Crowley Impact Fees by Project Type
Crowley: Single-Family Impact Fees
A new single-family home in Crowley pays at least $10,001.00 per unit in impact fees (rates sourced November 26, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Park Development Fee (City of Crowley) ($600.00) and Parkland Dedication Fee in Lieu (City of Crowley) ($600.00).
Water Impact Fee (City of Fort Worth, Crowley) — 5/8" meter, Water Impact Fee (City of Crowley) — 5/8" meter, Wastewater Impact Fee (City of Fort Worth, Crowley) — 5/8" meter, and Wastewater Impact Fee (City of Crowley) — 5/8" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Tap Fee (City of Crowley) and Water Tap Fee (City of Crowley) are set by the utility and not published online. City Impact Fee (City of Crowley) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Crowley Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Crowley) — 5/8" meter$2,990.00Requires confirmationCity of Fort Worth (collected by City of Crowley)As a Fort Worth wholesale water customer, Crowley assesses the City of Fort Worth water impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $2,990 for a 5/8 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025); larger meters pay by Fort Worth's meter equivalents.
- Water Impact Fee (City of Crowley) — 5/8" meter$2,827.00Requires confirmationCity of CrowleyCrowley's own water impact fee is $2,827 per 5/8 in. meter (one living unit equivalent), collected at 50% of the maximum under Ordinance 03-2024-519 (March 21, 2024). Larger meters pay by living unit equivalent. Crowley also collects the City of Fort Worth water impact fee on new connections.
- Water Tap Fee (City of Crowley)Requires confirmationCity of Crowley
- Wastewater Impact Fee (City of Fort Worth, Crowley) — 5/8" meter$2,838.00Requires confirmationCity of Fort Worth (collected by City of Crowley)Fort Worth treats Crowley's wastewater, and Crowley assesses the City of Fort Worth wastewater impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $2,838 for a 5/8 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025); larger meters pay by Fort Worth's meter equivalents.
- Wastewater Impact Fee (City of Crowley) — 5/8" meter$146.00Requires confirmationCity of CrowleyCrowley's own wastewater impact fee is $146 per 5/8 in. meter (one living unit equivalent), collected at 50% of the maximum under Ordinance 03-2024-519 (March 21, 2024). Larger meters pay by living unit equivalent. Crowley also collects the City of Fort Worth wastewater impact fee, since Fort Worth treats Crowley's wastewater.
- Sewer Tap Fee (City of Crowley)Requires confirmationCity of Crowley
- Park Development Fee (City of Crowley)$600.00City of CrowleyCity of Crowley charges $600 per dwelling unit as a park development fee. It is paid at final plat, so a lot already platted has paid it.
- Parkland Dedication Fee in Lieu (City of Crowley)$600.00City of CrowleyCity of Crowley charges $600 per dwelling unit as money in lieu of parkland dedication. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- City Impact Fee (City of Crowley)Requires confirmationCity of CrowleyCrowley has no roadway impact fee: its impact fee ordinance (Ordinance 03-2024-519) covers water and wastewater only.
- County Impact Fee (Tarrant County)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Crowley.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Crowley: Multifamily Impact Fees
A new multifamily unit in Crowley pays at least $10,001.00 per unit in impact fees (rates sourced November 26, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Park Development Fee (City of Crowley, MF) ($600.00) and Parkland Dedication Fee in Lieu (City of Crowley, MF) ($600.00).
Wastewater Impact Fee (City of Fort Worth, Crowley, MF) — 5/8" meter, Water Impact Fee (City of Crowley, MF) — 5/8" meter, Water Impact Fee (City of Fort Worth, Crowley, MF) — 5/8" meter, and Wastewater Impact Fee (City of Crowley, MF) — 5/8" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Tap Fee (City of Crowley, MF) and Water Tap Fee (City of Crowley, MF) are set by the utility and not published online. City Impact Fee (City of Crowley, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Crowley Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Crowley, MF) — 5/8" meter$2,990.00Requires confirmationCity of Fort Worth (collected by City of Crowley)Crowley also assesses the City of Fort Worth water impact fee by meter size: $2,990 for a 5/8 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025). A building served by one master meter pays once at that meter's size, up to $23,920 for a 2 in. meter.
- Water Impact Fee (City of Crowley, MF) — 5/8" meter$2,827.00Requires confirmationCity of CrowleyCrowley prices its water impact fee by meter size only (Ordinance 03-2024-519, March 21, 2024). The amount shown is the smallest meter, the floor for a unit with its own meter; a building served by one master meter pays once at that meter's size, up to $22,616 for a 2 in. meter.
- Water Tap Fee (City of Crowley, MF)Requires confirmationCity of Crowley
- Wastewater Impact Fee (City of Fort Worth, Crowley, MF) — 5/8" meter$2,838.00Requires confirmationCity of Fort Worth (collected by City of Crowley)Crowley also assesses the City of Fort Worth wastewater impact fee by meter size: $2,838 for a 5/8 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025). A building served by one master meter pays once at that meter's size, up to $22,704 for a 2 in. meter.
