Davie applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $14,779.00 per unit (rates sourced July 12, 2026). The full breakdown is below.

Davie impact fees by project type

Davie: Single-Family Impact Fees

A new single-family home in Davie pays $14,779.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $5,970.00.

The largest line items are School Impact Fee (SFR, 3BR) ($8,809.00), Water Capacity Charge (Town of Davie, SFR) ($3,050.00) and Wastewater Capacity Charge (Town of Davie, SFR) ($2,920.00).

City Impact Fee (Town of Davie, SFR) and Road / Transportation Concurrency Fee (Broward County, SFR) and Park/Recreational Impact Fee (Broward County, SFR) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

Official fee schedule

View the full fee schedule
Water$3,050.00
  • Water Capacity Charge (Town of Davie, SFR)
    Town of Davie Utilities
    $3,050 per ERC (1 ERC = SFR). Source: Town of Davie Connection Fees for New Construction / Water & Sewer Service Rates (FY Oct 1 2025–Sep 30 2026). Not Broward WWS (prior $1,590 wrong).
    $3,050.00
Sewer$2,920.00
  • Wastewater Capacity Charge (Town of Davie, SFR)
    Town of Davie Utilities
    $2,920 per ERC (combined W+S = $5,970/ERC). Source: Town of Davie Connection Fees for New Construction (FY 2025–26). Not Broward WWS (prior $2,010 wrong).
    $2,920.00
City$0.00
  • City Impact Fee (Town of Davie, SFR)
    Town may levy municipal impact fees (parks/police/fire); not confirmed against adopted schedule. $0 placeholder. ⚠️ VERIFY Town of Davie 954-797-1101.
    Contact jurisdiction/utility to verifyRequires confirmation
County$8,809.00
  • $8,809.00
  • Road / Transportation Concurrency Fee (Broward County, SFR)
    Broward County Road Impact OR Transportation Concurrency Fee, computed at plan review via TRIPS calculator — not a flat rate. $0 placeholder. ⚠️ VERIFY 954-357-6666 opt 2.
    Contact jurisdiction/utility to verifyRequires confirmation
  • Park/Recreational Impact Fee (Broward County, SFR)
    Broward County Park/Recreational Impact Fee applies only if platting required. $0 placeholder. ⚠️ VERIFY 954-357-6666.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Davie): $14,779.00
Sources last checked July 12, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Davie: Multifamily Impact Fees

A new multifamily unit in Davie pays $1,475.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (MF, Mid-Rise, 2+ BR) ($1,475.00).

Wastewater Capacity Charge (Town of Davie, MF) and Road / Transportation Concurrency Fee (Broward County, MF) and Park/Recreational Impact Fee (Broward County, MF) and Water Capacity Charge (Town of Davie, MF) and City Impact Fee (Town of Davie, MF) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water Capacity Charge (Town of Davie, MF)
    Broward County
    Town of Davie own utility, not Broward WWS (prior $1,124.13 wrong). SFR = $3,050/ERC (FY2025-26 Connection Fees). MF per-unit ERC factor not confirmed. ⚠️ VERIFY Davie Utilities 954-797-1000.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Wastewater Capacity Charge (Town of Davie, MF)
    Broward County
    Town of Davie own utility, not Broward WWS (prior $1,421.07 wrong). SFR = $2,920/ERC (FY2025-26 Connection Fees). MF per-unit ERC factor not confirmed. ⚠️ VERIFY 954-797-1000.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fee (Town of Davie, MF)
    Town may levy municipal impact fees (parks/police/fire); not confirmed. $0 placeholder. ⚠️ VERIFY 954-797-1101.
    Contact jurisdiction/utility to verifyRequires confirmation
County$1,475.00
  • $1,475.00
  • Road / Transportation Concurrency Fee (Broward County, MF)
    Broward County Road Impact OR Transportation Concurrency Fee, computed at plan review via TRIPS calculator — not a flat rate. $0 placeholder. ⚠️ VERIFY 954-357-6666 opt 2.
    Contact jurisdiction/utility to verifyRequires confirmation
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County Park/Recreational Impact Fee applies only if platting required. $0 placeholder. ⚠️ VERIFY 954-357-6666.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Davie): $1,475.00
Sources last checked July 12, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Davie: Commercial Impact Fees

Commercial development in Davie pays $0.77 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $44,470.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($3,050.00 one-time), Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($2,920.00 one-time) and Fire Impact Fee (Town of Davie, Commercial) ($0.32/sq ft).

