Skip to content
IMPACTFEES.ORG

Blue Mound, Texas Impact Fees

Blue Mound applies its own fee schedule. Tarrant County does not currently add county-level impact fees inside city limits. A new single-family home pays $7,978.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Blue Mound Impact Fees by Project Type

Blue Mound: Single-Family Impact Fees

A new single-family home in Blue Mound pays $7,978.00 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Fort Worth, Blue Mound) — 5/8" x 3/4" meter ($2,990.00), Sewer Impact Fee (City of Fort Worth, Blue Mound) — 5/8" x 3/4" meter ($2,838.00) and Water System Connection Fee (City of Blue Mound) ($1,000.00).

Sewer System Connection Fee (City of Blue Mound) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Blue Mound Impact Fee Schedule
Water$4,065.00
  • Water Impact Fee (City of Fort Worth, Blue Mound) — 5/8" x 3/4" meter
    City of Fort Worth (collected by City of Blue Mound)
    Blue Mound collects the City of Fort Worth water impact fee on every new water connection, at Fort Worth's current schedule: $2,990 for a 5/8 x 3/4 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025). Larger meters pay by meter equivalent.
    $2,990.00
  • Water System Connection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound charges a $1,000 city system connection fee for any connection to its water system, separate from the tap cost. The city installs residential water taps at cost plus 15% (cost plus 25% outside the city limits), and the meter is billed at cost plus 15% plus a 10-year cellular fee.
    $1,000.00
  • Water Tap Inspection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound charges a $75 inspection fee for each new water tap (Code Sec. A8.002); a failed inspection adds further inspection fees.
    $75.00
Sewer$3,913.00
  • Sewer Impact Fee (City of Fort Worth, Blue Mound) — 5/8" x 3/4" meter
    City of Fort Worth (collected by City of Blue Mound)
    Blue Mound collects the City of Fort Worth wastewater impact fee on every new sewer connection, at Fort Worth's current schedule: $2,838 for a 5/8 x 3/4 in. meter for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025). Larger meters pay by meter equivalent.
    $2,838.00
  • Sewer System Connection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound's $1,000 city system connection fee applies to any connection to its sewer system, separate from the tap cost. Residential sewer taps up to 4 inches are installed at cost plus 15% (cost plus 25% outside the city limits).
    $1,000.00Requires confirmation
  • Sewer Tap Inspection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound charges a $75 inspection fee for each new sewer tap (Code Sec. A8.002); a failed inspection adds further inspection fees.
    $75.00
City$0.00
  • City Impact Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound has not adopted its own impact fees or a parkland dedication fee; the only impact fees collected are the City of Fort Worth water and wastewater impact fees on new utility connections.
    $0.00
County$0.00
  • County Impact Fee (Tarrant County)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Blue Mound.
    $0.00
Total (Blue Mound): $7,978.00
Sources last checked Official fee schedules:City of Fort Worth (collected by City of Blue Mound) City of Blue Mound Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Blue Mound: Multifamily Impact Fees

A new multifamily unit in Blue Mound pays $7,978.00 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Fort Worth, Blue Mound, MF) — 5/8" x 3/4" meter ($2,990.00), Sewer Impact Fee (City of Fort Worth, Blue Mound, MF) — 5/8" x 3/4" meter ($2,838.00) and Water System Connection Fee (City of Blue Mound, MF) ($1,000.00).