- Wastewater Impact Fee (City of Crowley, MF) — 5/8" meter$146.00Requires confirmationCity of CrowleyCrowley prices its wastewater impact fee by meter size only (Ordinance 03-2024-519, March 21, 2024). The amount shown is the smallest meter, the floor for a unit with its own meter; a building served by one master meter pays once at that meter's size, up to $1,168 for a 2 in. meter.
- Sewer Tap Fee (City of Crowley, MF)Requires confirmationCity of Crowley
- Park Development Fee (City of Crowley, MF)$600.00City of CrowleyCity of Crowley charges $600 per dwelling unit as a park development fee. It is paid at final plat, so a lot already platted has paid it.
- Parkland Dedication Fee in Lieu (City of Crowley, MF)$600.00City of CrowleyCity of Crowley charges $600 per dwelling unit as money in lieu of parkland dedication. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- City Impact Fee (City of Crowley, MF)Requires confirmationCity of CrowleyCrowley has no roadway impact fee: its impact fee ordinance (Ordinance 03-2024-519) covers water and wastewater only.
- County Impact Fee (Tarrant County, MF)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Crowley.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Crowley: Commercial Impact Fees
Commercial development in Crowley pays no per-square-foot impact fees, but owes $22,002.50 in one-time water and sewer connection fees (rates sourced November 26, 2026).
For a 50,000 sq ft building, that comes to at least $22,002.50. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Impact Fee (City of Fort Worth, Crowley) — 1" meter, Wastewater Impact Fee (City of Crowley) — 1" meter, Water Impact Fee (City of Crowley) — 1" meter, and Water Impact Fee (City of Fort Worth, Crowley) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Tap Fee (City of Crowley) and Sewer Tap Fee (City of Crowley) are set by the utility and not published online. City Impact Fee (City of Crowley, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Crowley Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Crowley) — 1" meter$7,475.00 one-timeRequires confirmationCity of Fort Worth (collected by City of Crowley)As a Fort Worth wholesale water customer, Crowley assesses the City of Fort Worth water impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $7,475 for a 1 in. meter (2.5 meter equivalents) for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025); other meter sizes pay by Fort Worth's meter equivalents.
- Water Impact Fee (City of Crowley) — 1" meter$7,067.50 one-timeRequires confirmationCity of CrowleyCrowley's own water impact fee is $7,067.50 for a 1 in. meter (2.5 living unit equivalents) under Ordinance 03-2024-519 (March 21, 2024); other meter sizes pay by living unit equivalent. Crowley also collects the City of Fort Worth water impact fee on new connections.
- Water Tap Fee (City of Crowley)Requires confirmationCity of Crowley
- Wastewater Impact Fee (City of Fort Worth, Crowley) — 1" meter$7,095.00 one-timeRequires confirmationCity of Fort Worth (collected by City of Crowley)Fort Worth treats Crowley's wastewater, and Crowley assesses the City of Fort Worth wastewater impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $7,095 for a 1 in. meter (2.5 meter equivalents) for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025); other meter sizes pay by Fort Worth's meter equivalents.
- Wastewater Impact Fee (City of Crowley) — 1" meter$365.00 one-timeRequires confirmationCity of CrowleyCrowley's own wastewater impact fee is $365 for a 1 in. meter (2.5 living unit equivalents) under Ordinance 03-2024-519 (March 21, 2024); other meter sizes pay by living unit equivalent. Crowley also collects the City of Fort Worth wastewater impact fee, since Fort Worth treats Crowley's wastewater.
- Sewer Tap Fee (City of Crowley)Requires confirmationCity of Crowley
- City Impact Fee (City of Crowley, Commercial)Requires confirmationCity of Crowley
- County Impact Fee (Tarrant County, Commercial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Crowley: Industrial Impact Fees
Industrial development in Crowley pays no per-square-foot impact fees, but owes $22,002.50 in one-time water and sewer connection fees (rates sourced November 26, 2026).
For a 50,000 sq ft building, that comes to at least $22,002.50. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Impact Fee (City of Fort Worth, Crowley) — 1" meter, Wastewater Impact Fee (City of Crowley) — 1" meter, Water Impact Fee (City of Crowley) — 1" meter, and Water Impact Fee (City of Fort Worth, Crowley) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Tap Fee (City of Crowley) and Sewer Tap Fee (City of Crowley) are set by the utility and not published online. City Impact Fee (City of Crowley, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Crowley Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Crowley) — 1" meter$7,475.00 one-timeRequires confirmationCity of Fort Worth (collected by City of Crowley)As a Fort Worth wholesale water customer, Crowley assesses the City of Fort Worth water impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $7,475 for a 1 in. meter (2.5 meter equivalents) for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025); other meter sizes pay by Fort Worth's meter equivalents.
