A new single-family home in Davie pays at least $14,779.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $5,970.00.
The largest line items are School Impact Fee (Broward County) ($8,809.00), Water Connection Fee (Town of Davie) — 1 ERC × $3,050/ERC ($3,050.00) and Wastewater Connection Fee (Town of Davie) — 1 ERC × $2,920/ERC ($2,920.00).
City Impact Fee (Town of Davie) — 'Per Town Council Resolution', amount not published is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Davie impact fee schedule
- Water Connection Fee (Town of Davie) — 1 ERC × $3,050/ERC$3,050.00Town of Davie Utilities
- Wastewater Connection Fee (Town of Davie) — 1 ERC × $2,920/ERC$2,920.00Town of Davie Utilities
- Requires confirmation
- School Impact Fee (Broward County)$8,809.00Single Family, 3 or fewer BRBroward County / School Board of Broward County
- Road Impact / Transportation Concurrency Fee (Broward County)$0.00Road / Transportation ConcurrencyBroward County
- Park/Recreational Impact Fee (Broward County)$0.00Broward County
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Davie: Multifamily Impact Fees
A new multifamily unit in Davie pays at least $1,475.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.
The largest line items are School Impact Fee (Broward County, MF) ($1,475.00).
Wastewater Connection Fee (Town of Davie, MF) — no published per-unit MF basis and Water Connection Fee (Town of Davie, MF) — no published per-unit MF basis are set by the utility and not published online. City Impact Fee (Town of Davie, MF) — 'Per Town Council Resolution', amount not published is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Davie impact fee schedule
- Water Connection Fee (Town of Davie, MF) — no published per-unit MF basisRequires confirmationTown of Davie Utilities
- Wastewater Connection Fee (Town of Davie, MF) — no published per-unit MF basisRequires confirmationTown of Davie Utilities
- City Impact Fee (Town of Davie, MF) — 'Per Town Council Resolution', amount not publishedRequires confirmationTown of Davie
- School Impact Fee (Broward County, MF)$1,475.00Mid-Rise, 2 or more BRBroward County / School Board of Broward County
- Road Impact / Transportation Concurrency Fee (Broward County, MF)$0.00Road / Transportation ConcurrencyBroward County
- Park/Recreational Impact Fee (Broward County, MF)$0.00Broward County
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Davie: Commercial Impact Fees
Commercial development in Davie pays $0.77 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $44,470.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($3,050.00 one-time), Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($2,920.00 one-time) and Fire Impact Fee (Town of Davie, Commercial) ($0.32/sq ft).
View the full Davie impact fee schedule
- Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum$3,050.00 one-timeTown of Davie UtilitiesDavie's water connection fee is $3,050 per ERC (1 ERC = 350 gpd); a project's total is this rate times the ERC count derived from the use and floor area. Combined water and wastewater is $5,970 per ERC. A water and sewer service agreement must be executed with the Town before applying for building permits.
- Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum$2,920.00 one-timeTown of Davie UtilitiesDavie's wastewater connection fee is $2,920 per ERC (1 ERC = 350 gpd); a project's total is this rate times the ERC count derived from the use and floor area. Combined water and wastewater is $5,970 per ERC. A water and sewer service agreement must be executed with the Town before applying for building permits.
- Fire Impact Fee (Town of Davie, Commercial)$0.32/sq ftTown of DavieThe Town of Davie's fire impact fee (Res. 2009-190) for commercial development is $0.32 per square foot. Davie's total nonresidential impact fee (police, fire, and general government combined) is $0.770/sf for commercial and $0.424/sf for industrial.
- Police Impact Fee (Town of Davie, Commercial)$0.30/sq ftTown of DavieThe Town of Davie's police impact fee (Res. 2009-190) for commercial development is $0.30 per square foot. Davie's total nonresidential impact fee (police, fire, and general government combined) is $0.770/sf for commercial and $0.424/sf for industrial.
- General Government Impact Fee (Town of Davie, Commercial)$0.15/sq ftTown of DavieThe Town of Davie's general government impact fee (Res. 2009-190) for commercial development is $0.15 per square foot. Davie's total nonresidential impact fee (police, fire, and general government combined) is $0.770/sf for commercial and $0.424/sf for industrial.
- Parks and Recreation Impact Fee (Town of Davie, Commercial)$0.00Town of DavieThe Town of Davie's parks and recreation impact fee (Res. 2009-190) applies to residential dwelling units only; nonresidential development is not charged a parks and recreation impact fee. Davie's nonresidential impact fee totals (police, fire, and general government combined) are $0.770/sf for commercial and $0.424/sf for industrial.
- County Impact / Transportation Concurrency Fees (Broward County, Commercial)$0.00Broward CountyBroward County's road, transportation concurrency, and recreational impact fees are suspended effective October 1, 2024 (Ord. No. 2024-34), and none are collected until the County adopts a new impact fee study; as of mid-2026 no such study has been accepted. County school impact fees remain in effect but apply to residential development only.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Davie: Industrial Impact Fees
Industrial development in Davie pays $0.42 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $27,170.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($3,050.00 one-time), Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($2,920.00 one-time) and Fire Impact Fee (Town of Davie, Industrial) ($0.26/sq ft).
