Davie, Florida Impact Fees

Davie applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $14,779.00 per unit (rates sourced July 12, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Davie impact fees by project type

Davie: Single-Family Impact Fees

A new single-family home in Davie pays at least $14,779.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $5,970.00.

The largest line items are School Impact Fee (Broward County) ($8,809.00), Water Connection Fee (Town of Davie) — 1 ERC × $3,050/ERC ($3,050.00) and Wastewater Connection Fee (Town of Davie) — 1 ERC × $2,920/ERC ($2,920.00).

City Impact Fee (Town of Davie) — 'Per Town Council Resolution', amount not published is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$3,050.00
  • Water Connection Fee (Town of Davie) — 1 ERC × $3,050/ERC
    Town of Davie Utilities
    CONFIRMED. Town of Davie water connection fee = $3,050 per ERC; 1 ERC = 350 GPD. Single-family = 1 ERC. Source: Town of Davie 'Connection Fees / Application for New Construction' page (current posted schedule). The page also states the combined water+sewer figure is $5,970/ERC ($3,050 water + $2,920 sewer). Applies within the Town of Davie utility service area only. Contact: Town of Davie 954-797-1120.
    $3,050.00
Sewer$2,920.00
  • Wastewater Connection Fee (Town of Davie) — 1 ERC × $2,920/ERC
    Town of Davie Utilities
    CONFIRMED. Town of Davie sewer connection fee = $2,920 per ERC; 1 ERC = 350 GPD. Single-family = 1 ERC. Source: Town of Davie 'Connection Fees / Application for New Construction' page (current posted schedule). The page also states the combined water+sewer figure is $5,970/ERC ($3,050 water + $2,920 sewer). Applies within the Town of Davie utility service area only. Contact: Town of Davie 954-797-1120.
    $2,920.00
City$0.00
  • City Impact Fee (Town of Davie) — 'Per Town Council Resolution', amount not published
    Town of Davie
    UNCONFIRMED ($0) — impact fees EXIST but the amounts are not published. The Town's Building Permit Fee Schedule (Exhibit A, modified fees effective 10/01/2025), item (7)(g), reads 'Impact Fees — Per Town Council Resolution.' CHECKED: Davie Municode full chapter list (no standalone impact-fee chapter; Ch. 12 is the LDC), the Building Fee Schedule, the Engineering Plan Review Fee Schedule, and the Annual Fire Safety Fee Schedule — NOT FOUND: the referenced Town Council resolution or any dollar schedule. Contact: Building Division 954-797-1120 / Planning & Zoning 954-797-1103.
    Requires confirmation
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Single Family 3-or-fewer BR = $8,809 (this record, the default/most common); 4-or-more BR = $11,070 (separate tier record). Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $8,809.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
Total (Davie): $14,779.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Davie: Multifamily Impact Fees

A new multifamily unit in Davie pays at least $1,475.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (Broward County, MF) ($1,475.00).

