Davie, Florida Impact Fees

Davie applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $17,325.98 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Davie Impact Fees by Project Type

Davie: Single-Family Impact Fees

A new single-family home in Davie pays $17,325.98 per unit in impact fees (rates sourced October 13, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $8,516.98.

The largest line items are School Impact Fee (Broward County) ($8,809.00), Water Connection Fee (Town of Davie) — 1 ERC × $3,050/ERC ($3,050.00) and Wastewater Connection Fee (Town of Davie) — 1 ERC × $2,920/ERC ($2,920.00).

Parks and Recreation Impact Fee (Town of Davie), Police Impact Fee (Town of Davie), Fire Impact Fee (Town of Davie), and General Government Impact Fee (Town of Davie) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Davie Impact Fee Schedule
Water$3,050.00
  • Water Connection Fee (Town of Davie) — 1 ERC × $3,050/ERC
    Town of Davie Utilities
    Town of Davie Utilities water connection fee: $3,050 per equivalent residential connection (ERC, 350 gallons per day); a single-family home is 1 ERC. Applies only inside the Town utility service area, and a water and sewer service agreement is required before building permits.
    $3,050.00
Sewer$2,920.00
  • Wastewater Connection Fee (Town of Davie) — 1 ERC × $2,920/ERC
    Town of Davie Utilities
    Town of Davie Utilities wastewater connection fee: $2,920 per equivalent residential connection (ERC); a single-family home is 1 ERC. Applies only inside the Town utility service area, and a water and sewer service agreement is required before building permits.
    $2,920.00
City$2,546.98
  • Parks and Recreation Impact Fee (Town of Davie)
    Town of Davie
    Town of Davie parks and recreation impact fee of $1,625.95 per single-family home, under Resolution 2009-190 as revised April 9, 2015, collected at building permit.
    $1,625.95Requires confirmation
  • Fire Impact Fee (Town of Davie)
    Town of Davie
    Town of Davie fire impact fee of $410.07 per single-family home, under Resolution 2009-190 as revised April 9, 2015, collected at building permit.
    $410.07Requires confirmation
  • Police Impact Fee (Town of Davie)
    Town of Davie
    Town of Davie police impact fee of $306.87 per single-family home, under Resolution 2009-190 as revised April 9, 2015, collected at building permit.
    $306.87Requires confirmation
  • General Government Impact Fee (Town of Davie)
    Town of Davie
    Town of Davie general government impact fee of $204.09 per single-family home, under Resolution 2009-190 as revised April 9, 2015, collected at building permit.
    $204.09Requires confirmation
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County school impact fee, charged on every new residential unit countywide, including inside cities. Rates effective January 1, 2022 (Ord. 2020-36) with no annual index. Since November 2025 it is paid directly to the School Board of Broward County, no later than building permit issuance. This is the single-family rate for 3 or fewer bedrooms, which covers the typical 3-bedroom house; homes with 4 or more bedrooms pay $11,070.
    $8,809.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    Broward County road impact fees and transportation concurrency assessments are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    Broward County regional park and local park impact fees are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
Total (Davie): $17,325.98
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Davie: Multifamily Impact Fees

A new multifamily unit in Davie pays at least $2,462.92 per unit in impact fees (rates sourced October 13, 2026). Of that, Broward County-levied fees account for $1,475.00 and municipal or utility fees for $987.92.

The largest line items are School Impact Fee (Broward County, MF) ($1,475.00).

General Government Impact Fee (Town of Davie, MF), Police Impact Fee (Town of Davie, MF), Fire Impact Fee (Town of Davie, MF), and Parks and Recreation Impact Fee (Town of Davie, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Wastewater Connection Fee (Town of Davie, MF) — no published per-unit MF basis and Water Connection Fee (Town of Davie, MF) — no published per-unit MF basis are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Davie Impact Fee Schedule
Water$0.00
Sewer$0.00
City$987.92
  • Parks and Recreation Impact Fee (Town of Davie, MF)
    10+ units per parcel
    Town of Davie
    Town of Davie parks and recreation impact fee of $630.67 per multifamily unit in a project of 10 or more units per parcel, under Resolution 2009-190 as revised April 9, 2015, collected at building permit.
    $630.67Requires confirmation
  • Fire Impact Fee (Town of Davie, MF)
    10+ units per parcel
    Town of Davie
    Town of Davie fire impact fee of $159.06 per multifamily unit in a project of 10 or more units per parcel, under Resolution 2009-190 as revised April 9, 2015, collected at building permit.
    $159.06Requires confirmation
  • Police Impact Fee (Town of Davie, MF)
    10+ units per parcel
    Town of Davie
    Town of Davie police impact fee of $119.03 per multifamily unit in a project of 10 or more units per parcel, under Resolution 2009-190 as revised April 9, 2015, collected at building permit.
    $119.03Requires confirmation
  • General Government Impact Fee (Town of Davie, MF)
    10+ units per parcel
    Town of Davie
    Town of Davie general government impact fee of $79.16 per multifamily unit in a project of 10 or more units per parcel, under Resolution 2009-190 as revised April 9, 2015, collected at building permit.
    $79.16Requires confirmation
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County school impact fee, charged on every new residential unit countywide, including inside cities. Rates effective January 1, 2022 (Ord. 2020-36) with no annual index. Since November 2025 it is paid directly to the School Board of Broward County, no later than building permit issuance. This tier (mid-rise, 2 or more bedrooms) covers the typical 2-bedroom unit in a 4-story building. Multifamily rates depend on building type and bedrooms: garden apartment (2 to 3 stories) 1 or fewer bedrooms $480, 2 bedrooms $4,918, 3 or more $5,901; mid-rise (4 to 8 stories) 1 or fewer bedrooms $375, 2 or more $1,475; high-rise (9 or more stories) $461 for all units.
    $1,475.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    Broward County road impact fees and transportation concurrency assessments are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    Broward County regional park and local park impact fees are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
Total (Davie): $2,462.92
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Davie: Commercial Impact Fees

