Tamarac, Florida Impact Fees

Tamarac applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $17,573.00 per unit (rates sourced July 14, 2026). The full breakdown is below.

Tamarac impact fees by project type

Tamarac: Single-Family Impact Fees

A new single-family home in Tamarac pays $17,573.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $8,764.00.

The largest line items are School Impact Fee (Broward County) ($8,809.00), Parks & Recreation Impact Fee (City of Tamarac) ($3,061.00) and Sewer Contribution in Aid of Construction (CIAC) (City of Tamarac) ($2,200.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,700.00
  • Water Contribution in Aid of Construction (CIAC) (City of Tamarac)
    City of Tamarac
    Water CIAC, Code sec. 22-189(d), Ord. 2013-17 sec. 2 (10-23-2013), current (code through Ord. O-2026-007). 1 ERC = 350 gpd = one SF dwelling unit. Water $1,700/ERC and sewer $2,200/ERC published as separate line items. City of Tamarac Utilities (own WTP; wastewater treated at Broward County North Regional WWTP; small eastern portion via Fort Lauderdale; Sunrise supplies only natural gas to west Tamarac, NOT water). sec. 22-96(b) annual Oct 1 CPI escalator applies to service/consumption rates, NOT CIAC; sec. 22-189(j) requires any CIAC increase by ordinance with 90-day notice. Community Development / Public Services 954-597-3530.
    $1,700.00
Sewer$2,200.00
  • Sewer Contribution in Aid of Construction (CIAC) (City of Tamarac)
    City of Tamarac
    Sewer CIAC, Code sec. 22-189(d), Ord. 2013-17 sec. 2 (10-23-2013), current. 1 ERC = 350 gpd = one SF dwelling unit. $2,200/ERC, separate line item from water $1,700/ERC. Wastewater treated at Broward County North Regional WWTP. sec. 22-96(b) Oct 1 CPI escalator applies to service/consumption rates, NOT CIAC; sec. 22-189(j) requires CIAC increase by ordinance w/ 90-day notice. Public Services 954-597-3530.
    $2,200.00
City$4,864.00
  • Parks & Recreation Impact Fee (City of Tamarac)
    1,500-2,499 sq ft
    City of Tamarac
    Ord. 2611 (adopted 10-22-2025, eff. 1-20-2026; 2025 Development Impact Fee Study, 25% increase phased over 2 yrs). Year 1 (eff. 1-20-2026 to 1-19-2027) CURRENTLY IN EFFECT. Parks & Rec SFR 1,500-2,499 sf = $3,061. Other SFR size tiers: <1,500 sf $2,754; >2,500 sf $3,434. Full SFR 1,500-2,499 total across 3 categories $4,864 (GenGov $774 + Parks $3,061 + Multimodal $1,029). Year 2 (from 1-20-2027): SF 1,500-2,499 total $5,379 - auto-steps, schedule a refresh. No city police/fire/library fee.
    $3,061.00
  • Multimodal Transportation Impact Fee (City of Tamarac)
    1,500-2,499 sq ft
    City of Tamarac
    Ord. 2611 Year 1 rates (eff. 1-20-2026, currently in effect). Multimodal Transportation SFR 1,500-2,499 sf = $1,029. Other size tiers: <1,500 sf $814; >2,500 sf $1,148. Year 2 (from 1-20-2027) auto-steps. One of three Tamarac city impact-fee categories; SFR 1,500-2,499 total $4,864.
    $1,029.00
  • General Government Impact Fee (City of Tamarac)
    1,500-2,499 sq ft
    City of Tamarac
    Ord. 2611 Year 1 rates (eff. 1-20-2026, currently in effect). General Government SFR 1,500-2,499 sf = $774. Other size tiers: <1,500 sf $695; >2,500 sf $870. Year 2 (from 1-20-2027) auto-steps. One of three Tamarac city impact-fee categories (GenGov, Parks & Rec, Multimodal); SFR 1,500-2,499 total $4,864.
    $774.00
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Single Family 3-or-fewer BR = $8,809 (this record, the default/most common); 4-or-more BR = $11,070 (separate tier record). Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $8,809.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
Total (Tamarac): $17,573.00
Sources last checked July 14, 2026Official fee schedules:City of Tamarac Broward County / School Board of Broward County Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tamarac: Multifamily Impact Fees

A new multifamily unit in Tamarac pays at least $4,694.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $1,475.00 and municipal or utility fees for $3,219.00.