Wastewater Connection Fee (Town of Davie, MF) — no published per-unit MF basis and Water Connection Fee (Town of Davie, MF) — no published per-unit MF basis are set by the utility and not published online. City Impact Fee (Town of Davie, MF) — 'Per Town Council Resolution', amount not published is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Davie, MF) — no published per-unit MF basis
    Town of Davie Utilities
    UNCONFIRMED ($0). The Town of Davie water connection fee is $3,050 per ERC (1 ERC = 350 gpd) and single-family = 1 ERC, but NO per-unit multifamily rate is published — the schedule is ERC-based only and the town computes ERCs per project from the proposed use. The SFR figure is deliberately NOT copied onto this MF row. CHECKED: the Town's 'Connection Fees / Application for New Construction' page — NOT FOUND: any per-unit MF factor or MF ERC equivalency. Contact: Town of Davie 954-797-1120.
    Requires confirmation
Sewer$0.00
  • Wastewater Connection Fee (Town of Davie, MF) — no published per-unit MF basis
    Town of Davie Utilities
    UNCONFIRMED ($0). The Town of Davie sewer connection fee is $2,920 per ERC (1 ERC = 350 gpd) and single-family = 1 ERC, but NO per-unit multifamily rate is published — the schedule is ERC-based only and the town computes ERCs per project from the proposed use. The SFR figure is deliberately NOT copied onto this MF row. CHECKED: the Town's 'Connection Fees / Application for New Construction' page — NOT FOUND: any per-unit MF factor or MF ERC equivalency. Contact: Town of Davie 954-797-1120.
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Davie, MF) — 'Per Town Council Resolution', amount not published
    Town of Davie
    UNCONFIRMED ($0) — impact fees EXIST but the amounts are not published. The Town's Building Permit Fee Schedule (Exhibit A, modified fees effective 10/01/2025), item (7)(g), reads 'Impact Fees — Per Town Council Resolution.' CHECKED: Davie Municode full chapter list (no standalone impact-fee chapter; Ch. 12 is the LDC), the Building Fee Schedule, the Engineering Plan Review Fee Schedule, and the Annual Fire Safety Fee Schedule — NOT FOUND: the referenced Town Council resolution or any dollar schedule. Contact: Building Division 954-797-1120 / Planning & Zoning 954-797-1103.
    Requires confirmation
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Adopted MF tiers: Garden Apartment (low-rise, 1–3 stories) 1-or-fewer BR $480 / 2 BR $4,918 / 3-or-more BR $5,901; Mid-Rise (4+ stories) 1-or-fewer BR $375 / 2-or-more BR $1,475; High-Rise all BR $461. The canonical MF unit (2BR/2BA, 1,000 sq ft, 4-story building) falls in Broward's Mid-Rise class, so Mid-Rise 2-or-more BR $1,475 is the DEFAULT record. Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $1,475.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
Total (Davie): $1,475.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Davie: Commercial Impact Fees

Commercial development in Davie pays $0.77 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $44,470.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($3,050.00 one-time), Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($2,920.00 one-time) and Fire Impact Fee (Town of Davie, Commercial) ($0.32/sq ft).

