IMPACTFEES.ORG

Miramar, Florida Impact Fees

Miramar applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $8,809.00 per unit (rates sourced July 12, 2026). The full breakdown is below.

Miramar impact fees by project type

Miramar: Single-Family Impact Fees

A new single-family home in Miramar pays $8,809.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (SFR, 3BR) ($8,809.00).

City Impact Fee (City of Miramar, SFR) and Wastewater Capacity Charge (City of Miramar) and Park/Recreational Impact Fee (Broward County, SFR) and Water Capacity Charge (City of Miramar) and Road / Transportation Concurrency Fee (Broward County, SFR) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water Capacity Charge (City of Miramar)
    City of Miramar Utilities
    Own utility, not Broward WWS (prior $1,590 copy-paste wrong). Capacity/impact fees under Municode Ch.21 Art.VI §21-233 set by resolution; amounts not published online. $0 placeholder. ⚠️ VERIFY Miramar Utilities 954-889-3850.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Wastewater Capacity Charge (City of Miramar)
    City of Miramar Utilities
    Own utility, not Broward WWS (prior $2,010 copy-paste wrong). Sewer capacity fee §21-233 set by resolution; not published online. $0 placeholder. ⚠️ VERIFY 954-889-3850.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fee (City of Miramar, SFR)
    City may levy municipal impact fees (parks/police/fire); not confirmed against adopted schedule. $0 placeholder. ⚠️ VERIFY City of Miramar 954-602-3000.
    Contact jurisdiction/utility to verifyRequires confirmation
County$8,809.00
  • School Impact Fee (SFR, 3BR)
    Broward County
    Effective Jan 1, 2022. 3 or fewer BR = $8,809; 4+ BR = $11,070.
    $8,809.00
  • Park/Recreational Impact Fee (Broward County, SFR)
    Broward County Park/Recreational Impact Fee applies only if platting required. $0 placeholder. ⚠️ VERIFY 954-357-6666.
    Contact jurisdiction/utility to verifyRequires confirmation
  • Road / Transportation Concurrency Fee (Broward County, SFR)
    Broward County Road Impact OR Transportation Concurrency Fee, computed at plan review via TRIPS calculator — not a flat rate. $0 placeholder. ⚠️ VERIFY 954-357-6666 opt 2.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Miramar): $8,809.00
Sources last checked July 12, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Miramar: Multifamily Impact Fees

A new multifamily unit in Miramar pays $1,475.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (MF, Mid-Rise, 2+ BR) ($1,475.00).

City Impact Fee (City of Miramar, MF) and Road / Transportation Concurrency Fee (Broward County, MF) and Park/Recreational Impact Fee (Broward County, MF) and Wastewater Capacity Charge (City of Miramar, MF) and Water Capacity Charge (City of Miramar, MF) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water Capacity Charge (City of Miramar, MF)
    Broward County
    Own utility, not Broward WWS (prior $1,124.13 wrong). Capacity/impact fees §21-233 set by resolution; MF per-unit not published online. ⚠️ VERIFY Miramar Utilities 954-889-3850.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Wastewater Capacity Charge (City of Miramar, MF)
    Broward County
    Own utility, not Broward WWS (prior $1,421.07 wrong). §21-233 by resolution; MF per-unit not published. ⚠️ VERIFY 954-889-3850.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fee (City of Miramar, MF)
    City may levy municipal impact fees (parks/police/fire); not confirmed. $0 placeholder. ⚠️ VERIFY 954-602-3000.
    Contact jurisdiction/utility to verifyRequires confirmation
County$1,475.00
  • $1,475.00
  • Road / Transportation Concurrency Fee (Broward County, MF)
    Broward County Road Impact OR Transportation Concurrency Fee, computed at plan review via TRIPS calculator — not a flat rate. $0 placeholder. ⚠️ VERIFY 954-357-6666 opt 2.
    Contact jurisdiction/utility to verifyRequires confirmation
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County Park/Recreational Impact Fee applies only if platting required. $0 placeholder. ⚠️ VERIFY 954-357-6666.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Miramar): $1,475.00
Sources last checked July 12, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Miramar: Commercial Impact Fees

Commercial development in Miramar pays $1.16 per square foot in impact fees, plus $8,808.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $66,808.00. The calculator below adjusts to your exact square footage.

