Everman Impact Fees by Project Type
Everman: Single-Family Impact Fees
A new single-family home in Everman pays at least $4,526.72 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter and Inspection Fee (City of Everman) — 5/8" or 3/4" meter ($526.72).
Water Impact Fee (City of Everman) and Sewer Impact Fee (City of Everman) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Tap Fee (City of Everman) is set by the utility and not published online. City Impact Fee (City of Everman) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Everman Impact Fee Schedule
- Water Impact Fee (City of Everman)$2,000.00Requires confirmationCity of EvermanEverman adopted water and sewer impact fees in 2022 (Ordinance 781) under its 2022-2032 capital improvements plan, set per equivalent dwelling unit based on a 5/8 x 3/4 in. meter, with larger meters paying more.
- Water Meter and Inspection Fee (City of Everman) — 5/8" or 3/4" meter$526.72City of EvermanFor a new water service where the contractor makes the physical tap, Everman charges a meter and inspection fee covering the meter plus a 20% administrative markup: $526.72 for a 5/8 or 3/4 in. meter (fee schedule effective September 1, 2026).
- Sewer Impact Fee (City of Everman)$2,000.00Requires confirmationCity of EvermanEverman adopted a sanitary sewer impact fee in 2022 (Ordinance 781), set per equivalent dwelling unit based on a 5/8 x 3/4 in. meter. Fort Worth treats Everman's wastewater under a long-term contract.
- Sewer Tap Fee (City of Everman)Requires confirmationCity of Everman
- City Impact Fee (City of Everman)Requires confirmationCity of EvermanEverman has no roadway or drainage impact fee: its impact fee ordinance (Ordinance 781, 2022) covers water and sewer only.
- County Impact Fee (Tarrant County)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Everman.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Everman: Multifamily Impact Fees
A new multifamily unit in Everman pays at least $4,526.72 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter and Inspection Fee (City of Everman, MF) — 5/8" or 3/4" meter ($526.72).
Water Impact Fee (City of Everman, MF) and Sewer Impact Fee (City of Everman, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Tap Fee (City of Everman, MF) is set by the utility and not published online. City Impact Fee (City of Everman, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Everman Impact Fee Schedule
- Water Impact Fee (City of Everman, MF)$2,000.00Requires confirmationCity of EvermanEverman's water impact fee (Ordinance 781, 2022) is set per equivalent dwelling unit based on a 5/8 x 3/4 in. meter; the amount shown is that one-meter floor, and a master-metered building pays by its meter size.
- Water Meter and Inspection Fee (City of Everman, MF) — 5/8" or 3/4" meter$526.72City of EvermanEverman charges a meter and inspection fee per new water service: $526.72 for a 5/8 or 3/4 in. meter (fee schedule effective September 1, 2026). A building on one meter pays once at that meter's size.
- Sewer Impact Fee (City of Everman, MF)$2,000.00Requires confirmationCity of EvermanEverman's sanitary sewer impact fee (Ordinance 781, 2022) is set per equivalent dwelling unit based on a 5/8 x 3/4 in. meter; the amount shown is that one-meter floor, and a master-metered building pays by its meter size.
- Sewer Tap Fee (City of Everman, MF)Requires confirmationCity of Everman
- City Impact Fee (City of Everman, MF)Requires confirmationCity of EvermanEverman has no roadway or drainage impact fee: its impact fee ordinance (Ordinance 781, 2022) covers water and sewer only.
- County Impact Fee (Tarrant County, MF)$0.00Tarrant CountyTexas counties have no authority to levy development impact fees (Local Government Code Chapter 395), so no county impact fee applies in Everman.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Everman: Commercial Impact Fees
Commercial development in Everman pays no per-square-foot impact fees, but owes $4,628.28 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to at least $4,628.28. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter and Inspection Fee (City of Everman) — 1" meter ($628.28 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (City of Everman) and Water Impact Fee (City of Everman) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Tap Fee (City of Everman) is set by the utility and not published online. City Impact Fee (City of Everman, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Everman Impact Fee Schedule
- Water Impact Fee (City of Everman)$2,000.00 one-timeRequires confirmationCity of EvermanEverman adopted water impact fees in 2022 (Ordinance 781) under its 2022-2032 capital improvements plan, charged per service unit based on a 5/8 x 3/4 in. meter. A commercial connection pays one service unit for each meter equivalent of the meter the city requires, so a 1 in. or larger meter pays a multiple of the amount shown. The fee in effect when the plat was recorded applies.
- Water Meter and Inspection Fee (City of Everman) — 1" meter$628.28 one-timeCity of EvermanEverman charges a meter and inspection fee on new water service connections where the contractor makes the tap: $628.28 for a 1 in. meter, from $526.72 for a 5/8 or 3/4 in. meter to $3,222.42 for a 4 in. meter, effective September 1, 2026 (Ordinance 855). It covers the city's meter cost plus a 20% administrative markup.
- Sewer Impact Fee (City of Everman)$2,000.00 one-timeRequires confirmationCity of EvermanEverman adopted sanitary sewer impact fees in 2022 (Ordinance 781), charged per service unit based on the water meter size, with a 5/8 x 3/4 in. meter as one unit. A commercial connection with a 1 in. or larger meter pays a multiple of the amount shown. The fee in effect when the plat was recorded applies.