The largest line items are Parks & Recreation Impact Fee (City of Tamarac, MF) ($2,140.00), School Impact Fee (Broward County, MF) ($1,475.00) and Multimodal Transportation Impact Fee (City of Tamarac, MF) ($564.00).

Water Contribution in Aid of Construction (CIAC) (City of Tamarac, MF) and Sewer Contribution in Aid of Construction (CIAC) (City of Tamarac, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Contribution in Aid of Construction (CIAC) (City of Tamarac, MF)
    City of Tamarac
    MF utility ERC factor not published; sec. 22-189 implies (but does not print) 1.0 ERC/unit for residential MF = $1,700 water. The meter-size ERC table is captioned General Service/Commercial and Irrigation Service; sec. 22-189(e)(2) defines commercial as not residential in nature. Do NOT treat as confirmed. Verify: Community Development / Public Services 954-597-3530. sec. 22-96(b) Oct 1 CPI escalator applies to service/consumption rates, NOT CIAC; sec. 22-189(j) requires CIAC increase by ordinance w/ 90-day notice.
    Requires confirmation
Sewer$0.00
  • Sewer Contribution in Aid of Construction (CIAC) (City of Tamarac, MF)
    City of Tamarac
    MF utility ERC factor not published; sec. 22-189 implies (but does not print) 1.0 ERC/unit for residential MF = $2,200 sewer. Meter-size ERC table captioned General Service/Commercial; sec. 22-189(e)(2) defines commercial as not residential. Do NOT treat as confirmed. Verify: Public Services 954-597-3530. sec. 22-96(b) CPI escalator applies to service/consumption rates, NOT CIAC; sec. 22-189(j) requires CIAC increase by ordinance w/ 90-day notice.
    Requires confirmation
City$3,219.00
  • Parks & Recreation Impact Fee (City of Tamarac, MF)
    City of Tamarac
    Ord. 2611 Year 1 rates (eff. 1-20-2026), per DU. Parks & Rec $2,140; General Government $515; Multimodal Transportation $564 (MF total $3,219). Year 2 (from 1-20-2027) MF total $3,576 - auto-steps, schedule a refresh. No city police/fire/library fee.
    $2,140.00
  • Multimodal Transportation Impact Fee (City of Tamarac, MF)
    City of Tamarac
    Ord. 2611 Year 1 rates (eff. 1-20-2026, currently in effect), per DU. Multimodal Transportation MF = $564. Year 2 (from 1-20-2027) auto-steps. One of three Tamarac city impact-fee categories; MF total $3,219/DU.
    $564.00
  • General Government Impact Fee (City of Tamarac, MF)
    City of Tamarac
    Ord. 2611 Year 1 rates (eff. 1-20-2026, currently in effect), per DU. General Government MF = $515. Year 2 (from 1-20-2027) auto-steps. One of three Tamarac city impact-fee categories; MF total $3,219/DU.
    $515.00
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Adopted MF tiers: Garden Apartment (low-rise, 1–3 stories) 1-or-fewer BR $480 / 2 BR $4,918 / 3-or-more BR $5,901; Mid-Rise (4+ stories) 1-or-fewer BR $375 / 2-or-more BR $1,475; High-Rise all BR $461. The canonical MF unit (2BR/2BA, 1,000 sq ft, 4-story building) falls in Broward's Mid-Rise class, so Mid-Rise 2-or-more BR $1,475 is the DEFAULT record. Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $1,475.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
Total (Tamarac): $4,694.00
Sources last checked July 14, 2026Official fee schedules:City of Tamarac Broward County / School Board of Broward County Broward County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tamarac: Commercial Impact Fees

Commercial development in Tamarac pays $2.20 per square foot in impact fees, plus $3,900.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $113,700.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Contribution in Aid of Construction (City of Tamarac) — per ERC ($2,200.00 one-time), Water Contribution in Aid of Construction (City of Tamarac) — per ERC ($1,700.00 one-time) and City Development Impact Fee (City of Tamarac, Commercial) ($2.20/sq ft).