The largest line items are Police Impact Fee (City of Miramar, Commercial) ($0.58/sq ft) and Fire Protection Impact Fee (City of Miramar, Commercial) ($0.58/sq ft).

Water Impact Fee (City of Miramar) — per ERC and Wastewater Impact Fee (City of Miramar) — per ERC are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Official fee schedule

View the full fee schedule
Water$4,394.00 one-time
  • Water Impact Fee (City of Miramar) — per ERC
    City of Miramar Utilities
    FY2026 Schedule of User Fees, Sec. V.H.1 'Water and Wastewater Impact Fees' (Engineering Services, p.13), Resolution R25-212, 9/17/2025. Published as a single figure of $4,394.00 with NO meter-size table; ERC basis implied by Sec. V.H.2 ('Developers who had balance ERC's in Assessment Program'). Fees revised each Oct 1 per adjustment/escalation formula in Code Sec. 21-197. VERIFY: the nonresidential ERC multiplier (how many ERCs a commercial meter/fixture count is assigned) is not published — amount stored is the 1-ERC figure. Contact: Miramar Engineering/Utilities, 954-602-3280.
    $4,394.00 one-timeRequires confirmation
Sewer$4,414.00 one-time
  • Wastewater Impact Fee (City of Miramar) — per ERC
    City of Miramar Utilities
    FY2026 Schedule of User Fees, Sec. V.H.1 'Water and Wastewater Impact Fees' (Engineering Services, p.13), Resolution R25-212, 9/17/2025. Published as a single figure of $4,414.00 with NO meter-size table; ERC basis implied by Sec. V.H.2. Fees revised each Oct 1 per Code Sec. 21-197 escalation formula. VERIFY: the nonresidential ERC multiplier is not published — amount stored is the 1-ERC figure. Contact: Miramar Engineering/Utilities, 954-602-3280.
    $4,414.00 one-timeRequires confirmation
City$1.16/sq ft
  • Police Impact Fee (City of Miramar, Commercial)
    City of Miramar
    Source: City of Miramar Schedule of User Fees, as adopted by Resolution R25-212, 9-17-2025; p. 50 of 52, Sec. XV (Utilities Department), subsec. C. Impact Fees, item 1. Schedule columns: 'Residential (per dwelling unit)' | 'Commercial (per non-residential square foot)'. Row 'Police' = $736.00 residential / $0.58 per nonresidential sq ft. VERIFIED 2026-07-12 audit: Police $0.58 and Fire Protection $0.58 are BOTH genuinely $0.58 per nonres sq ft - the identical value is a coincidence, NOT a double-count of one schedule line (the residential column differs: Police $736.00 vs Fire Protection $574.00). SINGLE NONRES COLUMN - no Commercial/Office/Industrial split in the adopted schedule; the same $0.58 applies to all nonresidential. An additional 3% administrative fee applies to all impact fees (Code Sec. 2-225.5). Miramar levies NO nonres transportation, general-government, parks, or library impact fee (Recreation and Community Parks Land Dedication are expressly dwelling-units-only). Water and Wastewater impact fees are separate (Sec. V.H, see W/S table). Contact: Miramar Building/Planning & Zoning, 954-602-3200.
    $0.58/sq ft
  • Fire Protection Impact Fee (City of Miramar, Commercial)
    City of Miramar
    Source: City of Miramar Schedule of User Fees, as adopted by Resolution R25-212, 9-17-2025; p. 50 of 52, Sec. XV (Utilities Department), subsec. C. Impact Fees, item 1. Schedule columns: 'Residential (per dwelling unit)' | 'Commercial (per non-residential square foot)'. Row 'Fire Protection' = $574.00 residential / $0.58 per nonresidential sq ft. VERIFIED 2026-07-12 audit: Fire Protection $0.58 and Police $0.58 are BOTH genuinely $0.58 per nonres sq ft - the identical value is a coincidence, NOT a double-count of one schedule line (the residential column differs: Fire Protection $574.00 vs Police $736.00). SINGLE NONRES COLUMN - no Commercial/Office/Industrial split in the adopted schedule. An additional 3% administrative fee applies to all impact fees (Code Sec. 2-225.5). Miramar levies NO nonres transportation, general-government, parks, or library impact fee (Recreation and Community Parks Land Dedication are expressly dwelling-units-only). Water and Wastewater impact fees are separate (Sec. V.H, see W/S table). Contact: Miramar Building/Planning & Zoning, 954-602-3200.
    $0.58/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Miramar): $1.16/sq ft + $8,808.00 one-time (≈ $66,808.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedule
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Miramar: Industrial Impact Fees

