Skip to content
IMPACTFEES.ORG

Miramar, Florida Impact Fees

Miramar applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $22,649.36 per unit (rates sourced ). The full breakdown is below.

Miramar Impact Fees by Project Type

Miramar: Single-Family Impact Fees

A new single-family home in Miramar pays $22,649.36 per unit in impact fees (rates sourced October 13, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $13,840.36.

The largest line items are School Impact Fee (Broward County) ($8,809.00), Wastewater Capacity Charge (City of Miramar) ($4,555.00) and Water Capacity Charge (City of Miramar) ($4,535.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Miramar Impact Fee Schedule
Water$4,535.00
  • Water Capacity Charge (City of Miramar)
    City of Miramar Utilities
    City of Miramar Utilities water capacity charge, $4,535 per equivalent residential connection (ERC) for fiscal year 2027 (Res. R26-213, adopted September 14, 2026); a single-family home on a 5/8-inch meter is 1 ERC. Paid before the building permit, and re-indexed each October 1 under City Code Section 21-197.
    $4,535.00
Sewer$4,555.00
  • Wastewater Capacity Charge (City of Miramar)
    City of Miramar Utilities
    City of Miramar Utilities wastewater capacity charge, $4,555 per equivalent residential connection (ERC) for fiscal year 2027 (Res. R26-213, adopted September 14, 2026); a single-family home on a 5/8-inch meter is 1 ERC. Paid before the building permit, and re-indexed each October 1 under City Code Section 21-197.
    $4,555.00
City$4,750.36
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County school impact fee, charged on every new residential unit countywide, including inside cities. Rates effective January 1, 2022 (Ord. 2020-36) with no annual index. Since November 2025 it is paid directly to the School Board of Broward County, no later than building permit issuance. This is the single-family rate for 3 or fewer bedrooms, which covers the typical 3-bedroom house; homes with 4 or more bedrooms pay $11,070.
    $8,809.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    Broward County regional park and local park impact fees are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    Broward County road impact fees and transportation concurrency assessments are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
Total (Miramar): $22,649.36

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Miramar: Multifamily Impact Fees

A new multifamily unit in Miramar pays $9,702.25 per unit in impact fees (rates sourced October 13, 2026). Of that, Broward County-levied fees account for $1,475.00 and municipal or utility fees for $8,227.25.

The largest line items are Wastewater Capacity Charge (City of Miramar, MF) - 0.500 ERC x $4,555/ERC ($2,277.50), Water Capacity Charge (City of Miramar, MF) - 0.500 ERC x $4,535/ERC ($2,267.50) and School Impact Fee (Broward County, MF) ($1,475.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Miramar Impact Fee Schedule
Water$2,267.50
  • Water Capacity Charge (City of Miramar, MF) - 0.500 ERC x $4,535/ERC
    City of Miramar Utilities
    City of Miramar Utilities water capacity charge, $4,535 per equivalent residential connection (ERC) for fiscal year 2027 (Res. R26-213, adopted September 14, 2026); apartments count as 0.5 ERC per unit. Paid before the building permit, and re-indexed each October 1 under City Code Section 21-197.
    $2,267.50
Sewer$2,277.50
  • Wastewater Capacity Charge (City of Miramar, MF) - 0.500 ERC x $4,555/ERC
    City of Miramar Utilities
    City of Miramar Utilities wastewater capacity charge, $4,555 per equivalent residential connection (ERC) for fiscal year 2027 (Res. R26-213, adopted September 14, 2026); apartments count as 0.5 ERC per unit. Paid before the building permit, and re-indexed each October 1 under City Code Section 21-197.
    $2,277.50
City$3,682.25
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County school impact fee, charged on every new residential unit countywide, including inside cities. Rates effective January 1, 2022 (Ord. 2020-36) with no annual index. Since November 2025 it is paid directly to the School Board of Broward County, no later than building permit issuance. This tier (mid-rise, 2 or more bedrooms) covers the typical 2-bedroom unit in a 4-story building. Multifamily rates depend on building type and bedrooms: garden apartment (2 to 3 stories) 1 or fewer bedrooms $480, 2 bedrooms $4,918, 3 or more $5,901; mid-rise (4 to 8 stories) 1 or fewer bedrooms $375, 2 or more $1,475; high-rise (9 or more stories) $461 for all units.
    $1,475.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    Broward County road impact fees and transportation concurrency assessments are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    Broward County regional park and local park impact fees are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
Total (Miramar): $9,702.25

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Miramar: Commercial Impact Fees

Commercial development in Miramar pays $1.16 per square foot in impact fees, plus $9,090.00 in one-time water and sewer connection fees (rates sourced October 13, 2026).

