Impact fees in Broward County depend on where you build. This page details the rates for unincorporated Broward County: $12,409.00 per single-family unit as of July 12, 2026. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Broward County impact fees by project type

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Broward County: Single-Family Impact Fees

A new single-family home in unincorporated Broward County pays $12,409.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (Broward County) ($8,809.00), Wastewater Capital Contribution (Broward County WWS - 1.0 ERU) ($2,010.00) and Water Capital Contribution (Broward County WWS - 1.0 ERU) ($1,590.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,590.00
  • Water Capital Contribution (Broward County WWS - 1.0 ERU)
    Broward County Water & Wastewater Services
    Broward County WWS water capital contribution: $1,590/ERU (1 ERU = 185 gpd), FY2026, Broward Admin. Code §38.18. SFR = 1.0 ERU. WWS retail serves unincorporated Broward + contract cities. Source: broward.org WaterServices Capital Recovery.
    $1,590.00
Sewer$2,010.00
City$0.00
  • City Impact Fees (Broward County - Unincorporated)
    Broward County
    Unincorporated Broward has no municipal government and therefore no municipal impact fee. County overlay fees (school; road/transportation and park when not suspended) apply directly. Confirmed $0 — not a gap.
    $0.00
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee. Broward Code §5-182.9(b)(2)c, Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022, unchanged since, no CPI/annual index. Countywide, all residential. SF 3-or-fewer BR = $8,809 (default); 4-or-more BR = $11,070. Since Nov 2025 paid directly to the School Board of Broward County via online portal. Only Broward county impact fee still collected — Road/Transportation Concurrency and Park suspended by Ord. 2024-34 eff. 10/1/2024. Source: broward.org School Impact Fee Schedule; amounts verified current 7/25/2026.
    $8,809.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward Ord. 2024-34 suspended Road Impact Fees and Transportation Concurrency Assessments eff. 10/1/2024; nothing collected unless a §163.31801 F.S. impact-fee study is accepted by the BOCC. No study accepted as of 7/25/2026, so $0 payable. Prior regime (pre-suspension): cost-per-trip across 46 zones ($41.67–$1,679.88/trip) × ITE trip generation. Source: broward.org DEReview.
    $0.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    SUSPENDED. Broward Ord. 2024-34 suspended Regional Park and BMSD Local Park impact fees eff. 10/1/2024; $0 collected pending an accepted impact-fee study. None accepted as of 7/25/2026. Prior flat schedule under Ord. 92-1 (e.g. SFR 3BR $514.12 + 1% admin; apt 2+BR $367.23 + 1% admin). Source: broward.org DEReview.
    $0.00
Total (unincorporated Broward County): $12,409.00

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Broward County: Multifamily Impact Fees

A new multifamily unit in unincorporated Broward County pays $4,020.20 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (Broward County, MF) ($1,475.00), Wastewater Capital Contribution (Broward County WWS, MF - 0.707 ERU/unit) ($1,421.07) and Water Capital Contribution (Broward County WWS, MF - 0.707 ERU/unit) ($1,124.13).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,124.13
Sewer$1,421.07
City$0.00
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee (MF), §5-182.9(b)(2)c / Ord. 2020-36, schedule eff. 1/1/2022, unchanged. Canonical MF unit (2BR, 1,000 sf, 4-story) = Mid-Rise 2-or-more BR = $1,475 (default). Other MF tiers: Mid-Rise <=1BR $375; Garden <=1BR $480 / 2BR $4,918 / 3+BR $5,901; High-Rise $461. Paid to School Board (online portal since Nov 2025). Only county impact fee still collected. Verified current 7/25/2026.
    $1,475.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Ord. 2024-34 suspended Road Impact/Transportation Concurrency eff. 10/1/2024; $0 payable, no study accepted as of 7/25/2026. Source: broward.org DEReview.
    $0.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    SUSPENDED. Ord. 2024-34 suspended Regional/Local Park fees eff. 10/1/2024; $0, no study accepted as of 7/25/2026. Prior apt 2+BR $367.23 + 1% admin under Ord. 92-1. Source: broward.org DEReview.
    $0.00
Total (unincorporated Broward County): $4,020.20

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Broward County: Commercial Impact Fees

Commercial development in unincorporated Broward County pays no per-square-foot impact fees, but owes $3,600.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $3,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Capital Recovery Charge (Broward County WWS) — per ERU ($2,010.00 one-time) and Water Capital Recovery Charge (Broward County WWS) — per ERU ($1,590.00 one-time).