View the full fee schedule
Water$3,050.00 one-time
  • Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie Utilities
    NOT METER-BASED — ERC-based. Town of Davie 'Connection Fees & Application for New Construction' (Utilities Customer Service): connection fees are based on Equivalent Residential Connections; 1 ERC = 350 GPD of water usage. Charge per ERC for WATER = $3,050.00. Amount stored here is the published 1-ERC rate (the canonical minimum); a nonresidential project's total = $3,050 × (its ERC count, derived from projected GPD for the specific commercial use — the Town requires the specific use and square footage, e.g. restaurant / warehouse sq ft / office sq ft, to compute ERCs). Combined water + wastewater = $5,970 per ERC ($3,050 water + $2,920 wastewater). A Water and Sewer Service Agreement must be executed with the Town before building permit application. Same schedule applies to residential and nonresidential — one shared ERC table, so the nonres 1-ERC amount legitimately equals the SFR amount. Contact: Town of Davie, 954-797-1000.
    $3,050.00 one-time
Sewer$2,920.00 one-time
  • Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie Utilities
    NOT METER-BASED — ERC-based. Town of Davie 'Connection Fees & Application for New Construction': 1 ERC = 350 GPD. Charge per ERC for WASTEWATER = $2,920.00. Amount stored is the published 1-ERC rate (canonical minimum); project total = $2,920 × ERC count derived from the specific commercial use and square footage. Combined water + wastewater = $5,970 per ERC. A Water and Sewer Service Agreement must be executed with the Town before applying for building permits. One shared ERC table for all customer classes, so the nonres 1-ERC amount equals the SFR amount. Contact: Town of Davie, 954-797-1000.
    $2,920.00 one-time
City$0.77/sq ft
  • Fire Impact Fee (Town of Davie, Commercial)
    Town of Davie
    Town of Davie Impact Fees and Implementation Schedule, Res. 2009-190 (8-19-2009), revised 4-9-2015; Town Code Ch. 18, Art. II. Schedule row: FIRE — COMMERCIAL, per SQ. FT. Only nonres rows in the schedule are COMMERCIAL and INDUSTRIAL. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.32/sq ft
  • Police Impact Fee (Town of Davie, Commercial)
    Town of Davie
    Town of Davie 'Impact Fees and Implementation Schedule', adopted by Resolution 2009-190 (8-19-2009), revised 4-9-2015. Authority: Town Code Ch. 18, Art. II. Schedule row: POLICE — COMMERCIAL, per SQ. FT. The schedule's only nonresidential rows are COMMERCIAL and INDUSTRIAL (no ITE codes, no size tiers). Schedule is designed to recover 35% of parks/recreation cost and 100% of all others. Total nonres impact fee: Commercial $0.770/sf, Industrial $0.424/sf. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.30/sq ft
  • General Government Impact Fee (Town of Davie, Commercial)
    Town of Davie
    Town of Davie Impact Fees and Implementation Schedule, Res. 2009-190 (8-19-2009), revised 4-9-2015; Town Code Ch. 18, Art. II. Schedule row: GENERAL GOVERNMENT — COMMERCIAL, per SQ. FT. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.15/sq ft
  • Parks and Recreation Impact Fee (Town of Davie, Commercial)
    Town of Davie
    CONFIRMED $0 — nonresidential development is NOT charged the Parks and Recreation impact fee. The Town of Davie Impact Fee Schedule (Res. 2009-190, rev. 4-9-2015) lists PARKS AND RECREATION rows for SFR Detached and Multi-Family dwelling units ONLY; there are no COMMERCIAL or INDUSTRIAL rows under that fee type, and the schedule's nonres totals ($0.770/sf Commercial, $0.424/sf Industrial) equal Police + Fire + General Government exactly, confirming parks is excluded from nonres. Consistent with FL precedent (park/rec fees commonly exempt nonres).
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County's Road Impact, Transportation Concurrency, and Recreational impact fees are all suspended as of 10/01/2024 per Broward County Code Sec. 5-182 (Ord. No. 2024-34, adopted 9-17-24, eff. 10-1-24) — no impact fees collected until a Sec. 163.31801 F.S. study is accepted by the Board of County Commissioners. No such study accepted as of 2026-07-11. County school impact fees remain in effect but are residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Davie): $0.77/sq ft + $5,970.00 one-time (≈ $44,470.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Town of Davie Utilities Town of Davie Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Davie: Industrial Impact Fees

Industrial development in Davie pays $0.42 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $27,170.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($3,050.00 one-time), Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($2,920.00 one-time) and Fire Impact Fee (Town of Davie, Industrial) ($0.26/sq ft).

