Lighthouse Point, Florida Impact Fees

Lighthouse Point applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $12,409.00 per unit (rates sourced July 14, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Lighthouse Point impact fees by project type

Lighthouse Point: Single-Family Impact Fees

A new single-family home in Lighthouse Point pays at least $12,409.00 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (Broward County) ($8,809.00) and Water Capital Recovery Charge (Broward County WWS) ($1,590.00).

Wastewater Capital Recovery Charge (Broward County WWS) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

City Impact Fees (City of Lighthouse Point) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,590.00
  • Water Capital Recovery Charge (Broward County WWS)
    Broward County Water & Wastewater Services
    PROVIDER CONFIRMED: the City's own staff directory entry is literally titled 'Water - Broward County WWS,' 2555 W. Copans Rd, 954-831-3250 (https://www.lighthousepointfl.gov/Directory.aspx?did=32). BCWWS Capital Recovery Charge, 1.000 ERU = $1,590. Lighthouse Point is NOT served by Pompano Beach (Pompano is a wholesale Large User of the County plant, not the LHP retail provider). CONFIRMED.
    $1,590.00
Sewer$2,010.00
  • Wastewater Capital Recovery Charge (Broward County WWS)
    Broward County Water & Wastewater Services
    Amount = BCWWS Capital Recovery Charge, 1.000 ERU = $2,010. UNCONFIRMED: provider INFERRED - the LHP Code has no utilities/water/sewer chapter at all (full Part II chapter list: 1, 2, 6, 10, 14, 18, 20, 22, 26, 30, 34, 38, 42, 46, 50, 54, 58, 62, 66, 70, 74, 77, 78, 82, 86, 90), so the City operates no utility, and water is confirmed BCWWS. Get a positive statement from BCWWS 954-831-3250.
    $2,010.00Requires confirmation
City$0.00
  • City Impact Fees (City of Lighthouse Point)
    City of Lighthouse Point
    $0 on the face of the posted code, but UNCONFIRMED. Checked (a) the full Part II chapter list - no impact-fee or concurrency-fee chapter; (b) Appendix A - Fee Schedule (~46,000 characters) - ZERO occurrences of 'impact', no water/sewer connection charge; (c) the City's Building Permit Fee Schedule 'Exhibit B,' rev. 9-12-22 - zero 'impact'. Kept UNCONFIRMED because LHP's Municode is codified only through Supp. 21 (Ord. 2018-0966), and a large LDC re-enactment (Ords. 2024-1021 to 2024-1045, adopted June 2024) INCLUDING Ch. 25 'Concurrency' (Ord. 2024-1025) is adopted but NOT YET CODIFIED - that is the one place a new fee could hide. Uncodified list: http://www.lighthousepoint.com/codes.cfm. Contact: City Hall 954-943-6500.
    Requires confirmation
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Single Family 3-or-fewer BR = $8,809 (this record, the default/most common); 4-or-more BR = $11,070 (separate tier record). Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $8,809.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
Total (Lighthouse Point): $12,409.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lighthouse Point: Multifamily Impact Fees

A new multifamily unit in Lighthouse Point pays at least $4,020.20 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (Broward County, MF) ($1,475.00) and Water Capital Recovery Charge (Broward County WWS, MF) — 0.707 ERU × $1,590/ERU ($1,124.13).

Wastewater Capital Recovery Charge (Broward County WWS, MF) — 0.707 ERU × $2,010/ERU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