Commercial development in Davie pays $0.77 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (rates sourced October 13, 2026).

For a 50,000 sq ft building, that comes to about $44,470.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($3,050.00 one-time) and Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($2,920.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Police Impact Fee (Town of Davie, Commercial), Fire Impact Fee (Town of Davie, Commercial), and General Government Impact Fee (Town of Davie, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Davie Impact Fee Schedule
Water$3,050.00 one-time
  • Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie service area
    Town of Davie Utilities
    Davie's water connection fee is $3,050 per ERC (1 ERC = 350 gpd); a project's total is this rate times the ERC count derived from the use and floor area. Combined water and wastewater is $5,970 per ERC. A water and sewer service agreement must be executed with the Town before applying for building permits.
    $3,050.00 one-time
Sewer$2,920.00 one-time
  • Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie service area
    Town of Davie Utilities
    Davie's wastewater connection fee is $2,920 per ERC (1 ERC = 350 gpd); a project's total is this rate times the ERC count derived from the use and floor area. Combined water and wastewater is $5,970 per ERC. A water and sewer service agreement must be executed with the Town before applying for building permits.
    $2,920.00 one-time
City$0.77/sq ft
  • Fire Impact Fee (Town of Davie, Commercial)
    Town of Davie
    The Town of Davie's fire impact fee (Res. 2009-190) for commercial development is $0.32 per square foot. Davie's total nonresidential impact fee (police, fire, and general government combined) is $0.770/sf for commercial and $0.424/sf for industrial.
    $0.32/sq ftRequires confirmation
  • Police Impact Fee (Town of Davie, Commercial)
    Town of Davie
    The Town of Davie's police impact fee (Res. 2009-190) for commercial development is $0.30 per square foot. Davie's total nonresidential impact fee (police, fire, and general government combined) is $0.770/sf for commercial and $0.424/sf for industrial.
    $0.30/sq ftRequires confirmation
  • General Government Impact Fee (Town of Davie, Commercial)
    Town of Davie
    The Town of Davie's general government impact fee (Res. 2009-190) for commercial development is $0.15 per square foot. Davie's total nonresidential impact fee (police, fire, and general government combined) is $0.770/sf for commercial and $0.424/sf for industrial.
    $0.15/sq ftRequires confirmation
  • Parks and Recreation Impact Fee (Town of Davie, Commercial)
    Town of Davie
    The Town of Davie's parks and recreation impact fee (Res. 2009-190) applies to residential dwelling units only; nonresidential development is not charged a parks and recreation impact fee. Davie's nonresidential impact fee totals (police, fire, and general government combined) are $0.770/sf for commercial and $0.424/sf for industrial.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Davie): $0.77/sq ft + $5,970.00 one-time (≈ $44,470.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Davie Utilities Town of Davie Broward County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Davie: Industrial Impact Fees

Industrial development in Davie pays $0.42 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (rates sourced October 13, 2026).

