Skip to content
IMPACTFEES.ORG

Haltom City, Texas Impact Fees

Haltom City applies its own fee schedule. Tarrant County does not currently add county-level impact fees inside city limits. A new single-family home pays $5,131.87 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Haltom City Impact Fees by Project Type

Haltom City: Single-Family Impact Fees

A new single-family home in Haltom City pays $5,131.87 per unit in impact fees (rates sourced November 5, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Meter and Tap Fee (City of Haltom City) — 5/8" x 3/4" meter, asphalt repair ($1,300.00) and Sewer Tap Connection Inspection Fee (City of Haltom City) ($300.00).

Sewer Impact Fee (City of Haltom City) — 5/8" meter, Parkland Dedication Fee (City of Haltom City), and Water Impact Fee (City of Haltom City) — 5/8" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Haltom City Impact Fee Schedule
Water$2,466.54
  • Water Meter and Tap Fee (City of Haltom City) — 5/8" x 3/4" meter, asphalt repair
    5/8" x 3/4", asphalt repair
    City of Haltom City
    Haltom City sets the meter, box and tap for a new water service: $1,300 for a 5/8 x 3/4 in. meter where the street repair is asphalt, $3,500 with concrete repair, $1,000 with no roadway repair, and $800 for a meter set only where the tap already exists. A street bore, where needed, adds $1,000.
    $1,300.00
  • Water Impact Fee (City of Haltom City) — 5/8" meter
    City of Haltom City
    Haltom City charges a water impact fee by meter size under its fiscal year 2026-27 fee schedule (approved August 31, 2026): $1,166.54 for a 5/8 in. or 3/4 in. meter, rising to $89,438.27 for a 10 in. meter. The meter, box and tap are charged separately.
    $1,166.54Requires confirmation
Sewer$2,415.33
City$250.00
County$0.00
  • County Impact Fee (Tarrant County)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Haltom City.
    $0.00
Total (Haltom City): $5,131.87
Sources last checked Official fee schedules:City of Haltom City Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Haltom City: Multifamily Impact Fees

A new multifamily unit in Haltom City pays $5,131.87 per unit in impact fees (rates sourced November 5, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Meter and Tap Fee (City of Haltom City, MF) — 5/8" x 3/4" meter, asphalt repair ($1,300.00) and Sewer Tap Connection Inspection Fee (City of Haltom City, MF) ($300.00).

Parkland Dedication Fee (City of Haltom City, MF), Water Impact Fee (City of Haltom City, MF) — 5/8" meter, and Sewer Impact Fee (City of Haltom City, MF) — 5/8" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Haltom City Impact Fee Schedule
Water$2,466.54
  • Water Meter and Tap Fee (City of Haltom City, MF) — 5/8" x 3/4" meter, asphalt repair
    5/8" x 3/4", asphalt repair
    City of Haltom City
    Haltom City charges its water meter, box and tap fee per meter, not per unit: the amount shown is the smallest meter ($1,300 with asphalt repair, $3,500 with concrete repair, $1,000 with no roadway repair, $800 meter set only). A building served by one meter pays once, at its meter size (up to $4,900 for a 2 in. domestic meter).
    $1,300.00
  • Water Impact Fee (City of Haltom City, MF) — 5/8" meter
    City of Haltom City
    Haltom City prices its water impact fee by meter size only (fiscal year 2026-27 schedule). The amount shown is the smallest meter, the floor for a unit with its own meter; a building served by one master meter pays once at that meter's size, $6,217.64 for a 2 in. meter and more for larger meters.
    $1,166.54Requires confirmation
Sewer$2,415.33
  • Sewer Impact Fee (City of Haltom City, MF) — 5/8" meter
    City of Haltom City
    Haltom City prices its wastewater impact fee by water meter size only (fiscal year 2026-27 schedule). The amount shown is the floor for a unit with its own meter; a building served by one master meter pays once at that meter's size, $11,074.74 for a 2 in. meter and more for larger meters.
    $2,115.33Requires confirmation
  • Sewer Tap Connection Inspection Fee (City of Haltom City, MF)
    City of Haltom City
    Haltom City charges $300 to inspect each new sewer tap connection; a building served by one connection pays once.
    $300.00
City$250.00
County$0.00
  • County Impact Fee (Tarrant County, MF)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Haltom City.
    $0.00
Total (Haltom City): $5,131.87
Sources last checked Official fee schedules:City of Haltom City Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Haltom City: Commercial Impact Fees

Commercial development in Haltom City pays no per-square-foot impact fees, but owes $7,280.72 in one-time water and sewer connection fees (rates sourced November 5, 2026).