City Impact Fees (City of Lighthouse Point, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,124.13
  • Water Capital Recovery Charge (Broward County WWS, MF) — 0.707 ERU × $1,590/ERU
    Condominium / Apartment / Duplex / Triplex (R03, 0.707 ERU)
    Broward County Water & Wastewater Services
    PROVIDER CONFIRMED: the City's own staff directory entry is literally titled 'Water - Broward County WWS,' 2555 W. Copans Rd, 954-831-3250 (https://www.lighthousepointfl.gov/Directory.aspx?did=32). Lighthouse Point is NOT served by Pompano Beach. Basis: BCWWS 'Equivalent Residential Unit Factors' (4/4/2017), code R03 Condominium/Apartment/Duplex/Triplex = 0.707 ERU - https://www.broward.org/WaterServices/Engineering/Documents/WWSEquivalentResidentialUnitFactors.pdf. Dollar product is DERIVED (0.707 x $1,590). CONFIRMED.
    $1,124.13
Sewer$1,421.07
  • Wastewater Capital Recovery Charge (Broward County WWS, MF) — 0.707 ERU × $2,010/ERU
    Condominium / Apartment / Duplex / Triplex (R03, 0.707 ERU)
    Broward County Water & Wastewater Services
    Amount = 0.707 ERU x $2,010 BCWWS Capital Recovery Charge (ERU factor source: https://www.broward.org/WaterServices/Engineering/Documents/WWSEquivalentResidentialUnitFactors.pdf, code R03). UNCONFIRMED: provider INFERRED - the LHP Code has no utilities/water/sewer chapter at all (full Part II chapter list: 1, 2, 6, 10, 14, 18, 20, 22, 26, 30, 34, 38, 42, 46, 50, 54, 58, 62, 66, 70, 74, 77, 78, 82, 86, 90), so the City operates no utility, and water is confirmed BCWWS. Get a positive statement from BCWWS 954-831-3250.
    $1,421.07Requires confirmation
City$0.00
  • City Impact Fees (City of Lighthouse Point, MF)
    City of Lighthouse Point
    $0 on the face of the posted code, but UNCONFIRMED. Checked (a) the full Part II chapter list - no impact-fee or concurrency-fee chapter; (b) Appendix A - Fee Schedule (~46,000 characters) - ZERO occurrences of 'impact', no water/sewer connection charge; (c) the City's Building Permit Fee Schedule 'Exhibit B,' rev. 9-12-22 - zero 'impact'. Kept UNCONFIRMED because LHP's Municode is codified only through Supp. 21 (Ord. 2018-0966), and a large LDC re-enactment (Ords. 2024-1021 to 2024-1045, adopted June 2024) INCLUDING Ch. 25 'Concurrency' (Ord. 2024-1025) is adopted but NOT YET CODIFIED - that is the one place a new fee could hide. Uncodified list: http://www.lighthousepoint.com/codes.cfm. Contact: City Hall 954-943-6500.
    Requires confirmation
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Adopted MF tiers: Garden Apartment (low-rise, 1–3 stories) 1-or-fewer BR $480 / 2 BR $4,918 / 3-or-more BR $5,901; Mid-Rise (4+ stories) 1-or-fewer BR $375 / 2-or-more BR $1,475; High-Rise all BR $461. The canonical MF unit (2BR/2BA, 1,000 sq ft, 4-story building) falls in Broward's Mid-Rise class, so Mid-Rise 2-or-more BR $1,475 is the DEFAULT record. Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $1,475.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
Total (Lighthouse Point): $4,020.20
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lighthouse Point: Commercial Impact Fees

Commercial development in Lighthouse Point pays no per-square-foot impact fees (rates sourced July 14, 2026).

Sewer Connection / Capacity Fee (City of Lighthouse Point) and Water Connection / Capacity Fee (City of Lighthouse Point) are set by the utility and not published online. City Impact Fees (City of Lighthouse Point, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection / Capacity Fee (City of Lighthouse Point)
    City of Lighthouse Point
    $0 placeholder — NO nonresidential water connection/capacity fee and NO meter-size table is published anywhere. Checked: Municode Appendix A (the city's complete codified fee schedule) — read in full; its only water entries are plumbing PERMIT fees (Sec. 14-56(3): 'Water service — new construction $15.00'; hook-up repair/replacement 3% of construction value), which are permit fees, not capacity charges. No 'Utilities' heading exists in the fee schedule. City website and targeted web search returned nothing. Lighthouse Point operates its own water distribution system (treated water purchased wholesale). VERIFY: nonres water capacity/connection charge and meter-size schedule. Contact: City of Lighthouse Point, 954-943-6500, 2200 NE 38th St.
    Requires confirmation
Sewer$0.00
  • Sewer Connection / Capacity Fee (City of Lighthouse Point)
    City of Lighthouse Point / Broward County regional treatment
    $0 placeholder — NO nonresidential sewer connection/capacity fee published. Checked: Municode Appendix A (complete codified fee schedule) read in full; only sewer entry is Sec. 14-56(4) plumbing PERMIT fee ('Sewage connections — new construction $15.00'; hook-up repair/replacement 3% of construction value), not a capacity charge. Sewage is conveyed to Broward County / Pompano Beach regional treatment; a regional capacity charge may be passed through. City website and web search returned nothing. VERIFY: nonres sewer capacity/connection charge. Contact: City of Lighthouse Point, 954-943-6500.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Lighthouse Point, Commercial)
    City of Lighthouse Point
    $0 — read Appendix A (Fee Schedule) in full: it is the city's complete codified fee schedule and contains NO impact fee of any kind (no transportation, park, police, fire, or general-government impact fee). Every nonres charge listed is a permit / plan-review / application fee (e.g. Sec. 14-53 building permit $9.00 per $1,000 construction cost; Sec. 34-62 fire plan review $0.05/sq ft on new commercial construction — a review fee, not an impact fee). LDC Ch. 42 has no impact-fee article. UNCONFIRMED because Municode is codified only through Ord. 2018-0966 (Supp. 21, 12/31/2018) with uncodified ordinances through 2024 — a post-2018 impact fee ordinance cannot be ruled out from the codifier alone. VERIFY: Building & Zoning Dept, 954-943-6500.
    Requires confirmation
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Lighthouse Point): $0.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lighthouse Point: Industrial Impact Fees

Industrial development in Lighthouse Point pays no per-square-foot impact fees (rates sourced July 14, 2026).