- Water Impact Fee (City of Crowley) — 1" meter$7,067.50 one-timeRequires confirmationCity of CrowleyCrowley's own water impact fee is $7,067.50 for a 1 in. meter (2.5 living unit equivalents) under Ordinance 03-2024-519 (March 21, 2024); other meter sizes pay by living unit equivalent. Crowley also collects the City of Fort Worth water impact fee on new connections.
- Water Tap Fee (City of Crowley)Requires confirmationCity of Crowley
- Wastewater Impact Fee (City of Fort Worth, Crowley) — 1" meter$7,095.00 one-timeRequires confirmationCity of Fort Worth (collected by City of Crowley)Fort Worth treats Crowley's wastewater, and Crowley assesses the City of Fort Worth wastewater impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $7,095 for a 1 in. meter (2.5 meter equivalents) for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025); other meter sizes pay by Fort Worth's meter equivalents.
- Wastewater Impact Fee (City of Crowley) — 1" meter$365.00 one-timeRequires confirmationCity of CrowleyCrowley's own wastewater impact fee is $365 for a 1 in. meter (2.5 living unit equivalents) under Ordinance 03-2024-519 (March 21, 2024); other meter sizes pay by living unit equivalent. Crowley also collects the City of Fort Worth wastewater impact fee, since Fort Worth treats Crowley's wastewater.
- Sewer Tap Fee (City of Crowley)Requires confirmationCity of Crowley
- City Impact Fee (City of Crowley, Industrial)Requires confirmationCity of Crowley
- County Impact Fee (Tarrant County, Industrial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Crowley: Office Impact Fees
Office development in Crowley pays no per-square-foot impact fees, but owes $22,002.50 in one-time water and sewer connection fees (rates sourced November 26, 2026).
For a 25,000 sq ft building, that comes to at least $22,002.50. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Impact Fee (City of Fort Worth, Crowley) — 1" meter, Wastewater Impact Fee (City of Crowley) — 1" meter, Water Impact Fee (City of Crowley) — 1" meter, and Water Impact Fee (City of Fort Worth, Crowley) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Tap Fee (City of Crowley) and Sewer Tap Fee (City of Crowley) are set by the utility and not published online. City Impact Fee (City of Crowley, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Crowley Impact Fee Schedule
- Water Impact Fee (City of Fort Worth, Crowley) — 1" meter$7,475.00 one-timeRequires confirmationCity of Fort Worth (collected by City of Crowley)As a Fort Worth wholesale water customer, Crowley assesses the City of Fort Worth water impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $7,475 for a 1 in. meter (2.5 meter equivalents) for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025); other meter sizes pay by Fort Worth's meter equivalents.
- Water Impact Fee (City of Crowley) — 1" meter$7,067.50 one-timeRequires confirmationCity of CrowleyCrowley's own water impact fee is $7,067.50 for a 1 in. meter (2.5 living unit equivalents) under Ordinance 03-2024-519 (March 21, 2024); other meter sizes pay by living unit equivalent. Crowley also collects the City of Fort Worth water impact fee on new connections.
- Water Tap Fee (City of Crowley)Requires confirmationCity of Crowley
- Wastewater Impact Fee (City of Fort Worth, Crowley) — 1" meter$7,095.00 one-timeRequires confirmationCity of Fort Worth (collected by City of Crowley)Fort Worth treats Crowley's wastewater, and Crowley assesses the City of Fort Worth wastewater impact fee on new connections in addition to its own fee. Fort Worth's current schedule is $7,095 for a 1 in. meter (2.5 meter equivalents) for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025); other meter sizes pay by Fort Worth's meter equivalents.
- Wastewater Impact Fee (City of Crowley) — 1" meter$365.00 one-timeRequires confirmationCity of CrowleyCrowley's own wastewater impact fee is $365 for a 1 in. meter (2.5 living unit equivalents) under Ordinance 03-2024-519 (March 21, 2024); other meter sizes pay by living unit equivalent. Crowley also collects the City of Fort Worth wastewater impact fee, since Fort Worth treats Crowley's wastewater.
- Sewer Tap Fee (City of Crowley)Requires confirmationCity of Crowley
- City Impact Fee (City of Crowley, Office)Requires confirmationCity of Crowley
- County Impact Fee (Tarrant County, Office)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Crowley Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Crowley Impact Fee FAQs
What are the total impact fees for a single-family home in Crowley, Texas?
A new single-family home in Crowley pays at least $10,001.00 per unit in combined impact fees (rates sourced November 26, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Crowley?
Commercial development in Crowley pays no per-square-foot impact fees, but owes $22,002.50 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Crowley charge its own impact fees?
Yes. Crowley levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Crowley. The schedule on this page shows every fee that applies to development in Crowley.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.