View the full fee schedule
Water$1,590.00 one-time
  • Water Capital Recovery Charge (Broward County WWS) — per ERU
    Broward County Water & Wastewater Services
    $1,590 PER ERU. Provider for unincorporated Broward = Broward County Water & Wastewater Services (WWS), Public Works Dept. Engineering Div., 2555 W. Copans Rd., Pompano Beach. WWS Capital Recovery Charge (its capital contribution / plant capacity charge), verbatim: '1. Water: All classes, all meter sizes: $1,590 per ERU'. NO METER-SIZE TABLE — explicitly 'all meter sizes'; meter size is SIZED FROM the ERU count, not the basis for it. Authority: Broward County Administrative Code §38.18 (Water and Wastewater Services Rates, Fees, and Charges); FY2026 schedule effective with all services rendered on or after 10-1-2025. Nonres ERUs are derived from GFA via the WWS Equivalent Residential Unit Factor Schedule (Water & Wastewater Engineering Division, 4-4-2017; first issued 1996), per 1,000 SF: Merchandising/retail (C05) 0.185; Office (C12) 0.212; Warehouse mixed-use, incl. light non-water-intensive manufacturing (C06) 0.168; Warehouse bulk (C07) 0.130; Self-Service Storage (C08) 0.043. 'ERUs are determined based on final build-out design capacity'; GFA = gross area measured by outside walls × number of stories; unlisted uses convert at 1 ERU = 185 gpd average water demand (or 246 gpd max day); ERU credit given when a new use replaces an existing use on an open account. 1 ERU water = 185 gpd. Amount stored = the published 1-ERU rate. ERU factor schedule: https://www.broward.org/WaterServices/Engineering/Documents/WWSEquivalentResidentialUnitFactors.pdf . Contact: WWS Engineering 954-831-0745; Customer Service 954-831-3250.
    $1,590.00 one-time
Sewer$2,010.00 one-time
  • Wastewater Capital Recovery Charge (Broward County WWS) — per ERU
    Broward County Water & Wastewater Services
    $2,010 PER ERU. Provider = Broward County Water & Wastewater Services (WWS). WWS Capital Recovery Charge, verbatim: '2. Wastewater: All classes, all meter sizes $2,010 per ERU'. NO METER-SIZE TABLE. Authority: Broward County Administrative Code §38.18; FY2026 schedule effective 10-1-2025. Nonres ERUs from the WWS Equivalent Residential Unit Factor Schedule (4-4-2017), per 1,000 SF GFA: Merchandising/retail (C05) 0.185; Office (C12) 0.212; Warehouse mixed-use (C06) 0.168; Warehouse bulk (C07) 0.130. Wastewater ERUs equal water ERUs for uses that consume water. Per Broward: '1 ERU wastewater is estimated at 147 gallons per day (gpd), requiring a plant capacity of 209 gpd.' Amount stored = the published 1-ERU rate. ERU factor schedule: https://www.broward.org/WaterServices/Engineering/Documents/WWSEquivalentResidentialUnitFactors.pdf . Contact: WWS Engineering 954-831-0745.
    $2,010.00 one-time
City$0.00
  • City Impact Fees (Broward County - Unincorporated, Commercial)
    Broward County
    CONFIRMED $0 — Not applicable. Unincorporated Broward County has no municipal government, so no city-level impact fee exists by definition. The county overlay is the sole impact fee applicable here and it is suspended (see the County-type records for this jurisdiction). Placeholder entered per project rule requiring a City record in every category. Contact: Broward Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (unincorporated Broward County): $3,600.00 one-time (≈ $3,600.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Broward County Water & Wastewater Services Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Broward County: Industrial Impact Fees

Industrial development in unincorporated Broward County pays no per-square-foot impact fees, but owes $3,600.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $3,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Capital Recovery Charge (Broward County WWS) — per ERU ($2,010.00 one-time) and Water Capital Recovery Charge (Broward County WWS) — per ERU ($1,590.00 one-time).

