IMPACTFEES.ORG

Hallandale Beach, Florida Impact Fees

Hallandale Beach applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $18,533.00 per unit (rates sourced July 14, 2026). The full breakdown is below.

Hallandale Beach impact fees by project type

Hallandale Beach: Single-Family Impact Fees

A new single-family home in Hallandale Beach pays $18,533.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $9,724.00.

The largest line items are School Impact Fee (Broward County) ($8,809.00), Multi-Modal Impact Fee (City of Hallandale Beach) ($3,068.00) and Parks & Recreation Impact Fee (City of Hallandale Beach) ($2,727.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,318.00
  • Water Impact Fee (City of Hallandale Beach)
    City of Hallandale Beach Utilities
    FY26 Amended Fee Booklet, pp. 60-61. Res. 2025-118 (adopted 9/29/2025, eff. 10/1/2025), amended by Res. 2026-002 (eff. 1/21/2026). Authority: Code Sec. 30-250, Ord. 2009-13. City of Hallandale Beach Utilities owns both water and wastewater. NOTE: despite the combined 'Water & Wastewater Impact Fee' framing on the city's Fees & Rates page, the booklet publishes TWO SEPARATE schedules - booked separately here. Monthly utility rate escalators (water +8% FY26, +7% FY27, +3.75% FY28) do NOT touch impact fees. CONFIRMED.
    $1,318.00
Sewer$1,672.00
  • Wastewater Impact Fee (City of Hallandale Beach)
    City of Hallandale Beach Utilities
    FY26 Amended Fee Booklet, pp. 60-61. Res. 2025-118 (adopted 9/29/2025, eff. 10/1/2025), amended by Res. 2026-002 (eff. 1/21/2026). Authority: Code Sec. 30-250, Ord. 2009-13. Separate wastewater schedule (not combined with water). Monthly utility rate escalators do NOT touch impact fees. CONFIRMED.
    $1,672.00
City$6,734.00
  • Multi-Modal Impact Fee (City of Hallandale Beach)
    1,500-2,499 sq ft
    City of Hallandale Beach
    Code Ch. 31 Development Impact Fees; Ord. 2022-001; Res. 2022-001 eff. 5/3/2022, Sec. 31-6 Table 1. 1,500-2,499 sq ft bracket. Total city fees for this bracket = $6,734. Sec. 31-14 indexing/updating. CONFIRMED.
    $3,068.00
  • Parks & Recreation Impact Fee (City of Hallandale Beach)
    1,500-2,499 sq ft
    City of Hallandale Beach
    Code Ch. 31 Development Impact Fees; Ord. 2022-001; Res. 2022-001 eff. 5/3/2022, Sec. 31-6 Table 1. 1,500-2,499 sq ft bracket. Total city fees for this bracket = $6,734. CONFIRMED.
    $2,727.00
  • Fire Rescue Impact Fee (City of Hallandale Beach)
    1,500-2,499 sq ft
    City of Hallandale Beach
    Code Ch. 31 Development Impact Fees; Ord. 2022-001 (adopted 2-2-2022); rates per Res. 2022-001 eff. 5/3/2022, Sec. 31-6 Table 1. SF schedule is bracketed by size; 1,500-2,499 sq ft is the canonical bracket. Total city fees for this bracket = $6,734 (Fire $552 + Law Enf $387 + Parks $2,727 + Multi-Modal $3,068). Sec. 31-14 provides for indexing/updating - watch. The monthly utility rate escalators (water +8% FY26, +7% FY27, +3.75% FY28) do NOT touch impact fees. CONFIRMED.
    $552.00
  • Law Enforcement Impact Fee (City of Hallandale Beach)
    1,500-2,499 sq ft
    City of Hallandale Beach
    Code Ch. 31 Development Impact Fees; Ord. 2022-001 (adopted 2-2-2022); rates per Res. 2022-001 eff. 5/3/2022, Sec. 31-6 Table 1. SF bracketed by size; 1,500-2,499 sq ft canonical bracket. Total city fees for this bracket = $6,734. Sec. 31-14 provides for indexing/updating. CONFIRMED.
    $387.00
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Single Family 3-or-fewer BR = $8,809 (this record, the default/most common); 4-or-more BR = $11,070 (separate tier record). Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $8,809.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
Total (Hallandale Beach): $18,533.00

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hallandale Beach: Multifamily Impact Fees

A new multifamily unit in Hallandale Beach pays $5,975.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $1,475.00 and municipal or utility fees for $4,500.00.

