Grapevine Impact Fees by Project Type
Grapevine: Single-Family Impact Fees
A new single-family home in Grapevine pays at least $5,059.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Grapevine) ($1,543.00) and Wastewater Impact Fee (City of Grapevine) ($845.00).
Water Tap Fee (City of Grapevine) — 5/8" x 1" tap, pavement, Open Space Fee (City of Grapevine) — R-7.5, and Sewer Tap Fee (City of Grapevine) — 0 to 6 ft deep, pavement are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (City of Grapevine) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Grapevine Impact Fee Schedule
- Water Impact Fee (City of Grapevine)$1,543.00City of GrapevineGrapevine assesses its water impact fee per single-family unit when the plat is recorded and collects it when the building permit is issued: $1,543 for plats recorded after December 7, 2021. Older plats pay the schedule in effect when they were recorded. Taps are charged separately.
- Water Tap Fee (City of Grapevine) — 5/8" x 1" tap, pavement$800.00Requires confirmation5/8" x 1", pavementCity of GrapevineGrapevine charges a water tap fee by tap size and where the connection is made: $800 for a 5/8 in. x 1 in. domestic tap made in asphalt or concrete pavement, $375 in a utility easement, and $100 where the developer has already installed the service line (pre-made tap). Taps larger than 2 in. are priced by contract.
- Wastewater Impact Fee (City of Grapevine)$845.00City of GrapevineGrapevine assesses its wastewater impact fee per single-family unit when the plat is recorded and collects it when the building permit is issued: $845 for plats recorded after December 7, 2021. Older plats pay the schedule in effect when they were recorded. Sewer taps are charged separately.
- Sewer Tap Fee (City of Grapevine) — 0 to 6 ft deep, pavement$725.00Requires confirmation0 to 6 ft, pavementCity of GrapevineGrapevine charges a sewer tap fee by the depth of the main and where the connection is made: $725 for a tap 0 to 6 ft deep in asphalt or concrete pavement, $325 in a utility easement and $40 for a pre-made tap. Deeper taps cost up to $1,375 (12 to 18 ft, in pavement).
- Open Space Fee (City of Grapevine) — R-7.5$1,146.00Requires confirmationCity of GrapevineCity of Grapevine charges $1,146 per lot (R-7.5) as money in lieu of parkland dedication. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- City Impact Fee (City of Grapevine)Requires confirmationCity of GrapevineGrapevine's published development fees include no roadway impact fee. Its open space fee ($807 to $1,416 per lot by zoning district) is paid at final plat submittal, before construction plan approval, so it is not charged at building permit.
- County Impact Fee (Tarrant County)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Grapevine.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Grapevine: Multifamily Impact Fees
A new multifamily unit in Grapevine pays at least $2,574.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Grapevine, MF) ($694.00) and Wastewater Impact Fee (City of Grapevine, MF) ($355.00).
Sewer Tap Fee (City of Grapevine, MF) — 0 to 6 ft deep, pavement and Water Tap Fee (City of Grapevine, MF) — 5/8" x 1" tap, pavement are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (City of Grapevine, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Grapevine Impact Fee Schedule
- Water Tap Fee (City of Grapevine, MF) — 5/8" x 1" tap, pavement$800.00Requires confirmation5/8" x 1", pavementCity of GrapevineGrapevine charges its water tap fee per connection, not per unit: the amount shown is the smallest domestic tap ($800 in pavement, $375 in a utility easement, $100 pre-made). A building served by one connection pays once, at its tap size (up to $2,150 for a 2 in. tap in pavement; larger taps by contract).
- Water Impact Fee (City of Grapevine, MF)$694.00City of GrapevineGrapevine assesses its water impact fee per multifamily unit when the plat is recorded and collects it when the building permit is issued: $694 per unit for plats recorded after December 7, 2021. Older plats pay the schedule in effect when they were recorded.
- Sewer Tap Fee (City of Grapevine, MF) — 0 to 6 ft deep, pavement$725.00Requires confirmation0 to 6 ft, pavementCity of GrapevineGrapevine charges its sewer tap fee per connection by the depth of the main and where the connection is made: $725 for a tap 0 to 6 ft deep in pavement, $325 in a utility easement and $40 pre-made, up to $1,375 for 12 to 18 ft in pavement. A building served by one connection pays once.
- Wastewater Impact Fee (City of Grapevine, MF)$355.00City of GrapevineGrapevine assesses its wastewater impact fee per multifamily unit when the plat is recorded and collects it when the building permit is issued: $355 per unit for plats recorded after December 7, 2021. Older plats pay the schedule in effect when they were recorded.
- City Impact Fee (City of Grapevine, MF)Requires confirmationCity of GrapevineGrapevine's published development fees include no roadway impact fee. Multifamily zoning districts must set aside open space (20 to 25 percent of the site) instead of paying an open space fee.