View the full fee schedule
Water$1,590.00 one-time
  • Water Capital Recovery Charge (Broward County WWS) — per ERU
    Broward County Water & Wastewater Services
    $1,590 PER ERU. Provider for unincorporated Broward = Broward County Water & Wastewater Services (WWS), Public Works Dept. Engineering Div., 2555 W. Copans Rd., Pompano Beach. WWS Capital Recovery Charge (its capital contribution / plant capacity charge), verbatim: '1. Water: All classes, all meter sizes: $1,590 per ERU'. NO METER-SIZE TABLE — explicitly 'all meter sizes'; meter size is SIZED FROM the ERU count, not the basis for it. Authority: Broward County Administrative Code §38.18 (Water and Wastewater Services Rates, Fees, and Charges); FY2026 schedule effective with all services rendered on or after 10-1-2025. Nonres ERUs are derived from GFA via the WWS Equivalent Residential Unit Factor Schedule (Water & Wastewater Engineering Division, 4-4-2017; first issued 1996), per 1,000 SF: Merchandising/retail (C05) 0.185; Office (C12) 0.212; Warehouse mixed-use, incl. light non-water-intensive manufacturing (C06) 0.168; Warehouse bulk (C07) 0.130; Self-Service Storage (C08) 0.043. 'ERUs are determined based on final build-out design capacity'; GFA = gross area measured by outside walls × number of stories; unlisted uses convert at 1 ERU = 185 gpd average water demand (or 246 gpd max day); ERU credit given when a new use replaces an existing use on an open account. 1 ERU water = 185 gpd. Amount stored = the published 1-ERU rate. ERU factor schedule: https://www.broward.org/WaterServices/Engineering/Documents/WWSEquivalentResidentialUnitFactors.pdf . Contact: WWS Engineering 954-831-0745; Customer Service 954-831-3250.
    $1,590.00 one-time
Sewer$2,010.00 one-time
  • Wastewater Capital Recovery Charge (Broward County WWS) — per ERU
    Broward County Water & Wastewater Services
    $2,010 PER ERU. Provider = Broward County Water & Wastewater Services (WWS). WWS Capital Recovery Charge, verbatim: '2. Wastewater: All classes, all meter sizes $2,010 per ERU'. NO METER-SIZE TABLE. Authority: Broward County Administrative Code §38.18; FY2026 schedule effective 10-1-2025. Nonres ERUs from the WWS Equivalent Residential Unit Factor Schedule (4-4-2017), per 1,000 SF GFA: Merchandising/retail (C05) 0.185; Office (C12) 0.212; Warehouse mixed-use (C06) 0.168; Warehouse bulk (C07) 0.130. Wastewater ERUs equal water ERUs for uses that consume water. Per Broward: '1 ERU wastewater is estimated at 147 gallons per day (gpd), requiring a plant capacity of 209 gpd.' Amount stored = the published 1-ERU rate. ERU factor schedule: https://www.broward.org/WaterServices/Engineering/Documents/WWSEquivalentResidentialUnitFactors.pdf . Contact: WWS Engineering 954-831-0745.
    $2,010.00 one-time
City$0.00
  • City Impact Fees (Broward County - Unincorporated, Industrial)
    Broward County
    CONFIRMED $0 — Not applicable. Unincorporated Broward County has no municipal government, so no city-level impact fee exists by definition. The county overlay is the sole impact fee applicable here and it is suspended (see the County-type records for this jurisdiction). Placeholder entered per project rule requiring a City record in every category. Contact: Broward Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (unincorporated Broward County): $3,600.00 one-time (≈ $3,600.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Broward County Water & Wastewater Services Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Broward County: Office Impact Fees

Office development in unincorporated Broward County pays no per-square-foot impact fees, but owes $3,600.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $3,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Capital Recovery Charge (Broward County WWS) — per ERU ($2,010.00 one-time) and Water Capital Recovery Charge (Broward County WWS) — per ERU ($1,590.00 one-time).