The largest line items are School Impact Fee (Broward County, MF) ($1,475.00), Multi-Modal Impact Fee (City of Hallandale Beach, MF) ($1,394.00) and Wastewater Impact Fee (City of Hallandale Beach, MF) — 0.60 ERU × $1,672 ($1,003.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$791.00
  • Water Impact Fee (City of Hallandale Beach, MF) — 0.60 ERU × $1,318
    Triplex / 4-plex / 5-plex / Condo or Co-op Apartments (0.60 ERU)
    City of Hallandale Beach Utilities
    FY26 Amended Fee Booklet, pp. 60-61. Res. 2025-118 (adopted 9/29/2025, eff. 10/1/2025), amended by Res. 2026-002 (eff. 1/21/2026). Authority: Code Sec. 30-250, Ord. 2009-13. MF per-unit rate = class 'Triplex, 4-plex, 5-plex, Condo or Co-op Apartments' = 0.60 ERU x $1,318 = $791. (Townhouse = 0.87 ERU = $1,147 - tier not booked.) The booklet publishes TWO SEPARATE water and wastewater schedules despite the combined framing on the city's Fees & Rates page. Monthly utility rate escalators do NOT touch impact fees. CONFIRMED.
    $791.00
Sewer$1,003.00
  • Wastewater Impact Fee (City of Hallandale Beach, MF) — 0.60 ERU × $1,672
    Triplex / 4-plex / 5-plex / Condo or Co-op Apartments (0.60 ERU)
    City of Hallandale Beach Utilities
    FY26 Amended Fee Booklet, pp. 60-61. Res. 2025-118 (adopted 9/29/2025, eff. 10/1/2025), amended by Res. 2026-002 (eff. 1/21/2026). Authority: Code Sec. 30-250, Ord. 2009-13. MF per-unit rate = 0.60 ERU x $1,672 = $1,003. Separate wastewater schedule (not combined with water). CONFIRMED.
    $1,003.00
City$2,706.00
  • Multi-Modal Impact Fee (City of Hallandale Beach, MF)
    10+ units, 4+ levels (mid-rise, LUC 221)
    City of Hallandale Beach
    Code Ch. 31; Ord. 2022-001; Res. 2022-001 eff. 5/3/2022, Sec. 31-6 Table 1. Canonical MF unit = mid-rise (10+ units, 4+ levels, LUC 221), Is Default. Mid-rise total = $2,706/unit. Sec. 31-14 indexing. CONFIRMED.
    $1,394.00
  • Parks & Recreation Impact Fee (City of Hallandale Beach, MF)
    10+ units, 4+ levels (mid-rise, LUC 221)
    City of Hallandale Beach
    Code Ch. 31; Ord. 2022-001; Res. 2022-001 eff. 5/3/2022, Sec. 31-6 Table 1. Canonical MF unit = mid-rise (10+ units, 4+ levels, LUC 221), Is Default. Mid-rise total = $2,706/unit. CONFIRMED.
    $975.00
  • Fire Rescue Impact Fee (City of Hallandale Beach, MF)
    10+ units, 4+ levels (mid-rise, LUC 221)
    City of Hallandale Beach
    Code Ch. 31 Development Impact Fees; Ord. 2022-001 (adopted 2-2-2022); rates per Res. 2022-001 eff. 5/3/2022, Sec. 31-6 Table 1. Canonical MF unit (2BR/2BA, 1,000 sq ft, 4-story) falls in the mid-rise class: 10+ units, 4+ levels, LUC 221 - hence Is Default. Mid-rise total = $2,706/unit (Fire $198 + Law Enf $139 + Parks $975 + Multi-Modal $1,394). Low-rise tier (3-9 units, 1-3 levels, LUC 220) booked separately as non-default. Sec. 31-14 provides for indexing/updating - watch. The monthly utility rate escalators do NOT touch impact fees. CONFIRMED.
    $198.00
  • Law Enforcement Impact Fee (City of Hallandale Beach, MF)
    10+ units, 4+ levels (mid-rise, LUC 221)
    City of Hallandale Beach
    Code Ch. 31 Development Impact Fees; Ord. 2022-001; Res. 2022-001 eff. 5/3/2022, Sec. 31-6 Table 1. Canonical MF unit (2BR/2BA, 1,000 sq ft, 4-story) = mid-rise (10+ units, 4+ levels, LUC 221), hence Is Default. Mid-rise total = $2,706/unit. CONFIRMED.
    $139.00
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Adopted MF tiers: Garden Apartment (low-rise, 1–3 stories) 1-or-fewer BR $480 / 2 BR $4,918 / 3-or-more BR $5,901; Mid-Rise (4+ stories) 1-or-fewer BR $375 / 2-or-more BR $1,475; High-Rise all BR $461. The canonical MF unit (2BR/2BA, 1,000 sq ft, 4-story building) falls in Broward's Mid-Rise class, so Mid-Rise 2-or-more BR $1,475 is the DEFAULT record. Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $1,475.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
Total (Hallandale Beach): $5,975.00

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hallandale Beach: Commercial Impact Fees

Commercial development in Hallandale Beach pays $5.45 per square foot in impact fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to at least $272,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Multi-Modal Transportation Impact Fee (City of Hallandale Beach, Commercial) ($4.11/sq ft), Fire Rescue Impact Fee (City of Hallandale Beach, Commercial) ($0.83/sq ft) and Law Enforcement Impact Fee (City of Hallandale Beach, Commercial) ($0.51/sq ft).

