Cooper City impact fees by project type
Cooper City: Single-Family Impact Fees
A new single-family home in Cooper City pays at least $12,525.97 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $3,716.97.
The largest line items are School Impact Fee (Broward County) ($8,809.00).
Sewer Connection / Contribution Charge (City of Cooper City) — 1.0 ERC × $2,326.15/ERC and Water Connection / Contribution Charge (City of Cooper City) — 1.0 ERC × $1,390.82/ERC are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fees (City of Cooper City) — none found is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Cooper City impact fee schedule
- Water Connection / Contribution Charge (City of Cooper City) — 1.0 ERC × $1,390.82/ERC$1,390.82Requires confirmationCity of Cooper City Utilities
- Sewer Connection / Contribution Charge (City of Cooper City) — 1.0 ERC × $2,326.15/ERC$2,326.15Requires confirmationCity of Cooper City Utilities
- City Impact Fees (City of Cooper City) — none foundRequires confirmationCity of Cooper City
- School Impact Fee (Broward County)$8,809.00Single Family, 3 or fewer BRBroward County / School Board of Broward County
- Road Impact / Transportation Concurrency Fee (Broward County)$0.00Road / Transportation ConcurrencyBroward County
- Park/Recreational Impact Fee (Broward County)$0.00Broward County
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cooper City: Multifamily Impact Fees
A new multifamily unit in Cooper City pays at least $5,191.97 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $1,475.00 and municipal or utility fees for $3,716.97.
The largest line items are School Impact Fee (Broward County, MF) ($1,475.00).
Water Connection / Contribution Charge (City of Cooper City, MF) — 1.0 ERC/unit × $1,390.82/ERC and Sewer Connection / Contribution Charge (City of Cooper City, MF) — 1.0 ERC/unit × $2,326.15/ERC are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fees (City of Cooper City, MF) — none found is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Cooper City impact fee schedule
- Water Connection / Contribution Charge (City of Cooper City, MF) — 1.0 ERC/unit × $1,390.82/ERC$1,390.82Requires confirmationCity of Cooper City Utilities
- Sewer Connection / Contribution Charge (City of Cooper City, MF) — 1.0 ERC/unit × $2,326.15/ERC$2,326.15Requires confirmationCity of Cooper City Utilities
- City Impact Fees (City of Cooper City, MF) — none foundRequires confirmationCity of Cooper City
- School Impact Fee (Broward County, MF)$1,475.00Mid-Rise, 2 or more BRBroward County / School Board of Broward County
- Park/Recreational Impact Fee (Broward County, MF)$0.00Broward County
- Road Impact / Transportation Concurrency Fee (Broward County, MF)$0.00Road / Transportation ConcurrencyBroward County
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cooper City: Commercial Impact Fees
Commercial development in Cooper City pays $0.71 per square foot in impact fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $35,750.00. The calculator below adjusts to your exact square footage.
The largest line items are Public Facilities Impact Fee (City of Cooper City, Commercial) ($0.71/sq ft).
Sewer Contribution (Connection) Charge (City of Cooper City Utilities) and Water Contribution (Connection) Charge (City of Cooper City Utilities) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Cooper City impact fee schedule
- Water Contribution (Connection) Charge (City of Cooper City Utilities)Requires confirmationCooper City Utilities
- Sewer Contribution (Connection) Charge (City of Cooper City Utilities)Requires confirmationCooper City Utilities
- Public Facilities Impact Fee (City of Cooper City, Commercial)$0.71/sq ftCity of Cooper CityCooper City's public facilities impact fee is $0.715 per gross developable square foot, applied to all nonresidential development at a single rate. A 2% administrative fee is added, and no fee is collected if the amount due is under $50.
- County Impact / Transportation Concurrency Fees (Broward County, Commercial)$0.00Broward CountyBroward County's road impact, transportation concurrency, and recreational impact fees are all suspended effective October 1, 2024 (Ord. No. 2024-34); no transportation concurrency assessments or impact fees are collected until the County accepts a new impact fee study, and as of mid-2026 none has been accepted. Fees resume automatically once a study is accepted. County school impact fees remain in effect but apply to residential development only.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cooper City: Industrial Impact Fees
Industrial development in Cooper City pays $0.71 per square foot in impact fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $35,750.00. The calculator below adjusts to your exact square footage.
The largest line items are Public Facilities Impact Fee (City of Cooper City, Industrial) ($0.71/sq ft).
Sewer Contribution (Connection) Charge (City of Cooper City Utilities) and Water Contribution (Connection) Charge (City of Cooper City Utilities) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Cooper City impact fee schedule
- Water Contribution (Connection) Charge (City of Cooper City Utilities)Requires confirmationCooper City Utilities
- Sewer Contribution (Connection) Charge (City of Cooper City Utilities)Requires confirmationCooper City Utilities
- Public Facilities Impact Fee (City of Cooper City, Industrial)$0.71/sq ftCity of Cooper CityCooper City's public facilities impact fee is $0.715 per gross developable square foot, applied to all nonresidential development at a single rate. A 2% administrative fee is added, and no fee is collected if the amount due is under $50.
- County Impact / Transportation Concurrency Fees (Broward County, Industrial)$0.00Broward CountyBroward County's road, transportation concurrency, and recreational impact fees are suspended effective October 1, 2024 (Ord. No. 2024-34), and none are collected until the County adopts a new impact fee study; as of mid-2026 no such study has been accepted. County school impact fees remain in effect but apply to residential development only.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cooper City: Office Impact Fees
Office development in Cooper City pays $0.71 per square foot in impact fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to at least $17,875.00. The calculator below adjusts to your exact square footage.
The largest line items are Public Facilities Impact Fee (City of Cooper City, Office) ($0.71/sq ft).
Sewer Contribution (Connection) Charge (City of Cooper City Utilities) and Water Contribution (Connection) Charge (City of Cooper City Utilities) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Cooper City impact fee schedule
- Water Contribution (Connection) Charge (City of Cooper City Utilities)Requires confirmationCooper City Utilities
- Sewer Contribution (Connection) Charge (City of Cooper City Utilities)Requires confirmationCooper City Utilities
- Public Facilities Impact Fee (City of Cooper City, Office)$0.71/sq ftCity of Cooper CityCooper City's public facilities impact fee is $0.715 per gross developable square foot, applied to all nonresidential development at a single rate. A 2% administrative fee is added, and no fee is collected if the amount due is under $50.
- County Impact / Transportation Concurrency Fees (Broward County, Office)$0.00Broward CountyBroward County's road, transportation concurrency, and recreational impact fees are suspended effective October 1, 2024 (Ord. No. 2024-34), and none are collected until the County adopts a new impact fee study; as of mid-2026 no such study has been accepted. County school impact fees remain in effect but apply to residential development only.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cooper City impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Cooper City impact fee FAQs
What are the total impact fees for a single-family home in Cooper City, Florida?
A new single-family home in Cooper City pays at least $12,525.97 per unit in combined impact fees (rates sourced July 14, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Cooper City?
Commercial development in Cooper City pays $0.71 per square foot in impact fees, at least $35,750.00 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Cooper City charge its own impact fees?
Yes. Cooper City levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Cooper City, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Broward County impact fees page.