Arlington Impact Fees by Project Type
Arlington: Single-Family Impact Fees
A new single-family home in Arlington pays at least $3,032.88 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Arlington) ($828.13), Roadway Impact Fee (City of Arlington) — Service Area B, 2.06 veh-mi × $312.50/veh-mi ($643.75) and Sewer Impact Fee (City of Arlington) ($418.00).
Park Development Fee (City of Arlington) — Six Flags, $674 neighborhood + $469 linear is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Tap and Activation Fee (City of Arlington) and Water Tap Fee (City of Arlington) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Arlington Impact Fee Schedule
- Water Impact Fee (City of Arlington)$828.13City of ArlingtonArlington Water Utilities serves the city. The water impact fee is $828.13 per 5/8 in. meter equivalent, the collection rate (Schedule 2) of the 2017 Impact Fee Program in effect since July 1, 2017 (Ordinance 17-002); the adopted maximum is $3,024. A standard home meter counts as one meter equivalent; larger meters pay more by meter capacity. The fee is paid when the building permit is issued, and it also applies in the city's extraterritorial jurisdiction.
- Water Tap Fee (City of Arlington)Requires confirmationCity of ArlingtonArlington Water Utilities charges a water tap fee by connection and meter size, or only a meter activation fee where an approved contractor installs the tap. The amounts are set by City Council resolution in the Water Utilities Office Policies.
- Sewer Impact Fee (City of Arlington)$418.00City of ArlingtonArlington Water Utilities provides sanitary sewer service in the city. The wastewater impact fee is $418 per 5/8 in. meter equivalent, the collection rate (Schedule 2) of the 2017 Impact Fee Program in effect since July 1, 2017 (Ordinance 17-002); the adopted maximum is $835. A standard home meter counts as one meter equivalent; larger meters pay more by meter capacity. The fee is paid when the building permit is issued.
- Sewer Tap and Activation Fee (City of Arlington)Requires confirmationCity of ArlingtonArlington Water Utilities charges a sewer activation fee before any sewer tap is made, per tap or per water account at the site, at amounts set by City Council resolution in the Water Utilities Office Policies.
- Park Development Fee (City of Arlington) — Six Flags, $674 neighborhood + $469 linear$1,143.00Requires confirmationCity of ArlingtonArlington charges a park development fee on each new dwelling unit at building permit: a neighborhood park component that varies by benefit district plus a citywide linear park component. $1,143 per unit ($674 neighborhood plus $469 linear) is the highest of the 10 district rates in the codified schedule and applies in the Six Flags, UTA, Lake Arlington, Tri-City, Johnson Station and South Rush Creek districts; Trinity West, Trinity East and Randol Mill pay $1,031 and Lynn Creek $1,083. The city code adjusts these amounts each September 1 by the Dallas-Fort Worth consumer price index unless the City Council has updated them, so the amount collected today can be higher than the codified schedule. Parkland dedicated under the subdivision rules is credited against the fee.
- Roadway Impact Fee (City of Arlington) — Service Area B, 2.06 veh-mi × $312.50/veh-mi$643.75City of ArlingtonArlington charges a roadway impact fee by service area: 2.06 vehicle-miles per dwelling unit times the collection rate, paid at building permit (2017 Impact Fee Program, Ordinance 17-002, in effect since July 1, 2017). $643.75 is the highest of 10 service areas and applies in Service Areas B, C, E, F, G, H and I ($312.50 per vehicle-mile); Service Area A pays $521.18 and Service Areas D and J pay nothing. Credits apply for qualifying right-of-way or roadway construction by the developer.
- County Impact Fee (Tarrant County)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Arlington.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Arlington: Multifamily Impact Fees
A new multifamily unit in Arlington pays at least $3,032.88 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Arlington, MF) ($828.13), Roadway Impact Fee (City of Arlington, MF) — Service Area B, 2.06 veh-mi × $312.50/veh-mi ($643.75) and Sewer Impact Fee (City of Arlington, MF) ($418.00).
