Skip to content
IMPACTFEES.ORG

Kennedale, Texas Impact Fees

Kennedale applies its own fee schedule. Tarrant County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $9,366.89 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Kennedale Impact Fees by Project Type

Kennedale: Single-Family Impact Fees

A new single-family home in Kennedale pays at least $9,366.89 per unit in impact fees (rates sourced November 24, 2026). Every line item is levied at the municipal or utility level.

Water Impact Fee (City of Kennedale) — 3/4" meter, Wastewater Impact Fee (City of Fort Worth, Kennedale) — 5/8" x 3/4" meter, Parkland Dedication Fee (City of Kennedale), Roadway Impact Fee (City of Kennedale), Wastewater Impact Fee (City of Kennedale) — 3/4" meter, and Water Meter Fee (City of Kennedale) — 5/8" x 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Impact Fee (City of Fort Worth, Kennedale) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Kennedale Impact Fee Schedule
Water$1,952.00
  • Water Impact Fee (City of Kennedale) — 3/4" meter
    City of Kennedale
    Kennedale's own water impact fee is $1,487 per living unit equivalent (LUE), priced by meter size with a 3/4 in. meter counted as 1 LUE, under Ordinance 604 (adopted August 15, 2016). It is charged in addition to the City of Fort Worth water impact fee that Kennedale passes through under its wholesale water contract.
    $1,487.00Requires confirmation
  • Water Meter Fee (City of Kennedale) — 5/8" x 3/4" meter
    City of Kennedale
    Kennedale charges a one-time water meter fee by meter size: $465 for a 5/8 x 3/4 in. meter (Schedule of Fees adopted by Ordinance 779, January 21, 2025). Meters over 2 in. and water and sewer taps are billed at actual cost.
    $465.00Requires confirmation
  • Water Impact Fee (City of Fort Worth, Kennedale)
    City of Fort Worth (collected by City of Kennedale)
    Kennedale collects the City of Fort Worth water impact fee on new water service under its wholesale water contract with Fort Worth. Because Kennedale receives only part of its water from Fort Worth, it pays a reduced percentage of Fort Worth's full rate ($2,990 for a 5/8 x 3/4 in. meter from October 1, 2026).
    Requires confirmation
Sewer$3,918.00
  • Wastewater Impact Fee (City of Fort Worth, Kennedale) — 5/8" x 3/4" meter
    City of Fort Worth (collected by City of Kennedale)
    Kennedale collects the City of Fort Worth wastewater impact fee on new connections under its wholesale wastewater contract with Fort Worth. Fort Worth's current schedule is $2,838 for a 5/8 x 3/4 in. meter for building permits issued on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025); larger meters pay by Fort Worth's meter equivalency factors. Kennedale's fee schedule also refers to a Kennedale water and wastewater impact fee under its own capital improvements plan.
    $2,838.00Requires confirmation
  • Wastewater Impact Fee (City of Kennedale) — 3/4" meter
    City of Kennedale
    Kennedale's own wastewater impact fee is $1,080 per living unit equivalent (LUE), priced by meter size with a 3/4 in. meter counted as 1 LUE, under Ordinance 604 (adopted August 15, 2016). It is charged in addition to the City of Fort Worth wastewater impact fee, and a development that needs a new local lift station or force main also pays a pro rata share of that cost.
    $1,080.00Requires confirmation
City$3,496.89
  • Roadway Impact Fee (City of Kennedale)
    City of Kennedale
    Kennedale charges a roadway impact fee of $2,296.89 per single-family detached home (1.81 vehicle-miles at $1,269 per service unit) under Ordinance 606, adopted August 15, 2016.
    $2,296.89Requires confirmation
  • Parkland Dedication Fee (City of Kennedale)
    City of Kennedale
    Kennedale assesses a parkland dedication fee of $1,200 per dwelling unit in lieu of dedicating parkland (Schedule of Fees adopted by Ordinance 779, January 21, 2025).
    $1,200.00Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Kennedale.
    $0.00
Total (Kennedale): $9,366.89
Sources last checked Official fee schedules:City of Kennedale City of Fort Worth (collected by City of Kennedale) Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Kennedale: Multifamily Impact Fees

A new multifamily unit in Kennedale pays at least $8,492.30 per unit in impact fees (rates sourced November 24, 2026). Every line item is levied at the municipal or utility level.