View the full fee schedule
Water$1,700.00 one-time
  • Water Contribution in Aid of Construction (City of Tamarac) — per ERC
    City of Tamarac Utilities
    $1,700.00 PER ERC. Code §22-189(d) 'Contribution in aid of construction charges' table, verbatim: 'Utility System | Rate per ERC — Water $1,700.00 — Wastewater 2,200.00'. Tamarac calls this a contribution in aid of construction, not a 'water impact fee'. §22-189(e)(2): 'Commercial means all property devoted to industrial, business, educational or other categories not residential in nature. The contribution charges... shall be based upon the residential equivalency of such proposed use. The city engineer shall estimate the anticipated water consumption on a daily basis and shall divide such gross daily consumption by the flow of one (1) ERC per day to determine the residential equivalency... No commercial use shall be less than one (1) residential equivalent.' NO METER-SIZE TABLE — per ERC, 1.0-ERC nonres floor. Amount stored = the published 1-ERC minimum. Code 1975 §27-51; current amount from Ord. No. 2013-17, §2, adopted 10-23-2013. Due prior to issuance of a utilities permit; developer's agreement required (§22-196). NOTE: the ERC daily-flow value is set by resolution of the city commission (§22-189(e)(1)) and is not published online — obtain from Tamarac Public Services/Engineering, 954-597-3800.
    $1,700.00 one-time
Sewer$2,200.00 one-time
  • Wastewater Contribution in Aid of Construction (City of Tamarac) — per ERC
    City of Tamarac Utilities
    $2,200.00 PER ERC. Code §22-189(d) contribution-in-aid-of-construction table: 'Utility System | Rate per ERC — Water $1,700.00 — Wastewater 2,200.00'. Nonres basis per §22-189(e)(2): city engineer estimates anticipated daily water consumption and divides by the flow of one ERC/day to get the residential equivalency; 'No commercial use shall be less than one (1) residential equivalent.' NO METER-SIZE TABLE — per ERC, 1.0-ERC nonres floor; amount stored = the published 1-ERC minimum. Code 1975 §27-51; Ord. No. 2013-17, §2, 10-23-2013. Due prior to issuance of a utilities permit; developer's agreement required (§22-196). The ERC daily-flow value is set by commission resolution (§22-189(e)(1)) and is not published — obtain from Tamarac Public Services/Engineering, 954-597-3800.
    $2,200.00 one-time
City$2.20/sq ft
  • City Development Impact Fee (City of Tamarac, Commercial)
    City of Tamarac
    NEW SCHEDULE IN FORCE. Land Development Code §10-5.7 'New Development Impact Fees', table (K). Adopted Ord. O-2025-024 (Temp. Ord. 2611), 2nd reading 10-22-2025; EFFECTIVE 2026-01-20. Aligned to HB 479 / F.S. 163.31801. Schedule row: 'Commercial', impact unit = 1,000 sf. YEAR 1 (in effect 1-20-2026 through 1-20-2027): General Government $695 + Parks & Recreation $0 + Multimodal Transportation $1,501 = $2,196 per 1,000 sf. NEXT STEP-UP 2027-01-20 (Year 2): Gen Govt $773 + Parks $0 + Multimodal $1,668 = $2,440 per 1,000 sf — re-read and update on/after that date. Parks & Rec is $0 for all nonresidential rows. Adopted schedule PDF: https://www.tamarac.gov/DocumentCenter/View/14350/Impact-Fee- ; fee page: https://www.tamarac.gov/1572/Fees . Contact: Community Development 954-597-3530.
    $2.20/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Tamarac): $2.20/sq ft + $3,900.00 one-time (≈ $113,700.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Tamarac Utilities City of Tamarac Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tamarac: Industrial Impact Fees

Industrial development in Tamarac pays $0.57 per square foot in impact fees, plus $3,900.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $32,550.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Contribution in Aid of Construction (City of Tamarac) — per ERC ($2,200.00 one-time), Water Contribution in Aid of Construction (City of Tamarac) — per ERC ($1,700.00 one-time) and City Development Impact Fee (City of Tamarac, Industrial) ($0.57/sq ft).