Park Development Fee (City of Arlington, MF) — Six Flags, $674 neighborhood + $469 linear is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Tap and Activation Fee (City of Arlington, MF) and Water Tap Fee (City of Arlington, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Arlington Impact Fee Schedule
- Water Impact Fee (City of Arlington, MF)$828.13City of ArlingtonArlington's water impact fee is charged per 5/8 in. meter equivalent ($828.13, the 2017 Impact Fee Program collection rate in effect since July 1, 2017), not per apartment. The amount shown is the smallest meter; a building served by one larger master meter pays once, by that meter's capacity.
- Water Tap Fee (City of Arlington, MF)Requires confirmationCity of ArlingtonArlington Water Utilities charges a water tap fee per connection by connection and meter size, or only a meter activation fee where an approved contractor installs the tap; a building on one connection pays once. The amounts are set by City Council resolution in the Water Utilities Office Policies.
- Sewer Impact Fee (City of Arlington, MF)$418.00City of ArlingtonArlington's wastewater impact fee is charged per 5/8 in. meter equivalent ($418, the 2017 Impact Fee Program collection rate in effect since July 1, 2017), not per apartment. The amount shown is the smallest meter; a building served by one larger master meter pays once, by that meter's capacity.
- Sewer Tap and Activation Fee (City of Arlington, MF)Requires confirmationCity of ArlingtonArlington Water Utilities charges a sewer activation fee before any sewer tap is made, per tap or per water account at the site, at amounts set by City Council resolution in the Water Utilities Office Policies.
- Park Development Fee (City of Arlington, MF) — Six Flags, $674 neighborhood + $469 linear$1,143.00Requires confirmationCity of ArlingtonArlington charges a park development fee on each new dwelling unit, apartments included, at building permit: a neighborhood park component that varies by benefit district plus a citywide linear park component. $1,143 per unit ($674 neighborhood plus $469 linear) is the highest of the 10 district rates in the codified schedule and applies in the Six Flags, UTA, Lake Arlington, Tri-City, Johnson Station and South Rush Creek districts; Trinity West, Trinity East and Randol Mill pay $1,031 and Lynn Creek $1,083. The city code adjusts these amounts each September 1 by the Dallas-Fort Worth consumer price index unless the City Council has updated them, so the amount collected today can be higher than the codified schedule. Parkland dedicated under the subdivision rules is credited against the fee.
- Roadway Impact Fee (City of Arlington, MF) — Service Area B, 2.06 veh-mi × $312.50/veh-mi$643.75City of ArlingtonArlington charges a roadway impact fee by service area: 2.06 vehicle-miles per dwelling unit, the same for apartments as for houses, times the collection rate, paid at building permit (2017 Impact Fee Program, Ordinance 17-002, in effect since July 1, 2017). $643.75 per unit is the highest of 10 service areas and applies in Service Areas B, C, E, F, G, H and I ($312.50 per vehicle-mile); Service Area A pays $521.18 and Service Areas D and J pay nothing. Credits apply for qualifying right-of-way or roadway construction by the developer.
- County Impact Fee (Tarrant County, MF)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Arlington.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Arlington: Commercial Impact Fees
Commercial development in Arlington pays $1.57 per square foot in impact fees, plus $1,246.13 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to at least $79,996.13. The calculator below adjusts to your exact square footage.
The largest line items are Roadway Impact Fee (City of Arlington, Commercial) — Service Area B, 5.04 veh-mi × $312.50/veh-mi ($1.57/sq ft).
Sewer Impact Fee (City of Arlington) — per 5/8" meter equivalent and Water Impact Fee (City of Arlington) — per 5/8" meter equivalent are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Tap and Activation Fee (City of Arlington) and Water Tap Fee (City of Arlington) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the Full Arlington Impact Fee Schedule
- Water Impact Fee (City of Arlington) — per 5/8" meter equivalent$828.13 one-timeRequires confirmationCity of ArlingtonArlington Water Utilities serves the city. The water impact fee is $828.13 per 5/8 in. meter equivalent, the collection rate (Schedule 2) of the 2017 Impact Fee Program in effect since July 1, 2017 (Ordinance 17-002); the adopted maximum is $3,024. Larger meters are charged more meter equivalents according to the city's impact fee capital improvements plan equivalency table. The fee is paid at building permit or connection application.