Water Impact Fee (City of Kennedale, MF) — 3/4" meter, Roadway Impact Fee (City of Kennedale, MF), Parkland Dedication Fee (City of Kennedale, MF), Wastewater Impact Fee (City of Kennedale, MF) — 3/4" meter, Wastewater Impact Fee (City of Fort Worth, Kennedale, MF) — 5/8" x 3/4" meter, and Water Meter Fee (City of Kennedale, MF) — 5/8" x 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Impact Fee (City of Fort Worth, Kennedale, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Kennedale Impact Fee Schedule
Water$1,952.00
  • Water Impact Fee (City of Kennedale, MF) — 3/4" meter
    City of Kennedale
    Kennedale's own water impact fee is priced by meter size only under Ordinance 604 (adopted August 15, 2016): $1,487 for a 3/4 in. meter, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size ($7,931 for a 2 in. meter; larger meters pay more). It is charged in addition to the City of Fort Worth water impact fee.
    $1,487.00Requires confirmation
  • Water Meter Fee (City of Kennedale, MF) — 5/8" x 3/4" meter
    City of Kennedale
    Kennedale charges a one-time water meter fee by meter size: $465 for a 5/8 x 3/4 in. meter, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size ($1,192 for a 2 in. meter; larger meters at actual cost).
    $465.00Requires confirmation
  • Water Impact Fee (City of Fort Worth, Kennedale, MF)
    City of Fort Worth (collected by City of Kennedale)
    Kennedale collects the City of Fort Worth water impact fee on new water service under its wholesale water contract with Fort Worth, at a reduced percentage of Fort Worth's full rate because Kennedale receives only part of its water from Fort Worth.
    Requires confirmation
Sewer$3,918.00
  • Wastewater Impact Fee (City of Fort Worth, Kennedale, MF) — 5/8" x 3/4" meter
    City of Fort Worth (collected by City of Kennedale)
    Kennedale collects the City of Fort Worth wastewater impact fee on new connections, priced by meter size only: $2,838 for a 5/8 x 3/4 in. meter from October 1, 2026, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $22,704 for a 2 in. meter and more for larger meters.
    $2,838.00Requires confirmation
  • Wastewater Impact Fee (City of Kennedale, MF) — 3/4" meter
    City of Kennedale
    Kennedale's own wastewater impact fee is priced by meter size only under Ordinance 604 (adopted August 15, 2016): $1,080 for a 3/4 in. meter, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size ($5,760 for a 2 in. meter; larger meters pay more). It is charged in addition to the City of Fort Worth wastewater impact fee.
    $1,080.00Requires confirmation
City$2,622.30
  • Roadway Impact Fee (City of Kennedale, MF)
    City of Kennedale
    Kennedale charges a roadway impact fee of $1,422.30 per apartment unit (1.12 vehicle-miles at $1,269 per service unit) under Ordinance 606, adopted August 15, 2016. Condominiums and townhouses pay $1,192.90 per unit.
    $1,422.30Requires confirmation
  • Parkland Dedication Fee (City of Kennedale, MF)
    City of Kennedale
    Kennedale assesses a parkland dedication fee of $1,200 per dwelling unit in lieu of dedicating parkland (Schedule of Fees adopted by Ordinance 779, January 21, 2025).
    $1,200.00Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, MF)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Kennedale.
    $0.00
Total (Kennedale): $8,492.30
Sources last checked Official fee schedules:City of Kennedale City of Fort Worth (collected by City of Kennedale) Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Kennedale: Commercial Impact Fees

Commercial development in Kennedale pays no per-square-foot impact fees, but owes $7,658.00 in one-time water and sewer connection fees (rates sourced November 24, 2026).