View the full fee schedule
Water$1,700.00 one-time
  • Water Contribution in Aid of Construction (City of Tamarac) — per ERC
    City of Tamarac Utilities
    $1,700.00 PER ERC. Code §22-189(d) 'Contribution in aid of construction charges' table, verbatim: 'Utility System | Rate per ERC — Water $1,700.00 — Wastewater 2,200.00'. Tamarac calls this a contribution in aid of construction, not a 'water impact fee'. §22-189(e)(2): 'Commercial means all property devoted to industrial, business, educational or other categories not residential in nature. The contribution charges... shall be based upon the residential equivalency of such proposed use. The city engineer shall estimate the anticipated water consumption on a daily basis and shall divide such gross daily consumption by the flow of one (1) ERC per day to determine the residential equivalency... No commercial use shall be less than one (1) residential equivalent.' NO METER-SIZE TABLE — per ERC, 1.0-ERC nonres floor. Amount stored = the published 1-ERC minimum. Code 1975 §27-51; current amount from Ord. No. 2013-17, §2, adopted 10-23-2013. Due prior to issuance of a utilities permit; developer's agreement required (§22-196). NOTE: the ERC daily-flow value is set by resolution of the city commission (§22-189(e)(1)) and is not published online — obtain from Tamarac Public Services/Engineering, 954-597-3800.
    $1,700.00 one-time
Sewer$2,200.00 one-time
  • Wastewater Contribution in Aid of Construction (City of Tamarac) — per ERC
    City of Tamarac Utilities
    $2,200.00 PER ERC. Code §22-189(d) contribution-in-aid-of-construction table: 'Utility System | Rate per ERC — Water $1,700.00 — Wastewater 2,200.00'. Nonres basis per §22-189(e)(2): city engineer estimates anticipated daily water consumption and divides by the flow of one ERC/day to get the residential equivalency; 'No commercial use shall be less than one (1) residential equivalent.' NO METER-SIZE TABLE — per ERC, 1.0-ERC nonres floor; amount stored = the published 1-ERC minimum. Code 1975 §27-51; Ord. No. 2013-17, §2, 10-23-2013. Due prior to issuance of a utilities permit; developer's agreement required (§22-196). The ERC daily-flow value is set by commission resolution (§22-189(e)(1)) and is not published — obtain from Tamarac Public Services/Engineering, 954-597-3800.
    $2,200.00 one-time
City$0.57/sq ft
  • City Development Impact Fee (City of Tamarac, Industrial)
    City of Tamarac
    LDC §10-5.7 'New Development Impact Fees', table (K). Adopted Ord. O-2025-024 (Temp. Ord. 2611), 10-22-2025; EFFECTIVE 2026-01-20. Schedule row: 'General Light Industrial', impact unit = 1,000 sf. YEAR 1 (1-20-2026 to 1-20-2027): General Government $231 + Parks & Recreation $0 + Multimodal Transportation $342 = $573 per 1,000 sf. NEXT STEP-UP 2027-01-20 (Year 2): $256 + $0 + $342 = $598 per 1,000 sf — re-read and update on/after that date. (Separate 'Warehousing' row = $212/1,000 sf Year 1 — not used; General Light Industrial is the default row per project rules.) Adopted schedule PDF: https://www.tamarac.gov/DocumentCenter/View/14350/Impact-Fee- . Contact: Community Development 954-597-3530.
    $0.57/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Tamarac): $0.57/sq ft + $3,900.00 one-time (≈ $32,550.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Tamarac Utilities City of Tamarac Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tamarac: Office Impact Fees

Office development in Tamarac pays $1.35 per square foot in impact fees, plus $3,900.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to about $37,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Contribution in Aid of Construction (City of Tamarac) — per ERC ($2,200.00 one-time), Water Contribution in Aid of Construction (City of Tamarac) — per ERC ($1,700.00 one-time) and City Development Impact Fee (City of Tamarac, Office) ($1.35/sq ft).