For a 50,000 sq ft building, that comes to about $67,090.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Miramar) — per ERC ($4,555.00 one-time), Water Impact Fee (City of Miramar) — per ERC ($4,535.00 one-time) and Police Impact Fee (City of Miramar, Commercial) ($0.58/sq ft).

View the Full Miramar Impact Fee Schedule
Water$4,535.00 one-time
  • Water Impact Fee (City of Miramar) — per ERC
    City of Miramar Utilities
    Miramar's water impact fee is $4,535 per ERC for fiscal year 2027 (Res. R26-213, adopted September 14, 2026), revised each October 1 under City Code Section 21-197. Nonresidential ERCs are computed from plumbing fixture units (fixture units x 14.1 gallons per day / 325 gallons per day per ERC), rounded up to a whole ERC per building; meter size is used only for detached single-family homes.
    $4,535.00 one-time
Sewer$4,555.00 one-time
  • Wastewater Impact Fee (City of Miramar) — per ERC
    City of Miramar Utilities
    Miramar's wastewater impact fee is $4,555 per ERC for fiscal year 2027 (Res. R26-213, adopted September 14, 2026), revised each October 1 under City Code Section 21-197. Nonresidential ERCs are computed from plumbing fixture units (fixture units x 14.1 gallons per day / 325 gallons per day per ERC), rounded up to a whole ERC per building; meter size is used only for detached single-family homes.
    $4,555.00 one-time
City$1.16/sq ft
  • Police Impact Fee (City of Miramar, Commercial)
    City of Miramar
    Miramar's police impact fee is $0.58 per nonresidential square foot (Res. R26-213, adopted September 14, 2026, unchanged from the prior year), applied to all nonresidential uses. A 3% administrative fee applies to all impact fees. Miramar does not levy nonresidential transportation, general-government, parks, or library impact fees; water and wastewater impact fees are separate.
    $0.58/sq ft
  • Fire Protection Impact Fee (City of Miramar, Commercial)
    City of Miramar
    Miramar's fire protection impact fee is $0.58 per nonresidential square foot (Res. R26-213, adopted September 14, 2026, unchanged from the prior year), applied to all nonresidential uses. A 3% administrative fee applies to all impact fees. Miramar does not levy nonresidential transportation, general-government, parks, or library impact fees; water and wastewater impact fees are separate.
    $0.58/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Miramar): $1.16/sq ft + $9,090.00 one-time (≈ $67,090.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Miramar Utilities City of Miramar Broward County

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Miramar: Industrial Impact Fees

Industrial development in Miramar pays $1.16 per square foot in impact fees, plus $9,090.00 in one-time water and sewer connection fees (rates sourced October 13, 2026).

For a 50,000 sq ft building, that comes to about $67,090.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Miramar) — per ERC ($4,555.00 one-time), Water Impact Fee (City of Miramar) — per ERC ($4,535.00 one-time) and Fire Protection Impact Fee (City of Miramar, Industrial) ($0.58/sq ft).

