Pantego applies its own fee schedule. Tarrant County does not currently add county-level impact fees inside city limits. A new single-family home pays $4,338.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Pantego Impact Fees by Project Type

Pantego: Single-Family Impact Fees

A new single-family home in Pantego pays $4,338.00 per unit in impact fees (rates sourced November 10, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Tap Fee (Town of Pantego) ($500.00), Water Meter Installation Fee (Town of Pantego) — 5/8" or 3/4" meter ($500.00) and Sewer Tap Fee (Town of Pantego) ($500.00).

Wastewater System Access Fee (City of Fort Worth, Pantego) — 5/8" x 3/4" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Pantego Impact Fee Schedule
Water$1,000.00
  • Water Tap Fee (Town of Pantego)
    Town of Pantego
    Pantego charges a $500 water tap fee, which authorizes the tie-in to town lines; the cost of making the tap is separate, and a street cut for a tap is $750. Pantego draws its water from its own wells and has no water impact fee. Pro rata charges ($8.05 per front foot for water) apply where the town's lines serve the lot.
    $500.00
  • Water Meter Installation Fee (Town of Pantego) — 5/8" or 3/4" meter
    Town of Pantego
    Pantego charges a one-time meter installation fee covering the meter, box and lids: $500 for a 5/8 in. or 3/4 in. meter, $700 for 1 in. and $900 for 1.5 in.; larger meters are priced on request.
    $500.00
Sewer$3,338.00
  • Wastewater System Access Fee (City of Fort Worth, Pantego) — 5/8" x 3/4" meter
    City of Fort Worth (collected by Town of Pantego)
    Pantego collects a wastewater system access fee at the current City of Fort Worth wastewater impact fee, paid before the building permit is issued: $2,838 for a 5/8 x 3/4 in. meter from October 1, 2026, rising to $595,980 for a 10 in. meter. Tap fees and deposits are additional.
    $2,838.00Requires confirmation
  • Sewer Tap Fee (Town of Pantego)
    Town of Pantego
    Pantego charges a $500 residential sewer tap fee ($750 commercial), which authorizes the tie-in to town lines; the cost of making the tap is separate. Pro rata charges ($7.40 per front foot for sewer) apply where the town's lines serve the lot.
    $500.00
City$0.00
County$0.00
  • County Impact Fee (Tarrant County)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Pantego.
    $0.00
Total (Pantego): $4,338.00
Sources last checked Official fee schedules:Town of Pantego City of Fort Worth (collected by Town of Pantego) Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pantego: Multifamily Impact Fees

A new multifamily unit in Pantego pays $4,338.00 per unit in impact fees (rates sourced November 10, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (Town of Pantego, MF) ($500.00), Water Tap Fee (Town of Pantego, MF) ($500.00) and Water Meter Installation Fee (Town of Pantego, MF) — 5/8" or 3/4" meter ($500.00).

Wastewater System Access Fee (City of Fort Worth, Pantego, MF) — 5/8" x 3/4" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Pantego Impact Fee Schedule
Water$1,000.00
  • Water Tap Fee (Town of Pantego, MF)
    Town of Pantego
    Pantego charges a $500 water tap fee per tap, which authorizes the tie-in to town lines; a building on one tap pays once. The cost of making the tap is separate. Pantego draws its water from its own wells and has no water impact fee.
    $500.00
  • Water Meter Installation Fee (Town of Pantego, MF) — 5/8" or 3/4" meter
    Town of Pantego
    Pantego's meter installation fee covers the meter, box and lids: $500 for a 5/8 in. or 3/4 in. meter, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size ($700 for 1 in., $900 for 1.5 in.; larger meters priced on request).
    $500.00
Sewer$3,338.00
  • Wastewater System Access Fee (City of Fort Worth, Pantego, MF) — 5/8" x 3/4" meter
    City of Fort Worth (collected by Town of Pantego)
    Pantego collects a wastewater system access fee at the current City of Fort Worth wastewater impact fee, priced by meter size: $2,838 for a 5/8 x 3/4 in. meter from October 1, 2026, the floor for a unit with its own meter. A building on one master meter pays once at that meter's size, $22,704 for a 2 in. meter and more for larger meters.
    $2,838.00Requires confirmation
  • Sewer Tap Fee (Town of Pantego, MF)
    Town of Pantego
    Pantego charges a $500 residential sewer tap fee per tap ($750 commercial); a building on one tap pays once.
    $500.00
City$0.00
County$0.00
  • County Impact Fee (Tarrant County, MF)
    Tarrant County
    Texas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Pantego.
    $0.00
Total (Pantego): $4,338.00
Sources last checked Official fee schedules:Town of Pantego City of Fort Worth (collected by Town of Pantego) Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pantego: Commercial Impact Fees

Commercial development in Pantego pays no per-square-foot impact fees, but owes $9,045.00 in one-time water and sewer connection fees (rates sourced November 10, 2026).

