IMPACTFEES.ORG

Sunrise, Florida Impact Fees

Sunrise applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $8,809.00 per unit (rates sourced July 12, 2026). The full breakdown is below.

Sunrise impact fees by project type

Sunrise: Single-Family Impact Fees

A new single-family home in Sunrise pays $8,809.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (SFR, 3BR) ($8,809.00).

Road / Transportation Concurrency Fee (Broward County, SFR) and Water Plant Connection Charge (City of Sunrise) and Park/Recreational Impact Fee (Broward County, SFR) and City Impact Fee (City of Sunrise, SFR) and Wastewater Plant Connection Charge (City of Sunrise) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water Plant Connection Charge (City of Sunrise)
    City of Sunrise Utilities
    Own utility, not Broward WWS (prior $1,590 copy-paste wrong). Plant connection fees (Code Ch.15) are formula-based on Broward County Health Dept consumption rates by use type — NOT a flat ERC amount. $0 placeholder. ⚠️ VERIFY Sunrise Public Service 954-746-3232.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Wastewater Plant Connection Charge (City of Sunrise)
    City of Sunrise Utilities
    Own utility, not Broward WWS (prior $2,010 copy-paste wrong). Plant connection fee formula-based per consumption (Code Ch.15), not flat. $0 placeholder. ⚠️ VERIFY 954-746-3232.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fee (City of Sunrise, SFR)
    City may levy municipal impact fees (parks/police/fire); not confirmed against adopted schedule. $0 placeholder. ⚠️ VERIFY City of Sunrise 954-746-3340.
    Contact jurisdiction/utility to verifyRequires confirmation
County$8,809.00
  • $8,809.00
  • Road / Transportation Concurrency Fee (Broward County, SFR)
    Broward County Road Impact OR Transportation Concurrency Fee, computed at plan review via TRIPS calculator — not a flat rate. $0 placeholder. ⚠️ VERIFY 954-357-6666 opt 2.
    Contact jurisdiction/utility to verifyRequires confirmation
  • Park/Recreational Impact Fee (Broward County, SFR)
    Broward County Park/Recreational Impact Fee applies only if platting required. $0 placeholder. ⚠️ VERIFY 954-357-6666.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Sunrise): $8,809.00
Sources last checked July 12, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Sunrise: Multifamily Impact Fees

A new multifamily unit in Sunrise pays $1,475.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (MF, Mid-Rise, 2+ BR) ($1,475.00).

Water Plant Connection Charge (City of Sunrise, MF) and City Impact Fee (City of Sunrise, MF) and Park/Recreational Impact Fee (Broward County, MF) and Road / Transportation Concurrency Fee (Broward County, MF) and Wastewater Plant Connection Charge (City of Sunrise, MF) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water Plant Connection Charge (City of Sunrise, MF)
    Broward County
    Own utility, not Broward WWS (prior $1,124.13 wrong). Plant connection fees Code Ch.15 are formula-based on consumption by use type, not a flat per-unit ERC. ⚠️ VERIFY Sunrise Public Service 954-746-3232.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Wastewater Plant Connection Charge (City of Sunrise, MF)
    Broward County
    Own utility, not Broward WWS (prior $1,421.07 wrong). Plant connection fee formula-based per consumption (Code Ch.15), not flat. ⚠️ VERIFY 954-746-3232.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fee (City of Sunrise, MF)
    City may levy municipal impact fees (parks/police/fire); not confirmed. $0 placeholder. ⚠️ VERIFY 954-746-3340.
    Contact jurisdiction/utility to verifyRequires confirmation
County$1,475.00
  • $1,475.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County Park/Recreational Impact Fee applies only if platting required. $0 placeholder. ⚠️ VERIFY 954-357-6666.
    Contact jurisdiction/utility to verifyRequires confirmation
  • Road / Transportation Concurrency Fee (Broward County, MF)
    Broward County Road Impact OR Transportation Concurrency Fee, computed at plan review via TRIPS calculator — not a flat rate. $0 placeholder. ⚠️ VERIFY 954-357-6666 opt 2.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Sunrise): $1,475.00
Sources last checked July 12, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Sunrise: Commercial Impact Fees

Commercial development in Sunrise pays no per-square-foot impact fees, but owes $2,850.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $2,850.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Plant Connection Charge (City of Sunrise) — General service, per ERC ($1,500.00 one-time) and Wastewater Plant Connection Charge (City of Sunrise) — General service, per ERC ($1,350.00 one-time).