Industrial development in Miramar pays $1.16 per square foot in impact fees, plus $8,808.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $66,808.00. The calculator below adjusts to your exact square footage.

The largest line items are Fire Protection Impact Fee (City of Miramar, Industrial) ($0.58/sq ft) and Police Impact Fee (City of Miramar, Industrial) ($0.58/sq ft).

Water Impact Fee (City of Miramar) — per ERC and Wastewater Impact Fee (City of Miramar) — per ERC are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Official fee schedule

View the full fee schedule
Water$4,394.00 one-time
  • Water Impact Fee (City of Miramar) — per ERC
    City of Miramar Utilities
    FY2026 Schedule of User Fees, Sec. V.H.1 'Water and Wastewater Impact Fees' (Engineering Services, p.13), Resolution R25-212, 9/17/2025. Published as a single figure of $4,394.00 with NO meter-size table; ERC basis implied by Sec. V.H.2 ('Developers who had balance ERC's in Assessment Program'). Fees revised each Oct 1 per adjustment/escalation formula in Code Sec. 21-197. VERIFY: the nonresidential ERC multiplier (how many ERCs a commercial meter/fixture count is assigned) is not published — amount stored is the 1-ERC figure. Contact: Miramar Engineering/Utilities, 954-602-3280.
    $4,394.00 one-timeRequires confirmation
Sewer$4,414.00 one-time
  • Wastewater Impact Fee (City of Miramar) — per ERC
    City of Miramar Utilities
    FY2026 Schedule of User Fees, Sec. V.H.1 'Water and Wastewater Impact Fees' (Engineering Services, p.13), Resolution R25-212, 9/17/2025. Published as a single figure of $4,414.00 with NO meter-size table; ERC basis implied by Sec. V.H.2. Fees revised each Oct 1 per Code Sec. 21-197 escalation formula. VERIFY: the nonresidential ERC multiplier is not published — amount stored is the 1-ERC figure. Contact: Miramar Engineering/Utilities, 954-602-3280.
    $4,414.00 one-timeRequires confirmation
City$1.16/sq ft
  • Fire Protection Impact Fee (City of Miramar, Industrial)
    City of Miramar
    Source: City of Miramar Schedule of User Fees, adopted by Res. R25-212, 9-17-2025; p. 50, Sec. XV.C.1. Row 'Fire Protection' = $0.58 per nonresidential sq ft (residential $574.00/DU). VERIFIED 2026-07-12 audit: Fire Protection $0.58 and Police $0.58 are both genuine - not a double-count (residential column differs). SINGLE NONRES COLUMN - no category split; industrial pays the same $0.58. 3% administrative fee applies (Code Sec. 2-225.5). No nonres transportation, general-government, parks, or library impact fee. W/S impact fees separate. Contact: Miramar Building/Planning & Zoning, 954-602-3200.
    $0.58/sq ft
  • Police Impact Fee (City of Miramar, Industrial)
    City of Miramar
    Source: City of Miramar Schedule of User Fees, adopted by Res. R25-212, 9-17-2025; p. 50, Sec. XV.C.1. Row 'Police' = $0.58 per nonresidential sq ft (residential $736.00/DU). VERIFIED 2026-07-12 audit: Police $0.58 and Fire Protection $0.58 are both genuine - not a double-count (residential column differs). SINGLE NONRES COLUMN - no category split; industrial pays the same $0.58. 3% administrative fee applies (Code Sec. 2-225.5). No nonres transportation, general-government, parks, or library impact fee. W/S impact fees separate. Contact: Miramar Building/Planning & Zoning, 954-602-3200.
    $0.58/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Miramar): $1.16/sq ft + $8,808.00 one-time (≈ $66,808.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedule
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Miramar: Office Impact Fees

Office development in Miramar pays $1.16 per square foot in impact fees, plus $8,808.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $37,808.00. The calculator below adjusts to your exact square footage.