Official fee schedule

View the full fee schedule
Water$3,050.00 one-time
  • Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie Utilities
    NOT METER-BASED — ERC-based. Town of Davie 'Connection Fees & Application for New Construction' (Utilities Customer Service): connection fees are based on Equivalent Residential Connections; 1 ERC = 350 GPD of water usage. Charge per ERC for WATER = $3,050.00. Amount stored here is the published 1-ERC rate (the canonical minimum); a nonresidential project's total = $3,050 × (its ERC count, derived from projected GPD for the specific commercial use — the Town requires the specific use and square footage, e.g. restaurant / warehouse sq ft / office sq ft, to compute ERCs). Combined water + wastewater = $5,970 per ERC ($3,050 water + $2,920 wastewater). A Water and Sewer Service Agreement must be executed with the Town before building permit application. Same schedule applies to residential and nonresidential — one shared ERC table, so the nonres 1-ERC amount legitimately equals the SFR amount. Contact: Town of Davie, 954-797-1000.
    $3,050.00 one-time
Sewer$2,920.00 one-time
  • Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie Utilities
    NOT METER-BASED — ERC-based. Town of Davie 'Connection Fees & Application for New Construction': 1 ERC = 350 GPD. Charge per ERC for WASTEWATER = $2,920.00. Amount stored is the published 1-ERC rate (canonical minimum); project total = $2,920 × ERC count derived from the specific commercial use and square footage. Combined water + wastewater = $5,970 per ERC. A Water and Sewer Service Agreement must be executed with the Town before applying for building permits. One shared ERC table for all customer classes, so the nonres 1-ERC amount equals the SFR amount. Contact: Town of Davie, 954-797-1000.
    $2,920.00 one-time
City$0.77/sq ft
  • Fire Impact Fee (Town of Davie, Commercial)
    Town of Davie
    Town of Davie Impact Fees and Implementation Schedule, Res. 2009-190 (8-19-2009), revised 4-9-2015; Town Code Ch. 18, Art. II. Schedule row: FIRE — COMMERCIAL, per SQ. FT. Only nonres rows in the schedule are COMMERCIAL and INDUSTRIAL. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.32/sq ft
  • Police Impact Fee (Town of Davie, Commercial)
    Town of Davie
    Town of Davie 'Impact Fees and Implementation Schedule', adopted by Resolution 2009-190 (8-19-2009), revised 4-9-2015. Authority: Town Code Ch. 18, Art. II. Schedule row: POLICE — COMMERCIAL, per SQ. FT. The schedule's only nonresidential rows are COMMERCIAL and INDUSTRIAL (no ITE codes, no size tiers). Schedule is designed to recover 35% of parks/recreation cost and 100% of all others. Total nonres impact fee: Commercial $0.770/sf, Industrial $0.424/sf. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.30/sq ft
  • General Government Impact Fee (Town of Davie, Commercial)
    Town of Davie
    Town of Davie Impact Fees and Implementation Schedule, Res. 2009-190 (8-19-2009), revised 4-9-2015; Town Code Ch. 18, Art. II. Schedule row: GENERAL GOVERNMENT — COMMERCIAL, per SQ. FT. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.15/sq ft
  • Parks and Recreation Impact Fee (Town of Davie, Commercial)
    Town of Davie
    CONFIRMED $0 — nonresidential development is NOT charged the Parks and Recreation impact fee. The Town of Davie Impact Fee Schedule (Res. 2009-190, rev. 4-9-2015) lists PARKS AND RECREATION rows for SFR Detached and Multi-Family dwelling units ONLY; there are no COMMERCIAL or INDUSTRIAL rows under that fee type, and the schedule's nonres totals ($0.770/sf Commercial, $0.424/sf Industrial) equal Police + Fire + General Government exactly, confirming parks is excluded from nonres. Consistent with FL precedent (park/rec fees commonly exempt nonres).
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County's Road Impact, Transportation Concurrency, and Recreational impact fees are all suspended as of 10/01/2024 per Broward County Code Sec. 5-182 (Ord. No. 2024-34, adopted 9-17-24, eff. 10-1-24) — no impact fees collected until a Sec. 163.31801 F.S. study is accepted by the Board of County Commissioners. No such study accepted as of 2026-07-11. County school impact fees remain in effect but are residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Davie): $0.77/sq ft + $5,970.00 one-time (≈ $44,470.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedule

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Davie: Industrial Impact Fees

Industrial development in Davie pays $0.42 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $27,170.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($3,050.00 one-time), Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($2,920.00 one-time) and Fire Impact Fee (Town of Davie, Industrial) ($0.26/sq ft).