For a 50,000 sq ft building, that comes to at least $7,280.72. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter and Tap Fee (City of Haltom City) — 1" meter, asphalt repair ($1,500.00 one-time) and Sewer Tap Connection Inspection Fee (City of Haltom City) ($300.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Impact Fee (City of Haltom City) — 1" meter and Sewer Impact Fee (City of Haltom City) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fee (City of Haltom City, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Haltom City Impact Fee Schedule
Water$3,448.11 one-time
  • Water Impact Fee (City of Haltom City) — 1" meter
    City of Haltom City
    Haltom City charges a water impact fee by meter size under its fiscal year 2026-27 fee schedule (approved August 31, 2026, effective October 1, 2026): $1,948.11 for a 1 in. meter, from $1,166.54 for a 5/8 or 3/4 in. meter to $89,438.27 for a 10 in. meter. The same schedule applies to commercial connections. The meter, box and tap are charged separately.
    $1,948.11 one-timeRequires confirmation
  • Water Meter and Tap Fee (City of Haltom City) — 1" meter, asphalt repair
    1", asphalt repair
    City of Haltom City
    Haltom City charges for the water meter, box and tap by meter size and street repair under its fiscal year 2026-27 fee schedule: $1,500 for a 1 in. meter with asphalt repair, $3,700 with concrete repair, $1,200 with no roadway repair and $1,000 to set the meter only. A 2 in. domestic meter costs $2,000 to $4,900. For 4 in. and larger meters the contractor makes the tap under city supervision and the city charges a $300 inspection fee.
    $1,500.00 one-time
Sewer$3,832.61 one-time
  • Sewer Impact Fee (City of Haltom City) — 1" meter
    City of Haltom City
    Haltom City charges a wastewater impact fee by water meter size under its fiscal year 2026-27 fee schedule (effective October 1, 2026): $3,532.61 for a 1 in. meter, from $2,115.33 for a 5/8 or 3/4 in. meter to $162,182.72 for a 10 in. meter. The same schedule applies to commercial connections.
    $3,532.61 one-timeRequires confirmation
  • Sewer Tap Connection Inspection Fee (City of Haltom City)
    City of Haltom City
    Haltom City charges $300 per inspection of a new sanitary sewer tap connection under its fiscal year 2026-27 fee schedule. Wastewater impact fees are charged separately.
    $300.00 one-time
City$0.00
  • City Impact Fee (City of Haltom City, Commercial)
    City of Haltom City
    Haltom City's fee schedule includes no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its parkland dedication fee applies to dwelling units only.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, Commercial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Haltom City): $7,280.72 one-time (≈ $7,280.72 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Haltom City Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$79,996.13Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$779,981.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$1,344,710.00Grapevine$1,575.00*Includes unconfirmed fees
Haltom City$7,280.72*this pageIncludes unconfirmed fees
Haslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$619,398.63Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$387,250.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$182,057.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Haltom City: Industrial Impact Fees

Industrial development in Haltom City pays no per-square-foot impact fees, but owes $7,280.72 in one-time water and sewer connection fees (rates sourced November 5, 2026).

For a 50,000 sq ft building, that comes to at least $7,280.72. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter and Tap Fee (City of Haltom City) — 1" meter, asphalt repair ($1,500.00 one-time) and Sewer Tap Connection Inspection Fee (City of Haltom City) ($300.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Impact Fee (City of Haltom City) — 1" meter and Sewer Impact Fee (City of Haltom City) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fee (City of Haltom City, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Haltom City Impact Fee Schedule
Water$3,448.11 one-time
  • Water Impact Fee (City of Haltom City) — 1" meter
    City of Haltom City
    Haltom City charges a water impact fee by meter size under its fiscal year 2026-27 fee schedule (approved August 31, 2026, effective October 1, 2026): $1,948.11 for a 1 in. meter, from $1,166.54 for a 5/8 or 3/4 in. meter to $89,438.27 for a 10 in. meter. The same schedule applies to commercial connections. The meter, box and tap are charged separately.
    $1,948.11 one-timeRequires confirmation
  • Water Meter and Tap Fee (City of Haltom City) — 1" meter, asphalt repair
    1", asphalt repair
    City of Haltom City
    Haltom City charges for the water meter, box and tap by meter size and street repair under its fiscal year 2026-27 fee schedule: $1,500 for a 1 in. meter with asphalt repair, $3,700 with concrete repair, $1,200 with no roadway repair and $1,000 to set the meter only. A 2 in. domestic meter costs $2,000 to $4,900. For 4 in. and larger meters the contractor makes the tap under city supervision and the city charges a $300 inspection fee.
    $1,500.00 one-time
Sewer$3,832.61 one-time
  • Sewer Impact Fee (City of Haltom City) — 1" meter
    City of Haltom City
    Haltom City charges a wastewater impact fee by water meter size under its fiscal year 2026-27 fee schedule (effective October 1, 2026): $3,532.61 for a 1 in. meter, from $2,115.33 for a 5/8 or 3/4 in. meter to $162,182.72 for a 10 in. meter. The same schedule applies to commercial connections.
    $3,532.61 one-timeRequires confirmation
  • Sewer Tap Connection Inspection Fee (City of Haltom City)
    City of Haltom City
    Haltom City charges $300 per inspection of a new sanitary sewer tap connection under its fiscal year 2026-27 fee schedule. Wastewater impact fees are charged separately.
    $300.00 one-time
City$0.00
  • City Impact Fee (City of Haltom City, Industrial)
    City of Haltom City
    Haltom City's fee schedule includes no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its parkland dedication fee applies to dwelling units only.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, Industrial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Haltom City): $7,280.72 one-time (≈ $7,280.72 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Haltom City Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$31,402.63Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$286,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$533,068.00Grapevine$1,575.00*Includes unconfirmed fees
Haltom City$7,280.72*this pageIncludes unconfirmed fees
Haslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$220,048.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$187,350.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$95,882.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Haltom City: Office Impact Fees