For a 50,000 sq ft building, that comes to at least $7,658.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Impact Fee (City of Fort Worth, Kennedale) — 1" meter and Water Meter Fee (City of Kennedale) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Impact Fee (City of Fort Worth, Kennedale), Wastewater Impact Fee (City of Kennedale), and Water Impact Fee (City of Kennedale) are set by the utility and not published online. Roadway Impact Fee (City of Kennedale, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Kennedale Impact Fee Schedule
Water$563.00 one-time
  • Water Meter Fee (City of Kennedale) — 1" meter
    City of Kennedale
    Kennedale charges a one-time water meter fee by meter size: $563 for a 1 in. meter, from $465 for a 5/8 x 3/4 in. meter to $1,192 for a 2 in. meter (Schedule of Fees adopted by Ordinance 779, January 21, 2025). Meters over 2 in. and water and sewer taps are billed at actual cost. The City of Arlington operates Kennedale's water and wastewater system.
    $563.00 one-timeRequires confirmation
  • Water Impact Fee (City of Fort Worth, Kennedale)
    City of Fort Worth
    Kennedale collects the City of Fort Worth water impact fee on new water service under its wholesale contract. Because Kennedale receives only part of its water from Fort Worth, it pays a reduced percentage of Fort Worth's full rate ($7,475 for a 1 in. meter from October 1, 2026).
    Requires confirmation
  • Requires confirmation
Sewer$7,095.00 one-time
  • Wastewater Impact Fee (City of Fort Worth, Kennedale) — 1" meter
    City of Fort Worth
    Kennedale's fee schedule says water and wastewater impact fees follow Kennedale's capital plan and City of Fort Worth rates, and Fort Worth's wholesale contract requires Kennedale to collect Fort Worth's wastewater impact fee. Fort Worth's current schedule is $7,095 for a 1 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025). Most Kennedale wastewater is treated by the City of Arlington, so the Fort Worth fee may apply only in part of the city.
    $7,095.00 one-timeRequires confirmation
  • Requires confirmation
City$0.00
County$0.00
  • County Impact Fee (Tarrant County, Commercial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Kennedale): $7,658.00 one-time (≈ $7,658.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Kennedale City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$79,996.13Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$779,981.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$1,344,710.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$619,398.63Includes unconfirmed fees
Kennedale$7,658.00*this pageIncludes unconfirmed fees
Lake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$387,250.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$182,057.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Kennedale: Industrial Impact Fees

Industrial development in Kennedale pays no per-square-foot impact fees, but owes $7,658.00 in one-time water and sewer connection fees (rates sourced November 24, 2026).

For a 50,000 sq ft building, that comes to at least $7,658.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Impact Fee (City of Fort Worth, Kennedale) — 1" meter and Water Meter Fee (City of Kennedale) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Impact Fee (City of Fort Worth, Kennedale), Wastewater Impact Fee (City of Kennedale), and Water Impact Fee (City of Kennedale) are set by the utility and not published online. Roadway Impact Fee (City of Kennedale, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Kennedale Impact Fee Schedule
Water$563.00 one-time
  • Water Meter Fee (City of Kennedale) — 1" meter
    City of Kennedale
    Kennedale charges a one-time water meter fee by meter size: $563 for a 1 in. meter, from $465 for a 5/8 x 3/4 in. meter to $1,192 for a 2 in. meter (Schedule of Fees adopted by Ordinance 779, January 21, 2025). Meters over 2 in. and water and sewer taps are billed at actual cost. The City of Arlington operates Kennedale's water and wastewater system.
    $563.00 one-timeRequires confirmation
  • Water Impact Fee (City of Fort Worth, Kennedale)
    City of Fort Worth
    Kennedale collects the City of Fort Worth water impact fee on new water service under its wholesale contract. Because Kennedale receives only part of its water from Fort Worth, it pays a reduced percentage of Fort Worth's full rate ($7,475 for a 1 in. meter from October 1, 2026).
    Requires confirmation
  • Requires confirmation
Sewer$7,095.00 one-time
  • Wastewater Impact Fee (City of Fort Worth, Kennedale) — 1" meter
    City of Fort Worth
    Kennedale's fee schedule says water and wastewater impact fees follow Kennedale's capital plan and City of Fort Worth rates, and Fort Worth's wholesale contract requires Kennedale to collect Fort Worth's wastewater impact fee. Fort Worth's current schedule is $7,095 for a 1 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025). Most Kennedale wastewater is treated by the City of Arlington, so the Fort Worth fee may apply only in part of the city.
    $7,095.00 one-timeRequires confirmation
  • Requires confirmation
City$0.00
County$0.00
  • County Impact Fee (Tarrant County, Industrial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Kennedale): $7,658.00 one-time (≈ $7,658.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Kennedale City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$31,402.63Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$286,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$533,068.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$220,048.13Includes unconfirmed fees
Kennedale$7,658.00*this pageIncludes unconfirmed fees
Lake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$187,350.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$95,882.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Kennedale: Office Impact Fees