- County Impact Fee (Tarrant County, MF)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Grapevine.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Grapevine: Commercial Impact Fees
Commercial development in Grapevine pays no per-square-foot impact fees, but owes $1,575.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $1,575.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (City of Grapevine) — 1" tap, pavement and Sewer Tap Fee (City of Grapevine) — 0 to 6 ft deep, pavement are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Impact Fee (City of Grapevine) — per acre and Water Impact Fee (City of Grapevine) — per acre are set by the utility and not published online. City Impact Fee (City of Grapevine, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Grapevine Impact Fee Schedule
- Water Tap Fee (City of Grapevine) — 1" tap, pavement$850.00 one-timeRequires confirmation1", pavementCity of GrapevineGrapevine charges a water tap fee by tap size and where the connection is made. A 1 in. domestic tap costs $850 in asphalt or concrete pavement, $425 in a utility easement and $150 where the developer has already installed the service line (pre-made tap). A 2 in. commercial tap that requires a meter bypass costs $2,500, $2,000 or $1,200 on the same terms. Taps larger than 2 in. are priced by contract. Water impact fees are charged separately.
- Water Impact Fee (City of Grapevine) — per acreRequires confirmationCity of GrapevineGrapevine assesses nonresidential water impact fees by site acreage when the plat is recorded and collects them when the building permit is issued. For plats recorded after December 7, 2021: commercial and industrial $3,734 per acre, corporate office $10,878 per acre, hotel $24,225 per acre and government use $2,330 per acre. Mixed-use nonresidential space pays $15,523 per 10,000 sq ft for restaurant and $926 per 10,000 sq ft for retail. Older plats pay the schedule in effect when they were recorded. Taps are charged separately.
- Sewer Tap Fee (City of Grapevine) — 0 to 6 ft deep, pavement$725.00 one-timeRequires confirmation0 to 6 ft, pavementCity of GrapevineGrapevine charges a sewer tap fee by the depth of the main and where the connection is made: $725 for a tap 0 to 6 ft deep in asphalt or concrete pavement, $325 in a utility easement and $40 for a pre-made tap. Deeper taps cost up to $1,375 (12 to 18 ft, in pavement). Wastewater impact fees are charged separately.
- Sewer Impact Fee (City of Grapevine) — per acreRequires confirmationCity of GrapevineGrapevine assesses nonresidential wastewater impact fees by site acreage when the plat is recorded and collects them when the building permit is issued. For plats recorded after December 7, 2021: commercial and industrial $1,936 per acre, corporate office $9,694 per acre, hotel $19,381 per acre and government use $2,096 per acre. Mixed-use nonresidential space pays $16,701 per 10,000 sq ft for restaurant and $1,048 per 10,000 sq ft for retail. Older plats pay the schedule in effect when they were recorded. Sewer taps are charged separately.
- City Impact Fee (City of Grapevine, Commercial)Requires confirmationCity of GrapevineGrapevine's published development fees include no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its open space fee does not apply to commercial or industrial zoning.
- County Impact Fee (Tarrant County, Commercial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Grapevine: Industrial Impact Fees
Industrial development in Grapevine pays no per-square-foot impact fees, but owes $1,575.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $1,575.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (City of Grapevine) — 1" tap, pavement and Sewer Tap Fee (City of Grapevine) — 0 to 6 ft deep, pavement are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Impact Fee (City of Grapevine) — per acre and Water Impact Fee (City of Grapevine) — per acre are set by the utility and not published online. City Impact Fee (City of Grapevine, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Grapevine Impact Fee Schedule
- Water Tap Fee (City of Grapevine) — 1" tap, pavement$850.00 one-timeRequires confirmation1", pavementCity of GrapevineGrapevine charges a water tap fee by tap size and where the connection is made. A 1 in. domestic tap costs $850 in asphalt or concrete pavement, $425 in a utility easement and $150 where the developer has already installed the service line (pre-made tap). A 2 in. commercial tap that requires a meter bypass costs $2,500, $2,000 or $1,200 on the same terms. Taps larger than 2 in. are priced by contract. Water impact fees are charged separately.
- Water Impact Fee (City of Grapevine) — per acreRequires confirmationCity of GrapevineGrapevine assesses nonresidential water impact fees by site acreage when the plat is recorded and collects them when the building permit is issued. For plats recorded after December 7, 2021: commercial and industrial $3,734 per acre, corporate office $10,878 per acre, hotel $24,225 per acre and government use $2,330 per acre. Mixed-use nonresidential space pays $15,523 per 10,000 sq ft for restaurant and $926 per 10,000 sq ft for retail. Older plats pay the schedule in effect when they were recorded. Taps are charged separately.
