Sea Ranch Lakes, Florida Impact Fees

Sea Ranch Lakes applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $10,786.00 per unit (rates sourced ). The full breakdown is below.

Sea Ranch Lakes Impact Fees by Project Type

Sea Ranch Lakes: Single-Family Impact Fees

A new single-family home in Sea Ranch Lakes pays $10,786.00 per unit in impact fees (rates sourced October 13, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $1,977.00.

The largest line items are School Impact Fee (Broward County) ($8,809.00) and Water Capital Expansion Fee (City of Fort Lauderdale) ($1,977.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Sea Ranch Lakes Impact Fee Schedule
Water$1,977.00
  • Water Capital Expansion Fee (City of Fort Lauderdale)
    City of Fort Lauderdale
    Sea Ranch Lakes is served by City of Fort Lauderdale water under a 1965 franchise. Fort Lauderdale charges a water capital expansion fee of $1,977 per equivalent residential connection (300 gallons per day) with no outside-city surcharge; a single-family home is 1 ERC.
    $1,977.00
Sewer$0.00
City$0.00
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County school impact fee, charged on every new residential unit countywide, including inside cities. Rates effective January 1, 2022 (Ord. 2020-36) with no annual index. Since November 2025 it is paid directly to the School Board of Broward County, no later than building permit issuance. This is the single-family rate for 3 or fewer bedrooms, which covers the typical 3-bedroom house; homes with 4 or more bedrooms pay $11,070.
    $8,809.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    Broward County regional park and local park impact fees are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    Broward County road impact fees and transportation concurrency assessments are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Sea Ranch Lakes: Multifamily Impact Fees

A new multifamily unit in Sea Ranch Lakes pays $1,475.00 per unit in impact fees (rates sourced October 13, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (Broward County, MF) ($1,475.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Sea Ranch Lakes Impact Fee Schedule
Water$0.00
  • Water Capital Expansion Fee (City of Fort Lauderdale, MF)
    City of Fort Lauderdale
    The Village of Sea Ranch Lakes permits only single-family detached homes, so no multifamily water connection applies. Fort Lauderdale, which supplies the Village water, rates condominium and apartment units at 0.805 of a connection ($1,591.49 per unit).
    $0.00
Sewer$0.00
City$0.00
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County school impact fee, charged on every new residential unit countywide, including inside cities. Rates effective January 1, 2022 (Ord. 2020-36) with no annual index. Since November 2025 it is paid directly to the School Board of Broward County, no later than building permit issuance. This tier (mid-rise, 2 or more bedrooms) covers the typical 2-bedroom unit in a 4-story building. Multifamily rates depend on building type and bedrooms: garden apartment (2 to 3 stories) 1 or fewer bedrooms $480, 2 bedrooms $4,918, 3 or more $5,901; mid-rise (4 to 8 stories) 1 or fewer bedrooms $375, 2 or more $1,475; high-rise (9 or more stories) $461 for all units.
    $1,475.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    Broward County road impact fees and transportation concurrency assessments are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    Broward County regional park and local park impact fees are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Sea Ranch Lakes: Commercial Impact Fees

Commercial development in Sea Ranch Lakes pays no per-square-foot impact fees, but owes $2,905.00 in one-time water and sewer connection fees (rates sourced October 13, 2026).

For a 50,000 sq ft building, that comes to about $2,905.00. The calculator below adjusts to your exact square footage.

The largest line items are Potable Water Capital Expansion Fee (City of Fort Lauderdale) — 1 ERC ($1,977.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Capital Recovery Fee (City of Pompano Beach, serving Sea Ranch Lakes) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Sea Ranch Lakes Impact Fee Schedule
Water$1,977.00 one-time
  • Potable Water Capital Expansion Fee (City of Fort Lauderdale) — 1 ERC
    City of Fort Lauderdale (water franchise)
    Sea Ranch Lakes is served under the City of Fort Lauderdale's water franchise; its potable water capital expansion fee is $1,977 per equivalent residential connection (300 gpd), or $6.59 per gallon (Code Sec. 28-256). The rate has been fixed since 2019 and is not indexed, and there is no outside-city surcharge on this capital fee. Nonresidential connections are assigned ERCs by flow (gpd).
    $1,977.00 one-time
Sewer$928.00 one-time
  • Wastewater Capital Recovery Fee (City of Pompano Beach, serving Sea Ranch Lakes) — 1" meter
    City of Pompano Beach Utilities
    Commercial property in Sea Ranch Lakes lies in the City of Pompano Beach sewer service area. Pompano Beach's wastewater capital recovery fee is $545 per ERC by meter size; a 1-inch meter equals 1.7 ERC, for $928 (Pompano Beach Code Section 51.11). Its code raises charges 25% for service outside its city limits unless an agreement provides otherwise.
    $928.00 one-timeRequires confirmation
City$0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Sea Ranch Lakes): $2,905.00 one-time (≈ $2,905.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Sea Ranch Lakes: Industrial Impact Fees

Industrial development in Sea Ranch Lakes pays no per-square-foot impact fees, but owes $2,905.00 in one-time water and sewer connection fees (rates sourced October 13, 2026).