- Water Tap Fee (City of Arlington)Requires confirmationCity of ArlingtonArlington Water Utilities charges a water tap fee by connection and meter size, or only a meter activation fee where an approved contractor installs the tap. The amounts are set by City Council resolution in the Water Utilities Office Policies.
- Sewer Impact Fee (City of Arlington) — per 5/8" meter equivalent$418.00 one-timeRequires confirmationCity of ArlingtonArlington Water Utilities provides sanitary sewer service in the city. The wastewater impact fee is $418 per 5/8 in. meter equivalent, the collection rate (Schedule 2) of the 2017 Impact Fee Program in effect since July 1, 2017 (Ordinance 17-002); the adopted maximum is $835. Larger meters are charged more meter equivalents according to the city's equivalency table.
- Sewer Tap and Activation Fee (City of Arlington)Requires confirmationCity of ArlingtonArlington Water Utilities charges a sewer activation fee before any sewer tap is made, at amounts set by City Council resolution in the Water Utilities Office Policies.
- Roadway Impact Fee (City of Arlington, Commercial) — Service Area B, 5.04 veh-mi × $312.50/veh-mi$1.57/sq ftCity of ArlingtonCity of Arlington roadway impact fee for commercial and retail space: 5.04 vehicle-miles per 1,000 sq ft times the service-area rate, $1,575 per 1,000 sq ft in Service Areas B, C, E, F, G, H and I (the highest of the city's rate districts), $1,275.12 in Service Area A and $0 in Service Areas D and J (Ordinance 17-002, rates effective July 1, 2017). Developers who dedicate or build eligible roadway facilities receive a discount against the fee.
- County Impact Fee (Tarrant County, Commercial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Arlington: Industrial Impact Fees
Industrial development in Arlington pays $0.60 per square foot in impact fees, plus $1,246.13 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to at least $31,402.63. The calculator below adjusts to your exact square footage.
The largest line items are Roadway Impact Fee (City of Arlington, Industrial) — Service Area B, 1.93 veh-mi × $312.50/veh-mi ($0.60/sq ft).
Sewer Impact Fee (City of Arlington) — per 5/8" meter equivalent and Water Impact Fee (City of Arlington) — per 5/8" meter equivalent are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Tap and Activation Fee (City of Arlington) and Water Tap Fee (City of Arlington) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the Full Arlington Impact Fee Schedule
- Water Impact Fee (City of Arlington) — per 5/8" meter equivalent$828.13 one-timeRequires confirmationCity of ArlingtonArlington Water Utilities serves the city. The water impact fee is $828.13 per 5/8 in. meter equivalent, the collection rate (Schedule 2) of the 2017 Impact Fee Program in effect since July 1, 2017 (Ordinance 17-002); the adopted maximum is $3,024. Larger meters are charged more meter equivalents according to the city's impact fee capital improvements plan equivalency table. The fee is paid at building permit or connection application.
- Water Tap Fee (City of Arlington)Requires confirmationCity of ArlingtonArlington Water Utilities charges a water tap fee by connection and meter size, or only a meter activation fee where an approved contractor installs the tap. The amounts are set by City Council resolution in the Water Utilities Office Policies.
- Sewer Impact Fee (City of Arlington) — per 5/8" meter equivalent$418.00 one-timeRequires confirmationCity of ArlingtonArlington Water Utilities provides sanitary sewer service in the city. The wastewater impact fee is $418 per 5/8 in. meter equivalent, the collection rate (Schedule 2) of the 2017 Impact Fee Program in effect since July 1, 2017 (Ordinance 17-002); the adopted maximum is $835. Larger meters are charged more meter equivalents according to the city's equivalency table.
- Sewer Tap and Activation Fee (City of Arlington)Requires confirmationCity of ArlingtonArlington Water Utilities charges a sewer activation fee before any sewer tap is made, at amounts set by City Council resolution in the Water Utilities Office Policies.