- Sewer Tap Fee (City of Grapevine) — 0 to 6 ft deep, pavement$725.00 one-timeRequires confirmation0 to 6 ft, pavementCity of GrapevineGrapevine charges a sewer tap fee by the depth of the main and where the connection is made: $725 for a tap 0 to 6 ft deep in asphalt or concrete pavement, $325 in a utility easement and $40 for a pre-made tap. Deeper taps cost up to $1,375 (12 to 18 ft, in pavement). Wastewater impact fees are charged separately.
- Sewer Impact Fee (City of Grapevine) — per acreRequires confirmationCity of GrapevineGrapevine assesses nonresidential wastewater impact fees by site acreage when the plat is recorded and collects them when the building permit is issued. For plats recorded after December 7, 2021: commercial and industrial $1,936 per acre, corporate office $9,694 per acre, hotel $19,381 per acre and government use $2,096 per acre. Mixed-use nonresidential space pays $16,701 per 10,000 sq ft for restaurant and $1,048 per 10,000 sq ft for retail. Older plats pay the schedule in effect when they were recorded. Sewer taps are charged separately.
- City Impact Fee (City of Grapevine, Industrial)Requires confirmationCity of GrapevineGrapevine's published development fees include no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its open space fee does not apply to commercial or industrial zoning.
- County Impact Fee (Tarrant County, Industrial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Grapevine: Office Impact Fees
Office development in Grapevine pays no per-square-foot impact fees, but owes $1,575.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to at least $1,575.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (City of Grapevine) — 1" tap, pavement and Sewer Tap Fee (City of Grapevine) — 0 to 6 ft deep, pavement are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Impact Fee (City of Grapevine) — per acre and Water Impact Fee (City of Grapevine) — per acre are set by the utility and not published online. City Impact Fee (City of Grapevine, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Grapevine Impact Fee Schedule
- Water Tap Fee (City of Grapevine) — 1" tap, pavement$850.00 one-timeRequires confirmation1", pavementCity of GrapevineGrapevine charges a water tap fee by tap size and where the connection is made. A 1 in. domestic tap costs $850 in asphalt or concrete pavement, $425 in a utility easement and $150 where the developer has already installed the service line (pre-made tap). A 2 in. commercial tap that requires a meter bypass costs $2,500, $2,000 or $1,200 on the same terms. Taps larger than 2 in. are priced by contract. Water impact fees are charged separately.
- Water Impact Fee (City of Grapevine) — per acreRequires confirmationCity of GrapevineGrapevine assesses nonresidential water impact fees by site acreage when the plat is recorded and collects them when the building permit is issued. For plats recorded after December 7, 2021: commercial and industrial $3,734 per acre, corporate office $10,878 per acre, hotel $24,225 per acre and government use $2,330 per acre. Mixed-use nonresidential space pays $15,523 per 10,000 sq ft for restaurant and $926 per 10,000 sq ft for retail. Older plats pay the schedule in effect when they were recorded. Taps are charged separately.
- Sewer Tap Fee (City of Grapevine) — 0 to 6 ft deep, pavement$725.00 one-timeRequires confirmation0 to 6 ft, pavementCity of GrapevineGrapevine charges a sewer tap fee by the depth of the main and where the connection is made: $725 for a tap 0 to 6 ft deep in asphalt or concrete pavement, $325 in a utility easement and $40 for a pre-made tap. Deeper taps cost up to $1,375 (12 to 18 ft, in pavement). Wastewater impact fees are charged separately.
- Sewer Impact Fee (City of Grapevine) — per acreRequires confirmationCity of GrapevineGrapevine assesses nonresidential wastewater impact fees by site acreage when the plat is recorded and collects them when the building permit is issued. For plats recorded after December 7, 2021: commercial and industrial $1,936 per acre, corporate office $9,694 per acre, hotel $19,381 per acre and government use $2,096 per acre. Mixed-use nonresidential space pays $16,701 per 10,000 sq ft for restaurant and $1,048 per 10,000 sq ft for retail. Older plats pay the schedule in effect when they were recorded. Sewer taps are charged separately.
- City Impact Fee (City of Grapevine, Office)Requires confirmationCity of GrapevineGrapevine's published development fees include no roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. Its open space fee does not apply to commercial or industrial zoning.
- County Impact Fee (Tarrant County, Office)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Grapevine Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Grapevine Impact Fee FAQs
What are the total impact fees for a single-family home in Grapevine, Texas?
A new single-family home in Grapevine pays at least $5,059.00 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Grapevine?
Commercial development in Grapevine pays no per-square-foot impact fees, but owes $1,575.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Grapevine charge its own impact fees?
Yes. Grapevine levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Grapevine. The schedule on this page shows every fee that applies to development in Grapevine.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Tarrant County impact fees page.