Wastewater Impact Fee (City of Hallandale Beach) — per gallon of capacity reservation and Water Impact Fee (City of Hallandale Beach) — per gallon of capacity reservation are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Impact Fee (City of Hallandale Beach) — per gallon of capacity reservation
    City of Hallandale Beach Utilities
    Code §30-250(a), Water Impact Fee Schedule, 'Non-Residential' row: $3.77 per gallon of capacity reservation — multiplied by total reserved gallons as determined using the non-residential designations in Appendix A of the impact fee report. NOT meter-size based and NOT ERU-based for nonres, so no meter tiers exist; Subtype blank, Is Default true. Exotic basis — Rate Type 'Per Gallon' added per the Guide's other-bases rule. (Residential comparison: SFR = 1.00 ERU = $1,318.) City runs its own water + wastewater utility (not Broward County WWS). Municode current through Apr 28, 2026.
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Wastewater Impact Fee (City of Hallandale Beach) — per gallon of capacity reservation
    City of Hallandale Beach Utilities
    Code §30-250(a), Wastewater Impact Fee Schedule, 'Non-Residential' row: $5.31 per gallon of capacity reservation — multiplied by total reserved gallons per the non-residential designations in Appendix A of the impact fee report. Not meter-size based for nonres; Subtype blank, Is Default true. Exotic basis — Rate Type 'Per Gallon'. (Residential comparison: SFR = 1.00 ERU = $1,672.) Accrued Guaranteed Revenue Charges (AGRC) are billed separately under §30-251 and are recurring, not an impact fee. Municode current through Apr 28, 2026.
    Contact jurisdiction/utility to verify
City$5.45/sq ft
  • Multi-Modal Transportation Impact Fee (City of Hallandale Beach, Commercial)
    City of Hallandale Beach
    Ord. No. 2022-001, Code §31-6(c) Table 1, 'Multi-modal' column. Schedule row: ITE 821 'Retail/shopping center 40,001 to 150,000 sq ft'. Per 1,000 sf GLA. Other tiers: ITE 822 ≤40,000 sf = $2,053; ITE 820 >150,000 sf = $4,415.
    $4.11/sq ft
  • Fire Rescue Impact Fee (City of Hallandale Beach, Commercial)
    City of Hallandale Beach
    Code Ch. 31 (Development Impact Fees Ordinance, Ord. No. 2022-001, adopted 2-2-2022), §31-6(c) Table 1. Schedule row: ITE 821 'Retail/shopping center 40,001 to 150,000 sq ft' — the tier containing the canonical 50,000 sq ft. Unit basis: per 1,000 sf GLA (leasable, not gross). Other retail tiers (not entered): ITE 822 ≤40,000 sf = $672; ITE 820 >150,000 sf = $454. Municode current through Apr 28, 2026.
    $0.83/sq ft
  • Law Enforcement Impact Fee (City of Hallandale Beach, Commercial)
    City of Hallandale Beach
    Ord. No. 2022-001, Code §31-6(c) Table 1. Schedule row: ITE 821 'Retail/shopping center 40,001 to 150,000 sq ft'. Per 1,000 sf GLA. Other tiers: ITE 822 ≤40,000 sf = $411; ITE 820 >150,000 sf = $278.
    $0.51/sq ft
  • Parks & Recreation Impact Fee (City of Hallandale Beach, Commercial)
    City of Hallandale Beach
    CONFIRMED $0. Ord. No. 2022-001, Code §31-6(c) Table 1: the 'Parks & recreation' column shows a dash (no fee) for every nonresidential land-use row — the parks fee applies only to residential dwelling units. Consistent with the FL pattern that park/rec impact fees exempt nonresidential.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-11. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Hallandale Beach): $5.45/sq ft (≈ $272,500.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Hallandale Beach Utilities City of Hallandale Beach Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hallandale Beach: Industrial Impact Fees

Industrial development in Hallandale Beach pays $1.59 per square foot in impact fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to at least $79,400.00. The calculator below adjusts to your exact square footage.

The largest line items are Multi-Modal Transportation Impact Fee (City of Hallandale Beach, Industrial) ($1.35/sq ft), Fire Rescue Impact Fee (City of Hallandale Beach, Industrial) ($0.15/sq ft) and Law Enforcement Impact Fee (City of Hallandale Beach, Industrial) ($0.09/sq ft).