View the full Davie impact fee schedule
- Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum$3,050.00 one-timeTown of Davie UtilitiesDavie's water connection fee is $3,050 per ERC (1 ERC = 350 gpd); a project's total is this rate times the ERC count derived from the use and floor area. Combined water and wastewater is $5,970 per ERC. A water and sewer service agreement must be executed with the Town before applying for building permits.
- Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum$2,920.00 one-timeTown of Davie UtilitiesDavie's wastewater connection fee is $2,920 per ERC (1 ERC = 350 gpd); a project's total is this rate times the ERC count derived from the use and floor area. Combined water and wastewater is $5,970 per ERC. A water and sewer service agreement must be executed with the Town before applying for building permits.
- Fire Impact Fee (Town of Davie, Industrial)$0.26/sq ftTown of DavieThe Town of Davie's fire impact fee (Res. 2009-190) for industrial development is $0.256 per square foot.
- General Government Impact Fee (Town of Davie, Industrial)$0.12/sq ftTown of DavieThe Town of Davie's general government impact fee (Res. 2009-190) for industrial development is $0.12 per square foot. Davie's total nonresidential impact fee (police, fire, and general government combined) is $0.770/sf for commercial and $0.424/sf for industrial.
- Police Impact Fee (Town of Davie, Industrial)$0.05/sq ftTown of DavieThe Town of Davie's police impact fee (Res. 2009-190) for industrial development is $0.048 per square foot. Davie's total nonresidential impact fee (police, fire, and general government combined) is $0.770/sf for commercial and $0.424/sf for industrial.
- Parks and Recreation Impact Fee (Town of Davie, Industrial)$0.00Town of DavieThe Town of Davie's parks and recreation impact fee (Res. 2009-190) applies to residential dwelling units only; nonresidential development is not charged a parks and recreation impact fee. Davie's nonresidential impact fee totals (police, fire, and general government combined) are $0.770/sf for commercial and $0.424/sf for industrial.
- County Impact / Transportation Concurrency Fees (Broward County, Industrial)$0.00Broward CountyBroward County's road, transportation concurrency, and recreational impact fees are suspended effective October 1, 2024 (Ord. No. 2024-34), and none are collected until the County adopts a new impact fee study; as of mid-2026 no such study has been accepted. County school impact fees remain in effect but apply to residential development only.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Davie: Office Impact Fees
Office development in Davie pays $0.77 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 25,000 sq ft building, that comes to about $25,220.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($3,050.00 one-time) and Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum ($2,920.00 one-time).
Fire Impact Fee (Town of Davie, Office), Police Impact Fee (Town of Davie, Office), and General Government Impact Fee (Town of Davie, Office) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full Davie impact fee schedule
- Water Connection Fee (Town of Davie Utilities) — 1 ERC minimum$3,050.00 one-timeTown of Davie UtilitiesDavie's water connection fee is $3,050 per ERC (1 ERC = 350 gpd); a project's total is this rate times the ERC count derived from the use and floor area. Combined water and wastewater is $5,970 per ERC. A water and sewer service agreement must be executed with the Town before applying for building permits.
- Sewer Connection Fee (Town of Davie Utilities) — 1 ERC minimum$2,920.00 one-timeTown of Davie UtilitiesDavie's wastewater connection fee is $2,920 per ERC (1 ERC = 350 gpd); a project's total is this rate times the ERC count derived from the use and floor area. Combined water and wastewater is $5,970 per ERC. A water and sewer service agreement must be executed with the Town before applying for building permits.
- Fire Impact Fee (Town of Davie, Office)$0.32/sq ftRequires confirmationTown of Davie
- Police Impact Fee (Town of Davie, Office)$0.30/sq ftRequires confirmationTown of Davie
- $0.15/sq ftRequires confirmation
- Parks and Recreation Impact Fee (Town of Davie, Office)$0.00Town of DavieThe Town of Davie's parks and recreation impact fee (Res. 2009-190) applies to residential dwelling units only; nonresidential development is not charged a parks and recreation impact fee.
- County Impact / Transportation Concurrency Fees (Broward County, Office)$0.00Broward CountyBroward County's road, transportation concurrency, and recreational impact fees are suspended effective October 1, 2024 (Ord. No. 2024-34), and none are collected until the County adopts a new impact fee study; as of mid-2026 no such study has been accepted. County school impact fees remain in effect but apply to residential development only.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Davie impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Davie impact fee FAQs
What are the total impact fees for a single-family home in Davie, Florida?
A new single-family home in Davie pays at least $14,779.00 per unit in combined impact fees (rates sourced July 12, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Davie?
Commercial development in Davie pays $0.77 per square foot in impact fees, plus $5,970.00 in one-time water and sewer connection fees, about $44,470.00 for a 50,000 sq ft building.
Does Davie charge its own impact fees?
Yes. Davie levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Davie, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.