Office development in Haltom City pays no per-square-foot impact fees, but owes $7,280.72 in one-time water and sewer connection fees (rates sourced November 5, 2026).

For a 25,000 sq ft building, that comes to at least $7,280.72. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter and Tap Fee (City of Haltom City) — 1" meter, asphalt repair ($1,500.00 one-time) and Sewer Tap Connection Inspection Fee (City of Haltom City) ($300.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Impact Fee (City of Haltom City) — 1" meter and Sewer Impact Fee (City of Haltom City) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fee (City of Haltom City, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Haltom City Impact Fee Schedule
Water$3,448.11 one-time
  • Water Impact Fee (City of Haltom City) — 1" meter
    City of Haltom City
    Haltom City charges a water impact fee by meter size under its fiscal year 2026-27 fee schedule (approved August 31, 2026, effective October 1, 2026): $1,948.11 for a 1 in. meter, from $1,166.54 for a 5/8 or 3/4 in. meter to $89,438.27 for a 10 in. meter. The same schedule applies to commercial connections. The meter, box and tap are charged separately.
    $1,948.11 one-timeRequires confirmation
  • Water Meter and Tap Fee (City of Haltom City) — 1" meter, asphalt repair
    1", asphalt repair
    City of Haltom City
    Haltom City charges for the water meter, box and tap by meter size and street repair under its fiscal year 2026-27 fee schedule: $1,500 for a 1 in. meter with asphalt repair, $3,700 with concrete repair, $1,200 with no roadway repair and $1,000 to set the meter only. A 2 in. domestic meter costs $2,000 to $4,900. For 4 in. and larger meters the contractor makes the tap under city supervision and the city charges a $300 inspection fee.
    $1,500.00 one-time
Sewer$3,832.61 one-time
  • Sewer Impact Fee (City of Haltom City) — 1" meter
    City of Haltom City
    Haltom City charges a wastewater impact fee by water meter size under its fiscal year 2026-27 fee schedule (effective October 1, 2026): $3,532.61 for a 1 in. meter, from $2,115.33 for a 5/8 or 3/4 in. meter to $162,182.72 for a 10 in. meter. The same schedule applies to commercial connections.
    $3,532.61 one-timeRequires confirmation
  • Sewer Tap Connection Inspection Fee (City of Haltom City)
    City of Haltom City
    Haltom City charges $300 per inspection of a new sanitary sewer tap connection under its fiscal year 2026-27 fee schedule. Wastewater impact fees are charged separately.
    $300.00 one-time
City$0.00
  • City Impact Fee (City of Haltom City, Office)
    City of Haltom City
    Haltom City's fee schedule includes no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its parkland dedication fee applies to dwelling units only.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, Office)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Haltom City): $7,280.72 one-time (≈ $7,280.72 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Haltom City Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$38,824.38Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$262,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$650,198.00Grapevine$1,575.00*Includes unconfirmed fees
Haltom City$7,280.72*this pageIncludes unconfirmed fees
Haslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$241,027.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$121,175.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$76,551.16Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Haltom City Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Haltom City Impact Fee FAQs

What are the total impact fees for a single-family home in Haltom City, Texas?

A new single-family home in Haltom City pays $5,131.87 per unit in combined impact fees (rates sourced November 5, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Haltom City?

Commercial development in Haltom City pays no per-square-foot impact fees, but owes $7,280.72 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Haltom City charge its own impact fees?

Yes. Haltom City levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Haltom City. The schedule on this page shows every fee that applies to development in Haltom City.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Tarrant County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.