Westlake, Texas Impact Fees

Westlake applies its own fee schedule. Tarrant County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $9,285.80 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Westlake Impact Fees by Project Type

Westlake: Single-Family Impact Fees

A new single-family home in Westlake pays at least $9,285.80 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Fort Worth, Westlake) — 3/4" x 3/4" meter ($4,485.00), Water Meter Fee (Town of Westlake) — 3/4" meter ($600.00) and Sewer Fee (Town of Westlake) ($375.00).

Roadway Impact Fee (Town of Westlake) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Wastewater Impact Fee (Town of Westlake) and Water Impact Fee (Town of Westlake) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Westlake Impact Fee Schedule
Water$5,085.00
  • Water Impact Fee (City of Fort Worth, Westlake) — 3/4" x 3/4" meter
    City of Fort Worth (collected by Town of Westlake)
    Westlake collects the City of Fort Worth water impact fee on new water meters, as Fort Worth supplies Westlake's water. For building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025) it is $4,485 for a 3/4 in. meter, Westlake's smallest, rising to $627,900 for a 10 in. meter; the amount can vary with the plat and permit dates.
    $4,485.00
  • Water Meter Fee (Town of Westlake) — 3/4" meter
    Town of Westlake
    Westlake water meter fee, effective January 1, 2026: $600 for a 3/4 in. meter, $650 for 1 in., $875 for 1.5 in. and $1,100 for 2 in. Where the Town must install a new service tap, it is billed at actual cost plus 10% (the 2025 rate sheet showed a $10,000 minimum plus $2,500 for a street cut or bore).
    $600.00
  • Water Impact Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a town water impact fee under Ordinance 1028, by meter size. The town's FY2027 fee schedule example for a 5,200 sq ft home shows a water impact fee of $8,949. The City of Fort Worth water impact fee is collected in addition.
    Requires confirmation
Sewer$375.00
  • Sewer Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a $375 sewer connection fee where the service line exists, effective January 1, 2026. A new sewer tap installed by the Town is billed at actual cost plus 10% (the 2025 rate sheet showed a $9,000 minimum plus $3,000 for a street cut or bore).
    $375.00
  • Wastewater Impact Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a town wastewater impact fee under Ordinance 1028. The town's FY2027 fee schedule example for a 5,200 sq ft home shows a sewer impact fee of $4,677.
    Requires confirmation
City$3,825.80
  • Roadway Impact Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a town roadway impact fee under Ordinance 1028; the town's FY2027 fee schedule example for a single-family home shows $3,825.80. Park land dedication is set by development agreement.
    $3,825.80Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Westlake.
    $0.00
Total (Westlake): $9,285.80
Sources last checked Official fee schedules:City of Fort Worth (collected by Town of Westlake) Town of Westlake Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Westlake: Multifamily Impact Fees

A new multifamily unit in Westlake pays at least $5,460.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Fort Worth, Westlake, MF) — 3/4" x 3/4" meter ($4,485.00), Water Meter Fee (Town of Westlake, MF) — 3/4" meter ($600.00) and Sewer Fee (Town of Westlake, MF) ($375.00).

Wastewater Impact Fee (Town of Westlake, MF) and Water Impact Fee (Town of Westlake, MF) are set by the utility and not published online. Roadway Impact Fee (Town of Westlake, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Westlake Impact Fee Schedule
Water$5,085.00
  • Water Impact Fee (City of Fort Worth, Westlake, MF) — 3/4" x 3/4" meter
    City of Fort Worth (collected by Town of Westlake)
    Westlake collects the City of Fort Worth water impact fee on new water meters, priced by meter size only (building permits on or after October 1, 2026, Ordinance 27745-06-2025). The amount shown is the 3/4 in. meter, the floor for a unit with its own meter; a building on one master meter pays once at that meter's size, $23,920 for 2 in. and more for larger meters.
    $4,485.00
  • Water Meter Fee (Town of Westlake, MF) — 3/4" meter
    Town of Westlake
    Westlake water meter fee: $600 for a 3/4 in. meter, the floor for a unit with its own meter; a building on one master meter pays once at that size, up to $1,100 for 2 in.
    $600.00
  • Water Impact Fee (Town of Westlake, MF)
    Town of Westlake
    Westlake charges a town water impact fee under Ordinance 1028, by meter size. The City of Fort Worth water impact fee is collected in addition.
    Requires confirmation
Sewer$375.00
  • Sewer Fee (Town of Westlake, MF)
    Town of Westlake
    Westlake charges a $375 sewer connection fee where the service line exists; a building on one sewer connection pays it once. A new tap installed by the Town is billed at actual cost plus 10%.
    $375.00
  • Wastewater Impact Fee (Town of Westlake, MF)
    Town of Westlake
    Westlake charges a town wastewater impact fee under Ordinance 1028.
    Requires confirmation
City$0.00
County$0.00
  • County Impact Fee (Tarrant County, MF)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Westlake.
    $0.00
Total (Westlake): $5,460.00
Sources last checked Official fee schedules:City of Fort Worth (collected by Town of Westlake) Town of Westlake Tarrant County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Westlake: Commercial Impact Fees

