a nonresidential sewer tap, plus the actual cost of materials and installation related to the tap (City Code Sec. A-3.500).
    $275.00 one-time
City$0.00
  • City Impact Fee (City of Haslet, Commercial)
    City of Haslet
    Haslet has no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its impact fees cover water and wastewater only.
    $0.00
County$0.00
  • County Impact Fee (Tarrant County, Commercial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Haslet): $22,941.00 one-time (≈ $22,941.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth City of Haslet Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$79,996.13Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$779,981.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$1,344,710.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed fees
Haslet$22,941.00*this pageIncludes unconfirmed fees
Hurst$18,987.00*Includes unconfirmed feesKeller$619,398.63Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$387,250.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$182,057.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Haslet: Industrial Impact Fees

Industrial development in Haslet pays no per-square-foot impact fees, but owes $22,941.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $22,941.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Fort Worth, Haslet) — 1" meter ($7,475.00 one-time), Wastewater Impact Fee (City of Haslet) — 1" meter ($5,760.00 one-time) and Water Impact Fee (City of Haslet) — 1" meter ($5,731.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap Fee (City of Haslet) and Water Connection Fee (City of Haslet) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Haslet Impact Fee Schedule
Water$16,906.00 one-time
  • Water Impact Fee (City of Fort Worth, Haslet) — 1" meter
    City of Fort Worth
    Haslet buys water from the City of Fort Worth and collects Fort Worth's water impact fee when the water tap is purchased, in addition to its own fee: $7,475 for a 1 in. meter for building permits issued October 1, 2026 through September 30, 2027 (City Code Sec. A-8.200), from $2,990 for a 5/8 x 3/4 in. meter to $627,900 for a 10 in. meter. It applies to property platted after January 1, 2022.
    $7,475.00 one-time
  • Water Impact Fee (City of Haslet) — 1" meter
    City of Haslet
    Haslet charges a water impact fee by meter size, collected at 40% of the maximum allowed (Ordinance 015-2021): $5,731 for a 1 in. meter, from $2,292 for a 5/8 or 5/8 x 3/4 in. meter to $332,398 for a 10 in. meter. The same table applies to commercial connections. Haslet also collects the City of Fort Worth water impact fee when the water tap is purchased.
    $5,731.00 one-time
  • Water Tap Fee (City of Haslet)
    City of Haslet
    Haslet's code sets a water tap fee of $2,500 for a tap up to 1 in., plus the actual cost of additional materials. The water connection fee and impact fees are charged separately.
    $2,500.00 one-timeRequires confirmation
  • Water Connection Fee (City of Haslet)
    City of Haslet
    Haslet's code sets a water connection fee of $1,200 for a meter up to 1 in., plus the actual cost of additional materials. A separate water tap fee applies.
    $1,200.00 one-timeRequires confirmation
Sewer$6,035.00 one-time
  • Wastewater Impact Fee (City of Haslet) — 1" meter
    City of Haslet
    Haslet charges a wastewater impact fee by water meter size, collected at 100% of the maximum allowed (Ordinance 015-2021): $5,760 for a 1 in. meter, from $2,304 for a 5/8 or 5/8 x 3/4 in. meter. The same table applies to commercial connections.
    $5,760.00 one-time
  • Sewer Tap Fee (City of Haslet)
    City of Haslet
    Haslet charges $275 for a nonresidential sewer tap, plus the actual cost of materials and installation related to the tap (City Code Sec. A-3.500).
    $275.00 one-time
City$0.00
  • City Impact Fee (City of Haslet, Industrial)
    City of Haslet
    Haslet has no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its impact fees cover water and wastewater only.
    $0.00
County$0.00
  • County Impact Fee (Tarrant County, Industrial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Haslet): $22,941.00 one-time (≈ $22,941.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth City of Haslet Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$31,402.63Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$286,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$533,068.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed fees
Haslet$22,941.00*this pageIncludes unconfirmed fees
Hurst$18,987.00*Includes unconfirmed feesKeller$220,048.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$187,350.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$95,882.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Haslet: Office Impact Fees