View the full fee schedule
Water$1,590.00 one-time
  • Water Capital Recovery Charge (Broward County WWS) — per ERU
    Broward County Water & Wastewater Services
    $1,590 PER ERU. Provider for unincorporated Broward = Broward County Water & Wastewater Services (WWS), Public Works Dept. Engineering Div., 2555 W. Copans Rd., Pompano Beach. WWS Capital Recovery Charge (its capital contribution / plant capacity charge), verbatim: '1. Water: All classes, all meter sizes: $1,590 per ERU'. NO METER-SIZE TABLE — explicitly 'all meter sizes'; meter size is SIZED FROM the ERU count, not the basis for it. Authority: Broward County Administrative Code §38.18 (Water and Wastewater Services Rates, Fees, and Charges); FY2026 schedule effective with all services rendered on or after 10-1-2025. Nonres ERUs are derived from GFA via the WWS Equivalent Residential Unit Factor Schedule (Water & Wastewater Engineering Division, 4-4-2017; first issued 1996), per 1,000 SF: Merchandising/retail (C05) 0.185; Office (C12) 0.212; Warehouse mixed-use, incl. light non-water-intensive manufacturing (C06) 0.168; Warehouse bulk (C07) 0.130; Self-Service Storage (C08) 0.043. 'ERUs are determined based on final build-out design capacity'; GFA = gross area measured by outside walls × number of stories; unlisted uses convert at 1 ERU = 185 gpd average water demand (or 246 gpd max day); ERU credit given when a new use replaces an existing use on an open account. 1 ERU water = 185 gpd. Amount stored = the published 1-ERU rate. ERU factor schedule: https://www.broward.org/WaterServices/Engineering/Documents/WWSEquivalentResidentialUnitFactors.pdf . Contact: WWS Engineering 954-831-0745; Customer Service 954-831-3250.
    $1,590.00 one-time
Sewer$2,010.00 one-time
  • Wastewater Capital Recovery Charge (Broward County WWS) — per ERU
    Broward County Water & Wastewater Services
    $2,010 PER ERU. Provider = Broward County Water & Wastewater Services (WWS). WWS Capital Recovery Charge, verbatim: '2. Wastewater: All classes, all meter sizes $2,010 per ERU'. NO METER-SIZE TABLE. Authority: Broward County Administrative Code §38.18; FY2026 schedule effective 10-1-2025. Nonres ERUs from the WWS Equivalent Residential Unit Factor Schedule (4-4-2017), per 1,000 SF GFA: Merchandising/retail (C05) 0.185; Office (C12) 0.212; Warehouse mixed-use (C06) 0.168; Warehouse bulk (C07) 0.130. Wastewater ERUs equal water ERUs for uses that consume water. Per Broward: '1 ERU wastewater is estimated at 147 gallons per day (gpd), requiring a plant capacity of 209 gpd.' Amount stored = the published 1-ERU rate. ERU factor schedule: https://www.broward.org/WaterServices/Engineering/Documents/WWSEquivalentResidentialUnitFactors.pdf . Contact: WWS Engineering 954-831-0745.
    $2,010.00 one-time
City$0.00
  • City Impact Fees (Broward County - Unincorporated, Office)
    Broward County
    CONFIRMED $0 — Not applicable. Unincorporated Broward County has no municipal government, so no city-level impact fee exists by definition. The county overlay is the sole impact fee applicable here and it is suspended (see the County-type records for this jurisdiction). Placeholder entered per project rule requiring a City record in every category. Contact: Broward Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (unincorporated Broward County): $3,600.00 one-time (≈ $3,600.00 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Broward County Water & Wastewater Services Broward County

Estimate your project in Broward County

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are single-family impact fees in Broward County, Florida?

A new single-family home in unincorporated Broward County pays $12,409.00 per unit in impact fees (rates sourced July 12, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Broward County?

Multifamily development in unincorporated Broward County pays $4,020.20 per unit in impact fees (rates sourced July 12, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Broward County?

Commercial development in unincorporated Broward County pays no per-square-foot impact fees, but owes $3,600.00 in one-time water and sewer connection fees.

Do cities in Broward County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 26 of 31 cities in Broward County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000