Official fee schedule

View the full fee schedule
Water$3,050.00 one-time
  • Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie Utilities
    NOT METER-BASED — ERC-based. Town of Davie 'Connection Fees & Application for New Construction' (Utilities Customer Service): connection fees are based on Equivalent Residential Connections; 1 ERC = 350 GPD of water usage. Charge per ERC for WATER = $3,050.00. Amount stored here is the published 1-ERC rate (the canonical minimum); a nonresidential project's total = $3,050 × (its ERC count, derived from projected GPD for the specific commercial use — the Town requires the specific use and square footage, e.g. restaurant / warehouse sq ft / office sq ft, to compute ERCs). Combined water + wastewater = $5,970 per ERC ($3,050 water + $2,920 wastewater). A Water and Sewer Service Agreement must be executed with the Town before building permit application. Same schedule applies to residential and nonresidential — one shared ERC table, so the nonres 1-ERC amount legitimately equals the SFR amount. Contact: Town of Davie, 954-797-1000.
    $3,050.00 one-time
Sewer$2,920.00 one-time
  • Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie Utilities
    NOT METER-BASED — ERC-based. Town of Davie 'Connection Fees & Application for New Construction': 1 ERC = 350 GPD. Charge per ERC for WASTEWATER = $2,920.00. Amount stored is the published 1-ERC rate (canonical minimum); project total = $2,920 × ERC count derived from the specific commercial use and square footage. Combined water + wastewater = $5,970 per ERC. A Water and Sewer Service Agreement must be executed with the Town before applying for building permits. One shared ERC table for all customer classes, so the nonres 1-ERC amount equals the SFR amount. Contact: Town of Davie, 954-797-1000.
    $2,920.00 one-time
City$0.42/sq ft
  • Fire Impact Fee (Town of Davie, Industrial)
    Town of Davie
    Town of Davie Impact Fees and Implementation Schedule, Res. 2009-190 (8-19-2009), revised 4-9-2015; Town Code Ch. 18, Art. II. Schedule row: FIRE — INDUSTRIAL, per SQ. FT. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.26/sq ft
  • General Government Impact Fee (Town of Davie, Industrial)
    Town of Davie
    Town of Davie Impact Fees and Implementation Schedule, Res. 2009-190 (8-19-2009), revised 4-9-2015; Town Code Ch. 18, Art. II. Schedule row: GENERAL GOVERNMENT — INDUSTRIAL, per SQ. FT. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.12/sq ft
  • Police Impact Fee (Town of Davie, Industrial)
    Town of Davie
    Town of Davie Impact Fees and Implementation Schedule, Res. 2009-190 (8-19-2009), revised 4-9-2015; Town Code Ch. 18, Art. II. Schedule row: POLICE — INDUSTRIAL, per SQ. FT. Total nonres: Industrial $0.424/sf (Police + Fire + General Government). Contact: Planning and Zoning Manager, 954-797-1075.
    $0.05/sq ft
  • Parks and Recreation Impact Fee (Town of Davie, Industrial)
    Town of Davie
    CONFIRMED $0 — nonresidential is NOT charged the Parks and Recreation impact fee. The Davie Impact Fee Schedule (Res. 2009-190, rev. 4-9-2015) lists PARKS AND RECREATION only for SFR Detached and Multi-Family dwelling units; the nonres totals ($0.770/sf Commercial, $0.424/sf Industrial) equal Police + Fire + General Government exactly.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County's Road Impact, Transportation Concurrency, and Recreational impact fees are all suspended as of 10/01/2024 per Broward County Code Sec. 5-182 (Ord. No. 2024-34, adopted 9-17-24, eff. 10-1-24) — no impact fees collected until a Sec. 163.31801 F.S. study is accepted by the Board of County Commissioners. No such study accepted as of 2026-07-11. County school impact fees remain in effect but are residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Davie): $0.42/sq ft + $5,970.00 one-time (≈ $27,170.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedule

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Davie: Office Impact Fees

Office development in Davie pays $0.77 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $25,220.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($3,050.00 one-time) and Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($2,920.00 one-time).

