Sunrise impact fees by project type
Sunrise: Single-Family Impact Fees
A new single-family home in Sunrise pays $12,490.78 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $3,681.78.
The largest line items are School Impact Fee (Broward County) ($8,809.00), Water Capital Connection Charge (City of Sunrise) ($1,500.00) and Sewer Capital Connection Charge (City of Sunrise) ($1,350.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capital Connection Charge (City of Sunrise)$1,500.005/8in meterCity of SunriseSchedule C water/sewer connection charges, sec. 15-119(a)(1), last amended Ord. 242-13-D sec. 2 (12-10-2013), still current. Schedule C is territory-neutral; the 6 territory rate sheets carry only MONTHLY rates, no capital charge. 5/8in meter SFR = $1,500; 1in = $3,750; 1.5in = $7,500 (sewer stays $1,350). Not CPI-indexed - sec. 15-117 Oct 1 escalator applies only to Schedule A monthly rates; sec. 15-119(c) requires only an annual September commission review. Confirm no uncodified Schedule C resolution supersedes it (sec. 15-116). Public Service 954-746-3232.
- Sewer Capital Connection Charge (City of Sunrise)$1,350.00City of SunriseSchedule C water/sewer connection charges, sec. 15-119(a)(1), Ord. 242-13-D sec. 2 (12-10-2013), current. Sewer $1,350 SFR all meter sizes (flat). Schedule C territory-neutral; territory rate sheets carry only monthly rates. Not CPI-indexed (sec. 15-117 applies to Schedule A only; sec. 15-119(c) annual Sept review). Public Service 954-746-3232.
- Park Dedication In-Lieu Fee (City of Sunrise)$831.783 BRPARK DEDICATION IN-LIEU fee (LDC sec. 16-68(1)c; Ord. 402-97-E; Ord. 402-11-E sec. 2, 9-12-2011), paid at building permit, per dwelling unit by bedroom count: 1BR $443.62 / 2BR $609.98 / 3BR $831.78 / 4+BR $978.73. sec. 16-68(1) gives the city discretion among (a) land dedication 3 ac/1,000 residents, (b) cash = appraised land value, or (c) this flat per-unit schedule; option (c) is the only fixed figure. No city police/fire/transportation/library/general-capital impact fee exists. Transit concurrency via Broward County methodology (sec. 16-64(e)).
- School Impact Fee (Broward County)$8,809.00Single Family, 3 or fewer BRBroward County / School Board of Broward CountyBroward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Single Family 3-or-fewer BR = $8,809 (this record, the default/most common); 4-or-more BR = $11,070 (separate tier record). Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
- Road Impact / Transportation Concurrency Fee (Broward County)$0.00Road / Transportation ConcurrencyBroward CountySUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
- Park/Recreational Impact Fee (Broward County)$0.00Broward CountySUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sunrise: Multifamily Impact Fees
A new multifamily unit in Sunrise pays $4,079.98 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $1,475.00 and municipal or utility fees for $2,604.98.
The largest line items are School Impact Fee (Broward County, MF) ($1,475.00), Water Capital Connection Charge (City of Sunrise, MF) — per §15-119(a)(2) ($1,050.00) and Sewer Capital Connection Charge (City of Sunrise, MF) — per §15-119(a)(2) ($945.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capital Connection Charge (City of Sunrise, MF) — per §15-119(a)(2)$1,050.00City of SunriseSchedule C water/sewer connection charges, sec. 15-119(a)(2), Ord. 242-13-D sec. 2 (12-10-2013), current. Residential multifamily, all meter sizes, x number of units behind the meter - a genuine published per-unit MF rate. Schedule C is territory-neutral; the 6 territory rate sheets carry only MONTHLY rates, no capital charge. Not CPI-indexed (sec. 15-117 applies to Schedule A only; sec. 15-119(c) annual Sept review). Public Service 954-746-3232.