Commercial development in Westlake pays no per-square-foot impact fees, but owes $8,500.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to at least $8,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Fort Worth, Westlake) — 1" meter ($7,475.00 one-time), Water Meter Fee (Town of Westlake) — 1" meter ($650.00 one-time) and Sewer Fee (Town of Westlake) ($375.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Impact Fee (Town of Westlake) and Water Impact Fee (Town of Westlake) are set by the utility and not published online. Roadway Impact Fee (Town of Westlake, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Westlake Impact Fee Schedule
Water$8,125.00 one-time
  • Water Impact Fee (City of Fort Worth, Westlake) — 1" meter
    City of Fort Worth
    Westlake collects the City of Fort Worth water impact fee on new water meters. For plats recorded on or after April 1, 2017 and building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,475; other sizes range from $4,485 for a 3/4 in. meter to $627,900 for a 10 in. meter. The Town's 2026 rate sheet still shows Fort Worth's October 2025 amounts.
    $7,475.00 one-time
  • Water Meter Fee (Town of Westlake) — 1" meter
    Town of Westlake
    Westlake water meter fee, effective January 1, 2026: $600 for a 3/4 in. meter, $650 for 1 in., $875 for 1.5 in. and $1,100 for 2 in. Larger meters and unusual conditions are billed at actual cost plus 10%.
    $650.00 one-time
  • Water Impact Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a town water impact fee on nonresidential development under Ordinance 1028, by meter size. The town's FY2027 fee schedule example for a 10,000 sq ft nonresidential building shows a water impact fee of $8,949. The City of Fort Worth water impact fee is collected in addition.
    Requires confirmation
Sewer$375.00 one-time
  • Sewer Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a $375 sewer connection fee where the service line exists, effective January 1, 2026. A new sewer tap installed by the Town, and service for meters over 2 in., is billed at actual cost plus 10%.
    $375.00 one-time
  • Wastewater Impact Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a town wastewater impact fee on nonresidential development under Ordinance 1028, by meter size. The town's FY2027 fee schedule example for a 10,000 sq ft nonresidential building shows a wastewater impact fee of $4,677.
    Requires confirmation
City$0.00
  • Roadway Impact Fee (Town of Westlake, Commercial)
    Town of Westlake
    Westlake charges a town roadway impact fee on nonresidential development under Ordinance 1028, by land use. The town's FY2027 fee schedule example for a 10,000 sq ft nonresidential building shows $9,907.40. Park land dedication is set by development agreement.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, Commercial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Westlake): $8,500.00 one-time (≈ $8,500.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth Town of Westlake Tarrant County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$79,996.13Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$779,981.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$1,344,710.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$619,398.63Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$387,250.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$182,057.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed fees
Westlake$8,500.00*this pageIncludes unconfirmed fees
Westover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Westlake: Industrial Impact Fees

Industrial development in Westlake pays no per-square-foot impact fees, but owes $8,500.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to at least $8,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Fort Worth, Westlake) — 1" meter ($7,475.00 one-time), Water Meter Fee (Town of Westlake) — 1" meter ($650.00 one-time) and Sewer Fee (Town of Westlake) ($375.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Impact Fee (Town of Westlake) and Water Impact Fee (Town of Westlake) are set by the utility and not published online. Roadway Impact Fee (Town of Westlake, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Westlake Impact Fee Schedule
Water$8,125.00 one-time
  • Water Impact Fee (City of Fort Worth, Westlake) — 1" meter
    City of Fort Worth
    Westlake collects the City of Fort Worth water impact fee on new water meters. For plats recorded on or after April 1, 2017 and building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,475; other sizes range from $4,485 for a 3/4 in. meter to $627,900 for a 10 in. meter. The Town's 2026 rate sheet still shows Fort Worth's October 2025 amounts.
    $7,475.00 one-time
  • Water Meter Fee (Town of Westlake) — 1" meter
    Town of Westlake
    Westlake water meter fee, effective January 1, 2026: $600 for a 3/4 in. meter, $650 for 1 in., $875 for 1.5 in. and $1,100 for 2 in. Larger meters and unusual conditions are billed at actual cost plus 10%.
    $650.00 one-time
  • Water Impact Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a town water impact fee on nonresidential development under Ordinance 1028, by meter size. The town's FY2027 fee schedule example for a 10,000 sq ft nonresidential building shows a water impact fee of $8,949. The City of Fort Worth water impact fee is collected in addition.
    Requires confirmation
Sewer$375.00 one-time
  • Sewer Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a $375 sewer connection fee where the service line exists, effective January 1, 2026. A new sewer tap installed by the Town, and service for meters over 2 in., is billed at actual cost plus 10%.
    $375.00 one-time
  • Wastewater Impact Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a town wastewater impact fee on nonresidential development under Ordinance 1028, by meter size. The town's FY2027 fee schedule example for a 10,000 sq ft nonresidential building shows a wastewater impact fee of $4,677.
    Requires confirmation
City$0.00
  • Roadway Impact Fee (Town of Westlake, Industrial)
    Town of Westlake
    Westlake charges a town roadway impact fee on nonresidential development under Ordinance 1028, by land use. The town's FY2027 fee schedule example for a 10,000 sq ft nonresidential building shows $9,907.40. Park land dedication is set by development agreement.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, Industrial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Westlake): $8,500.00 one-time (≈ $8,500.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth Town of Westlake Tarrant County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$31,402.63Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$286,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$533,068.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$220,048.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$187,350.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$95,882.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed fees
Westlake$8,500.00*this pageIncludes unconfirmed fees
Westover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Westlake: Office Impact Fees