Sewer System Connection Fee (City of Blue Mound, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Blue Mound Impact Fee Schedule
Water$4,065.00
  • Water Impact Fee (City of Fort Worth, Blue Mound, MF) — 5/8" x 3/4" meter
    City of Fort Worth (collected by City of Blue Mound)
    Blue Mound collects the City of Fort Worth water impact fee on every new water connection by meter size, not per dwelling unit: $2,990 for a 5/8 x 3/4 in. meter from October 1, 2026 (Fort Worth Ordinance 27745-06-2025), up to $23,920 for a 2 in. meter; larger master meters pay more ($65,033 for 3 in.). A building on one meter pays once for that meter.
    $2,990.00
  • Water System Connection Fee (City of Blue Mound, MF)
    City of Blue Mound
    Blue Mound charges a $1,000 city system connection fee for any connection to its water system, separate from the tap cost; a building on one connection pays once. Development projects tap with their own licensed and bonded contractor.
    $1,000.00
  • Water Tap Inspection Fee (City of Blue Mound, MF)
    City of Blue Mound
    Blue Mound charges a $75 inspection fee for each new water tap (Code Sec. A8.002); a building served by one tap pays once.
    $75.00
Sewer$3,913.00
  • Sewer Impact Fee (City of Fort Worth, Blue Mound, MF) — 5/8" x 3/4" meter
    City of Fort Worth (collected by City of Blue Mound)
    Blue Mound collects the City of Fort Worth wastewater impact fee on every new sewer connection by water meter size, not per dwelling unit: $2,838 for a 5/8 x 3/4 in. meter from October 1, 2026 (Fort Worth Ordinance 27745-06-2025), up to $22,704 for a 2 in. meter; larger master meters pay more ($61,727 for 3 in.). A building on one meter pays once for that meter.
    $2,838.00
  • Sewer System Connection Fee (City of Blue Mound, MF)
    City of Blue Mound
    Blue Mound's $1,000 city system connection fee applies to any connection to its sewer system, separate from the tap cost; a building on one connection pays once.
    $1,000.00Requires confirmation
  • Sewer Tap Inspection Fee (City of Blue Mound, MF)
    City of Blue Mound
    Blue Mound charges a $75 inspection fee for each new sewer tap (Code Sec. A8.002); a building served by one tap pays once.
    $75.00
City$0.00
  • City Impact Fee (City of Blue Mound, MF)
    City of Blue Mound
    Blue Mound has not adopted its own impact fees or a parkland dedication fee; the only impact fees collected are the City of Fort Worth water and wastewater impact fees on new utility connections.
    $0.00
County$0.00
  • County Impact Fee (Tarrant County, MF)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Blue Mound.
    $0.00
Total (Blue Mound): $7,978.00
Sources last checked Official fee schedules:City of Fort Worth (collected by City of Blue Mound) City of Blue Mound Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Blue Mound: Commercial Impact Fees

Commercial development in Blue Mound pays no per-square-foot impact fees, but owes $16,720.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).

For a 50,000 sq ft building, that comes to about $16,720.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Fort Worth, Blue Mound) — 1" meter ($7,475.00 one-time), Sewer Impact Fee (City of Fort Worth, Blue Mound) — 1" meter ($7,095.00 one-time) and Water System Connection Fee (City of Blue Mound) ($1,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer System Connection Fee (City of Blue Mound) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Blue Mound Impact Fee Schedule
Water$8,550.00 one-time
  • Water Impact Fee (City of Fort Worth, Blue Mound) — 1" meter
    City of Fort Worth
    Blue Mound collects the City of Fort Worth water impact fee on every new water connection, including commercial (City Code Sec. A8.002). A 1 in. meter (2.5 meter equivalents) pays $7,475 for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), in effect until Fort Worth's next impact fee study; other meter sizes pay by meter equivalent. Commercial projects install their own taps with a licensed contractor; Blue Mound also charges a $1,000 system connection fee and a $75 tap inspection fee.
    $7,475.00 one-time
  • Water System Connection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound charges a $1,000 city system connection fee for any connection to its water system, fire lines included, separate from the tap cost and the Fort Worth impact fee. Commercial projects install their own water taps with a licensed and bonded contractor.
    $1,000.00 one-time
  • Water Tap Inspection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound charges a $75 inspection fee for each water tap; a failed inspection adds further inspection fees.
    $75.00 one-time
Sewer$8,170.00 one-time
  • Sewer Impact Fee (City of Fort Worth, Blue Mound) — 1" meter
    City of Fort Worth
    Blue Mound collects the City of Fort Worth wastewater impact fee on every new sewer connection, including commercial (City Code Sec. A8.002). A 1 in. meter (2.5 meter equivalents) pays $7,095 for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), in effect until Fort Worth's next impact fee study; other meter sizes pay by meter equivalent. Blue Mound also charges a $1,000 system connection fee and a $75 tap inspection fee.
    $7,095.00 one-time
  • Sewer System Connection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound's $1,000 city system connection fee applies to any connection to its sewer system, separate from the tap cost and the Fort Worth wastewater impact fee. Commercial projects install their own sewer taps with a licensed and bonded contractor.
    $1,000.00 one-timeRequires confirmation
  • Sewer Tap Inspection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound charges a $75 inspection fee for each sewer tap; a failed inspection adds further inspection fees.
    $75.00 one-time
City$0.00
  • City Impact Fee (City of Blue Mound, Commercial)
    City of Blue Mound
    Blue Mound has not adopted its own roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. The only impact fees collected are the City of Fort Worth water and wastewater impact fees on new utility connections.
    $0.00
County$0.00
  • County Impact Fee (Tarrant County, Commercial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Blue Mound): $16,720.00 one-time (≈ $16,720.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth City of Blue Mound Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$79,996.13Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed fees
Blue Mound$16,720.00*this pageIncludes unconfirmed fees
Colleyville$779,981.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$1,344,710.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$619,398.63Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$387,250.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$182,057.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Blue Mound: Industrial Impact Fees