- Sewer Capital Connection Charge (City of Sunrise, MF) — per §15-119(a)(2)$945.00City of SunriseSchedule C water/sewer connection charges, sec. 15-119(a)(2), Ord. 242-13-D sec. 2 (12-10-2013), current. Residential multifamily $945/unit, all meter sizes, x number of units behind the meter - published per-unit MF rate. Schedule C territory-neutral; territory rate sheets carry only monthly rates. Public Service 954-746-3232.
- Park Dedication In-Lieu Fee (City of Sunrise, MF)$609.982 BRPARK DEDICATION IN-LIEU fee (LDC sec. 16-68(1)c; Ord. 402-97-E; Ord. 402-11-E sec. 2, 9-12-2011), per dwelling unit by bedroom: 1BR $443.62 / 2BR $609.98 / 3BR $831.78 / 4+BR $978.73. Used 2BR bracket for MF canonical unit. sec. 16-68(1) gives city discretion among (a) land dedication, (b) cash = appraised land value, or (c) this flat per-unit schedule; (c) is the only fixed figure. No city police/fire/transportation/library/general-capital impact fee. Transit concurrency via Broward County (sec. 16-64(e)).
- School Impact Fee (Broward County, MF)$1,475.00Mid-Rise, 2 or more BRBroward County / School Board of Broward CountyBroward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Adopted MF tiers: Garden Apartment (low-rise, 1–3 stories) 1-or-fewer BR $480 / 2 BR $4,918 / 3-or-more BR $5,901; Mid-Rise (4+ stories) 1-or-fewer BR $375 / 2-or-more BR $1,475; High-Rise all BR $461. The canonical MF unit (2BR/2BA, 1,000 sq ft, 4-story building) falls in Broward's Mid-Rise class, so Mid-Rise 2-or-more BR $1,475 is the DEFAULT record. Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
- Park/Recreational Impact Fee (Broward County, MF)$0.00Broward CountySUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
- Road Impact / Transportation Concurrency Fee (Broward County, MF)$0.00Road / Transportation ConcurrencyBroward CountySUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sunrise: Commercial Impact Fees
Commercial development in Sunrise pays no per-square-foot impact fees, but owes $2,850.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $2,850.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Plant Connection Charge (City of Sunrise) — General service, per ERC ($1,500.00 one-time) and Wastewater Plant Connection Charge (City of Sunrise) — General service, per ERC ($1,350.00 one-time).
View the full fee schedule
- Water Plant Connection Charge (City of Sunrise) — General service, per ERC$1,500.00 one-timeCity of Sunrise Utilities$1,500 PER ERC (water component). Code §15-119 'Schedule C, water and sewer connection charges; trust fund', subsection (a)(3), schedule row 'General service' (the nonresidential row), Meter Size 'All': Water $1,500 / Sewer $1,350 / Total Charge $2,850 — 'times the number of ERC's of demand as determined by the department of planning and development in accordance with the minimum design flow provisions of F.A.C. 10D-6.048(1), as revised from time to time.' NO METER-SIZE TABLE — basis is ERCs of demand derived from the type of use. City FAQ: 'plant connection fees are calculated by using standard water consumption rates developed by the Broward County Health Department... based upon the type of use (i.e. retail, restaurant, office...).' Ord. No. 242-B (9-25-90); last amended Ord. No. 242-13-D, §2, 12-10-13. Sunrise also serves Davie, Lauderhill, Southwest Ranches, Tamarac, Weston (bulk/Bonaventure) and parts of unincorporated Broward. ADDITIONAL one-time charge, not entered: §15-73 capacity reservation fee = base facility charge for 1 ERC × number of ERCs × 60 months (the per-ERC base facility charge used in the multiplier is not published — obtain from Public Service, 954-746-3232, customerservice@sunrisefl.gov).
- Wastewater Plant Connection Charge (City of Sunrise) — General service, per ERC$1,350.00 one-timeCity of Sunrise Utilities$1,350 PER ERC (sewer component). Code §15-119(a)(3), schedule row 'General service' (nonresidential), Meter Size 'All': Water $1,500 / Sewer $1,350 / Total $2,850 per ERC of demand, ERC count set by the department of planning and development per the minimum design flow provisions of F.A.C. 10D-6.048(1). Sunrise uses 225 gpd wastewater = 1 ERC (§15-122(b)(2)). Sewer-only customers: connection charge computed on hypothetical water demand but 'The customer shall only be charged for the sewer connection fee' (§15-122(c)). NO METER-SIZE TABLE. Ord. No. 242-B (9-25-90); am. Ord. No. 242-13-D, §2, 12-10-13. Contact: Public Service 954-746-3232.