View the full fee schedule
Water$1,700.00 one-time
  • Water Contribution in Aid of Construction (City of Tamarac) — per ERC
    City of Tamarac Utilities
    $1,700.00 PER ERC. Code §22-189(d) 'Contribution in aid of construction charges' table, verbatim: 'Utility System | Rate per ERC — Water $1,700.00 — Wastewater 2,200.00'. Tamarac calls this a contribution in aid of construction, not a 'water impact fee'. §22-189(e)(2): 'Commercial means all property devoted to industrial, business, educational or other categories not residential in nature. The contribution charges... shall be based upon the residential equivalency of such proposed use. The city engineer shall estimate the anticipated water consumption on a daily basis and shall divide such gross daily consumption by the flow of one (1) ERC per day to determine the residential equivalency... No commercial use shall be less than one (1) residential equivalent.' NO METER-SIZE TABLE — per ERC, 1.0-ERC nonres floor. Amount stored = the published 1-ERC minimum. Code 1975 §27-51; current amount from Ord. No. 2013-17, §2, adopted 10-23-2013. Due prior to issuance of a utilities permit; developer's agreement required (§22-196). NOTE: the ERC daily-flow value is set by resolution of the city commission (§22-189(e)(1)) and is not published online — obtain from Tamarac Public Services/Engineering, 954-597-3800.
    $1,700.00 one-time
Sewer$2,200.00 one-time
  • Wastewater Contribution in Aid of Construction (City of Tamarac) — per ERC
    City of Tamarac Utilities
    $2,200.00 PER ERC. Code §22-189(d) contribution-in-aid-of-construction table: 'Utility System | Rate per ERC — Water $1,700.00 — Wastewater 2,200.00'. Nonres basis per §22-189(e)(2): city engineer estimates anticipated daily water consumption and divides by the flow of one ERC/day to get the residential equivalency; 'No commercial use shall be less than one (1) residential equivalent.' NO METER-SIZE TABLE — per ERC, 1.0-ERC nonres floor; amount stored = the published 1-ERC minimum. Code 1975 §27-51; Ord. No. 2013-17, §2, 10-23-2013. Due prior to issuance of a utilities permit; developer's agreement required (§22-196). The ERC daily-flow value is set by commission resolution (§22-189(e)(1)) and is not published — obtain from Tamarac Public Services/Engineering, 954-597-3800.
    $2,200.00 one-time
City$1.35/sq ft
  • City Development Impact Fee (City of Tamarac, Office)
    City of Tamarac
    LDC §10-5.7 'New Development Impact Fees', table (K). Adopted Ord. O-2025-024 (Temp. Ord. 2611), 10-22-2025; EFFECTIVE 2026-01-20. Schedule row: 'Office & Other Services', impact unit = 1,000 sf. YEAR 1 (1-20-2026 to 1-20-2027): General Government $410 + Parks & Recreation $0 + Multimodal Transportation $938 = $1,348 per 1,000 sf. NEXT STEP-UP 2027-01-20 (Year 2): $455 + $0 + $1,043 = $1,498 per 1,000 sf — re-read and update on/after that date. Adopted schedule PDF: https://www.tamarac.gov/DocumentCenter/View/14350/Impact-Fee- . Contact: Community Development 954-597-3530.
    $1.35/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Tamarac): $1.35/sq ft + $3,900.00 one-time (≈ $37,600.00 at 25,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Tamarac Utilities City of Tamarac Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Tamarac

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Tamarac, Florida?

A new single-family home in Tamarac pays $17,573.00 per unit in combined impact fees (rates sourced July 14, 2026).

How much are commercial impact fees in Tamarac?

Commercial development in Tamarac pays $2.20 per square foot in impact fees, plus $3,900.00 in one-time water and sewer connection fees, about $113,700.00 for a 50,000 sq ft building.

Does Tamarac charge its own impact fees?

Yes. Tamarac levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Tamarac, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.