For a 50,000 sq ft building, that comes to about $27,170.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($3,050.00 one-time) and Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($2,920.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Fire Impact Fee (Town of Davie, Industrial), General Government Impact Fee (Town of Davie, Industrial), and Police Impact Fee (Town of Davie, Industrial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Davie Impact Fee Schedule
Water$3,050.00 one-time
  • Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie service area
    Town of Davie Utilities
    Davie's water connection fee is $3,050 per ERC (1 ERC = 350 gpd); a project's total is this rate times the ERC count derived from the use and floor area. Combined water and wastewater is $5,970 per ERC. A water and sewer service agreement must be executed with the Town before applying for building permits.
    $3,050.00 one-time
Sewer$2,920.00 one-time
  • Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie service area
    Town of Davie Utilities
    Davie's wastewater connection fee is $2,920 per ERC (1 ERC = 350 gpd); a project's total is this rate times the ERC count derived from the use and floor area. Combined water and wastewater is $5,970 per ERC. A water and sewer service agreement must be executed with the Town before applying for building permits.
    $2,920.00 one-time
City$0.42/sq ft
  • Fire Impact Fee (Town of Davie, Industrial)
    Town of Davie
    The Town of Davie's fire impact fee (Res. 2009-190) for industrial development is $0.256 per square foot.
    $0.26/sq ftRequires confirmation
  • General Government Impact Fee (Town of Davie, Industrial)
    Town of Davie
    The Town of Davie's general government impact fee (Res. 2009-190) for industrial development is $0.12 per square foot. Davie's total nonresidential impact fee (police, fire, and general government combined) is $0.770/sf for commercial and $0.424/sf for industrial.
    $0.12/sq ftRequires confirmation
  • Police Impact Fee (Town of Davie, Industrial)
    Town of Davie
    The Town of Davie's police impact fee (Res. 2009-190) for industrial development is $0.048 per square foot. Davie's total nonresidential impact fee (police, fire, and general government combined) is $0.770/sf for commercial and $0.424/sf for industrial.
    $0.05/sq ftRequires confirmation
  • Parks and Recreation Impact Fee (Town of Davie, Industrial)
    Town of Davie
    The Town of Davie's parks and recreation impact fee (Res. 2009-190) applies to residential dwelling units only; nonresidential development is not charged a parks and recreation impact fee. Davie's nonresidential impact fee totals (police, fire, and general government combined) are $0.770/sf for commercial and $0.424/sf for industrial.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Davie): $0.42/sq ft + $5,970.00 one-time (≈ $27,170.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Davie Utilities Town of Davie Broward County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Davie: Office Impact Fees

Office development in Davie pays $0.77 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (rates sourced October 13, 2026).

For a 25,000 sq ft building, that comes to about $25,220.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($3,050.00 one-time) and Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($2,920.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Fire Impact Fee (Town of Davie, Office), Police Impact Fee (Town of Davie, Office), and General Government Impact Fee (Town of Davie, Office) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Davie Impact Fee Schedule
Water$3,050.00 one-time
  • Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie service area
    Town of Davie Utilities
    Davie's water connection fee is $3,050 per ERC (1 ERC = 350 gpd); a project's total is this rate times the ERC count derived from the use and floor area. Combined water and wastewater is $5,970 per ERC. A water and sewer service agreement must be executed with the Town before applying for building permits.
    $3,050.00 one-time
Sewer$2,920.00 one-time
  • Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie service area
    Town of Davie Utilities
    Davie's wastewater connection fee is $2,920 per ERC (1 ERC = 350 gpd); a project's total is this rate times the ERC count derived from the use and floor area. Combined water and wastewater is $5,970 per ERC. A water and sewer service agreement must be executed with the Town before applying for building permits.
    $2,920.00 one-time
City$0.77/sq ft
  • Fire Impact Fee (Town of Davie, Office)
    Town of Davie
    The Town of Davie's impact fee schedule (Resolution 2009-190, revised April 9, 2015) has commercial and industrial rows only; this office figure applies the commercial rate of $0.32 per square foot.
    $0.32/sq ftRequires confirmation
  • Police Impact Fee (Town of Davie, Office)
    Town of Davie
    The Town of Davie's impact fee schedule (Resolution 2009-190, revised April 9, 2015) has commercial and industrial rows only; this office figure applies the commercial rate of $0.3 per square foot.
    $0.30/sq ftRequires confirmation
  • General Government Impact Fee (Town of Davie, Office)
    Town of Davie
    The Town of Davie's impact fee schedule (Resolution 2009-190, revised April 9, 2015) has commercial and industrial rows only; this office figure applies the commercial rate of $0.15 per square foot.
    $0.15/sq ftRequires confirmation
  • Parks and Recreation Impact Fee (Town of Davie, Office)
    Town of Davie
    The Town of Davie's parks and recreation impact fee (Res. 2009-190) applies to residential dwelling units only; nonresidential development is not charged a parks and recreation impact fee.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Davie): $0.77/sq ft + $5,970.00 one-time (≈ $25,220.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Davie Utilities Town of Davie Broward County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Davie Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Davie Impact Fee FAQs

What are the total impact fees for a single-family home in Davie, Florida?

A new single-family home in Davie pays $17,325.98 per unit in combined impact fees (rates sourced October 13, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Davie?

Commercial development in Davie pays $0.77 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $44,470.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Davie charge its own impact fees?

Yes. Davie levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Davie, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.