- City Impact Fees (City of Sunrise, Commercial)$0.00City of SunriseCONFIRMED $0 — Sunrise levies NO nonresidential impact fees. Community Development Dept. Planning & Engineering Division Fee Schedule (effective 2-16-2015, the city's adopted development fee schedule) contains only processing/review/permit fees — no impact-fee line item. Full-code search for 'impact fee' returns only: §16-66 public school concurrency (Broward school impact fee, residential-only), §5-78 (generic fee-waiver language), and §15-119 (utility connection charges — see W/S table). No transportation/park/police/fire/library impact fee ordinance exists. NOT impact fees: DRI Application for Development Approval $22,500 + $1,125 tech fee (a processing fee), stormwater rate $4.55/ERU/month (recurring), utility inspection/plan review fees. Contact: Community Development 954-746-3270.
- County Impact / Transportation Concurrency Fees (Broward County, Commercial)$0.00Broward CountyCONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sunrise: Industrial Impact Fees
Industrial development in Sunrise pays no per-square-foot impact fees, but owes $2,850.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $2,850.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Plant Connection Charge (City of Sunrise) — General service, per ERC ($1,500.00 one-time) and Wastewater Plant Connection Charge (City of Sunrise) — General service, per ERC ($1,350.00 one-time).
View the full fee schedule
- Water Plant Connection Charge (City of Sunrise) — General service, per ERC$1,500.00 one-timeCity of Sunrise Utilities$1,500 PER ERC (water component). Code §15-119 'Schedule C, water and sewer connection charges; trust fund', subsection (a)(3), schedule row 'General service' (the nonresidential row), Meter Size 'All': Water $1,500 / Sewer $1,350 / Total Charge $2,850 — 'times the number of ERC's of demand as determined by the department of planning and development in accordance with the minimum design flow provisions of F.A.C. 10D-6.048(1), as revised from time to time.' NO METER-SIZE TABLE — basis is ERCs of demand derived from the type of use. City FAQ: 'plant connection fees are calculated by using standard water consumption rates developed by the Broward County Health Department... based upon the type of use (i.e. retail, restaurant, office...).' Ord. No. 242-B (9-25-90); last amended Ord. No. 242-13-D, §2, 12-10-13. Sunrise also serves Davie, Lauderhill, Southwest Ranches, Tamarac, Weston (bulk/Bonaventure) and parts of unincorporated Broward. ADDITIONAL one-time charge, not entered: §15-73 capacity reservation fee = base facility charge for 1 ERC × number of ERCs × 60 months (the per-ERC base facility charge used in the multiplier is not published — obtain from Public Service, 954-746-3232, customerservice@sunrisefl.gov).
- Wastewater Plant Connection Charge (City of Sunrise) — General service, per ERC$1,350.00 one-timeCity of Sunrise Utilities$1,350 PER ERC (sewer component). Code §15-119(a)(3), schedule row 'General service' (nonresidential), Meter Size 'All': Water $1,500 / Sewer $1,350 / Total $2,850 per ERC of demand, ERC count set by the department of planning and development per the minimum design flow provisions of F.A.C. 10D-6.048(1). Sunrise uses 225 gpd wastewater = 1 ERC (§15-122(b)(2)). Sewer-only customers: connection charge computed on hypothetical water demand but 'The customer shall only be charged for the sewer connection fee' (§15-122(c)). NO METER-SIZE TABLE. Ord. No. 242-B (9-25-90); am. Ord. No. 242-13-D, §2, 12-10-13. Contact: Public Service 954-746-3232.