Office development in Westlake pays no per-square-foot impact fees, but owes $8,500.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 25,000 sq ft building, that comes to at least $8,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Fort Worth, Westlake) — 1" meter ($7,475.00 one-time), Water Meter Fee (Town of Westlake) — 1" meter ($650.00 one-time) and Sewer Fee (Town of Westlake) ($375.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Impact Fee (Town of Westlake) and Water Impact Fee (Town of Westlake) are set by the utility and not published online. Roadway Impact Fee (Town of Westlake, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Westlake Impact Fee Schedule
Water$8,125.00 one-time
  • Water Impact Fee (City of Fort Worth, Westlake) — 1" meter
    City of Fort Worth
    Westlake collects the City of Fort Worth water impact fee on new water meters. For plats recorded on or after April 1, 2017 and building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), a 1 in. meter (2.5 meter equivalents) pays $7,475; other sizes range from $4,485 for a 3/4 in. meter to $627,900 for a 10 in. meter. The Town's 2026 rate sheet still shows Fort Worth's October 2025 amounts.
    $7,475.00 one-time
  • Water Meter Fee (Town of Westlake) — 1" meter
    Town of Westlake
    Westlake water meter fee, effective January 1, 2026: $600 for a 3/4 in. meter, $650 for 1 in., $875 for 1.5 in. and $1,100 for 2 in. Larger meters and unusual conditions are billed at actual cost plus 10%.
    $650.00 one-time
  • Water Impact Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a town water impact fee on nonresidential development under Ordinance 1028, by meter size. The town's FY2027 fee schedule example for a 10,000 sq ft nonresidential building shows a water impact fee of $8,949. The City of Fort Worth water impact fee is collected in addition.
    Requires confirmation
Sewer$375.00 one-time
  • Sewer Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a $375 sewer connection fee where the service line exists, effective January 1, 2026. A new sewer tap installed by the Town, and service for meters over 2 in., is billed at actual cost plus 10%.
    $375.00 one-time
  • Wastewater Impact Fee (Town of Westlake)
    Town of Westlake
    Westlake charges a town wastewater impact fee on nonresidential development under Ordinance 1028, by meter size. The town's FY2027 fee schedule example for a 10,000 sq ft nonresidential building shows a wastewater impact fee of $4,677.
    Requires confirmation
City$0.00
  • Roadway Impact Fee (Town of Westlake, Office)
    Town of Westlake
    Westlake charges a town roadway impact fee on nonresidential development under Ordinance 1028, by land use. The town's FY2027 fee schedule example for a 10,000 sq ft nonresidential building shows $9,907.40. Park land dedication is set by development agreement.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, Office)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Westlake): $8,500.00 one-time (≈ $8,500.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth Town of Westlake Tarrant County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$38,824.38Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$262,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$650,198.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$241,027.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$121,175.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$76,551.16Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed fees
Westlake$8,500.00*this pageIncludes unconfirmed fees
Westover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Westlake Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Westlake Impact Fee FAQs

What are the total impact fees for a single-family home in Westlake, Texas?

A new single-family home in Westlake pays at least $9,285.80 per unit in combined impact fees (rates sourced November 11, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Westlake?

Commercial development in Westlake pays no per-square-foot impact fees, but owes $8,500.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Westlake charge its own impact fees?

Yes. Westlake levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Westlake. The schedule on this page shows every fee that applies to development in Westlake.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Tarrant County impact fees page.