Office development in Haslet pays no per-square-foot impact fees, but owes $22,941.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $22,941.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Fort Worth, Haslet) — 1" meter ($7,475.00 one-time), Wastewater Impact Fee (City of Haslet) — 1" meter ($5,760.00 one-time) and Water Impact Fee (City of Haslet) — 1" meter ($5,731.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap Fee (City of Haslet) and Water Connection Fee (City of Haslet) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Haslet Impact Fee Schedule
Water$16,906.00 one-time
  • Water Impact Fee (City of Fort Worth, Haslet) — 1" meter
    City of Fort Worth
    Haslet buys water from the City of Fort Worth and collects Fort Worth's water impact fee when the water tap is purchased, in addition to its own fee: $7,475 for a 1 in. meter for building permits issued October 1, 2026 through September 30, 2027 (City Code Sec. A-8.200), from $2,990 for a 5/8 x 3/4 in. meter to $627,900 for a 10 in. meter. It applies to property platted after January 1, 2022.
    $7,475.00 one-time
  • Water Impact Fee (City of Haslet) — 1" meter
    City of Haslet
    Haslet charges a water impact fee by meter size, collected at 40% of the maximum allowed (Ordinance 015-2021): $5,731 for a 1 in. meter, from $2,292 for a 5/8 or 5/8 x 3/4 in. meter to $332,398 for a 10 in. meter. The same table applies to commercial connections. Haslet also collects the City of Fort Worth water impact fee when the water tap is purchased.
    $5,731.00 one-time
  • Water Tap Fee (City of Haslet)
    City of Haslet
    Haslet's code sets a water tap fee of $2,500 for a tap up to 1 in., plus the actual cost of additional materials. The water connection fee and impact fees are charged separately.
    $2,500.00 one-timeRequires confirmation
  • Water Connection Fee (City of Haslet)
    City of Haslet
    Haslet's code sets a water connection fee of $1,200 for a meter up to 1 in., plus the actual cost of additional materials. A separate water tap fee applies.
    $1,200.00 one-timeRequires confirmation
Sewer$6,035.00 one-time
  • Wastewater Impact Fee (City of Haslet) — 1" meter
    City of Haslet
    Haslet charges a wastewater impact fee by water meter size, collected at 100% of the maximum allowed (Ordinance 015-2021): $5,760 for a 1 in. meter, from $2,304 for a 5/8 or 5/8 x 3/4 in. meter. The same table applies to commercial connections.
    $5,760.00 one-time
  • Sewer Tap Fee (City of Haslet)
    City of Haslet
    Haslet charges $275 for a nonresidential sewer tap, plus the actual cost of materials and installation related to the tap (City Code Sec. A-3.500).
    $275.00 one-time
City$0.00
  • City Impact Fee (City of Haslet, Office)
    City of Haslet
    Haslet has no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its impact fees cover water and wastewater only.
    $0.00
County$0.00
  • County Impact Fee (Tarrant County, Office)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Haslet): $22,941.00 one-time (≈ $22,941.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth City of Haslet Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$38,824.38Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$262,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$650,198.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed fees
Haslet$22,941.00*this pageIncludes unconfirmed fees
Hurst$18,987.00*Includes unconfirmed feesKeller$241,027.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$121,175.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$76,551.16Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Haslet Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Haslet Impact Fee FAQs

What are the total impact fees for a single-family home in Haslet, Texas?

A new single-family home in Haslet pays $12,561.00 per unit in combined impact fees (rates sourced November 25, 2026).

How much are commercial impact fees in Haslet?

Commercial development in Haslet pays no per-square-foot impact fees, but owes $22,941.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Haslet charge its own impact fees?

Yes. Haslet levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Haslet. The schedule on this page shows every fee that applies to development in Haslet.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Tarrant County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.