Sewer Connection / Capacity Fee (City of Lighthouse Point) and Water Connection / Capacity Fee (City of Lighthouse Point) are set by the utility and not published online. City Impact Fees (City of Lighthouse Point, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection / Capacity Fee (City of Lighthouse Point)
    City of Lighthouse Point
    $0 placeholder — NO nonresidential water connection/capacity fee and NO meter-size table is published anywhere. Checked: Municode Appendix A (the city's complete codified fee schedule) — read in full; its only water entries are plumbing PERMIT fees (Sec. 14-56(3): 'Water service — new construction $15.00'; hook-up repair/replacement 3% of construction value), which are permit fees, not capacity charges. No 'Utilities' heading exists in the fee schedule. City website and targeted web search returned nothing. Lighthouse Point operates its own water distribution system (treated water purchased wholesale). VERIFY: nonres water capacity/connection charge and meter-size schedule. Contact: City of Lighthouse Point, 954-943-6500, 2200 NE 38th St.
    Requires confirmation
Sewer$0.00
  • Sewer Connection / Capacity Fee (City of Lighthouse Point)
    City of Lighthouse Point / Broward County regional treatment
    $0 placeholder — NO nonresidential sewer connection/capacity fee published. Checked: Municode Appendix A (complete codified fee schedule) read in full; only sewer entry is Sec. 14-56(4) plumbing PERMIT fee ('Sewage connections — new construction $15.00'; hook-up repair/replacement 3% of construction value), not a capacity charge. Sewage is conveyed to Broward County / Pompano Beach regional treatment; a regional capacity charge may be passed through. City website and web search returned nothing. VERIFY: nonres sewer capacity/connection charge. Contact: City of Lighthouse Point, 954-943-6500.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Lighthouse Point, Industrial)
    City of Lighthouse Point
    $0 — Appendix A (Fee Schedule), read in full, contains NO impact fee of any kind; all nonres charges are permit/plan-review/application fees. Lighthouse Point is a small, built-out residential/marine city with no industrial zoning district of consequence. UNCONFIRMED: Municode codified only through Ord. 2018-0966 (Supp. 21). VERIFY: Building & Zoning Dept, 954-943-6500.
    Requires confirmation
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Lighthouse Point): $0.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lighthouse Point: Office Impact Fees

Office development in Lighthouse Point pays no per-square-foot impact fees (rates sourced July 14, 2026).

Sewer Connection / Capacity Fee (City of Lighthouse Point) and Water Connection / Capacity Fee (City of Lighthouse Point) are set by the utility and not published online. City Impact Fees (City of Lighthouse Point, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection / Capacity Fee (City of Lighthouse Point)
    City of Lighthouse Point
    $0 placeholder — NO nonresidential water connection/capacity fee and NO meter-size table is published anywhere. Checked: Municode Appendix A (the city's complete codified fee schedule) — read in full; its only water entries are plumbing PERMIT fees (Sec. 14-56(3): 'Water service — new construction $15.00'; hook-up repair/replacement 3% of construction value), which are permit fees, not capacity charges. No 'Utilities' heading exists in the fee schedule. City website and targeted web search returned nothing. Lighthouse Point operates its own water distribution system (treated water purchased wholesale). VERIFY: nonres water capacity/connection charge and meter-size schedule. Contact: City of Lighthouse Point, 954-943-6500, 2200 NE 38th St.
    Requires confirmation
Sewer$0.00
  • Sewer Connection / Capacity Fee (City of Lighthouse Point)
    City of Lighthouse Point / Broward County regional treatment
    $0 placeholder — NO nonresidential sewer connection/capacity fee published. Checked: Municode Appendix A (complete codified fee schedule) read in full; only sewer entry is Sec. 14-56(4) plumbing PERMIT fee ('Sewage connections — new construction $15.00'; hook-up repair/replacement 3% of construction value), not a capacity charge. Sewage is conveyed to Broward County / Pompano Beach regional treatment; a regional capacity charge may be passed through. City website and web search returned nothing. VERIFY: nonres sewer capacity/connection charge. Contact: City of Lighthouse Point, 954-943-6500.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Lighthouse Point, Office)
    City of Lighthouse Point
    $0 — Appendix A (Fee Schedule), read in full, contains NO impact fee of any kind; all nonres charges are permit/plan-review/application fees. LDC Ch. 42 has no impact-fee article. UNCONFIRMED: Municode codified only through Ord. 2018-0966 (Supp. 21) with uncodified ordinances through 2024. VERIFY: Building & Zoning Dept, 954-943-6500.
    Requires confirmation
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Lighthouse Point): $0.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Lighthouse Point

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Lighthouse Point, Florida?

A new single-family home in Lighthouse Point pays at least $12,409.00 per unit in combined impact fees (rates sourced July 14, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Lighthouse Point?

Lighthouse Point does not currently levy impact fees on commercial development.

Does Lighthouse Point charge its own impact fees?

Yes. Lighthouse Point levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Lighthouse Point, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.