Industrial development in Blue Mound pays no per-square-foot impact fees, but owes $16,720.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).

For a 50,000 sq ft building, that comes to about $16,720.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Fort Worth, Blue Mound) — 1" meter ($7,475.00 one-time), Sewer Impact Fee (City of Fort Worth, Blue Mound) — 1" meter ($7,095.00 one-time) and Water System Connection Fee (City of Blue Mound) ($1,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer System Connection Fee (City of Blue Mound) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Blue Mound Impact Fee Schedule
Water$8,550.00 one-time
  • Water Impact Fee (City of Fort Worth, Blue Mound) — 1" meter
    City of Fort Worth
    Blue Mound collects the City of Fort Worth water impact fee on every new water connection, including commercial (City Code Sec. A8.002). A 1 in. meter (2.5 meter equivalents) pays $7,475 for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), in effect until Fort Worth's next impact fee study; other meter sizes pay by meter equivalent. Commercial projects install their own taps with a licensed contractor; Blue Mound also charges a $1,000 system connection fee and a $75 tap inspection fee.
    $7,475.00 one-time
  • Water System Connection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound charges a $1,000 city system connection fee for any connection to its water system, fire lines included, separate from the tap cost and the Fort Worth impact fee. Commercial projects install their own water taps with a licensed and bonded contractor.
    $1,000.00 one-time
  • Water Tap Inspection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound charges a $75 inspection fee for each water tap; a failed inspection adds further inspection fees.
    $75.00 one-time
Sewer$8,170.00 one-time
  • Sewer Impact Fee (City of Fort Worth, Blue Mound) — 1" meter
    City of Fort Worth
    Blue Mound collects the City of Fort Worth wastewater impact fee on every new sewer connection, including commercial (City Code Sec. A8.002). A 1 in. meter (2.5 meter equivalents) pays $7,095 for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), in effect until Fort Worth's next impact fee study; other meter sizes pay by meter equivalent. Blue Mound also charges a $1,000 system connection fee and a $75 tap inspection fee.
    $7,095.00 one-time
  • Sewer System Connection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound's $1,000 city system connection fee applies to any connection to its sewer system, separate from the tap cost and the Fort Worth wastewater impact fee. Commercial projects install their own sewer taps with a licensed and bonded contractor.
    $1,000.00 one-timeRequires confirmation
  • Sewer Tap Inspection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound charges a $75 inspection fee for each sewer tap; a failed inspection adds further inspection fees.
    $75.00 one-time
City$0.00
  • City Impact Fee (City of Blue Mound, Industrial)
    City of Blue Mound
    Blue Mound has not adopted its own roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. The only impact fees collected are the City of Fort Worth water and wastewater impact fees on new utility connections.
    $0.00
County$0.00
  • County Impact Fee (Tarrant County, Industrial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Blue Mound): $16,720.00 one-time (≈ $16,720.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth City of Blue Mound Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$31,402.63Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed fees
Blue Mound$16,720.00*this pageIncludes unconfirmed fees
Colleyville$286,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$533,068.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$220,048.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$187,350.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$95,882.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Blue Mound: Office Impact Fees

Office development in Blue Mound pays no per-square-foot impact fees, but owes $16,720.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).