For a 50,000 sq ft building, that comes to about $9,045.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (Town of Pantego, Commercial) ($750.00 one-time), Water Meter Installation Fee (Town of Pantego) — 1" meter ($700.00 one-time) and Water Tap Fee (Town of Pantego) ($500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater System Access Fee (City of Fort Worth, Pantego) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Pantego Impact Fee Schedule
Water$1,200.00 one-time
  • Water Meter Installation Fee (Town of Pantego) — 1" meter
    Town of Pantego
    Pantego's meter installation fee covers the meter, box and lids: $700 for a 1-inch meter, $500 for 5/8 or 3/4 inch and $900 for 1.5 inch. Larger meters are priced on request.
    $700.00 one-time
  • Water Tap Fee (Town of Pantego)
    Town of Pantego
    Pantego charges a $500 water tap fee for the right to tap into town water lines; the cost of making the tap is separate. A meter installation fee by size also applies.
    $500.00 one-time
Sewer$7,845.00 one-time
  • Wastewater System Access Fee (City of Fort Worth, Pantego) — 1" meter
    City of Fort Worth
    Pantego collects a wastewater system access fee at the current City of Fort Worth wastewater impact fee, paid before the building permit is issued: $7,095 for a 1-inch meter from October 1, 2026, from $2,838 (5/8 x 3/4 inch) to $595,980 (10 inch). Tap fees and deposits are additional.
    $7,095.00 one-timeRequires confirmation
  • Sewer Tap Fee (Town of Pantego, Commercial)
    Town of Pantego
    Pantego charges commercial customers a $750 sewer tap fee for the right to tap into town sewer lines; the cost of making the tap is separate. The Fort Worth wastewater access fee is also due before the building permit.
    $750.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Tarrant County, Commercial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Pantego): $9,045.00 one-time (≈ $9,045.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Pantego City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$79,996.13Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$779,981.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$1,344,710.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$619,398.63Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$387,250.00North Richland Hills$10,151.87*Includes unconfirmed fees
Pantego$9,045.00*this pageIncludes unconfirmed fees
Pelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$182,057.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Pantego: Industrial Impact Fees

Industrial development in Pantego pays no per-square-foot impact fees, but owes $9,045.00 in one-time water and sewer connection fees (rates sourced November 10, 2026).

For a 50,000 sq ft building, that comes to about $9,045.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (Town of Pantego, Commercial) ($750.00 one-time), Water Meter Installation Fee (Town of Pantego) — 1" meter ($700.00 one-time) and Water Tap Fee (Town of Pantego) ($500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater System Access Fee (City of Fort Worth, Pantego) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Pantego Impact Fee Schedule
Water$1,200.00 one-time
  • Water Meter Installation Fee (Town of Pantego) — 1" meter
    Town of Pantego
    Pantego's meter installation fee covers the meter, box and lids: $700 for a 1-inch meter, $500 for 5/8 or 3/4 inch and $900 for 1.5 inch. Larger meters are priced on request.
    $700.00 one-time
  • Water Tap Fee (Town of Pantego)
    Town of Pantego
    Pantego charges a $500 water tap fee for the right to tap into town water lines; the cost of making the tap is separate. A meter installation fee by size also applies.
    $500.00 one-time
Sewer$7,845.00 one-time
  • Wastewater System Access Fee (City of Fort Worth, Pantego) — 1" meter
    City of Fort Worth
    Pantego collects a wastewater system access fee at the current City of Fort Worth wastewater impact fee, paid before the building permit is issued: $7,095 for a 1-inch meter from October 1, 2026, from $2,838 (5/8 x 3/4 inch) to $595,980 (10 inch). Tap fees and deposits are additional.
    $7,095.00 one-timeRequires confirmation
  • Sewer Tap Fee (Town of Pantego, Commercial)
    Town of Pantego
    Pantego charges commercial customers a $750 sewer tap fee for the right to tap into town sewer lines; the cost of making the tap is separate. The Fort Worth wastewater access fee is also due before the building permit.
    $750.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Tarrant County, Industrial)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Pantego): $9,045.00 one-time (≈ $9,045.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Pantego City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$31,402.63Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$286,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$533,068.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$220,048.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$187,350.00North Richland Hills$10,151.87*Includes unconfirmed fees
Pantego$9,045.00*this pageIncludes unconfirmed fees
Pelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$95,882.41Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Pantego: Office Impact Fees

Office development in Pantego pays no per-square-foot impact fees, but owes $9,045.00 in one-time water and sewer connection fees (rates sourced November 10, 2026).