Official fee schedule

View the full fee schedule
Water$1,500.00 one-time
  • Water Plant Connection Charge (City of Sunrise) — General service, per ERC
    City of Sunrise Utilities
    $1,500 PER ERC (water component). Code §15-119 'Schedule C, water and sewer connection charges; trust fund', subsection (a)(3), schedule row 'General service' (the nonresidential row), Meter Size 'All': Water $1,500 / Sewer $1,350 / Total Charge $2,850 — 'times the number of ERC's of demand as determined by the department of planning and development in accordance with the minimum design flow provisions of F.A.C. 10D-6.048(1), as revised from time to time.' NO METER-SIZE TABLE — basis is ERCs of demand derived from the type of use. City FAQ: 'plant connection fees are calculated by using standard water consumption rates developed by the Broward County Health Department... based upon the type of use (i.e. retail, restaurant, office...).' Ord. No. 242-B (9-25-90); last amended Ord. No. 242-13-D, §2, 12-10-13. Sunrise also serves Davie, Lauderhill, Southwest Ranches, Tamarac, Weston (bulk/Bonaventure) and parts of unincorporated Broward. ADDITIONAL one-time charge, not entered: §15-73 capacity reservation fee = base facility charge for 1 ERC × number of ERCs × 60 months (the per-ERC base facility charge used in the multiplier is not published — obtain from Public Service, 954-746-3232, customerservice@sunrisefl.gov).
    $1,500.00 one-time
Sewer$1,350.00 one-time
  • Wastewater Plant Connection Charge (City of Sunrise) — General service, per ERC
    City of Sunrise Utilities
    $1,350 PER ERC (sewer component). Code §15-119(a)(3), schedule row 'General service' (nonresidential), Meter Size 'All': Water $1,500 / Sewer $1,350 / Total $2,850 per ERC of demand, ERC count set by the department of planning and development per the minimum design flow provisions of F.A.C. 10D-6.048(1). Sunrise uses 225 gpd wastewater = 1 ERC (§15-122(b)(2)). Sewer-only customers: connection charge computed on hypothetical water demand but 'The customer shall only be charged for the sewer connection fee' (§15-122(c)). NO METER-SIZE TABLE. Ord. No. 242-B (9-25-90); am. Ord. No. 242-13-D, §2, 12-10-13. Contact: Public Service 954-746-3232.
    $1,350.00 one-time
City$0.00
  • City Impact Fees (City of Sunrise, Commercial)
    City of Sunrise
    CONFIRMED $0 — Sunrise levies NO nonresidential impact fees. Community Development Dept. Planning & Engineering Division Fee Schedule (effective 2-16-2015, the city's adopted development fee schedule) contains only processing/review/permit fees — no impact-fee line item. Full-code search for 'impact fee' returns only: §16-66 public school concurrency (Broward school impact fee, residential-only), §5-78 (generic fee-waiver language), and §15-119 (utility connection charges — see W/S table). No transportation/park/police/fire/library impact fee ordinance exists. NOT impact fees: DRI Application for Development Approval $22,500 + $1,125 tech fee (a processing fee), stormwater rate $4.55/ERU/month (recurring), utility inspection/plan review fees. Contact: Community Development 954-746-3270.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Sunrise): $2,850.00 one-time (≈ $2,850.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedule

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Sunrise: Industrial Impact Fees

Industrial development in Sunrise pays no per-square-foot impact fees, but owes $2,850.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $2,850.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Plant Connection Charge (City of Sunrise) — General service, per ERC ($1,500.00 one-time) and Wastewater Plant Connection Charge (City of Sunrise) — General service, per ERC ($1,350.00 one-time).

Official fee schedule

View the full fee schedule
Water$1,500.00 one-time
  • Water Plant Connection Charge (City of Sunrise) — General service, per ERC
    City of Sunrise Utilities
    $1,500 PER ERC (water component). Code §15-119 'Schedule C, water and sewer connection charges; trust fund', subsection (a)(3), schedule row 'General service' (the nonresidential row), Meter Size 'All': Water $1,500 / Sewer $1,350 / Total Charge $2,850 — 'times the number of ERC's of demand as determined by the department of planning and development in accordance with the minimum design flow provisions of F.A.C. 10D-6.048(1), as revised from time to time.' NO METER-SIZE TABLE — basis is ERCs of demand derived from the type of use. City FAQ: 'plant connection fees are calculated by using standard water consumption rates developed by the Broward County Health Department... based upon the type of use (i.e. retail, restaurant, office...).' Ord. No. 242-B (9-25-90); last amended Ord. No. 242-13-D, §2, 12-10-13. Sunrise also serves Davie, Lauderhill, Southwest Ranches, Tamarac, Weston (bulk/Bonaventure) and parts of unincorporated Broward. ADDITIONAL one-time charge, not entered: §15-73 capacity reservation fee = base facility charge for 1 ERC × number of ERCs × 60 months (the per-ERC base facility charge used in the multiplier is not published — obtain from Public Service, 954-746-3232, customerservice@sunrisefl.gov).
    $1,500.00 one-time
Sewer$1,350.00 one-time
  • Wastewater Plant Connection Charge (City of Sunrise) — General service, per ERC
    City of Sunrise Utilities
    $1,350 PER ERC (sewer component). Code §15-119(a)(3), schedule row 'General service' (nonresidential), Meter Size 'All': Water $1,500 / Sewer $1,350 / Total $2,850 per ERC of demand, ERC count set by the department of planning and development per the minimum design flow provisions of F.A.C. 10D-6.048(1). Sunrise uses 225 gpd wastewater = 1 ERC (§15-122(b)(2)). Sewer-only customers: connection charge computed on hypothetical water demand but 'The customer shall only be charged for the sewer connection fee' (§15-122(c)). NO METER-SIZE TABLE. Ord. No. 242-B (9-25-90); am. Ord. No. 242-13-D, §2, 12-10-13. Contact: Public Service 954-746-3232.
    $1,350.00 one-time
City$0.00
  • City Impact Fees (City of Sunrise, Industrial)
    City of Sunrise
    CONFIRMED $0 — no nonresidential impact fees. Planning & Engineering Division Fee Schedule (eff. 2-16-2015) has only processing/review/permit fees. Full-code 'impact fee' search returns only school concurrency (§16-66, residential-only), §5-78 fee-waiver language, and §15-119 utility connection charges. Contact: Community Development 954-746-3270.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Sunrise): $2,850.00 one-time (≈ $2,850.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedule

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Sunrise: Office Impact Fees

Office development in Sunrise pays no per-square-foot impact fees, but owes $2,850.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $2,850.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Plant Connection Charge (City of Sunrise) — General service, per ERC ($1,500.00 one-time) and Wastewater Plant Connection Charge (City of Sunrise) — General service, per ERC ($1,350.00 one-time).

Official fee schedule

View the full fee schedule
Water$1,500.00 one-time
  • Water Plant Connection Charge (City of Sunrise) — General service, per ERC
    City of Sunrise Utilities
    $1,500 PER ERC (water component). Code §15-119 'Schedule C, water and sewer connection charges; trust fund', subsection (a)(3), schedule row 'General service' (the nonresidential row), Meter Size 'All': Water $1,500 / Sewer $1,350 / Total Charge $2,850 — 'times the number of ERC's of demand as determined by the department of planning and development in accordance with the minimum design flow provisions of F.A.C. 10D-6.048(1), as revised from time to time.' NO METER-SIZE TABLE — basis is ERCs of demand derived from the type of use. City FAQ: 'plant connection fees are calculated by using standard water consumption rates developed by the Broward County Health Department... based upon the type of use (i.e. retail, restaurant, office...).' Ord. No. 242-B (9-25-90); last amended Ord. No. 242-13-D, §2, 12-10-13. Sunrise also serves Davie, Lauderhill, Southwest Ranches, Tamarac, Weston (bulk/Bonaventure) and parts of unincorporated Broward. ADDITIONAL one-time charge, not entered: §15-73 capacity reservation fee = base facility charge for 1 ERC × number of ERCs × 60 months (the per-ERC base facility charge used in the multiplier is not published — obtain from Public Service, 954-746-3232, customerservice@sunrisefl.gov).
    $1,500.00 one-time
Sewer$1,350.00 one-time
  • Wastewater Plant Connection Charge (City of Sunrise) — General service, per ERC
    City of Sunrise Utilities
    $1,350 PER ERC (sewer component). Code §15-119(a)(3), schedule row 'General service' (nonresidential), Meter Size 'All': Water $1,500 / Sewer $1,350 / Total $2,850 per ERC of demand, ERC count set by the department of planning and development per the minimum design flow provisions of F.A.C. 10D-6.048(1). Sunrise uses 225 gpd wastewater = 1 ERC (§15-122(b)(2)). Sewer-only customers: connection charge computed on hypothetical water demand but 'The customer shall only be charged for the sewer connection fee' (§15-122(c)). NO METER-SIZE TABLE. Ord. No. 242-B (9-25-90); am. Ord. No. 242-13-D, §2, 12-10-13. Contact: Public Service 954-746-3232.
    $1,350.00 one-time
City$0.00
  • City Impact Fees (City of Sunrise, Office)
    City of Sunrise
    CONFIRMED $0 — no nonresidential impact fees. Planning & Engineering Division Fee Schedule (eff. 2-16-2015) has only processing/review/permit fees. Full-code 'impact fee' search returns only school concurrency (§16-66, residential-only), §5-78 fee-waiver language, and §15-119 utility connection charges. The $22,500 DRI ADA fee is a processing fee, not an impact fee. Contact: Community Development 954-746-3270.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Sunrise): $2,850.00 one-time (≈ $2,850.00 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedule

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Estimate your project in Sunrise

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Sunrise, Florida?

A new single-family home in Sunrise pays $8,809.00 per unit in combined impact fees (rates sourced July 12, 2026).

How much are commercial impact fees in Sunrise?

Commercial development in Sunrise pays no per-square-foot impact fees, but owes $2,850.00 in one-time water and sewer connection fees.

Does Sunrise charge its own impact fees?

Yes. Sunrise levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Sunrise, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.