The largest line items are Fire Protection Impact Fee (City of Miramar, Office) ($0.58/sq ft) and Police Impact Fee (City of Miramar, Office) ($0.58/sq ft).

Water Impact Fee (City of Miramar) — per ERC and Wastewater Impact Fee (City of Miramar) — per ERC are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Official fee schedule

View the full fee schedule
Water$4,394.00 one-time
  • Water Impact Fee (City of Miramar) — per ERC
    City of Miramar Utilities
    FY2026 Schedule of User Fees, Sec. V.H.1 'Water and Wastewater Impact Fees' (Engineering Services, p.13), Resolution R25-212, 9/17/2025. Published as a single figure of $4,394.00 with NO meter-size table; ERC basis implied by Sec. V.H.2 ('Developers who had balance ERC's in Assessment Program'). Fees revised each Oct 1 per adjustment/escalation formula in Code Sec. 21-197. VERIFY: the nonresidential ERC multiplier (how many ERCs a commercial meter/fixture count is assigned) is not published — amount stored is the 1-ERC figure. Contact: Miramar Engineering/Utilities, 954-602-3280.
    $4,394.00 one-timeRequires confirmation
Sewer$4,414.00 one-time
  • Wastewater Impact Fee (City of Miramar) — per ERC
    City of Miramar Utilities
    FY2026 Schedule of User Fees, Sec. V.H.1 'Water and Wastewater Impact Fees' (Engineering Services, p.13), Resolution R25-212, 9/17/2025. Published as a single figure of $4,414.00 with NO meter-size table; ERC basis implied by Sec. V.H.2. Fees revised each Oct 1 per Code Sec. 21-197 escalation formula. VERIFY: the nonresidential ERC multiplier is not published — amount stored is the 1-ERC figure. Contact: Miramar Engineering/Utilities, 954-602-3280.
    $4,414.00 one-timeRequires confirmation
City$1.16/sq ft
  • Fire Protection Impact Fee (City of Miramar, Office)
    City of Miramar
    Source: City of Miramar Schedule of User Fees, adopted by Res. R25-212, 9-17-2025; p. 50, Sec. XV.C.1. Row 'Fire Protection' = $0.58 per nonresidential sq ft (residential $574.00/DU). VERIFIED 2026-07-12 audit: Fire Protection $0.58 and Police $0.58 are both genuine - not a double-count (residential column differs). SINGLE NONRES COLUMN - no category split; office pays the same $0.58. 3% administrative fee applies (Code Sec. 2-225.5). No nonres transportation, general-government, parks, or library impact fee. W/S impact fees separate. Contact: Miramar Building/Planning & Zoning, 954-602-3200.
    $0.58/sq ft
  • Police Impact Fee (City of Miramar, Office)
    City of Miramar
    Source: City of Miramar Schedule of User Fees, adopted by Res. R25-212, 9-17-2025; p. 50, Sec. XV.C.1. Row 'Police' = $0.58 per nonresidential sq ft (residential $736.00/DU). VERIFIED 2026-07-12 audit: Police $0.58 and Fire Protection $0.58 are both genuine - not a double-count (residential column differs). SINGLE NONRES COLUMN - no category split; office pays the same $0.58. 3% administrative fee applies (Code Sec. 2-225.5). No nonres transportation, general-government, parks, or library impact fee. W/S impact fees separate. Contact: Miramar Building/Planning & Zoning, 954-602-3200.
    $0.58/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Miramar): $1.16/sq ft + $8,808.00 one-time (≈ $37,808.00 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedule
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Estimate your project in Miramar

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Miramar, Florida?

A new single-family home in Miramar pays $8,809.00 per unit in combined impact fees (rates sourced July 12, 2026).

How much are commercial impact fees in Miramar?

Commercial development in Miramar pays $1.16 per square foot in impact fees, plus $8,808.00 in one-time water and sewer connection fees, about $66,808.00 for a 50,000 sq ft building.

Does Miramar charge its own impact fees?

Yes. Miramar levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Miramar, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.