View the Full Miramar Impact Fee Schedule
Water$4,535.00 one-time
  • Water Impact Fee (City of Miramar) — per ERC
    City of Miramar Utilities
    Miramar's water impact fee is $4,535 per ERC for fiscal year 2027 (Res. R26-213, adopted September 14, 2026), revised each October 1 under City Code Section 21-197. Nonresidential ERCs are computed from plumbing fixture units (fixture units x 14.1 gallons per day / 325 gallons per day per ERC), rounded up to a whole ERC per building; meter size is used only for detached single-family homes.
    $4,535.00 one-time
Sewer$4,555.00 one-time
  • Wastewater Impact Fee (City of Miramar) — per ERC
    City of Miramar Utilities
    Miramar's wastewater impact fee is $4,555 per ERC for fiscal year 2027 (Res. R26-213, adopted September 14, 2026), revised each October 1 under City Code Section 21-197. Nonresidential ERCs are computed from plumbing fixture units (fixture units x 14.1 gallons per day / 325 gallons per day per ERC), rounded up to a whole ERC per building; meter size is used only for detached single-family homes.
    $4,555.00 one-time
City$1.16/sq ft
  • Fire Protection Impact Fee (City of Miramar, Industrial)
    City of Miramar
    Miramar's fire protection impact fee is $0.58 per nonresidential square foot (Res. R26-213, adopted September 14, 2026, unchanged from the prior year), applied to all nonresidential uses. A 3% administrative fee applies to all impact fees. Miramar does not levy nonresidential transportation, general-government, parks, or library impact fees; water and wastewater impact fees are separate.
    $0.58/sq ft
  • Police Impact Fee (City of Miramar, Industrial)
    City of Miramar
    Miramar's police impact fee is $0.58 per nonresidential square foot (Res. R26-213, adopted September 14, 2026, unchanged from the prior year), applied to all nonresidential uses. A 3% administrative fee applies to all impact fees. Miramar does not levy nonresidential transportation, general-government, parks, or library impact fees; water and wastewater impact fees are separate.
    $0.58/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Miramar): $1.16/sq ft + $9,090.00 one-time (≈ $67,090.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Miramar Utilities City of Miramar Broward County

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Miramar: Office Impact Fees

Office development in Miramar pays $1.16 per square foot in impact fees, plus $9,090.00 in one-time water and sewer connection fees (rates sourced October 13, 2026).

For a 25,000 sq ft building, that comes to about $38,090.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Miramar) — per ERC ($4,555.00 one-time), Water Impact Fee (City of Miramar) — per ERC ($4,535.00 one-time) and Fire Protection Impact Fee (City of Miramar, Office) ($0.58/sq ft).

View the Full Miramar Impact Fee Schedule
Water$4,535.00 one-time
  • Water Impact Fee (City of Miramar) — per ERC
    City of Miramar Utilities
    Miramar's water impact fee is $4,535 per ERC for fiscal year 2027 (Res. R26-213, adopted September 14, 2026), revised each October 1 under City Code Section 21-197. Nonresidential ERCs are computed from plumbing fixture units (fixture units x 14.1 gallons per day / 325 gallons per day per ERC), rounded up to a whole ERC per building; meter size is used only for detached single-family homes.
    $4,535.00 one-time
Sewer$4,555.00 one-time
  • Wastewater Impact Fee (City of Miramar) — per ERC
    City of Miramar Utilities
    Miramar's wastewater impact fee is $4,555 per ERC for fiscal year 2027 (Res. R26-213, adopted September 14, 2026), revised each October 1 under City Code Section 21-197. Nonresidential ERCs are computed from plumbing fixture units (fixture units x 14.1 gallons per day / 325 gallons per day per ERC), rounded up to a whole ERC per building; meter size is used only for detached single-family homes.
    $4,555.00 one-time
City$1.16/sq ft
  • Fire Protection Impact Fee (City of Miramar, Office)
    City of Miramar
    Miramar's fire protection impact fee is $0.58 per nonresidential square foot (Res. R26-213, adopted September 14, 2026, unchanged from the prior year), applied to all nonresidential uses. A 3% administrative fee applies to all impact fees. Miramar does not levy nonresidential transportation, general-government, parks, or library impact fees; water and wastewater impact fees are separate.
    $0.58/sq ft
  • Police Impact Fee (City of Miramar, Office)
    City of Miramar
    Miramar's police impact fee is $0.58 per nonresidential square foot (Res. R26-213, adopted September 14, 2026, unchanged from the prior year), applied to all nonresidential uses. A 3% administrative fee applies to all impact fees. Miramar does not levy nonresidential transportation, general-government, parks, or library impact fees; water and wastewater impact fees are separate.
    $0.58/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Miramar): $1.16/sq ft + $9,090.00 one-time (≈ $38,090.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Miramar Utilities City of Miramar Broward County

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Miramar Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Miramar Impact Fee FAQs

What are the total impact fees for a single-family home in Miramar, Florida?

A new single-family home in Miramar pays $22,649.36 per unit in combined impact fees (rates sourced October 13, 2026).

How much are commercial impact fees in Miramar?

Commercial development in Miramar pays $1.16 per square foot in impact fees, plus $9,090.00 in one-time water and sewer connection fees, about $67,090.00 for a 50,000 sq ft building.

Does Miramar charge its own impact fees?

Yes. Miramar levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Miramar, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000