- Sewer Tap Fee (City of Everman)Requires confirmationCity of Everman
- City Impact Fee (City of Everman, Commercial)Requires confirmationCity of EvermanEverman's adopted impact fees (Ordinance 781, 2022) cover water and sanitary sewer only, and Texas law allows no city impact fee for parks, fire, police or general government.
- County Impact Fee (Tarrant County, Commercial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Everman: Industrial Impact Fees
Industrial development in Everman pays no per-square-foot impact fees, but owes $4,628.28 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to at least $4,628.28. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter and Inspection Fee (City of Everman) — 1" meter ($628.28 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (City of Everman) and Water Impact Fee (City of Everman) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Tap Fee (City of Everman) is set by the utility and not published online. City Impact Fee (City of Everman, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Everman Impact Fee Schedule
- Water Impact Fee (City of Everman)$2,000.00 one-timeRequires confirmationCity of EvermanEverman adopted water impact fees in 2022 (Ordinance 781) under its 2022-2032 capital improvements plan, charged per service unit based on a 5/8 x 3/4 in. meter. A commercial connection pays one service unit for each meter equivalent of the meter the city requires, so a 1 in. or larger meter pays a multiple of the amount shown. The fee in effect when the plat was recorded applies.
- Water Meter and Inspection Fee (City of Everman) — 1" meter$628.28 one-timeCity of EvermanEverman charges a meter and inspection fee on new water service connections where the contractor makes the tap: $628.28 for a 1 in. meter, from $526.72 for a 5/8 or 3/4 in. meter to $3,222.42 for a 4 in. meter, effective September 1, 2026 (Ordinance 855). It covers the city's meter cost plus a 20% administrative markup.
- Sewer Impact Fee (City of Everman)$2,000.00 one-timeRequires confirmationCity of EvermanEverman adopted sanitary sewer impact fees in 2022 (Ordinance 781), charged per service unit based on the water meter size, with a 5/8 x 3/4 in. meter as one unit. A commercial connection with a 1 in. or larger meter pays a multiple of the amount shown. The fee in effect when the plat was recorded applies.
- Sewer Tap Fee (City of Everman)Requires confirmationCity of Everman
- City Impact Fee (City of Everman, Industrial)Requires confirmationCity of EvermanEverman's adopted impact fees (Ordinance 781, 2022) cover water and sanitary sewer only, and Texas law allows no city impact fee for parks, fire, police or general government.
- County Impact Fee (Tarrant County, Industrial)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Everman: Office Impact Fees
Office development in Everman pays no per-square-foot impact fees, but owes $4,628.28 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 25,000 sq ft building, that comes to at least $4,628.28. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter and Inspection Fee (City of Everman) — 1" meter ($628.28 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (City of Everman) and Water Impact Fee (City of Everman) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Tap Fee (City of Everman) is set by the utility and not published online. City Impact Fee (City of Everman, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Everman Impact Fee Schedule
- Water Impact Fee (City of Everman)$2,000.00 one-timeRequires confirmationCity of EvermanEverman adopted water impact fees in 2022 (Ordinance 781) under its 2022-2032 capital improvements plan, charged per service unit based on a 5/8 x 3/4 in. meter. A commercial connection pays one service unit for each meter equivalent of the meter the city requires, so a 1 in. or larger meter pays a multiple of the amount shown. The fee in effect when the plat was recorded applies.
- Water Meter and Inspection Fee (City of Everman) — 1" meter$628.28 one-timeCity of EvermanEverman charges a meter and inspection fee on new water service connections where the contractor makes the tap: $628.28 for a 1 in. meter, from $526.72 for a 5/8 or 3/4 in. meter to $3,222.42 for a 4 in. meter, effective September 1, 2026 (Ordinance 855). It covers the city's meter cost plus a 20% administrative markup.
- Sewer Impact Fee (City of Everman)$2,000.00 one-timeRequires confirmationCity of EvermanEverman adopted sanitary sewer impact fees in 2022 (Ordinance 781), charged per service unit based on the water meter size, with a 5/8 x 3/4 in. meter as one unit. A commercial connection with a 1 in. or larger meter pays a multiple of the amount shown. The fee in effect when the plat was recorded applies.
- Sewer Tap Fee (City of Everman)Requires confirmationCity of Everman
- City Impact Fee (City of Everman, Office)Requires confirmationCity of EvermanEverman's adopted impact fees (Ordinance 781, 2022) cover water and sanitary sewer only, and Texas law allows no city impact fee for parks, fire, police or general government.
- County Impact Fee (Tarrant County, Office)$0.00Tarrant CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Tarrant County.
Where in Tarrant County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Everman Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Everman Impact Fee FAQs
What are the total impact fees for a single-family home in Everman, Texas?
A new single-family home in Everman pays at least $4,526.72 per unit in combined impact fees (rates sourced November 4, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Everman?
Commercial development in Everman pays no per-square-foot impact fees, but owes $4,628.28 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Everman charge its own impact fees?
Yes. Everman levies its own municipal impact or utility fees. Tarrant County does not currently add county-level impact fees inside Everman. The schedule on this page shows every fee that applies to development in Everman.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Tarrant County impact fees page.