Fire Impact Fee (Town of Davie, Office) and Police Impact Fee (Town of Davie, Office) and General Government Impact Fee (Town of Davie, Office) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Official fee schedule

View the full fee schedule
Water$3,050.00 one-time
  • Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie Utilities
    NOT METER-BASED — ERC-based. Town of Davie 'Connection Fees & Application for New Construction' (Utilities Customer Service): connection fees are based on Equivalent Residential Connections; 1 ERC = 350 GPD of water usage. Charge per ERC for WATER = $3,050.00. Amount stored here is the published 1-ERC rate (the canonical minimum); a nonresidential project's total = $3,050 × (its ERC count, derived from projected GPD for the specific commercial use — the Town requires the specific use and square footage, e.g. restaurant / warehouse sq ft / office sq ft, to compute ERCs). Combined water + wastewater = $5,970 per ERC ($3,050 water + $2,920 wastewater). A Water and Sewer Service Agreement must be executed with the Town before building permit application. Same schedule applies to residential and nonresidential — one shared ERC table, so the nonres 1-ERC amount legitimately equals the SFR amount. Contact: Town of Davie, 954-797-1000.
    $3,050.00 one-time
Sewer$2,920.00 one-time
  • Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie Utilities
    NOT METER-BASED — ERC-based. Town of Davie 'Connection Fees & Application for New Construction': 1 ERC = 350 GPD. Charge per ERC for WASTEWATER = $2,920.00. Amount stored is the published 1-ERC rate (canonical minimum); project total = $2,920 × ERC count derived from the specific commercial use and square footage. Combined water + wastewater = $5,970 per ERC. A Water and Sewer Service Agreement must be executed with the Town before applying for building permits. One shared ERC table for all customer classes, so the nonres 1-ERC amount equals the SFR amount. Contact: Town of Davie, 954-797-1000.
    $2,920.00 one-time
City$0.77/sq ft
  • Fire Impact Fee (Town of Davie, Office)
    Town of Davie
    NO SEPARATE OFFICE ROW IN SCHEDULE — rate entered is the COMMERCIAL rate. Davie Impact Fee Schedule (Res. 2009-190, rev. 4-9-2015) has only COMMERCIAL and INDUSTRIAL nonres rows. VERIFY office is charged at the COMMERCIAL rate. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.32/sq ftRequires confirmation
  • Police Impact Fee (Town of Davie, Office)
    Town of Davie
    NO SEPARATE OFFICE ROW IN SCHEDULE — rate entered is the COMMERCIAL rate. The Town of Davie Impact Fee Schedule (Res. 2009-190, 8-19-2009, rev. 4-9-2015; Town Code Ch. 18, Art. II) has exactly two nonresidential rows: COMMERCIAL and INDUSTRIAL. Office development is not separately listed and would be assessed under COMMERCIAL. VERIFY that office use is charged at the COMMERCIAL rate rather than INDUSTRIAL. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.30/sq ftRequires confirmation
  • General Government Impact Fee (Town of Davie, Office)
    Town of Davie
    NO SEPARATE OFFICE ROW IN SCHEDULE — rate entered is the COMMERCIAL rate. Davie Impact Fee Schedule (Res. 2009-190, rev. 4-9-2015) has only COMMERCIAL and INDUSTRIAL nonres rows. VERIFY office is charged at the COMMERCIAL rate. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.15/sq ftRequires confirmation
  • Parks and Recreation Impact Fee (Town of Davie, Office)
    Town of Davie
    CONFIRMED $0 — nonresidential is NOT charged the Parks and Recreation impact fee. The Davie Impact Fee Schedule (Res. 2009-190, rev. 4-9-2015) lists PARKS AND RECREATION only for SFR Detached and Multi-Family dwelling units; nonres totals equal Police + Fire + General Government exactly.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County's Road Impact, Transportation Concurrency, and Recreational impact fees are all suspended as of 10/01/2024 per Broward County Code Sec. 5-182 (Ord. No. 2024-34, adopted 9-17-24, eff. 10-1-24) — no impact fees collected until a Sec. 163.31801 F.S. study is accepted by the Board of County Commissioners. No such study accepted as of 2026-07-11. County school impact fees remain in effect but are residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Davie): $0.77/sq ft + $5,970.00 one-time (≈ $25,220.00 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedule
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Estimate your project in Davie

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Davie, Florida?

A new single-family home in Davie pays $14,779.00 per unit in combined impact fees (rates sourced July 12, 2026).

How much are commercial impact fees in Davie?

Commercial development in Davie pays $0.77 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees, about $44,470.00 for a 50,000 sq ft building.

Does Davie charge its own impact fees?

Yes. Davie levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Davie, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.