- City Impact Fees (City of Sunrise, Industrial)$0.00City of SunriseCONFIRMED $0 — no nonresidential impact fees. Planning & Engineering Division Fee Schedule (eff. 2-16-2015) has only processing/review/permit fees. Full-code 'impact fee' search returns only school concurrency (§16-66, residential-only), §5-78 fee-waiver language, and §15-119 utility connection charges. Contact: Community Development 954-746-3270.
- County Impact / Transportation Concurrency Fees (Broward County, Industrial)$0.00Broward CountyCONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sunrise: Office Impact Fees
Office development in Sunrise pays no per-square-foot impact fees, but owes $2,850.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to about $2,850.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Plant Connection Charge (City of Sunrise) — General service, per ERC ($1,500.00 one-time) and Wastewater Plant Connection Charge (City of Sunrise) — General service, per ERC ($1,350.00 one-time).
View the full fee schedule
- Water Plant Connection Charge (City of Sunrise) — General service, per ERC$1,500.00 one-timeCity of Sunrise Utilities$1,500 PER ERC (water component). Code §15-119 'Schedule C, water and sewer connection charges; trust fund', subsection (a)(3), schedule row 'General service' (the nonresidential row), Meter Size 'All': Water $1,500 / Sewer $1,350 / Total Charge $2,850 — 'times the number of ERC's of demand as determined by the department of planning and development in accordance with the minimum design flow provisions of F.A.C. 10D-6.048(1), as revised from time to time.' NO METER-SIZE TABLE — basis is ERCs of demand derived from the type of use. City FAQ: 'plant connection fees are calculated by using standard water consumption rates developed by the Broward County Health Department... based upon the type of use (i.e. retail, restaurant, office...).' Ord. No. 242-B (9-25-90); last amended Ord. No. 242-13-D, §2, 12-10-13. Sunrise also serves Davie, Lauderhill, Southwest Ranches, Tamarac, Weston (bulk/Bonaventure) and parts of unincorporated Broward. ADDITIONAL one-time charge, not entered: §15-73 capacity reservation fee = base facility charge for 1 ERC × number of ERCs × 60 months (the per-ERC base facility charge used in the multiplier is not published — obtain from Public Service, 954-746-3232, customerservice@sunrisefl.gov).
- Wastewater Plant Connection Charge (City of Sunrise) — General service, per ERC$1,350.00 one-timeCity of Sunrise Utilities$1,350 PER ERC (sewer component). Code §15-119(a)(3), schedule row 'General service' (nonresidential), Meter Size 'All': Water $1,500 / Sewer $1,350 / Total $2,850 per ERC of demand, ERC count set by the department of planning and development per the minimum design flow provisions of F.A.C. 10D-6.048(1). Sunrise uses 225 gpd wastewater = 1 ERC (§15-122(b)(2)). Sewer-only customers: connection charge computed on hypothetical water demand but 'The customer shall only be charged for the sewer connection fee' (§15-122(c)). NO METER-SIZE TABLE. Ord. No. 242-B (9-25-90); am. Ord. No. 242-13-D, §2, 12-10-13. Contact: Public Service 954-746-3232.
- City Impact Fees (City of Sunrise, Office)$0.00City of SunriseCONFIRMED $0 — no nonresidential impact fees. Planning & Engineering Division Fee Schedule (eff. 2-16-2015) has only processing/review/permit fees. Full-code 'impact fee' search returns only school concurrency (§16-66, residential-only), §5-78 fee-waiver language, and §15-119 utility connection charges. The $22,500 DRI ADA fee is a processing fee, not an impact fee. Contact: Community Development 954-746-3270.
- County Impact / Transportation Concurrency Fees (Broward County, Office)$0.00Broward CountyCONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Sunrise
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Sunrise, Florida?
A new single-family home in Sunrise pays $12,490.78 per unit in combined impact fees (rates sourced July 14, 2026).
How much are commercial impact fees in Sunrise?
Commercial development in Sunrise pays no per-square-foot impact fees, but owes $2,850.00 in one-time water and sewer connection fees.
Does Sunrise charge its own impact fees?
Yes. Sunrise levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Sunrise, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Broward County impact fees page.