Wastewater Impact Fee (City of Hallandale Beach) — per gallon of capacity reservation and Water Impact Fee (City of Hallandale Beach) — per gallon of capacity reservation are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Impact Fee (City of Hallandale Beach) — per gallon of capacity reservation
    City of Hallandale Beach Utilities
    Code §30-250(a), Water Impact Fee Schedule, 'Non-Residential' row: $3.77 per gallon of capacity reservation — multiplied by total reserved gallons as determined using the non-residential designations in Appendix A of the impact fee report. NOT meter-size based and NOT ERU-based for nonres, so no meter tiers exist; Subtype blank, Is Default true. Exotic basis — Rate Type 'Per Gallon' added per the Guide's other-bases rule. (Residential comparison: SFR = 1.00 ERU = $1,318.) City runs its own water + wastewater utility (not Broward County WWS). Municode current through Apr 28, 2026.
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Wastewater Impact Fee (City of Hallandale Beach) — per gallon of capacity reservation
    City of Hallandale Beach Utilities
    Code §30-250(a), Wastewater Impact Fee Schedule, 'Non-Residential' row: $5.31 per gallon of capacity reservation — multiplied by total reserved gallons per the non-residential designations in Appendix A of the impact fee report. Not meter-size based for nonres; Subtype blank, Is Default true. Exotic basis — Rate Type 'Per Gallon'. (Residential comparison: SFR = 1.00 ERU = $1,672.) Accrued Guaranteed Revenue Charges (AGRC) are billed separately under §30-251 and are recurring, not an impact fee. Municode current through Apr 28, 2026.
    Contact jurisdiction/utility to verify
City$1.59/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-11. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2.
    $0.00
Total (Hallandale Beach): $1.59/sq ft (≈ $79,400.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Hallandale Beach Utilities City of Hallandale Beach Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hallandale Beach: Office Impact Fees

Office development in Hallandale Beach pays $3.52 per square foot in impact fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to at least $87,925.00. The calculator below adjusts to your exact square footage.

The largest line items are Multi-Modal Transportation Impact Fee (City of Hallandale Beach, Office) ($3.02/sq ft), Fire Rescue Impact Fee (City of Hallandale Beach, Office) ($0.31/sq ft) and Law Enforcement Impact Fee (City of Hallandale Beach, Office) ($0.19/sq ft).

Wastewater Impact Fee (City of Hallandale Beach) — per gallon of capacity reservation and Water Impact Fee (City of Hallandale Beach) — per gallon of capacity reservation are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Impact Fee (City of Hallandale Beach) — per gallon of capacity reservation
    City of Hallandale Beach Utilities
    Code §30-250(a), Water Impact Fee Schedule, 'Non-Residential' row: $3.77 per gallon of capacity reservation — multiplied by total reserved gallons as determined using the non-residential designations in Appendix A of the impact fee report. NOT meter-size based and NOT ERU-based for nonres, so no meter tiers exist; Subtype blank, Is Default true. Exotic basis — Rate Type 'Per Gallon' added per the Guide's other-bases rule. (Residential comparison: SFR = 1.00 ERU = $1,318.) City runs its own water + wastewater utility (not Broward County WWS). Municode current through Apr 28, 2026.
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Wastewater Impact Fee (City of Hallandale Beach) — per gallon of capacity reservation
    City of Hallandale Beach Utilities
    Code §30-250(a), Wastewater Impact Fee Schedule, 'Non-Residential' row: $5.31 per gallon of capacity reservation — multiplied by total reserved gallons per the non-residential designations in Appendix A of the impact fee report. Not meter-size based for nonres; Subtype blank, Is Default true. Exotic basis — Rate Type 'Per Gallon'. (Residential comparison: SFR = 1.00 ERU = $1,672.) Accrued Guaranteed Revenue Charges (AGRC) are billed separately under §30-251 and are recurring, not an impact fee. Municode current through Apr 28, 2026.
    Contact jurisdiction/utility to verify
City$3.52/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-11. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2.
    $0.00
Total (Hallandale Beach): $3.52/sq ft (≈ $87,925.00 at 25,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Hallandale Beach Utilities City of Hallandale Beach Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Hallandale Beach

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Hallandale Beach, Florida?

A new single-family home in Hallandale Beach pays $18,533.00 per unit in combined impact fees (rates sourced July 14, 2026).

How much are commercial impact fees in Hallandale Beach?

Commercial development in Hallandale Beach pays $5.45 per square foot in impact fees, at least $272,500.00 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Hallandale Beach charge its own impact fees?

Yes. Hallandale Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Hallandale Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000