For a 50,000 sq ft building, that comes to about $2,905.00. The calculator below adjusts to your exact square footage.

The largest line items are Potable Water Capital Expansion Fee (City of Fort Lauderdale) — 1 ERC ($1,977.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Capital Recovery Fee (City of Pompano Beach, serving Sea Ranch Lakes) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Sea Ranch Lakes Impact Fee Schedule
Water$1,977.00 one-time
  • Potable Water Capital Expansion Fee (City of Fort Lauderdale) — 1 ERC
    City of Fort Lauderdale (water franchise)
    Sea Ranch Lakes is served under the City of Fort Lauderdale's water franchise; its potable water capital expansion fee is $1,977 per equivalent residential connection (300 gpd), or $6.59 per gallon (Code Sec. 28-256). The rate has been fixed since 2019 and is not indexed, and there is no outside-city surcharge on this capital fee. Nonresidential connections are assigned ERCs by flow (gpd).
    $1,977.00 one-time
Sewer$928.00 one-time
  • Wastewater Capital Recovery Fee (City of Pompano Beach, serving Sea Ranch Lakes) — 1" meter
    City of Pompano Beach Utilities
    Commercial property in Sea Ranch Lakes lies in the City of Pompano Beach sewer service area. Pompano Beach's wastewater capital recovery fee is $545 per ERC by meter size; a 1-inch meter equals 1.7 ERC, for $928 (Pompano Beach Code Section 51.11). Its code raises charges 25% for service outside its city limits unless an agreement provides otherwise.
    $928.00 one-timeRequires confirmation
City$0.00
  • City Impact Fees (Village of Sea Ranch Lakes, Industrial)
    Village of Sea Ranch Lakes
    The Village of Sea Ranch Lakes does not levy any impact fees. Its land use districts are limited to single-family residential, commercial, community facility, and recreation/open space; there is no industrial district.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Sea Ranch Lakes): $2,905.00 one-time (≈ $2,905.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Sea Ranch Lakes: Office Impact Fees

Office development in Sea Ranch Lakes pays no per-square-foot impact fees, but owes $2,905.00 in one-time water and sewer connection fees (rates sourced October 13, 2026).

For a 25,000 sq ft building, that comes to about $2,905.00. The calculator below adjusts to your exact square footage.

The largest line items are Potable Water Capital Expansion Fee (City of Fort Lauderdale) — 1 ERC ($1,977.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Capital Recovery Fee (City of Pompano Beach, serving Sea Ranch Lakes) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Sea Ranch Lakes Impact Fee Schedule
Water$1,977.00 one-time
  • Potable Water Capital Expansion Fee (City of Fort Lauderdale) — 1 ERC
    City of Fort Lauderdale (water franchise)
    Sea Ranch Lakes is served under the City of Fort Lauderdale's water franchise; its potable water capital expansion fee is $1,977 per equivalent residential connection (300 gpd), or $6.59 per gallon (Code Sec. 28-256). The rate has been fixed since 2019 and is not indexed, and there is no outside-city surcharge on this capital fee. Nonresidential connections are assigned ERCs by flow (gpd).
    $1,977.00 one-time
Sewer$928.00 one-time
  • Wastewater Capital Recovery Fee (City of Pompano Beach, serving Sea Ranch Lakes) — 1" meter
    City of Pompano Beach Utilities
    Commercial property in Sea Ranch Lakes lies in the City of Pompano Beach sewer service area. Pompano Beach's wastewater capital recovery fee is $545 per ERC by meter size; a 1-inch meter equals 1.7 ERC, for $928 (Pompano Beach Code Section 51.11). Its code raises charges 25% for service outside its city limits unless an agreement provides otherwise.
    $928.00 one-timeRequires confirmation
City$0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Sea Ranch Lakes): $2,905.00 one-time (≈ $2,905.00 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Sea Ranch Lakes Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Sea Ranch Lakes Impact Fee FAQs

What are the total impact fees for a single-family home in Sea Ranch Lakes, Florida?

A new single-family home in Sea Ranch Lakes pays $10,786.00 per unit in combined impact fees (rates sourced October 13, 2026).

How much are commercial impact fees in Sea Ranch Lakes?

Commercial development in Sea Ranch Lakes pays no per-square-foot impact fees, but owes $2,905.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Sea Ranch Lakes charge its own impact fees?

Yes. Sea Ranch Lakes levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Sea Ranch Lakes, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000