View the full fee schedule
Water$3,050.00 one-time
  • Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie Utilities
    NOT METER-BASED — ERC-based. Town of Davie 'Connection Fees & Application for New Construction' (Utilities Customer Service): connection fees are based on Equivalent Residential Connections; 1 ERC = 350 GPD of water usage. Charge per ERC for WATER = $3,050.00. Amount stored here is the published 1-ERC rate (the canonical minimum); a nonresidential project's total = $3,050 × (its ERC count, derived from projected GPD for the specific commercial use — the Town requires the specific use and square footage, e.g. restaurant / warehouse sq ft / office sq ft, to compute ERCs). Combined water + wastewater = $5,970 per ERC ($3,050 water + $2,920 wastewater). A Water and Sewer Service Agreement must be executed with the Town before building permit application. Same schedule applies to residential and nonresidential — one shared ERC table, so the nonres 1-ERC amount legitimately equals the SFR amount. Contact: Town of Davie, 954-797-1000.
    $3,050.00 one-time
Sewer$2,920.00 one-time
  • Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie Utilities
    NOT METER-BASED — ERC-based. Town of Davie 'Connection Fees & Application for New Construction': 1 ERC = 350 GPD. Charge per ERC for WASTEWATER = $2,920.00. Amount stored is the published 1-ERC rate (canonical minimum); project total = $2,920 × ERC count derived from the specific commercial use and square footage. Combined water + wastewater = $5,970 per ERC. A Water and Sewer Service Agreement must be executed with the Town before applying for building permits. One shared ERC table for all customer classes, so the nonres 1-ERC amount equals the SFR amount. Contact: Town of Davie, 954-797-1000.
    $2,920.00 one-time
City$0.42/sq ft
  • Fire Impact Fee (Town of Davie, Industrial)
    Town of Davie
    Town of Davie Impact Fees and Implementation Schedule, Res. 2009-190 (8-19-2009), revised 4-9-2015; Town Code Ch. 18, Art. II. Schedule row: FIRE — INDUSTRIAL, per SQ. FT. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.26/sq ft
  • General Government Impact Fee (Town of Davie, Industrial)
    Town of Davie
    Town of Davie Impact Fees and Implementation Schedule, Res. 2009-190 (8-19-2009), revised 4-9-2015; Town Code Ch. 18, Art. II. Schedule row: GENERAL GOVERNMENT — INDUSTRIAL, per SQ. FT. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.12/sq ft
  • Police Impact Fee (Town of Davie, Industrial)
    Town of Davie
    Town of Davie Impact Fees and Implementation Schedule, Res. 2009-190 (8-19-2009), revised 4-9-2015; Town Code Ch. 18, Art. II. Schedule row: POLICE — INDUSTRIAL, per SQ. FT. Total nonres: Industrial $0.424/sf (Police + Fire + General Government). Contact: Planning and Zoning Manager, 954-797-1075.
    $0.05/sq ft
  • Parks and Recreation Impact Fee (Town of Davie, Industrial)
    Town of Davie
    CONFIRMED $0 — nonresidential is NOT charged the Parks and Recreation impact fee. The Davie Impact Fee Schedule (Res. 2009-190, rev. 4-9-2015) lists PARKS AND RECREATION only for SFR Detached and Multi-Family dwelling units; the nonres totals ($0.770/sf Commercial, $0.424/sf Industrial) equal Police + Fire + General Government exactly.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County's Road Impact, Transportation Concurrency, and Recreational impact fees are all suspended as of 10/01/2024 per Broward County Code Sec. 5-182 (Ord. No. 2024-34, adopted 9-17-24, eff. 10-1-24) — no impact fees collected until a Sec. 163.31801 F.S. study is accepted by the Board of County Commissioners. No such study accepted as of 2026-07-11. County school impact fees remain in effect but are residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Davie): $0.42/sq ft + $5,970.00 one-time (≈ $27,170.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Town of Davie Utilities Town of Davie Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Davie: Office Impact Fees

Office development in Davie pays $0.77 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $25,220.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($3,050.00 one-time) and Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($2,920.00 one-time).