For a 25,000 sq ft building, that comes to about $9,045.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (Town of Pantego, Commercial) ($750.00 one-time), Water Meter Installation Fee (Town of Pantego) — 1" meter ($700.00 one-time) and Water Tap Fee (Town of Pantego) ($500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater System Access Fee (City of Fort Worth, Pantego) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Pantego Impact Fee Schedule
Water$1,200.00 one-time
  • Water Meter Installation Fee (Town of Pantego) — 1" meter
    Town of Pantego
    Pantego's meter installation fee covers the meter, box and lids: $700 for a 1-inch meter, $500 for 5/8 or 3/4 inch and $900 for 1.5 inch. Larger meters are priced on request.
    $700.00 one-time
  • Water Tap Fee (Town of Pantego)
    Town of Pantego
    Pantego charges a $500 water tap fee for the right to tap into town water lines; the cost of making the tap is separate. A meter installation fee by size also applies.
    $500.00 one-time
Sewer$7,845.00 one-time
  • Wastewater System Access Fee (City of Fort Worth, Pantego) — 1" meter
    City of Fort Worth
    Pantego collects a wastewater system access fee at the current City of Fort Worth wastewater impact fee, paid before the building permit is issued: $7,095 for a 1-inch meter from October 1, 2026, from $2,838 (5/8 x 3/4 inch) to $595,980 (10 inch). Tap fees and deposits are additional.
    $7,095.00 one-timeRequires confirmation
  • Sewer Tap Fee (Town of Pantego, Commercial)
    Town of Pantego
    Pantego charges commercial customers a $750 sewer tap fee for the right to tap into town sewer lines; the cost of making the tap is separate. The Fort Worth wastewater access fee is also due before the building permit.
    $750.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Tarrant County, Office)
    Tarrant County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
    $0.00
Total (Pantego): $9,045.00 one-time (≈ $9,045.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Pantego City of Fort Worth Tarrant County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Tarrant County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Tarrant County$21,830.00*Includes unconfirmed feesArlington$38,824.38Includes unconfirmed feesAzle$14,796.21*Includes unconfirmed feesBedford$0.00Includes unconfirmed feesBenbrook$18,134.00*Includes unconfirmed feesBlue Mound$16,720.00*Includes unconfirmed feesColleyville$262,631.00Includes unconfirmed feesCrowley$22,002.50*Includes unconfirmed feesDalworthington Gardens$130.00*Includes unconfirmed feesEdgecliff Village$16,890.00*Euless$5,006.50*Everman$4,628.28*Includes unconfirmed feesForest Hill$16,027.00*Includes unconfirmed feesFort Worth$650,198.00Grapevine$1,575.00*Includes unconfirmed feesHaltom City$7,280.72*Includes unconfirmed feesHaslet$22,941.00*Includes unconfirmed feesHurst$18,987.00*Includes unconfirmed feesKeller$241,027.13Includes unconfirmed feesKennedale$7,658.00*Includes unconfirmed feesLake Worth$17,729.00*Includes unconfirmed feesLakeside (Tarrant County)$2,000.00*Includes unconfirmed feesMansfield$121,175.00North Richland Hills$10,151.87*Includes unconfirmed fees
Pantego$9,045.00*this pageIncludes unconfirmed fees
Pelican Bay$1,450.00*Includes unconfirmed feesRichland Hills$15,070.00*River Oaks$9,695.00*Includes unconfirmed feesSaginaw$14,895.00*Includes unconfirmed feesSansom Park$7,690.00*Includes unconfirmed feesSouthlake$76,551.16Includes unconfirmed feesWatauga$7,965.00*Includes unconfirmed feesWestlake$8,500.00*Includes unconfirmed feesWestover Hills$14,570.00*Includes unconfirmed feesWestworth Village$15,970.00*Includes unconfirmed feesWhite Settlement$20,835.00*Includes unconfirmed fees

Pantego Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Pantego Impact Fee FAQs

What are the total impact fees for a single-family home in Pantego, Texas?

A new single-family home in Pantego pays $4,338.00 per unit in combined impact fees (rates sourced November 10, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Pantego?

Commercial development in Pantego pays no per-square-foot impact fees, but owes $9,045.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Pantego charge its own impact fees?

Yes. Pantego levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Pantego. The schedule on this page shows every fee that applies to development in Pantego.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Tarrant County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.