For a 25,000 sq ft building, that comes to about $16,720.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Fort Worth, Blue Mound) — 1" meter ($7,475.00 one-time), Sewer Impact Fee (City of Fort Worth, Blue Mound) — 1" meter ($7,095.00 one-time) and Water System Connection Fee (City of Blue Mound) ($1,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer System Connection Fee (City of Blue Mound) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Blue Mound Impact Fee Schedule
Water$8,550.00 one-time
  • Water Impact Fee (City of Fort Worth, Blue Mound) — 1" meter
    City of Fort Worth
    Blue Mound collects the City of Fort Worth water impact fee on every new water connection, including commercial (City Code Sec. A8.002). A 1 in. meter (2.5 meter equivalents) pays $7,475 for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), in effect until Fort Worth's next impact fee study; other meter sizes pay by meter equivalent. Commercial projects install their own taps with a licensed contractor; Blue Mound also charges a $1,000 system connection fee and a $75 tap inspection fee.
    $7,475.00 one-time
  • Water System Connection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound charges a $1,000 city system connection fee for any connection to its water system, fire lines included, separate from the tap cost and the Fort Worth impact fee. Commercial projects install their own water taps with a licensed and bonded contractor.
    $1,000.00 one-time
  • Water Tap Inspection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound charges a $75 inspection fee for each water tap; a failed inspection adds further inspection fees.
    $75.00 one-time
Sewer$8,170.00 one-time
  • Sewer Impact Fee (City of Fort Worth, Blue Mound) — 1" meter
    City of Fort Worth
    Blue Mound collects the City of Fort Worth wastewater impact fee on every new sewer connection, including commercial (City Code Sec. A8.002). A 1 in. meter (2.5 meter equivalents) pays $7,095 for building permits on or after October 1, 2026 (Fort Worth Ordinance 27745-06-2025), in effect until Fort Worth's next impact fee study; other meter sizes pay by meter equivalent. Blue Mound also charges a $1,000 system connection fee and a $75 tap inspection fee.
    $7,095.00 one-time
  • Sewer System Connection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound's $1,000 city system connection fee applies to any connection to its sewer system, separate from the tap cost and the Fort Worth wastewater impact fee. Commercial projects install their own sewer taps with a licensed and bonded contractor.
    $1,000.00 one-timeRequires confirmation
  • Sewer Tap Inspection Fee (City of Blue Mound)
    City of Blue Mound
    Blue Mound charges a $75 inspection fee for each sewer tap; a failed inspection adds further inspection fees.
    $75.00 one-time
City$0.00
  • City Impact Fee (City of Blue Mound, Office)
    City of Blue Mound
    Blue Mound has not adopted its own roadway impact fee, and Texas law allows no city impact fee for parks, fire, police or general government. The only impact fees collected are the City of Fort Worth water and wastewater impact fees on new utility connections.
    $0.00
County$0.00
  • County Impact Fee (Tarrant County, Office)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Blue Mound): $16,720.00 one-time (≈ $16,720.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Fort Worth City of Blue Mound Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$38,824.38Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed fees
Blue Mound$16,720.00*this pageIncludes unconfirmed fees
Colleyville$262,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$650,198.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$241,027.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$121,175.00North Richland Hills$10,151.87*Includes unconfirmed feesPantego$9,045.00*Includes unconfirmed feesPelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$76,551.16Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Blue Mound Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Blue Mound Impact Fee FAQs

What are the total impact fees for a single-family home in Blue Mound, Texas?

A new single-family home in Blue Mound pays $7,978.00 per unit in combined impact fees (rates sourced November 4, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Blue Mound?

Commercial development in Blue Mound pays no per-square-foot impact fees, but owes $16,720.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Blue Mound charge its own impact fees?

Yes. Blue Mound levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Blue Mound. The schedule on this page shows every fee that applies to development in Blue Mound.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Tarrant County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.