Office development in Kennedale pays no per-square-foot impact fees, but owes $7,658.00 in one-time water and sewer connection fees (rates sourced November 24, 2026).

For a 25,000 sq ft building, that comes to at least $7,658.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Impact Fee (City of Fort Worth, Kennedale) — 1" meter and Water Meter Fee (City of Kennedale) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Impact Fee (City of Fort Worth, Kennedale), Wastewater Impact Fee (City of Kennedale), and Water Impact Fee (City of Kennedale) are set by the utility and not published online. Roadway Impact Fee (City of Kennedale, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Kennedale Impact Fee Schedule
Water$563.00 one-time
  • Water Meter Fee (City of Kennedale) — 1" meter
    City of Kennedale
    Kennedale charges a one-time water meter fee by meter size: $563 for a 1 in. meter, from $465 for a 5/8 x 3/4 in. meter to $1,192 for a 2 in. meter (Schedule of Fees adopted by Ordinance 779, January 21, 2025). Meters over 2 in. and water and sewer taps are billed at actual cost. The City of Arlington operates Kennedale's water and wastewater system.
    $563.00 one-timeRequires confirmation
  • Water Impact Fee (City of Fort Worth, Kennedale)
    City of Fort Worth
    Kennedale collects the City of Fort Worth water impact fee on new water service under its wholesale contract. Because Kennedale receives only part of its water from Fort Worth, it pays a reduced percentage of Fort Worth's full rate ($7,475 for a 1 in. meter from October 1, 2026).
    Requires confirmation
  • Requires confirmation
Sewer$7,095.00 one-time
  • Wastewater Impact Fee (City of Fort Worth, Kennedale) — 1" meter
    City of Fort Worth
    Kennedale's fee schedule says water and wastewater impact fees follow Kennedale's capital plan and City of Fort Worth rates, and Fort Worth's wholesale contract requires Kennedale to collect Fort Worth's wastewater impact fee. Fort Worth's current schedule is $7,095 for a 1 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025). Most Kennedale wastewater is treated by the City of Arlington, so the Fort Worth fee may apply only in part of the city.
    $7,095.00 one-timeRequires confirmation
  • Requires confirmation
City$0.00
  • Roadway Impact Fee (City of Kennedale, Office)
    City of Kennedale
    Kennedale collects a roadway impact fee on new development, funding its Roadway Impact Fee Fund. The city does not publish the rate schedule online.
    Requires confirmation
County$0.00
  • County Impact Fee (Tarrant County, Office)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Kennedale): $7,658.00 one-time (≈ $7,658.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Kennedale City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$38,824.38Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$262,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$650,198.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$241,027.13Includes unconfirmed fees
Kennedale$7,658.00*this pageIncludes unconfirmed fees
Lake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$121,175.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$76,551.16Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Kennedale Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Kennedale Impact Fee FAQs

What are the total impact fees for a single-family home in Kennedale, Texas?

A new single-family home in Kennedale pays at least $9,366.89 per unit in combined impact fees (rates sourced November 24, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Kennedale?

Commercial development in Kennedale pays no per-square-foot impact fees, but owes $7,658.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Kennedale charge its own impact fees?

Yes. Kennedale levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Kennedale. The schedule on this page shows every fee that applies to development in Kennedale.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Tarrant County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.