- Roadway Impact Fee (City of Arlington, Industrial) — Service Area B, 1.93 veh-mi × $312.50/veh-mi$0.60/sq ftCity of ArlingtonCity of Arlington roadway impact fee for industrial space: 1.93 vehicle-miles per 1,000 sq ft times the service-area rate, about $603.13 per 1,000 sq ft in Service Areas B, C, E, F, G, H and I (the highest of the city's rate districts), $488.29 in Service Area A and $0 in Service Areas D and J (Ordinance 17-002, rates effective July 1, 2017). Developers who dedicate or build eligible roadway facilities receive a discount against the fee.
- County Impact Fee (Tarrant County, Industrial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Arlington: Office Impact Fees
Office development in Arlington pays $1.50 per square foot in impact fees, plus $1,246.13 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 25,000 sq ft building, that comes to at least $38,824.38. The calculator below adjusts to your exact square footage.
The largest line items are Roadway Impact Fee (City of Arlington, Office) — Service Area B, 4.81 veh-mi × $312.50/veh-mi ($1.50/sq ft).
Sewer Impact Fee (City of Arlington) — per 5/8" meter equivalent and Water Impact Fee (City of Arlington) — per 5/8" meter equivalent are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Tap and Activation Fee (City of Arlington) and Water Tap Fee (City of Arlington) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the Full Arlington Impact Fee Schedule
- Water Impact Fee (City of Arlington) — per 5/8" meter equivalent$828.13 one-timeRequires confirmationCity of ArlingtonArlington Water Utilities serves the city. The water impact fee is $828.13 per 5/8 in. meter equivalent, the collection rate (Schedule 2) of the 2017 Impact Fee Program in effect since July 1, 2017 (Ordinance 17-002); the adopted maximum is $3,024. Larger meters are charged more meter equivalents according to the city's impact fee capital improvements plan equivalency table. The fee is paid at building permit or connection application.
- Water Tap Fee (City of Arlington)Requires confirmationCity of ArlingtonArlington Water Utilities charges a water tap fee by connection and meter size, or only a meter activation fee where an approved contractor installs the tap. The amounts are set by City Council resolution in the Water Utilities Office Policies.
- Sewer Impact Fee (City of Arlington) — per 5/8" meter equivalent$418.00 one-timeRequires confirmationCity of ArlingtonArlington Water Utilities provides sanitary sewer service in the city. The wastewater impact fee is $418 per 5/8 in. meter equivalent, the collection rate (Schedule 2) of the 2017 Impact Fee Program in effect since July 1, 2017 (Ordinance 17-002); the adopted maximum is $835. Larger meters are charged more meter equivalents according to the city's equivalency table.
- Sewer Tap and Activation Fee (City of Arlington)Requires confirmationCity of ArlingtonArlington Water Utilities charges a sewer activation fee before any sewer tap is made, at amounts set by City Council resolution in the Water Utilities Office Policies.
- Roadway Impact Fee (City of Arlington, Office) — Service Area B, 4.81 veh-mi × $312.50/veh-mi$1.50/sq ftCity of ArlingtonCity of Arlington roadway impact fee for office space: 4.81 vehicle-miles per 1,000 sq ft times the service-area rate, about $1,503.13 per 1,000 sq ft in Service Areas B, C, E, F, G, H and I (the highest of the city's rate districts), $1,216.93 in Service Area A and $0 in Service Areas D and J (Ordinance 17-002, rates effective July 1, 2017). Developers who dedicate or build eligible roadway facilities receive a discount against the fee.
- County Impact Fee (Tarrant County, Office)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Arlington Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Arlington Impact Fee FAQs
What are the total impact fees for a single-family home in Arlington, Texas?
A new single-family home in Arlington pays at least $3,032.88 per unit in combined impact fees (rates sourced November 4, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Arlington?
Commercial development in Arlington pays $1.57 per square foot in impact fees, plus $1,246.13 in one-time water and sewer connection fees, at least $79,996.13 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Arlington charge its own impact fees?
Yes. Arlington levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Arlington. The schedule on this page shows every fee that applies to development in Arlington.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Tarrant County impact fees page.