Fire Impact Fee (Town of Davie, Office), Police Impact Fee (Town of Davie, Office), and General Government Impact Fee (Town of Davie, Office) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$3,050.00 one-time
  • Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie Utilities
    NOT METER-BASED — ERC-based. Town of Davie 'Connection Fees & Application for New Construction' (Utilities Customer Service): connection fees are based on Equivalent Residential Connections; 1 ERC = 350 GPD of water usage. Charge per ERC for WATER = $3,050.00. Amount stored here is the published 1-ERC rate (the canonical minimum); a nonresidential project's total = $3,050 × (its ERC count, derived from projected GPD for the specific commercial use — the Town requires the specific use and square footage, e.g. restaurant / warehouse sq ft / office sq ft, to compute ERCs). Combined water + wastewater = $5,970 per ERC ($3,050 water + $2,920 wastewater). A Water and Sewer Service Agreement must be executed with the Town before building permit application. Same schedule applies to residential and nonresidential — one shared ERC table, so the nonres 1-ERC amount legitimately equals the SFR amount. Contact: Town of Davie, 954-797-1000.
    $3,050.00 one-time
Sewer$2,920.00 one-time
  • Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum
    Town of Davie Utilities
    NOT METER-BASED — ERC-based. Town of Davie 'Connection Fees & Application for New Construction': 1 ERC = 350 GPD. Charge per ERC for WASTEWATER = $2,920.00. Amount stored is the published 1-ERC rate (canonical minimum); project total = $2,920 × ERC count derived from the specific commercial use and square footage. Combined water + wastewater = $5,970 per ERC. A Water and Sewer Service Agreement must be executed with the Town before applying for building permits. One shared ERC table for all customer classes, so the nonres 1-ERC amount equals the SFR amount. Contact: Town of Davie, 954-797-1000.
    $2,920.00 one-time
City$0.77/sq ft
  • Fire Impact Fee (Town of Davie, Office)
    Town of Davie
    NO SEPARATE OFFICE ROW IN SCHEDULE — rate entered is the COMMERCIAL rate. Davie Impact Fee Schedule (Res. 2009-190, rev. 4-9-2015) has only COMMERCIAL and INDUSTRIAL nonres rows. VERIFY office is charged at the COMMERCIAL rate. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.32/sq ftRequires confirmation
  • Police Impact Fee (Town of Davie, Office)
    Town of Davie
    NO SEPARATE OFFICE ROW IN SCHEDULE — rate entered is the COMMERCIAL rate. The Town of Davie Impact Fee Schedule (Res. 2009-190, 8-19-2009, rev. 4-9-2015; Town Code Ch. 18, Art. II) has exactly two nonresidential rows: COMMERCIAL and INDUSTRIAL. Office development is not separately listed and would be assessed under COMMERCIAL. VERIFY that office use is charged at the COMMERCIAL rate rather than INDUSTRIAL. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.30/sq ftRequires confirmation
  • General Government Impact Fee (Town of Davie, Office)
    Town of Davie
    NO SEPARATE OFFICE ROW IN SCHEDULE — rate entered is the COMMERCIAL rate. Davie Impact Fee Schedule (Res. 2009-190, rev. 4-9-2015) has only COMMERCIAL and INDUSTRIAL nonres rows. VERIFY office is charged at the COMMERCIAL rate. Contact: Planning and Zoning Manager, 954-797-1075.
    $0.15/sq ftRequires confirmation
  • Parks and Recreation Impact Fee (Town of Davie, Office)
    Town of Davie
    CONFIRMED $0 — nonresidential is NOT charged the Parks and Recreation impact fee. The Davie Impact Fee Schedule (Res. 2009-190, rev. 4-9-2015) lists PARKS AND RECREATION only for SFR Detached and Multi-Family dwelling units; nonres totals equal Police + Fire + General Government exactly.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County's Road Impact, Transportation Concurrency, and Recreational impact fees are all suspended as of 10/01/2024 per Broward County Code Sec. 5-182 (Ord. No. 2024-34, adopted 9-17-24, eff. 10-1-24) — no impact fees collected until a Sec. 163.31801 F.S. study is accepted by the Board of County Commissioners. No such study accepted as of 2026-07-11. County school impact fees remain in effect but are residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Davie): $0.77/sq ft + $5,970.00 one-time (≈ $25,220.00 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Town of Davie Utilities Town of Davie Broward County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Davie

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Davie, Florida?

A new single-family home in Davie pays at least $14,779.00 per unit in combined impact fees (rates sourced July 12, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Davie?

Commercial development in Davie pays $0.77 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees, about $44,470.00 for a 50,000 sq ft building.

Does Davie charge its own impact fees?

Yes. Davie levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Davie, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000